A. 837 Drainage Dip Maintenance.pdf

PDF 253 KB Posted

Attached to
Carson National Forest- Road 44B Maintenance
Solicitation number
12363N23Q4010
Issued by

View the file

Other files

File Type Posted
12363N23Q4010-amendment2.pdf PDF
Picture3.png PNG image
12363N23Q4010-amendmentextension.pdf PDF
Picture2.png PNG image
Picture5.png PNG image
Picture1.png PNG image
Picture4.png PNG image
12363N23Q4010-Amendment1.pdf PDF
A. 837-1 Drainage Dip Maintenance.pdf PDF
A. 834 Drainage Structure Maintenance.pdf PDF
A. 839-Restore Drainage Function.pdf PDF
E. WageDetermination.pdf PDF
12363N23Q4010 (1).pdf PDF
B. Fire Plan.pdf PDF
A. 805 Mobilization.pdf PDF
D. CAF NFSR 44B MAP 2022.pdf PDF
A. 807 Equipment Rental.pdf PDF
C. CAF NFSR 44B WORK LOCATION SPREADSHEET.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

837 DRAINAGE DIP MAINTENANCE (10/16)

1. DESCRIPTION

This work consists of separately ordered maintenance of existing drainage dips and special outlet structures on all types of roads. Included in this are rolling dips on native, aggregate, and paved roads.

2. MATERIALS

Materials used in maintenance shall conform to the requirements of the applicable Sections for the materials within the structure.

3. MAINTENANCE REQUIREMENTS

a. Special outlet structures such as aprons, culverts, and flumes shall be removed if necessary prior to maintaining the drainage dip, or the finished dip shall be oriented to the structure for alignment and gradient.

b. Hand work may be necessary to obtain a smooth surface and uniform cross section. Any special outlet structure removed shall be reinstalled to the flow line grade established by the completed drainage dip. The first six (6) feet of any lead-off ditch or channel shall be cleaned incidental to this Section.

c. Native material drainage dips shall be shaped to reasonably conform with the lines, grades, and cross sections shown in Drawing 837-1 or staked on the ground. Removed materials shall be distributed uniformly over the downgrade road surface adjacent to the dip. Rocks shall not project more than two (2) inches above the final surface.

d. Aggregate or rock surfaced drainage dips shall be cleaned. When the Government determines the drainage dip requires shaping to conform to Drawing 837-1, existing surfacing materials shall be conserved for reuse upon completion of shaping. Conserved surfacing shall be placed and compacted with equipment prior to reinstalling any special outlet structures. Watering when required, will be in accordance with Section 891. Additional surfacing, if required, will be ordered under Section 813.

e. Bituminous surfaced drainage dips shall be cleaned.

4. MEASUREMENT

Measurement of drainage dips maintained will be the number of units of each type completed and accepted.

5. PAYMENT

a. The quantities will be paid for at the contract unit price as shown in the Schedule of Items.

b. Payment will be made under:

Pay Item Description Pay Unit

837 (1) Clean and Shape Drainage Dip, Native Surface Each

837 (2) Clean Drainage Dip, Aggregate Surface Each

837 (3) Reshape Drainage Dip, Aggregate Each

837 (4) Clean Bituminous Drainage Dips Each