This document is an Exhibit Line Item Numbers (ELINS) spreadsheet that details the recurring and non-recurring work pricing for a contract to operate and maintain a sewage treatment plant and collection system at Camp Fuji, Japan.
The spreadsheet includes pricing for various tasks such as operating the wastewater treatment plant, performing integrated maintenance, cleaning the equalization tanks, collecting and transporting sludge and waste water, and analyzing sewage sludge. It also includes pricing for unit-priced labor work, materials and equipment, and providing cylindrical plastic carriers for the biofilm filtration tank. The pricing is provided for the base period and four option periods. The agency involved is the Department of the Navy Naval Facilities Engineering Command. This ELINS spreadsheet is attached to Solicitation Number N4008424R8903 for the "Operation and Maintenance of Wastewater Treatment Plant at the Combined Arms Training Center, Camp Fuji, Japan."
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008424R8903_0001.pdf | ||
| B_SiteVisit_Request.xlsx | XLSX spreadsheet | |
| D_PIEE_Vendor_Access_Instruction.pdf | ||
| N4008424R8903.pdf | ||
| C_PreProposal_InquiryForm.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINS-Base Period-RECU
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT A |
| Line Item 0001 Recurring Work Price - Base Year |
| PROVIDE PRICES TO OPERATE AND MAINTAIN SEWAGE TREATMENT PLANT AND COLLECTION SYSTEM - RECURRING WORK PRICE - |
| IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs A001 |
ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total
| A001 - MCB Portion Spec Item 3 | |||
| A001AA | Operation (Spec Item 3.1) | ||
| The Contractor shall operate the wastewater treatment plant to efficiently and safely collect, treat and dispose of wastewater such that the effluent complies with the regulatory discharge permit 24 hours per day, seven days per week, throughout the contract period. | 12 | MO | |
| A001AB | Integrated Maintenance Program (IMP) (Spec Item 3.2) | ||
| The Contractor shall develop and implement an IMP for the wastewater treatment plant to ensure all equipment and components remain in optimum condition and sustain maximum life. | 12 | MO | |
| A001AC | Wastewater Treatment Plant (Spec Item 3.2.1) | ||
| The Contractor shall perform equalization tanks and related equipment cleaning services once a year. | 1 | LS | |
| A001AD | Sludge, Residue (shisa), and Waste Water Collection and Transportation Service (Spec Item 3.3.1) |
The Contractor shall collect and transport all accumulated utility system sewage residue (shisa), waste water, and sludge from
| Sewage Treatment Plant periodically. | 12 | MO | |
| A001AE | Sewage Sludge Analysis (Spec Item 3.3.2) | ||
| The Contractor shall sample and analyze the sludge to be disposed of utilizing a certified laboratory in the Base Period of performance. | 1 | LS |
\TOTAL NON-RECURRING WORK PRICE BASE YEAR
| Note: |
| MO = Month |
CUI
ELINS-Base Period-NON-RE
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT A |
| Line Item 0002 Non-Recurring Work Price - Base Year |
| PROVIDE PRICES FOR SEWAGE TREATMENT PLANT AND COLLECTION SYSTEM - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A703 |
| ELIN/ | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit of Price | Extended Price |
| A700 | Unit Priced Labor Work - During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 500 | LH | |||||
| A701 | Unit Priced Labor Work - Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 100 | LH | |||||
| A702 | Materials and Equipment (Negotiated) | Provide all materials and equipment to perform all UPL work on the Wastewater Treatment Plant per the scope and delivery schedule specified in the task order. | ¥5,000,000 | LS | 1.2 | |
| Coefficient (see Note 1) | ||||||
| A703 | Provide a Cylindrical plastic carrier for Biofilm Filtration Tank | Provide appropriate carrier for biofilm filtration tank. This item includes labor, delivery, and adjustment cost of the biofilm filtration tank. | 200 | Kg | ||
| TOTAL NON-RECURRING WORK PRICE BASE YEAR |
| Notes: | |
| Note 1: The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, | |
| stockpiling, overhead, and profits. Only "Coefficient" will be used for these associated costs. | |
| Extend the coefficient to no more than two (2) decimal places. | |
| For example, if the offeror's coefficient for material is 1.20, then; 12,000,000 Yen x 1.20 = ¥ 14,400,000 |
Note 2: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price.
Note 3: Abbreviation LH= Labor Hours LS = Lump Sum
CUI
ELINS-1st-RECU
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT B |
| Line Item 0003 Recurring Work Price - First Option |
| PROVIDE PRICES TO OPERATE AND MAINTAIN SEWAGE TREATMENT PLANT AND COLLECTION SYSTEM - RECURRING WORK PRICE - |
| IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs B001 |
ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total
| B001 - MCB Portion Spec Item 3 | |||
| B001AA | Operation (Spec Item 3.1) | ||
| The Contractor shall operate the wastewater treatment plant to efficiently and safely collect, treat and dispose of wastewater such that the effluent complies with the regulatory discharge permit 24 hours per day, seven days per week, throughout the contract period. | 12 | MO | |
| B001AB | Integrated Maintenance Program (IMP) (Spec Item 3.2) | ||
| The Contractor shall develop and implement an IMP for the wastewater treatment plant to ensure all equipment and components remain in optimum condition and sustain maximum life. | 12 | MO | |
| B001AC | Wastewater Treatment Plant (Spec Item 3.2.1) | ||
| The Contractor shall perform equalization tanks and related equipment cleaning services once a year. | 1 | LS | |
| B001AD | Sludge, Residue (shisa), and Waste Water Collection and Transportation Service (Spec Item 3.3.1) |
The Contractor shall collect and transport all accumulated utility system sewage residue (shisa), waste water, and sludge from
| Sewage Treatment Plant periodically. | 12 | MO | |
| B001AE | Sewage Sludge Analysis (Spec Item 3.3.2) | ||
| The Contractor shall sample and analyze the sludge to be disposed of utilizing a certified laboratory in the Base Period of performance. | 1 | LS |
TOTAL RECURRING WORK ELINS FIRST OPTION-B001
| Note: |
| MO = Month |
CUI
ELINS-1st-NON-RE
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT B |
| Line Item 0004 Non-Recurring Work Price - First Option |
| PROVIDE PRICES FOR SEWAGE TREATMENT PLANT AND COLLECTION SYSTEM - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B703 |
| ELIN/ | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit of Price | Extended Price |
| B700 | Unit Priced Labor Work - During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 500 | LH | |||||
| B701 | Unit Priced Labor Work - Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 100 | LH | |||||
| B702 | Materials and Equipment (Negotiated) | Provide all materials and equipment to perform all UPL work on the Wastewater Treatment Plant per the scope and delivery schedule specified in the task order. | ¥5,000,000 | LS | 1.2 | |
| Coefficient (see Note 1) | ||||||
| B703 | Provide a Cylindrical plastic carrier for Biofilm Filtration Tank | Provide appropriate carrier for biofilm filtration tank. This item includes labor, delivery, and adjustment cost of the biofilm filtration tank. | 200 | Kg | ||
| TOTAL NON-RECURRING WORK PRICE FIRST OPTION |
| Notes: | |
| Note 1: The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, | |
| stockpiling, overhead, and profits. Only "Coefficient" will be used for these associated costs. | |
| Extend the coefficient to no more than two (2) decimal places. | |
| For example, if the offeror's coefficient for material is 1.20, then; 12,000,000 Yen x 1.20 = ¥ 14,400,000 |
Note 2: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price.
Note 3: Abbreviation LH= Labor Hours LS = Lump Sum
CUI
ELINS-2nd-RECU
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT C |
| Line Item 0005 Recurring Work Price - Second Option |
| PROVIDE PRICES TO OPERATE AND MAINTAIN SEWAGE TREATMENT PLANT AND COLLECTION SYSTEM - RECURRING WORK PRICE - |
| IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs C001 |
ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total
| C001 - MCB Portion Spec Item 3 | |||
| C001AA | Operation (Spec Item 3.1) | ||
| The Contractor shall operate the wastewater treatment plant to efficiently and safely collect, treat and dispose of wastewater such that the effluent complies with the regulatory discharge permit 24 hours per day, seven days per week, throughout the contract period. | 12 | MO | |
| C001AB | Integrated Maintenance Program (IMP) (Spec Item 3.2) | ||
| The Contractor shall develop and implement an IMP for the wastewater treatment plant to ensure all equipment and components remain in optimum condition and sustain maximum life. | 12 | MO | |
| C001AC | Wastewater Treatment Plant (Spec Item 3.2.1) | ||
| The Contractor shall perform equalization tanks and related equipment cleaning services once a year. | 1 | LS | |
| C001AD | Sludge, Residue (shisa), and Waste Water Collection and Transportation Service (Spec Item 3.3.1) |
The Contractor shall collect and transport all accumulated utility system sewage residue (shisa), waste water, and sludge from
| Sewage Treatment Plant periodically. | 12 | MO | |
| C001AE | Sewage Sludge Analysis (Spec Item 3.3.2) | ||
| The Contractor shall sample and analyze the sludge to be disposed of utilizing a certified laboratory in the Base Period of performance. | 1 | LS |
TOTAL RECURRING WORK ELINS SECOND OPTION-C001
| Note: |
| MO = Month |
CUI
ELINS-2nd-NON-RE
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT C |
| Line Item 0006 Non-Recurring Work Price - Second Option |
| PROVIDE PRICES FOR SEWAGE TREATMENT PLANT AND COLLECTION SYSTEM - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs C700 through C703 |
| ELIN/ | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit of Price | Extended Price |
| C700 | Unit Priced Labor Work - During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 500 | LH | |||||
| C701 | Unit Priced Labor Work - Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 100 | LH | |||||
| C702 | Materials and Equipment (Negotiated) | Provide all materials and equipment to perform all UPL work on the Wastewater Treatment Plant per the scope and delivery schedule specified in the task order. | ¥5,000,000 | LS | 1.2 | |
| Coefficient (see Note 1) | ||||||
| C703 | Provide a Cylindrical plastic carrier for Biofilm Filtration Tank | Provide appropriate carrier for biofilm filtration tank. This item includes labor, delivery, and adjustment cost of the biofilm filtration tank. | 200 | Kg | ||
| TOTAL NON-RECURRING WORK PRICE SECOND OPTION |
| Notes: | |
| Note 1: The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, | |
| stockpiling, overhead, and profits. Only "Coefficient" will be used for these associated costs. | |
| Extend the coefficient to no more than two (2) decimal places. | |
| For example, if the offeror's coefficient for material is 1.20, then; 12,000,000 Yen x 1.20 = ¥ 14,400,000 |
Note 2: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price.
Note 3: Abbreviation LH= Labor Hours LS = Lump Sum
CUI
ELINS-3rd-RECU
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT D |
| Line Item 0007 Recurring Work Price - Third Option |
| PROVIDE PRICES TO OPERATE AND MAINTAIN SEWAGE TREATMENT PLANT AND COLLECTION SYSTEM - RECURRING WORK PRICE - |
| IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs D001 |
ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total
| D001 - MCB Portion Spec Item 3 | |||
| D001AA | Operation (Spec Item 3.1) | ||
| The Contractor shall operate the wastewater treatment plant to efficiently and safely collect, treat and dispose of wastewater such that the effluent complies with the regulatory discharge permit 24 hours per day, seven days per week, throughout the contract period. | 12 | MO | |
| D001AB | Integrated Maintenance Program (IMP) (Spec Item 3.2) | ||
| The Contractor shall develop and implement an IMP for the wastewater treatment plant to ensure all equipment and components remain in optimum condition and sustain maximum life. | 12 | MO | |
| D001AC | Wastewater Treatment Plant (Spec Item 3.2.1) | ||
| The Contractor shall perform equalization tanks and related equipment cleaning services once a year. | 1 | LS | |
| D001AD | Sludge, Residue (shisa), and Waste Water Collection and Transportation Service (Spec Item 3.3.1) |
The Contractor shall collect and transport all accumulated utility system sewage residue (shisa), waste water, and sludge from
| Sewage Treatment Plant periodically. | 12 | MO | |
| D001AE | Sewage Sludge Analysis (Spec Item 3.3.2) | ||
| The Contractor shall sample and analyze the sludge to be disposed of utilizing a certified laboratory in the Base Period of performance. | 1 | LS |
TOTAL RECURRING WORK ELINS THIRD OPTION-D001 ¥0
| Note: |
| MO = Month |
CUI
ELINS-3rd-NON-RE
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT D |
| Line Item 0008 Non-Recurring Work Price - Third Option |
| PROVIDE PRICES FOR SEWAGE TREATMENT PLANT AND COLLECTION SYSTEM - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs D700 through D703 |
| ELIN/ | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit of Price | Extended Price |
| D700 | Unit Priced Labor Work - During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 500 | LH | |||||
| D701 | Unit Priced Labor Work - Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 100 | LH | |||||
| D702 | Materials and Equipment (Negotiated) | Provide all materials and equipment to perform all UPL work on the Wastewater Treatment Plant per the scope and delivery schedule specified in the task order. | ¥5,000,000 | LS | 1.2 | |
| Coefficient (see Note 1) | ||||||
| D703 | Provide a Cylindrical plastic carrier for Biofilm Filtration Tank | Provide appropriate carrier for biofilm filtration tank. This item includes labor, delivery, and adjustment cost of the biofilm filtration tank. | 200 | Kg | ||
| TOTAL NON-RECURRING WORK PRICE THIRD OPTION |
| Notes: | |
| Note 1: The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, | |
| stockpiling, overhead, and profits. Only "Coefficient" will be used for these associated costs. | |
| Extend the coefficient to no more than two (2) decimal places. | |
| For example, if the offeror's coefficient for material is 1.20, then; 12,000,000 Yen x 1.20 = ¥ 14,400,000 |
Note 2: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price.
Note 3: Abbreviation LH= Labor Hours LS = Lump Sum
CUI
ELINS-4th-RECU
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT E |
| Line Item 0009 Recurring Work Price - Fourth Option |
| PROVIDE PRICES TO OPERATE AND MAINTAIN SEWAGE TREATMENT PLANT AND COLLECTION SYSTEM - RECURRING WORK PRICE - |
| IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs E001 |
ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total
| E001 - MCB Portion Spec Item 3 | |||
| E001AA | Operation (Spec Item 3.1) | ||
| The Contractor shall operate the wastewater treatment plant to efficiently and safely collect, treat and dispose of wastewater such that the effluent complies with the regulatory discharge permit 24 hours per day, seven days per week, throughout the contract period. | 12 | MO | |
| E001AB | Integrated Maintenance Program (IMP) (Spec Item 3.2) | ||
| The Contractor shall develop and implement an IMP for the wastewater treatment plant to ensure all equipment and components remain in optimum condition and sustain maximum life. | 12 | MO | |
| E001AC | Wastewater Treatment Plant (Spec Item 3.2.1) | ||
| The Contractor shall perform equalization tanks and related equipment cleaning services once a year. | 1 | LS | |
| E001AD | Sludge, Residue (shisa), and Waste Water Collection and Transportation Service (Spec Item 3.3.1) |
The Contractor shall collect and transport all accumulated utility system sewage residue (shisa), waste water, and sludge from
| Sewage Treatment Plant periodically. | 12 | MO | |
| E001AE | Sewage Sludge Analysis (Spec Item 3.3.2) | ||
| The Contractor shall sample and analyze the sludge to be disposed of utilizing a certified laboratory in the Base Period of performance. | 1 | LS | |
| E001AF | Computer Replacement Service (Spec Item 3.2.3) | ||
| The Contractor shall provide and replace standard desktop computers or laptops for Sewage Treatment Plant control systems in coordination, with the Government, ensuring the equipment is up-to-date, secure, and aligned with the manufacturer's current specifications and support. | 1 | LS |
TOTAL RECURRING WORK ELINS FOURTH OPTION-E001
| Note: |
| MO = Month |
CUI
ELINS-4th-NON-RE
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT E |
| Line Item 0010 Non-Recurring Work Price - Fourth Option |
| PROVIDE PRICES FOR SEWAGE TREATMENT PLANT AND COLLECTION SYSTEM - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs E700 through E703 |
| ELIN/ | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit of Price | Extended Price |
| E700 | Unit Priced Labor Work - During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 500 | LH | |||||
| E701 | Unit Priced Labor Work - Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 100 | LH | |||||
| E702 | Materials and Equipment (Negotiated) | Provide all materials and equipment to perform all UPL work on the Wastewater Treatment Plant per the scope and delivery schedule specified in the task order. | ¥5,000,000 | LS | 1.2 | |
| Coefficient (see Note 1) | ||||||
| E703 | Provide a Cylindrical plastic carrier for Biofilm Filtration Tank | Provide appropriate carrier for biofilm filtration tank. This item includes labor, delivery, and adjustment cost of the biofilm filtration tank. | 200 | Kg | ||
| TOTAL NON-RECURRING WORK PRICE FOURTH OPTION |
| Notes: | |
| Note 1: The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, | |
| stockpiling, overhead, and profits. Only "Coefficient" will be used for these associated costs. | |
| Extend the coefficient to no more than two (2) decimal places. | |
| For example, if the offeror's coefficient for material is 1.20, then; 12,000,000 Yen x 1.20 = ¥ 14,400,000 |
Note 2: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price.
Note 3: Abbreviation LH= Labor Hours LS = Lump Sum
CUI
ELINS-5th-RECU
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT F |
| Line Item 0011 Recurring Work Price - Fifth Option |
| PROVIDE PRICES TO OPERATE AND MAINTAIN SEWAGE TREATMENT PLANT AND COLLECTION SYSTEM - RECURRING WORK PRICE - |
| IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs F001 |
ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total
| F001 - MCB Portion Spec Item 3 | |||
| F001AA | Operation (Spec Item 3.1) | ||
| The Contractor shall operate the wastewater treatment plant to efficiently and safely collect, treat and dispose of wastewater such that the effluent complies with the regulatory discharge permit 24 hours per day, seven days per week, throughout the contract period. | 12 | MO | |
| F001AB | Integrated Maintenance Program (IMP) (Spec Item 3.2) | ||
| The Contractor shall develop and implement an IMP for the wastewater treatment plant to ensure all equipment and components remain in optimum condition and sustain maximum life. | 12 | MO | |
| F001AC | Wastewater Treatment Plant (Spec Item 3.2.1) | ||
| The Contractor shall perform equalization tanks and related equipment cleaning services once a year. | 1 | LS | |
| F001AD | Sludge, Residue (shisa), and Waste Water Collection and Transportation Service (Spec Item 3.3.1) |
The Contractor shall collect and transport all accumulated utility system sewage residue (shisa), waste water, and sludge from
| Sewage Treatment Plant periodically. | 12 | MO | |
| F001AE | Sewage Sludge Analysis (Spec Item 3.3.2) | ||
| The Contractor shall sample and analyze the sludge to be disposed of utilizing a certified laboratory in the Base Period of performance. | 1 | LS |
TOTAL RECURRING WORK ELINS FIFTH OPTION- F001
| Note: |
| MO = Month |
CUI
ELINS-5th-NON-RECU
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT F |
| Line Item 0012 Non-Recurring Work Price - Fifth Option |
| PROVIDE PRICES FOR SEWAGE TREATMENT PLANT AND COLLECTION SYSTEM - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs F700 through F703 |
| ELIN/ | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit of Price | Extended Price |
| F700 | Unit Priced Labor Work - During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 500 | LH | |||||
| F701 | Unit Priced Labor Work - Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 100 | LH | |||||
| F702 | Materials and Equipment (Negotiated) | Provide all materials and equipment to perform all UPL work on the Wastewater Treatment Plant per the scope and delivery schedule specified in the task order. | ¥5,000,000 | LS | 1.2 | |
| Coefficient (see Note 1) | ||||||
| F703 | Provide a Cylindrical plastic carrier for Biofilm Filtration Tank | Provide appropriate carrier for biofilm filtration tank. This item includes labor, delivery, and adjustment cost of the biofilm filtration tank. | 200 | Kg | ||
| TOTAL NON-RECURRING WORK PRICE FIFTH OPTION | ¥ - |
| Notes: | |
| Note 1: The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, | |
| stockpiling, overhead, and profits. Only "Coefficient" will be used for these associated costs. | |
| Extend the coefficient to no more than two (2) decimal places. | |
| For example, if the offeror's coefficient for material is 1.20, then; 12,000,000 Yen x 1.20 = ¥ 14,400,000 |
Note 2: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price.
Note 3: Abbreviation LH= Labor Hours LS = Lump Sum