A. 807 Equipment Rental.pdf
PDF 261 KB Posted
- Attached to
- Carson National Forest- Road 44B Maintenance
- Solicitation number
- 12363N23Q4010
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12363N23Q4010-amendment2.pdf | ||
| Picture3.png | PNG image | |
| 12363N23Q4010-amendmentextension.pdf | ||
| Picture2.png | PNG image | |
| Picture5.png | PNG image | |
| Picture1.png | PNG image | |
| Picture4.png | PNG image | |
| 12363N23Q4010-Amendment1.pdf | ||
| A. 837-1 Drainage Dip Maintenance.pdf | ||
| A. 834 Drainage Structure Maintenance.pdf | ||
| A. 839-Restore Drainage Function.pdf | ||
| E. WageDetermination.pdf | ||
| 12363N23Q4010 (1).pdf | ||
| A. 837 Drainage Dip Maintenance.pdf | ||
| B. Fire Plan.pdf | ||
| A. 805 Mobilization.pdf | ||
| D. CAF NFSR 44B MAP 2022.pdf | ||
| C. CAF NFSR 44B WORK LOCATION SPREADSHEET.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
807 EQUIPMENT RENTAL (10/16)
1. DESCRIPTION
This Section establishes the basis for the Government to equipment with operators to accomplish road maintenance work.
2. PERFORMANCE STANDARD
Make equipment available for inspection and approval before use.
3. LOCATION OF WORK
As specified on roads listed on the task orders, shown on the plans, or as ordered by the Contracting Officer.
4. ACCEPTABLE QUALITY LEVELS
a. Equipment shall be weed free before used on National Forest System Lands, see contract section H Control of Noxious Weeds-Cleaning of Equipment.
b. Equipment shall be well maintained, free of leaks, capable of operating at least 90% of the time, and meet all state and federal regulations.
c. Equipment under this Section, shall be provided fully operated by the Contractor and includes subcontractor equipment performing work under the contract. The equipment shall be operated by a fully trained, qualified, and competent operator at all times.
5. HOURS OF OPERATION
Hours of operation shall be the same as for the Contractor's regular work shift, unless otherwise directed in writing by the Government.
6. MEASUREMENTS
a. The accepted quantities will be paid at the established hourly rate, rounded to the nearest half (1/2) hour, that the equipment is in operation.
b. Non-operable equipment or equipment dependent on another piece of non-operable equipment will not be paid for.
c. Hours of operation shall be the same as fo unless otherwise directed in writing by the Contracting Officer.
d. Moving of equipment will be paid at the established hourly rate. Pay item for Mobilization may be used if additional transport is shown in the task order.
7. PAYMENT
a. The quantities measured and accepted will be paid for at the contract unit price shown in the Schedule of Items.
b. Payment will be made under:
Pay Item Description Pay Unit
807 (1) Excavator with Operator, in one or more of the following classes:
121-160 FWHP Hour
161-200 FWHP Hour
201-280 FWHP Hour
807 (2) Backhoe with Operator Hour
807 (3) Grader with Operator Hour
807 (4) Crawler Tractor (Dozer) with Operator, in one or more of the following classes:
80-120 FWHP Hour
121-180 FWHP Hour
181-269 FWHP Hour
807 (5) Dump Truck with Operator Hour
807 (6) Brush Cutter with Operator Hour
807 (7) Roller with Operator Hour
807 (8) Trailer Hour
807 (9) Laborer Hour
File details come from the government source that posted it. Updated .