A. 805 Mobilization.pdf

PDF 12 KB Posted

Attached to
Carson National Forest- Road 44B Maintenance
Solicitation number
12363N23Q4010
Issued by

View the file

Other files

File Type Posted
12363N23Q4010-amendment2.pdf PDF
Picture3.png PNG image
12363N23Q4010-amendmentextension.pdf PDF
Picture2.png PNG image
Picture5.png PNG image
Picture1.png PNG image
Picture4.png PNG image
12363N23Q4010-Amendment1.pdf PDF
A. 837-1 Drainage Dip Maintenance.pdf PDF
A. 834 Drainage Structure Maintenance.pdf PDF
A. 839-Restore Drainage Function.pdf PDF
E. WageDetermination.pdf PDF
12363N23Q4010 (1).pdf PDF
A. 837 Drainage Dip Maintenance.pdf PDF
B. Fire Plan.pdf PDF
D. CAF NFSR 44B MAP 2022.pdf PDF
A. 807 Equipment Rental.pdf PDF
C. CAF NFSR 44B WORK LOCATION SPREADSHEET.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

805 MOBILIZATION / EQUIPMENT MOVING (10/16)

1. DESCRIPTION

This Section consists of one or more mobilizations of personnel, equipment, supplies, and incidentals to the project site, or sites listed in the Schedule of Items.

2. REQUIREMENT

a. Make equipment available for inspection before it is used on National Forest System lands.

b. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.

c. Equipment will be clean and weed free before it arrives on National Forest System lands.

3. LOCATION OF WORK

As specified on roads listed on the Road Listing, Shown on the Plans, or as ordered by the

Contracting Officer.

4. MEASUREMENT

Measurement under this Section will be made by the total number of units for each item listed in the Schedule of Items completed and accepted.

Mile: work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of the move, to the ordered work site.

5. PAYMENT

a. The accepted quantities will be paid at the contract price per unit of measurement for the

Section 805 pay items listed in the schedule of items. Mobilization is complete when all equipment, personnel, and materials are moved to the project site and work has been started. Payment will be full compensation for the work prescribed in this Section.

Mobilization is incidental unless ordered for a specific project at a specific time.

b. Payment will be made under:

Pay Item Description Pay Unit

805 (1) Mobilization Mile