A_ExhibitLineItemNumbers.xlsx
XLSX spreadsheet 149 KB Posted
- Solicitation number
- N4008425B8909
About this file
This document is an Exhibit Line Item Numbers for a federal contract opportunity for Grounds Maintenance and Landscaping Services at the U.S. Naval Air Facility in Atsugi, Japan. The contract is being issued by the Department of the Navy Naval Facilities Engineering Command.
The contract requires the contractor to provide recurring grounds maintenance and landscaping services, including maintenance of improved grounds, vegetation, edging, lawn services, weed control, plant and shrub maintenance, and tree maintenance. The contract also includes non-recurring services such as vacant quarters mowing, grass cutting, raking, hedges and tree pruning, and tree removal. Pricing is provided for hundreds of specific line items across the base period and three option periods. The contract includes fixed-price and unit-priced line items, and allows for the use of various equipment and labor categories. Key details are provided for scope of work, service level standards, and estimated quantities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| D_RevisedExhibitLineItemNumbers.xlsx | XLSX spreadsheet | |
| N4008425B8909_0001.pdf | ||
| N4008425B8909.pdf | ||
| C_SiteVisit_Request.xlsx | XLSX spreadsheet | |
| B_PreBid_InquiryForm.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINs-Base R
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 Recurring Work Price - Base Period | |||||
| PROVIDE PRICES TO PERFORM GROUNDS MAINTENANCE AND LANDSCAPING SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs A001 through A010 | |||||
| ELIN / Sub ELIN | Description | QTY | Unit of Issue | Unit Price | Total |
| A001 - NAF ATSUGI CNIC FX FUND (Region) - 1503050 Grounds Maintenance and Landscaping | ||||
| Services for CNIC FX Fund Prestige areas/acreage provided in the Site Maps provided in J-1503050-08, -12-and -14 performed as specified for Prestige Areas per the Service Level Standards listed in J-1503050-11. | ||||
| A001 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
| A001 | AB | Tree Maintenance (Spec Item 3.1.4) | 1 | LS |
| A001 | AC | Ornament Tree (Spec Item 3.1.4.1) | 1 | LS |
| A001 | AD | Vegetation Control (Spec Item 3.1.5) | 1 | LS |
| A002 - NAF ATSUGI CNIC FX FUND (Standard) - 1503050 Grounds Maintenance and Landscaping | ||||
| Services for CNIC FX Fund Standard Grounds areas/acreage other than those specified as Prestige in the Site Maps provided in J-1503050-08 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-11. | ||||
| A002 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
| A002 | AD | Vegetation Control (Spec Item 3.1.5) | 1 | LS |
| A003 - NAF ATSUGI CNIC FX FUND (Operational) - 1503050 Grounds Maintenance and Landscaping | ||||
| Services for CNIC FX Fund Operational Grounds areas/acreage other than those specified as Prestige and Standard in the Site Maps provided in J-1503050-08 and -15 performed as specified for the Operational grounds per the Service Level Standards listed in J-1503050-11. | ||||
| A003 | AE | Ammunition Storage Areas (Spec Item 3.2.1) | 1 | LS |
| A003 | AF | Anti-Terrorism Force Protection (ATFP) (Spec Item 3.2.2) | 1 | LS |
| A003 | AG | Fire Lanes and Breaks (Spec Item 3.2.3) | 1 | LS |
| A003 | AH | Road and Right of Ways (Spec Item 3.2.4) | 1 | LS |
NAF ATSUGI CNIC FX FUND Subtotal
| A004 - SUPPORTED COMMNAD HOUSING SERVICE CENTER (HSC) Level I | ||||
| Services for HSC Level I areas/acreage provided in the Site Maps provided in J-1503050-08 performed as specified for Supported Command Level I per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| A004 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
| A004 | AD | Vegetation Control (Spec Item 3.1.5) | 1 | LS |
| A005 - SUPPORTED COMMNAD HOUSING SERVICE CENTER (HSC) Level III | ||||
| Services for Level III areas/acreage provided in the Site Maps provided in J-1503050-08 performed as specified for Supported Command Level III per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| A005 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
| A006 - SUPPORTED COMMNAD HOUSING SERVICE CENTER (HSC) Category I | ||||
| Services for Category I areas/acreage provided in the Site Maps provided in J-1503050-12 performed as specified for Supported Command Category I per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| A006 | AB | Tree Maintenance (Spec Item 3.1.4) | 1 | LS |
| A006 | AJ | Plant and Plant Bed Maintenance (Spec Item 3.1.2) | 1 | LS |
| A006 | AK | Shrub and Hedge Maintenance (Spec Item 3.1.3) | 1 | LS |
| A007 - SUPPORTED COMMNAD HOUSING SERVICE CENTER (HSC) Category II | ||||
| Services for Category III areas/acreage provided in the Site Maps provided in J-1503050-12 performed as specified for Supported Command Category II per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| A007 | AB | Tree Maintenance (Spec Item 3.1.4) | 1 | LS |
| A007 | AK | Shrub and Hedge Maintenance (Spec Item 3.1.3) | 1 | LS |
| A007 | AL | Weeding (Spec Item 3.1.1.5) | 1 | LS |
SUPPORTED COMMNAD HOUSING SERVICE CENTER (HSC) FUND Subtotal
| A008 - SUPPORTED COMMNAD NAVY GATE-INN SUITS (NGIS) | ||||
| Services for NGIS Level Il I areas/acreage provided in the Site Maps provided in J-1503050-08 performed as specified for Supported Command Level II per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| A008 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
| A008 | AD | Vegetation Control (Spec Item 3.1.5) | 1 | LS |
SUPPORTED COMMNAD NAVY GATE-INN SUITS (NGIS) Subtotal
| A009 - SUPPORTED COMMNAD DEPARTMENT OF DEFENCE EDUCATION AGENCY (DoDEA) | ||||
| Services for DoDEA Level III areas/acreage provided in the Site Maps provided in J-1503050-08 performed as specified for Supported Command Level III per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| A009 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
SUPPORTED COMMNAD DEPARTMENT OF DEFENCE EDUCATION AGENCY (DoDEA) Subtotal
| A010 - SUPPORTED COMMNAD BRANCH HEALTH CLINIC (BHC) | ||||
| Services for BHC Level III areas/acreage provided in the Site Maps provided in J-1503050-08 performed as specified for Supported Command Level III per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| A010 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
SUPPORTED COMMNAD BRANCH HEALTH CLINIC (BHC) Subtotal
TOTAL BASE PERIOD RECURRING WORK
Note: Abbreviation QTY=Quantity LS=Lump Sum
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs-Base Non-R
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT A - CLIN 9000 |
| Line Item 0002 Non-Recurring Work - Base Period |
| PROVIDE PRICES FOR GROUNDS MAINTENANCE AND LANDSCAPING - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A701 |
| ELIN | Product Name | Description Extended | Estimated Qty | Unit of Issue | Unit Price | Extended Price |
| A700 | Grounds Maintenance and Landscaping Services | |||||
| A700A | Housing Vacant Quarters Mowing | Grass (inclusive of weeds or other invasive vegetation) shall be mowed and trimmed to a uniform height of 2 inches. Grass shall be edged to provide a uniform edged cut. Clippings and debris shall be removed. Cut grass shall be disposed to the off base facility. | 5,000 | SM | ||
| A700B | Grass Cutting (Current Grass Height more than 6 inches) | Grass (inclusive of weeds or other invasive vegetation) shall be mowed and trimmed to a uniform height of 3 inches. All clippings and debris shall be removed. Cut grass shall be disposed to the off base facility. | 50,000 | SM | ||
| A700C | Raking | This work includes the raking and removal of leaves, pine straw and pinecones, limbs, and other debris from the raked area. All debris shall be removed on the same day as raked. Debris shall be disposed to the off base facility. Minimum Order is 500 SM | 2,000 | SM | ||
| A700D | Hedges Pruning (Height up to 3 Meters). | Prune hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. | 100 | LM | ||
| A700E | Trees/Shrubs Pruning of (Tree/Shrub Height up to 8 Meters) | Prune trees/shrubs (height up to 8 meters) according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. | 5 | EA | ||
| A700F | Trees Pruning (Tree Height 8.1 Meters to 15 Meters) | Prune trees(height 8.1 meters to 15 meters) according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. | 5 | EA | ||
| A700G | Trees Pruning (Tree Height more than 15 Meters) | Prune tree (height more than 15 meters) according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. | 5 | EA | ||
| A700H | Hedge and other Trees Removal (Height up to 3 Meters). | Remove up to three meters height hedge and other plants, and cut their stumps and route as same ground level as surrounding area for tipping prevention. Where the hedges were removed shall be filled with topsoil, fertilized, raked, seeded, and grass established to match the surrounding surface. | 200 | LM | ||
| A700J | Trees Removal, up to 60 cm Trunk Circumference | Remove up to 60cm circumstance trees and cut their stumps and roots at the same ground level as surrounding area for tipping prevention. The areas where the trees were removed shall be filled with topsoil, fertilized, raked, seeded, and grass established to match the surrounding surface. The trunk circumference may be calculated at one meter from ground level. If the tree is branched off, measure the original root. The Government will provide a storage area before transport to an off-base facility. All debris shall be disposed of at an off-base facility within 90 days unless otherwise specified. Fallen tree removal shall be applied to this item. Note: Issue with ELIN 701 item if performance requires an aerial platform vehicle to access trees exceeding a height 20 meters above ground level. This ELIN applies to improved grounds lawn area, Categories I, II, and III. A markup will be applied to other than improved grounds lawn area, Categories I, II, and III. | 10 | EA | ||
| A700K | Trees Removal, 61 cm to 90 cm Trunk Circumference | Remove 61cm to 90cm circumstance trees and cut their stumps and roots at the same ground level as surrounding area for tipping prevention. The areas where the trees were removed shall be filled with topsoil, fertilized, raked, seeded, and grass established to match the surrounding surface. The trunk circumference may be calculated at one meter from ground level. If the tree is branched off, measure the original root. The Government will provide a storage area before transport to an off-base facility. All debris shall be disposed of at an off-base facility within 90 days unless otherwise specified. Fallen tree removal shall be applied to this item. Note: Issue with ELIN 701 item if performance requires an aerial platform vehicle to access trees exceeding a height 20 meters above ground level. This ELIN applies to improved grounds lawn area, Categories I, II, and III. A markup will be applied to other than improved grounds lawn area, Categories I, II, and III. | 50 | EA | ||
| A700L | Trees Removal, 91 cm to 150 cm Trunk Circumference | Remove 91cm to 150cm circumstance trees and cut their stumps and roots at the same ground level as surrounding area for tipping prevention. The areas where the trees were removed shall be filled with topsoil, fertilized, raked, seeded, and grass established to match the surrounding surface. The trunk circumference may be calculated at one meter from ground level. If the tree is branched off, measure the original root. The Government will provide a storage area before transport to an off-base facility. All debris shall be disposed of at an off-base facility within 90 days unless otherwise specified. Fallen tree removal shall be applied to this item. Note: Issue with ELIN 701 item if performance requires an aerial platform vehicle to access trees exceeding a height 20 meters above ground level. This ELIN applies to improved grounds lawn area, Categories I, II, and III. A markup will be applied to other than improved grounds lawn area, Categories I, II, and III. | 100 | EA | ||
| A700M | Trees Removal, 151 cm to 200 cm Trunk Circumference | Remove 151 cm to 200cm circumstance trees and cut their stumps and roots at the same ground level as surrounding area for tipping prevention. The areas where the trees were removed shall be filled with topsoil, fertilized, raked, seeded, and grass established to match the surrounding surface. The trunk circumference may be calculated at one meter from ground level. If the tree is branched off, measure the original root. The Government will provide a storage area before transport to an off-base facility. All debris shall be disposed of at an off-base facility within 90 days unless otherwise specified. Fallen tree removal shall be applied to this item. Note: Issue with ELIN 701 item if performance requires an aerial platform vehicle to access trees exceeding a height 20 meters above ground level. This ELIN applies to improved grounds lawn area, Categories I, II, and III. A markup will be applied to other than improved grounds lawn area, Categories I, II, and III. | 100 | EA | ||
| A700N | Trees/shrubs Planting, Height up to 100 cm | Trees/Shrub price will be used ELIN 700P. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked properly. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be accomplished by or under the guidance of a certified arborist. | 100 | EA | ||
| A700P | Trees/Shrubs Price | ELIN 700N will be applied for planting of tree (s)/shrub (s) and garden material. Tree and shrub shall have fine, balancing roots and well balanced branches, and shall be healthy and free from diseases and insects. The Government will use price of tree and shrub listed on latest Japanese standard price data book, "Kensetsu Bukka" or "Sekisan Shiryo" or "Sekisan Poketto Gaikou-hen". Unit price of this ELIN for each tree or shrub shall be calculated multiplying "Price of tree or shrub listed on that" by "Fixed Burden Rate (FBR) proposed by the Contractor". Unit price shall include material cost, its one year guarantee cost, transportation cost and other all costs necessary to providing tree or shrub at planting site. | 5,000,000 | Yen | ||
| FBR(*1) | ||||||
| A700Q | Unit Priced Labor Work for Certified Arborist (during Regular Working Hours) - MUST BE NEGOTIATED BY KO | Provide labor (during regular working hours) to perform tree/ground maintenance work by certified arborist Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 200 | HR | ||
| A700R | Unit Priced Labor Work for Certified Arborist (during Outside Regular Working Hours) - MUST BE NEGOTIATED BY KO | Provide labor (during outside regular working hours) to perform tree/ground maintenance work by ground maintenance worker Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | ||||
| 50 | HR | |||||
| A700S | Unit Priced Labor Work for Ground Maintenance Worker (during Regular Working Hours) - MUST BE NEGOTIATED BY KO | Provide labor (during regular working hours) to perform tree/ground maintenance work by ground maintenance Worker Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | ||||
| 800 | HR | |||||
| A700T | Unit Priced Labor Work for Ground Maintenance Worker (during Outside Regular Working Hours) - MUST BE NEGOTIATED BY KO | Provide labor (during outside regular working hours) to perform tree/ground maintenance work by ground maintenance worker Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | ||||
| 50 | HR | |||||
| A700U | Material Costs | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 5,000,000 | Yen | ||
| FBR(*1) | ||||||
| A701 | Other Related Grounds Maintenance and Landscaping Services (*2) | |||||
| A701A | Aerial work vehicle 30 |
meters class, non-folding
| type with operator service | Provide equipment service shall be; Truck mounted, basket capacity:200 kg of two people, 30 meters maximum bottom height, gasoline/diesel engine drive, 4 × 2, telescopic boom type, include eight hours on-site operator service within regular working hours per a day for related service of grounds maintenance. This item shall be issued with ELIN 700J, 700K, 700L, and 700M. | 5 | DAY |
| A701B | Aerial work vehicle 50 |
meters class, non-folding
| type with operator service | Provide equipment service shall be; Truck mounted, minimum capacity platform (Basket) 200 kg, telescopic boom, operator control on platform, working radius (Height) maximum - at least 50 meters, wheel mounted, gasoline/diesel engine driven, include eight hours on-site operator service within regular working hours per a day | |
| for related service of grounds maintenance. This item shall be issued with ELIN 700J, 700K, 700L, and 700M. | 5 | DAY |
| A701C | Rough-terrain crane, rated |
lifting capacity up to 70 ton
| class with operator service | Provide rough-terrain crane service shall be; Rated lifting capacity up to 70 ton class, maximum height approx. 43 meters, full revolving telescoping boom, pneumatic tires, and diesel engine driven. In addition, equipment and its operator shall meet the requirements specified in spec item 2.3, include eight hours on-site operator service within regular working hours per a day, and one round trip delivery between the designated site and the Contractor’s premise for related service of grounds maintenance. This item shall be issued with ELIN 700J, 700K, 700L, and 700M. | 5 | DAY | |
| A701D | Backhoe, 0.30 CM class | |||
| with operator service | Provide backhoe service shall be; Crawler type, rubber/steel caterpillar, diesel/gasoline engine driven, with additional hydraulic impact hammer/fork. Bucket capacity: up to 0.30 cubic meter, include eight hours on-site operator service within regular working hours per a day for related service of grounds maintenance. This item shall be issued with ELIN 700 items | 3 | DAY | |
| TOTAL NON-RECURRING WORK PRICE BASE PERIOD | ||||
| Markup for ELIN 700J, 700K, 700, and 700M (*3) % | % |
Note: SM = Square Meter, EA= Each, LM= Liner Meter
| *1 : Fixed Burden Rate (FBR): FBR is an adjustment to the material cost to allow for all associated costs including but not limited to | |
| ordering, handling, stockpiling, overhead, and profits. Only FBR will be used for these associated costs. | |
| Example : Proposed Material cost is ¥120,000, the offeror's FBR for material is 20% | |
| ¥120,000 x 20% = ¥ 144,000 is applied as Material Cost |
* 2: ELIN 701 shall be issued with ELIN700. Not issued a single element
| * 3: Markup: Markup will be applied to ELIN 700J, 700K, 700L, and 700M. | |
| Example : If ELIN 700L is under operation area, pre-price is ¥50,000, and Markup is 30%, then, ¥50,000 x 1.3 = ¥65,000 |
ELINs-1st-Rec
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT B - CLIN 9001 |
| Line Item 0004 Recurring Work Price - First Option Period | |||||
| PROVIDE PRICES TO PERFORM GROUNDS MAINTENANCE AND LANDSCAPING SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs B001 through B010 | |||||
| ELIN/Sub ELIN | Description | QTY | Unit of Issue | Unit Price | Total |
| B001 - NAF ATSUGI CNIC FX FUND (Region) - 1503050 Grounds Maintenance and Landscaping | ||||
| Services for CNIC FX Fund Prestige areas/acreage provided in the Site Maps provided in J-1503050-08, -12-and -14 performed as specified for Prestige Areas per the Service Level Standards listed in J-1503050-11. | ||||
| B001 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
| B001 | AB | Tree Maintenance (Spec Item 3.1.4) | 1 | LS |
| B001 | AC | Ornament Tree (Spec Item 3.1.4.1) | 1 | LS |
| B001 | AD | Vegetation Control (Spec Item 3.1.5) | 1 | LS |
| B002 - NAF ATSUGI CNIC FX FUND (Standard) - 1503050 Grounds Maintenance and Landscaping | ||||
| Services for CNIC FX Fund Standard Grounds areas/acreage other than those specified as Prestige in the Site Maps provided in J-1503050-08 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-11. | ||||
| B002 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
| B002 | AD | Vegetation Control (Spec Item 3.1.5) | 1 | LS |
| B003 - NAF ATSUGI CNIC FX FUND (Operational) - 1503050 Grounds Maintenance and Landscaping | ||||
| Services for CNIC FX Fund Operational Grounds areas/acreage other than those specified as Prestige and Standard in the Site Maps provided in J-1503050-08 and -15 performed as specified for the Operational grounds per the Service Level Standards listed in J-1503050-11. | ||||
| B003 | AE | Ammunition Storage Areas (Spec Item 3.2.1) | 1 | LS |
| B003 | AF | Anti-Terrorism Force Protection (ATFP) (Spec Item 3.2.2) | 1 | LS |
| B003 | AG | Fire Lanes and Breaks (Spec Item 3.2.3) | 1 | LS |
| B003 | AH | Road and Right of Ways (Spec Item 3.2.4) | 1 | LS |
NAF ATSUGI CNIC FX FUND Subtotal
| B004 - SUPPORTED COMMNAD HOUSING SERVICE CENTER (HSC) Level I | ||||
| Services for HSC Level I areas/acreage provided in the Site Maps provided in J-1503050-08 performed as specified for Supported Command Level I per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| B004 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
| B004 | AD | Vegetation Control (Spec Item 3.1.5) | 1 | LS |
| B005 - SUPPORTED COMMNAD HOUSING SERVICE CENTER (HSC) Level III | ||||
| Services for Level III areas/acreage provided in the Site Maps provided in J-1503050-08 performed as specified for Supported Command Level III per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| B005 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
| B006 - SUPPORTED COMMNAD HOUSING SERVICE CENTER (HSC) Category I | ||||
| Services for Category I areas/acreage provided in the Site Maps provided in J-1503050-12 performed as specified for Supported Command Category I per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| B006 | AB | Tree Maintenance (Spec Item 3.1.4) | 1 | LS |
| B006 | AJ | Plant and Plant Bed Maintenance (Spec Item 3.1.2) | 1 | LS |
| B006 | AK | Shrub and Hedge Maintenance (Spec Item 3.1.3) | 1 | LS |
| B007 - SUPPORTED COMMNAD HOUSING SERVICE CENTER (HSC) Category II | ||||
| Services for Category II areas/acreage provided in the Site Maps provided in J-1503050-12 performed as specified for Supported Command Category III per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| B007 | AB | Tree Maintenance (Spec Item 3.1.4) | 1 | LS |
| B007 | AK | Shrub and Hedge Maintenance (Spec Item 3.1.3) | 1 | LS |
| B007 | AL | Weeding (Spec Item 3.1.1.5) | 1 | LS |
SUPPORTED COMMNAD HOUSING SERVICE CENTER (HSC) FUND Subtotal
| B008 - SUPPORTED COMMNAD NAVY GATE-INN SUITS (NGIS) | ||||
| Services for NGIS Level Il I areas/acreage provided in the Site Maps provided in J-1503050-08 performed as specified for Supported Command Level II per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| B008 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
| B008 | AD | Vegetation Control (Spec Item 3.1.5) | 1 | LS |
SUPPORTED COMMNAD NAVY GATE-INN SUITS (NGIS) Subtotal
| B009 - SUPPORTED COMMNAD DEPARTMENT OF DEFENCE EDUCATION AGENCY (DoDEA) | ||||
| Services for DoDEA Level III areas/acreage provided in the Site Maps provided in J-1503050-08 performed as specified for Supported Command Level III per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| B009 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
SUPPORTED COMMNAD DEPARTMENT OF DEFENCE EDUCATION AGENCY (DoDEA) Subtotal
| B010 - SUPPORTED COMMNAD BRANCH HEALTH CLINIC (BHC) | ||||
| Services for BHC Level III areas/acreage provided in the Site Maps provided in J-1503050-08 performed as specified for Supported Command Level III per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| B010 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
SUPPORTED COMMNAD BRANCH HEALTH CLINIC (BHC) Subtotal
TOTAL FIRST OPTION RECURRING WORK
Note: Abbreviation QTY=Quantity LS=Lump Sum
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs-1st Non-R
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT B - CLIN 9001 |
| Line Item 0004 Non-Recurring Work - First Option Period |
| PROVIDE PRICES FOR GROUNDS MAINTENANCE AND LANDSCAPING - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B701 |
| ELIN | Product Name | Description Extended | Estimated Qty | Unit of Issue | Unit Price | Extended Price |
| B700 | Grounds Maintenance and Landscaping Services | |||||
| B700A | Housing Vacant Quarters Mowing | Grass (inclusive of weeds or other invasive vegetation) shall be mowed and trimmed to a uniform height of 2 inches. Grass shall be edged to provide a uniform edged cut. Clippings and debris shall be removed. Cut grass shall be disposed to the off base facility. | 5,000 | SM | ||
| B700B | Grass Cutting (Current Grass Height more than 6 inches) | Grass (inclusive of weeds or other invasive vegetation) shall be mowed and trimmed to a uniform height of 3 inches. All clippings and debris shall be removed. Cut grass shall be disposed to the off base facility. | 50,000 | SM | ||
| B700C | Raking | This work includes the raking and removal of leaves, pine straw and pinecones, limbs, and other debris from the raked area. All debris shall be removed on the same day as raked. Debris shall be disposed to the off base facility. Minimum Order is 500 SM | 2,000 | SM | ||
| B700D | Hedges Pruning (Height up to 3 Meters). | Prune hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. | 100 | LM | ||
| B700E | Trees/Shrubs Pruning of (Tree/Shrub Height up to 8 Meters) | Prune trees/shrubs (height up to 8 meters) according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. | 5 | EA | ||
| B700F | Trees Pruning (Tree Height 8.1 Meters to 15 Meters) | Prune trees(height 8.1 meters to 15 meters) according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. | 5 | EA | ||
| B700G | Trees Pruning (Tree Height more than 15 Meters) | Prune tree (height more than 15 meters) according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. | 5 | EA | ||
| B700H | Hedge and other Trees Removal (Height up to 3 Meters). | Remove up to three meters height hedge and other plants, and cut their stumps and route as same ground level as surrounding area for tipping prevention. Where the hedges were removed shall be filled with topsoil, fertilized, raked, seeded, and grass established to match the surrounding surface. | 200 | LM | ||
| B700J | Trees Removal, up to 60 cm Trunk Circumference | Remove up to 60cm circumstance trees and cut their stumps and roots at the same ground level as surrounding area for tipping prevention. The areas where the trees were removed shall be filled with topsoil, fertilized, raked, seeded, and grass established to match the surrounding surface. The trunk circumference may be calculated at one meter from ground level. If the tree is branched off, measure the original root. The Government will provide a storage area before transport to an off-base facility. All debris shall be disposed of at an off-base facility within 90 days unless otherwise specified. Fallen tree removal shall be applied to this item. Note: Issue with ELIN 701 item if performance requires an aerial platform vehicle to access trees exceeding a height 20 meters above ground level. This ELIN applies to improved grounds lawn area, Categories I, II, and III. A markup will be applied to other than improved grounds lawn area, Categories I, II, and III. | 10 | EA | ||
| B700K | Trees Removal, 61 cm to 90 cm Trunk Circumference | Remove 61cm to 90cm circumstance trees and cut their stumps and roots at the same ground level as surrounding area for tipping prevention. The areas where the trees were removed shall be filled with topsoil, fertilized, raked, seeded, and grass established to match the surrounding surface. The trunk circumference may be calculated at one meter from ground level. If the tree is branched off, measure the original root. The Government will provide a storage area before transport to an off-base facility. All debris shall be disposed of at an off-base facility within 90 days unless otherwise specified. Fallen tree removal shall be applied to this item. Note: Issue with ELIN 701 item if performance requires an aerial platform vehicle to access trees exceeding a height 20 meters above ground level. This ELIN applies to improved grounds lawn area, Categories I, II, and III. A markup will be applied to other than improved grounds lawn area, Categories I, II, and III. | 50 | EA | ||
| B700L | Trees Removal, 91 cm to 150 cm Trunk Circumference | Remove 91cm to 150cm circumstance trees and cut their stumps and roots at the same ground level as surrounding area for tipping prevention. The areas where the trees were removed shall be filled with topsoil, fertilized, raked, seeded, and grass established to match the surrounding surface. The trunk circumference may be calculated at one meter from ground level. If the tree is branched off, measure the original root. The Government will provide a storage area before transport to an off-base facility. All debris shall be disposed of at an off-base facility within 90 days unless otherwise specified. Fallen tree removal shall be applied to this item. Note: Issue with ELIN 701 item if performance requires an aerial platform vehicle to access trees exceeding a height 20 meters above ground level. This ELIN applies to improved grounds lawn area, Categories I, II, and III. A markup will be applied to other than improved grounds lawn area, Categories I, II, and III. | 200 | EA | ||
| B700M | Trees Removal, 151 cm to 200 cm Trunk Circumference | Remove 151 cm to 200cm circumstance trees and cut their stumps and roots at the same ground level as surrounding area for tipping prevention. The areas where the trees were removed shall be filled with topsoil, fertilized, raked, seeded, and grass established to match the surrounding surface. The trunk circumference may be calculated at one meter from ground level. If the tree is branched off, measure the original root. The Government will provide a storage area before transport to an off-base facility. All debris shall be disposed of at an off-base facility within 90 days unless otherwise specified. Fallen tree removal shall be applied to this item. Note: Issue with ELIN 701 item if performance requires an aerial platform vehicle to access trees exceeding a height 20 meters above ground level. This ELIN applies to improved grounds lawn area, Categories I, II, and III. A markup will be applied to other than improved grounds lawn area, Categories I, II, and III. | 200 | EA | ||
| B700N | Trees/shrubs Planting, Height up to 100 cm | Trees/Shrub price will be used ELIN 700P. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked properly. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be accomplished by or under the guidance of a certified arborist. | 200 | EA | ||
| B700P | Trees/Shrubs Price | ELIN 700N will be applied for planting of tree (s)/shrub (s) and garden material. Tree and shrub shall have fine, balancing roots and well balanced branches, and shall be healthy and free from diseases and insects. The Government will use price of tree and shrub listed on latest Japanese standard price data book, "Kensetsu Bukka" or "Sekisan Shiryo" or "Sekisan Poketto Gaikou-hen". Unit price of this ELIN for each tree or shrub shall be calculated multiplying "Price of tree or shrub listed on that" by "Fixed Burden Rate (FBR) proposed by the Contractor". Unit price shall include material cost, its one year guarantee cost, transportation cost and other all costs necessary to providing tree or shrub at planting site. | 5,000,000 | Yen | ||
| FBR(*1) | ||||||
| B700Q | Unit Priced Labor Work for Certified Arborist (during Regular Working Hours) - MUST BE NEGOTIATED BY KO | Provide labor (during regular working hours) to perform tree/ground maintenance work by certified arborist Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 200 | HR | ||
| B700R | Unit Priced Labor Work for Certified Arborist (during Outside Regular Working Hours) - MUST BE NEGOTIATED BY KO | Provide labor (during outside regular working hours) to perform tree/ground maintenance work by ground maintenance worker Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | ||||
| 50 | HR | |||||
| B700S | Unit Priced Labor Work for Ground Maintenance Worker (during Regular Working Hours) - MUST BE NEGOTIATED BY KO | Provide labor (during regular working hours) to perform tree/ground maintenance work by ground maintenance Worker Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | ||||
| 1,000 | HR | |||||
| B700T | Unit Priced Labor Work for Ground Maintenance Worker (during Outside Regular Working Hours) - MUST BE NEGOTIATED BY KO | Provide labor (during outside regular working hours) to perform tree/ground maintenance work by ground maintenance worker Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | ||||
| 50 | HR | |||||
| B700U | Material Costs | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 5,000,000 | Yen | ||
| FBR(*1) | ||||||
| B701 | Other Related Grounds Maintenance and Landscaping Services (*2) | |||||
| B701A | Aerial work vehicle 30 |
meters class, non-folding
| type with operator service | Provide equipment service shall be; Truck mounted, basket capacity:200 kg of two people, 30 meters maximum bottom height, gasoline/diesel engine drive, 4 × 2, telescopic boom type, include eight hours on-site operator service within regular working hours per a day for related service of grounds maintenance. This item shall be issued with ELIN 700J, 700K, 700L, and 700M. | 5 | DAY |
| B701B | Aerial work vehicle 50 |
meters class, non-folding
| type with operator service | Provide equipment service shall be; Truck mounted, minimum capacity platform (Basket) 200 kg, telescopic boom, operator control on platform, working radius (Height) maximum - at least 50 meters, wheel mounted, gasoline/diesel engine driven, include eight hours on-site operator service within regular working hours per a day for related service of grounds maintenance. This item shall be issued with ELIN 700J, 700K, 700L, and 700M. | 5 | DAY |
| B701C | Rough-terrain crane, rated |
lifting capacity up to 70 ton
| class with operator service | Provide rough-terrain crane service shall be; Rated lifting capacity up to 70 ton class, maximum height approx. 43 meters, full revolving telescoping boom, pneumatic tires, and diesel engine driven. In addition, equipment and its operator shall meet the requirements specified in spec item 2.3, include eight hours on-site operator service within regular working hours per a day, and one round trip delivery between the designated site and the Contractor’s premise for related service of grounds maintenance. This item shall be issued with ELIN 700J, 700K, 700L, and 700M. | 5 | DAY | |
| B701D | Backhoe, 0.30 CM class | |||
| with operator service | Provide backhoe service shall be; Crawler type, rubber/steel caterpillar, diesel/gasoline engine driven, with additional hydraulic impact hammer/fork. Bucket capacity: up to 0.30 cubic meter, include eight hours on-site operator service within regular working hours per a day for related service of grounds maintenance. This item shall be issued with ELIN 700 items | 3 | DAY | |
| TOTAL NON-RECURRING WORK PRICE FIRST OPTION PERIOD | ||||
| Markup for ELIN 700J, 700K, 700, and 700M (*3) % | % |
Note: SM = Square Meter, EA= Each, LM= Liner Meter
| *1 : Fixed Burden Rate (FBR): FBR is an adjustment to the material cost to allow for all associated costs including but not limited to | |
| ordering, handling, stockpiling, overhead, and profits. Only FBR will be used for these associated costs. | |
| Example : Proposed Material cost is ¥120,000, the offeror's FBR for material is 20% | |
| ¥120,000 x 20% = ¥ 144,000 is applied as Material Cost |
* 2: ELIN 701 shall be issued with ELIN700. Not issued a single element
| * 3: Markup: Markup will be applied to ELIN 700J, 700K, 700L, and 700M. | |
| Example : If ELIN 700L is under operation area, pre-price is ¥50,000, and Markup is 30%, then, ¥50,000 x 1.3 = ¥65,000 |
ELINs-2nd-Rec
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT C - CLIN 9003 |
| Line Item 0006 Recurring Work Price - Second Option | |||||
| PROVIDE PRICES TO PERFORM GROUNDS MAINTENANCE AND LANDSCAPING SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs C001 through C010 | |||||
| ELIN/Sub ELIN | Description | QTY | Unit of Issue | Unit Price | Total |
| C001 - NAF ATSUGI CNIC FX FUND (Region) - 1503050 Grounds Maintenance and Landscaping | ||||
| Services for CNIC FX Fund Prestige areas/acreage provided in the Site Maps provided in J-1503050-08, -12-and -14 performed as specified for Prestige Areas per the Service Level Standards listed in J-1503050-11. | ||||
| C001 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
| C001 | AB | Tree Maintenance (Spec Item 3.1.4) | 1 | LS |
| C001 | AC | Ornament Tree (Spec Item 3.1.4.1) | 1 | LS |
| C001 | AD | Vegetation Control (Spec Item 3.1.5) | 1 | LS |
| C002 - NAF ATSUGI CNIC FX FUND (Standard) - 1503050 Grounds Maintenance and Landscaping | ||||
| Services for CNIC FX Fund Standard Grounds areas/acreage other than those specified as Prestige in the Site Maps provided in J-1503050-08 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-11. | ||||
| C002 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
| C002 | AD | Vegetation Control (Spec Item 3.1.5) | 1 | LS |
| C003 - NAF ATSUGI CNIC FX FUND (Operational) - 1503050 Grounds Maintenance and Landscaping | ||||
| Services for CNIC FX Fund Operational Grounds areas/acreage other than those specified as Prestige and Standard in the Site Maps provided in J-1503050-08 and -15 performed as specified for the Operational grounds per the Service Level Standards listed in J-1503050-11. | ||||
| C003 | AE | Ammunition Storage Areas (Spec Item 3.2.1) | 1 | LS |
| C003 | AF | Anti-Terrorism Force Protection (ATFP) (Spec Item 3.2.2) | 1 | LS |
| C003 | AG | Fire Lanes and Breaks (Spec Item 3.2.3) | 1 | LS |
| C003 | AH | Road and Right of Ways (Spec Item 3.2.4) | 1 | LS |
NAF ATSUGI CNIC FX FUND Subtotal
| C004 - SUPPORTED COMMNAD HOUSING SERVICE CENTER (HSC) Level I | ||||
| Services for HSC Level I areas/acreage provided in the Site Maps provided in J-1503050-08 performed as specified for Supported Command Level I per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| C004 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
| C004 | AD | Vegetation Control (Spec Item 3.1.5) | 1 | LS |
| C005 - SUPPORTED COMMNAD HOUSING SERVICE CENTER (HSC) Level III | ||||
| Services for Level III areas/acreage provided in the Site Maps provided in J-1503050-08 performed as specified for Supported Command Level III per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| C005 | AA | Lawn and Field Maintenance (Spec Item 3.1.1) | 1 | LS |
| C006 - SUPPORTED COMMNAD HOUSING SERVICE CENTER (HSC) Category I | ||||
| Services for Category I areas/acreage provided in the Site Maps provided in J-1503050-12 performed as specified for Supported Command Category I per the Supported Commands Fund Grounds Service Level Standards in J-1503050-11. | ||||
| C006 | AB | Tree Maintenance (Spec Item 3.1.4) | 1 | LS |
| C006 | AJ | Plant and Plant Bed Maintenance (Spec Item 3.1.2) | 1 | LS |
| C006 | AK | Shrub and Hedge Maintenance (Spec Item 3.1.3) | 1 | LS |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .