A.2.11.3 W9128A21B0003 Drawings.pdf
PDF 26 MB Posted
- Solicitation number
- W9128A21B0003
About this file
This document announces a federal solicitation for construction services. The U.S. Army Corps of Engineers, Honolulu District is seeking bids to remove and replace the existing vapor recovery system, underground storage tanks, and piping at a gas station facility on Aliamanu Military Reservation in Oahu, Hawaii. The project involves demolishing three underground storage tanks and replacing them with new identical tanks in the same location, as well as installing new dispenser pumps, control wiring, and conduits. The estimated period of performance is 300 calendar days for a project valued between $1 million and $5 million. A site visit is scheduled for June 24, 2021 for interested bidders. The North American Industry Classification code is 236220 for commercial and institutional building construction, with a small business size standard of $39.5 million average annual revenue. The government intends to award a fixed-price construction contract and will solicit bids as a small business set-aside. The solicitation documents will be issued via an invitation for bid posted on SAM.gov.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C T
N
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
DESIGN COMPLETE
J U
E
W A
D
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
H O
N O
L U
L U
D
I S
T R
I C
T
F O
R
H A
F T
E R
O
A H
U
H
A W
A I I
F Y
R
E P
A
A
P
L A
V
P
C
O V
E R
Y
S Y
S T
E M
U
N D
E R
G R
O U
O
R A
G
N
K S
A
N D
P I P
I N
G
A
T
G
A
T I O
N
A
M
O
A H
U
H
A W
A I I
PROJECT
LOCATION
FY20 REPAIR AND REPLACE VAPOR RECOVERY SYSTEM,
UNDERGROUND STORAGE TANKS AND PIPING AT GAS
STATION AMR 880
VICINITY PLANPROJECT LOCATION MAP
US Army Corps of Engineers
ALIAMANU MILITARY RESERVATION
OAHU, HAWAII
DESIGN COMPLETE
JUNE 2021
ALIAMANU
MILITARY
RESERVATION
TASK ORDER No. W9128A-20-F-0028
CONTRACT No. W9128A-18-D-0001
BOUGAINV
ILLEA LP.
PLAN NORTH PLAN NORTH
G-001
C O
V E
R
S
H E
E T
D
M
U N
N E
L L
J
J A
C O
B I
D
M
U N
N E
L L
M
F
U R
R
F Y
A
M R
G
D
W
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
DESIGN COMPLETE
J U
W A
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I C
T
F O
A
F T
E R
O
A H
U
H
A W
A I I
F Y
R
E P
A
P
L A
P
C
O V
E R
Y
S Y
S T
E M
U
N D
E R
G R
O U
O
R A
N
K S
A
N D
P I P
I N
G
A
T
G
A
T I O
N
A
O
A H
U
H
A W
A I I
DRAWING INDEX
Sheet Number Sheet Title
GENERAL
G-001 COVER SHEET
G-002 DRAWING INDEX
G-003
GENERAL NOTES, ABBREVIATIONS AND LEGENDS
G-004 CONSTRUCTION AND ENVIRONMENTAL NOTES
G-005 CONSTRUCTION AND ENVIRONMENTAL NOTES
G-006 CONTRACTOR ACCESS ROUTE
G-007 PHOTOS
CIVIL
C-101 EXISTING CONDITIONS PLAN
C-102 DEMOLITION PLAN
C-103 OVERALL SITE PLAN
C-401 ENLARGED SITE PLAN
C-402 JOINT LAYOUT AND HORIZONTAL CONTROL
C-403 GRADING PLAN
C-501 DEMOLITION DETAILS
C-502 PAVEMENT DETAILS
C-503 MISCELLANEOUS DETAILS
C-504 EROSION CONTROL DETAILS
MECHANICAL
M-001
GENERAL NOTES, LEGEND, SCHEDULES AND ABBREVIATIONS
M-101 FUELING SYSTEM OVERALL SITE LAYOUT PLAN
M-301 FUEL STORAGE TANK ELEVATIONS
M-401 TANKS PIPING LAYOUT PLANS
M-501
MECHANICAL FUELING SYSTEM DETAILS (1 OF 2)
M-502
MECHANICAL FUELING SYSTEM DETAILS (2 OF 2)
M-601 FUEL SYSTEM FLOW DIAGRAM
M-602 FUEL SYSTEM PIPING PLAN AND ISOMETRIC
M-603 FUELING EQUIPMENT SCHEDULE
ELECTRICAL
E-001 ELECTRICAL LEGEND AND ABBREVIATIONS
E-101 HAZARD AREA PLAN AND DETAILS
E-102 ENLARGED FUELING AREA SITE PLAN
E-103 SHOPPETTE ELECTRICAL MODIFICATION PLAN
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-601 CONDUIT AND CABLE SCHEMATICS
E-602 ENVIRONMENTAL MONITORING SCHEMATICS
E-603
PANEL SCHEDULE, ELEVATION AND REQUIREMENTS
G-002
D R
A W
I N
G
I N
D E
X
D
M
U N
N E
L L
J
J A
C O
B I
D
M
U N
N E
L L
M
F
U R
R
F Y
A
M R
G
D
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
DESIGN COMPLETE
J U
W A
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I C
T
F O
A
F T
E R
O
A H
U
H
A W
A I I
F Y
R
E P
A
P
L A
P
C
O V
E R
Y
S Y
S T
E M
U
N D
E R
G R
O U
O
R A
N
K S
A
N D
P I P
I N
G
A
T
G
A
T I O
N
A
O
A H
U
H
A W
A I I
REINFORCED CONCRETE PIPE
UNITED STATES COASTAL AND
SANITARY SEWER MANHOLE
UNDERGROUND ELECTRICAL LINE
STATION
YARD INLET
TEL
VERTICAL CURVE
GEOLOGICAL SURVEY
UNDERGROUND
WELDED WIRE FABRIC
SQUARE YARD
TIE DOWN
TEMPORARY BENCH MARK
TOP OF CURB
TOP OF GRATE
TOP OF COVER
TYPICAL
SANITARY SEWER
STORM DRAIN
FINISHED FLOOR ELEVATIONFFEL
DIA
EFSO
EHH
Ø
COR
CONC
DI
CMP
CC
DIAMETER
EMERGENCY FUEL SHUTOFF
ELECTRICAL HANDHOLE
DIAMETER
CENTER TO CENTER
CORRUGATED METAL PIPE
CONCRETE
DROP INLET
CORNER
BOP
A/G
BOTTOM OF PIPE
ABOVEGROUND
TBM
HORIZONTALHORZ.
R
LOW POINT DRAIN PIT
HIGH POINT VENT PIT
LATERAL CONTROL PIT
LOW POINT DRAIN
HIGH POINT VENT
INVERT ELEVATION
INVERTINV
LPD
LPDP
LT
M
LCP
KL
LEFT
KILOLITER
HW
IN
IE
HPVP
HPV
HEADWALL
INCH
PRC
PVC
PVI
PVT
PSI
PT
PRT
PCCP
PI
PIV
PC
OFF
RADIUS
POINT OF VERTICAL INTERSECTION
POINT OF VERTICAL TANGENCY
POINT OF REVERSE CURVE
POINT OF VERTICAL CURVE
POINT OF TANGENCY
POUND PER SQUARE INCH
PRODUCT RECOVERY TANK
POINT OF INTERSECTION
PORTLAND CEMENT
POINT OF CURVATURE
POST INDICATOR VALVE
CONCRETE PAVEMENT
OFFSET
U/G
VC
WWF
W
YI
WATER
TYP
T/C
T/G
TOC
UE
TD
GLOBAL POSITIONING SYSTEM
FIBERGLASS REINFORCED PIPE
FINISHED GRADE ELEVATION
FIBER OPTICS CABLE
FIRE HYDRANT
FRP
GPS
FH
FOC
FG
NTS
OA
OC
MIN
NO.
MAX
ABBREVIATIONS
NOT TO SCALE
OUTLET APRON
ON CENTER
MINIMUM
NUMBER
MAXIMUM
STA
RCP
SSMH
SS
SY
RT
SD
RD
RIGHT
ROAD
GENERAL NOTES
ELECTRICAL LINE
OVERHEAD
U/G FUEL LINE
MAJOR CONTOUR
SPOT ELEVATION
SECURITY FENCE
ELECTRIC SERVICE
BOX
BOLLARD
POWER POLE WITH
COMMUNICATIONS BOX
GUY WIRE
FIRE HYDRANT
EMERGENCY SHUT-
OFF CABLE
U/G ELECTRIC
SERVICE
ES
E
SIGNAGE
POWER POLE
VALVES
NEWEXISTING
LEGEND
.0 x
.5 x 15.5
.0
OCCUPATIONAL SAFETY &
INSIDE DIAMETER
HEALTH ADMINISTRATION
EL
EMH ELECTRICAL MANHOLE
ELEVATION
MW
OSHA
ID
MH
MANWAY
METER
MANHOLE
USCS
WV
&GS
WATER VALVE
COE CORPS OF ENGINEERS
TELEPHONE
YARD HYDRANTYH
STAINLESS STEELSS
B BOLLARD
ENLARGED VIEW
LIMIT LINE
LIGHT POLELP
1/32"=1'-0"
20'0' 100'40' 60' 80' 120'
NORTH ARROW
DRAWING SCALE INDICATOR
DETAIL CALLOUT INDICATOR
EXTERIOR ELEVATIONS INDICATOR
WALL SECTION INDICATOR
BUILDING SECTION INDICATOR
DRAWING TITLE INDICATOR
SHEET DETAIL IS LOCATED ON
DETAIL NUMBER
DIRECTION OF CUTTING PLANE
SHEET DETAIL IS LOCATED ON
DETAIL NUMBER
SHEET DETAIL IS LOCATED ON
DIRECTION OF CUTTING PLANE
DETAIL NUMBER
LIMIT OF CUTTING PLANE
LINE OF CUTTING PLANE
SHEET DETAIL IS LOCATED ON
DIRECTION OF CUTTING PLANE
DETAIL NUMBER
LINE OF CUTTING PLANE
DRAWING VIEW NUMBER
DRAWING VIEW SCALE
DRAWING VIEW TITLE
1. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL AND FEDERAL REGULATIONS THAT ARE PERTINENT TO THIS WORK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN AND PAY
ALL COSTS ASSOCIATED WITH PERMITS, INSURANCE AND LICENSES REQUIRED TO ACCOMPLISH THIS WORK.
2. ANY DAMAGE TO THE EXISTING ROADWAYS, FACILITIES OR IMPROVEMENTS CAUSED BY THE CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS, OR EQUIPMENT DURING CONSTRUCTION SHALL
BE REPAIRED AT THE SOLE EXPENSE OF THE CONTRACTOR. PHOTOS OF EXISTING CONDITIONS SHALL BE GIVEN TO THE CONTRACTING OFFICER PRIOR TO COMMENCING WORK. WORK
AROUND EXISTING UTILITIES SHALL BE PERFORMED IN A MANNER THAT WILL AVOID DAMAGE AND/OR INTERRUPTION TO THE UTILITIES. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
3. THE CONTRACTOR SHALL ENSURE THAT ANY EQUIPMENT USED TO COMMUNICATE WITH THEIR WORK FORCES DOES NOT INTERFERE WITH ANY BASE FACILITIES OR OPERATIONS.
4. NO OPEN BURNING IS PERMITTED ON THE PROJECT SITE.
5. THE CONTRACTOR SHALL CONFINE HIS EMPLOYEES, SUBCONTRACTORS AND EQUIPMENT TO THE PROJECT WORK AREA. HAUL TRUCKS MUST BE COVERED AND ANY SPILLAGE OF DEBRIS MUST
BE PROMPTLY REMOVED.
6. SMOKING, MATCHES OR LIGHTERS ARE NOT ALLOWED WITHIN THE PROJECT SITE. THE CONTRACTOR WILL POST SIGNS WITH THIS INFORMATION.
7. ALL CONSTRUCTION ACCESS IS THROUGH THE GATE AND ALONG THE ROADS AS SHOWN. AT NO TIME WILL THE CONTRACTOR'S EMPLOYEES OR EQUIPMENT BE ALLOWED ON OTHER ROUTES
OR IN AREAS OTHER THAN THE PROJECT AREA WITHOUT PRIOR CLEARANCE WITH THE CONTRACTING OFFICER. HAUL TRUCKS MUST BE COVERED AND ANY SPILLAGE OF DEBRIS MUST BE
PROMPTLY REMOVED.
8. THE CONTRACTOR WILL CONTROL DUST, WASTE AND DEBRIS RESULTING FROM HIS OPERATIONS AT ALL TIMES. THE CONTRACTOR WILL HAVE THE MEANS TO CLEAN AND REMOVE ANY DEBRIS
OR EARTH MATERIAL DROPPED ON ANY ROADWAY AT ALL TIMES. FAILURE TO PROPERLY REMOVE ANY SPILLED MATERIAL MAY RESULT IN THE STOPPING OF THE CONSTRUCTION ACTIVITY
UNTIL THE SITUATION IS CORRECTED.
9. SUB-SURFACE INFORMATION HAS BEEN OBTAINED FROM AS-BUILTS.
10. THE INFORMATION SHOWN ON THE DRAWING CONCERNING TYPE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL-INCLUSIVE. THE CONTRACTOR IS
RESPONSIBLE FOR MAKING HIS OWN INVESTIGATIONS AS TO THE TYPE AND LOCATION OF UNDERGROUND UTILITIES AS MAY BE NECESSARY TO AVOID ANY DAMAGE. THE CONTRACTOR WILL
WALK ALL AREAS WITH A UTILITY LOCATOR AND MARK LOCATIONS OF ALL UNDERGROUND UTILITIES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. UTILITY PROVIDERS WILL
BE NOTIFIED AND SHALL HAVE THE OPTION TO ACCOMPANY THIS FIELD INVESTIGATION. EXPLORATORY EXCAVATIONS IN THE VICINITY OF EXISTING UNDERGROUND UTILITIES WILL BE CARRIED
OUT WITH HAND TOOLS UNTIL THE EXACT CHARACTER AND LOCATION OF SUCH FACILITIES ARE DETERMINED.
11. DISTURBED AREA IS 0.10 ACRES ±.
12. EXACT LIMITS OF STAGING AREAS WILL BE DETERMINED BY THE CONTRACTING OFFICER. UPON COMPLETION OF THE WORK, THE STAGING AREAS WILL BE CLEANED AND RESTORED TO ITS
ORIGINAL CONDITION.
13. THE USE OF CRANES WILL BE COORDINATED THROUGH THE CONTRACTING OFFICER.
14. THE GENERAL CONTRACTOR AND SUBCONTRACTORS WILL BE REQUIRED TO COMPLY WITH OSHA 29 CFR 1910.46 PERMIT WHICH IS REQUIRED FOR CONFINED SPACES BEFORE PROCEEDING
WITH A CONFINED SPACE ENTRY. THE CONTRACTOR WILL SUBMIT A CONFINED SPACE PLAN TO THE CONTRACTING OFFICER FOR APPROVAL.
15. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER PRIOR TO COMMENCING OPEN TRENCH EXCAVATION TO A DEPTH OF FOUR (4) FEET OR MORE. ALL EXCAVATIONS, TRENCHES, OPEN MANHOLES, ETC. WILL BE PROPERLY SHORED, BRACED, BARRICADED OR GUARDED IN ACCORDANCE WITH THE PROVISIONS OF TITLE 29 CODE OF FEDERAL REGULATION, PARTS 1926, “CONSTRUCTION SAFETY AND HEALTH STANDARDS”. WARNING LIGHTS OR OTHER ILLUMINATION MAINTAINED FROM SUNSET TO SUN UP SHALL BE PLACED AT ALL EXCAVATIONS WHICH ARE
ADJACENT TO PEDESTRIAN OR VEHICLE THOROUGHFARES. ADEQUATE PHYSICAL PROTECTION WILL BE PROVIDED AT ALL REMOTELY LOCATED EXCAVATIONS.
16. PETROLEUM CONTAMINATED SOILS MAY BE ENCOUNTERED DURING EXCAVATIONS. IMMEDIATELY NOTIFY THE CONTRACTING OFFICER. DO NOT DISTURB THIS MATERIAL UNTIL AUTHORIZED BY
THE CONTRACTING OFFICER. SEE SPECIFICATION SECTION 02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL.
17. THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES WHETHER SHOWN ON THE PLANS OR NOT. BEFORE DISRUPTING SERVICE (OUTAGE) TO ANY UTILITY (WATER OR ELECTRICAL), THE
CONTRACTOR SHALL PROVIDE A MINIMUM OF FORTY-FIVE DAY WRITTEN NOTICE TO THE CONTRACTING OFFICER. ALL UTILITY OUTAGES MUST BE APPROVED BY THE CONTRACTING OFFICER.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TOURING THE PROJECT AREA PRIOR TO AND DURING EXCAVATIONS TO LOCATE EXISTING UTILITIES.
19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING FIELD CONDITIONS OF EXISTING UTILITIES PRIOR TO TRENCHING.
20. THE CONTRACTOR SHALL MINIMIZE DISTURBANCES TO PARKING AREAS, WALKWAYS, AND ROADWAYS.
21. THE CONTRACTOR SHALL PROVIDE TEMPORARY FENCING AROUND CONSTRUCTION OPERATIONS TO ENSURE THE SAFETY OF PERSONNEL. AT THE END OF THE WORKING DAY THE FENCING
SHALL REMAIN AROUND THE WORK AREA.
22. THE CONTRACTOR SHALL PROTECT TREES AND SHRUBS, AND MAKE PROVISIONS TO RESTORE AND/OR REPLACE DAMAGED TREES AT HIS OWN EXPENSE.
23. TAKE REASONABLE PRECAUTIONS TO MINIMIZE FUGITIVE DUST GENERATED FROM CONSTRUCTION ACTIVITIES. PLEASE SEE HAWAII ADMINISTRATIVE RULES 11-60.1-33, "FUGITIVE DUST" FOR A
DESCRIPTION OF REASONABLE PRECAUTIONS: HTTP://HEALTH.HAWAII.GOV/OPPPD/FILES/2015/06/11-60.1.PDF.
24. THE SHOPPETTE STORE WILL REMAIN IN CONTINUOUS NORMAL OPERATION DURING CONSTRUCTION (M-F 0700-2200, S-S 0900-2100). WORK IN THE STORE WILL NEED TO BE COORDINATED WITH
STORE MANAGER DUE TO NOISE, DUST AND OTHER CONSTRUCTION CONCERNS.
UNDERGROUND GAS LINE
BENCHMARK
STORM STRUCTURESTR
STORM DRAIN LINESTM LINE
DRAWING TARGET LEGEND
NEWEXISTING
JERSEY BARRIERS
MINOR CONTOUR
.5
.5
ASPHALT PAVEMENT
PHOTO LOCATION
A1
ASPHALT PAVEMENT
DEMOLITION
CONCRETE PAVEMENT
DEMOLITION
ASPHALT OVERLAY ON
CONCRETE PAVEMENT
DEMOLITION
REINFORCED CONCRETE
PAVEMENT
GRASSED AREA
PLAN NORTH
G-003
N
E R
T
E S
A
B B
R E
V I A
T I O
N S
A N
D
L
E G
E N
D S
D
M
U N
N E
L L
J
J A
C O
B I
D
M
U N
N E
L L
M
F
U R
R
F Y
A
M R
G
D
W G
6/15/2021
NO. 23905
PROFESSIONAL
R
E
G
I S
T E
R
E
D
E
N
G
I N E
E
R
D
O
U
G
L
A
S
G
E
O
R G
I
A
M
U
N
N
E
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
DESIGN COMPLETE
J U
W A
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I C
T
F O
A
F T
E R
O
A H
U
H
A W
A I I
F Y
R
E P
A
P
L A
P
C
O V
E R
Y
S Y
S T
E M
U
N D
E R
G R
O U
O
R A
N
K S
A
N D
P I P
I N
G
A
T
G
A
T I O
N
A
O
A H
U
H
A W
A I I
CONSTRUCTION NOTES
1. THE CONTRACTOR SHALL COORDINATE ALL PHASES OF WORK WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
2. ALL WORK SHALL BE PERFORMED BETWEEN THE HOURS OF 0800 TO 1630, MONDAY THROUGH FRIDAY.
3. ALL CONSTRUCTION ACTIVITIES SHALL BE WITHIN PROJECT LIMITS.
4. THE CONTRACTOR SHALL KEEP THE AREA CLEAN AND CLEAR OF DIRT AND DUST.
PETROLEUM CONTAMINATED SOILS NOTES
1. CONTAMINATED SOIL SHALL BE SEGREGATED AND STOCKPILED IN A STORAGE CONTAINMENT AREA DESIGNATED BY THE CONTRACTING OFFICER AND CONSTRUCTED BY THE
CONTRACTOR. CONTAMINATED SOIL SHALL BE STOCKPILED AS SPECIFIED. THE CONTRACTOR SHALL TAKE PRECAUTIONS TO ENSURE THAT STORM WATER DOES NOT MIX WITH
CONTAMINATED SOILS IN THE STORAGE CONTAINMENT AREA. THE CONTRACTOR SHALL ENSURE THAT, IN THE EVENT THAT STORM WATER MIXES WITH THE CONTAMINATED
SOILS IN THE STORAGE CONTAINMENT AREA, THE STORM WATER IS NOT DISCHARGED INTO STATE WATERS. FOR THE PURPOSES OF BIDDING, IT IS ESTIMATED THAT 5 TONS OF
NONHAZARDOUS PETROLEUM CONTAMINATED SOILS WILL REQUIRE REMOVAL.
2. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER WITHIN ONE HOUR OF THE DISCOVERY OF CONTAMINATED MATERIALS.
3. SOIL EXCAVATION:
A. THE CONTRACTOR SHALL PLACE CONTAMINATED SOIL FROM THE EXCAVATION INTO SEPARATE HOLDING CELLS AS SPECIFIED.
B. EXCAVATION SHALL BE DONE UNDER THE SUPERVISION OF THE CONTRACTING OFFICER OR AUTHORIZED REPRESENTATIVE.
C. CONTAMINATED SOILS SHALL BE PLACED ON HIGH-DENSITY POLYETHYLENE SHEETING.
4. SOIL TRANSPORTATION/DISPOSAL:
A. THE BED OF THE TRUCK USED FOR TRANSPORTING SOIL SHALL BE CLEAN AND CAPABLE OF HOLDING THE SOIL WITHOUT SPILLAGE OR LEAKAGE.
B. THE CONTRACTOR SHALL EMPLOY A PLACEMENT METHOD THAT DOES NOT DISTURB OR DAMAGE THE POLYETHYLENE LINER. THE DRIVING OF MACHINERY ON TO THE SOIL
IS STRICTLY PROHIBITED.
C. THE CONTRACTOR SHALL LEAVE THE TEMPORARY EXCAVATED SOIL STOCKPILE AREA FREE OF EXCESS MATERIALS.
D. THE CONTRACTOR SHALL MOISTEN THE SOIL ENOUGH TO MINIMIZE DUST, IF NECESSARY, BUT LEAVE NO STANDING WATER.
E. IF DEWATERING IS NECESSARY, THE CONTRACTOR SHALL ADHERE TO ALL LOCAL, STATE, AND FEDERAL REGULATIONS REGARDING DEWATERING SYSTEMS.
F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF CONTAMINATED SOILS AT AN EPA APPROVED DUMPSITE.
5. SOIL SAMPLING AND ANALYSIS:
A. SOIL SAMPLING, IF REQUIRED, SHALL BE PERFORMED BY A QUALIFIED AND COMPETENT PERSON WITH DEMONSTRABLE FIELD EXPERIENCE IN THE REQUIRED
ENVIRONMENTAL SAMPLING. LABORATORY SERVICES SHALL BE PROVIDED BY ENVIRONMENTAL LABORATORIES COMPLIANT WITH THE MOST CURRENT PUBLISHED
VERSION OF THE DEPARTMENT OF DEFENSE QUALITY SYSTEMS MANUAL (DOD QSM) AND HOLDING CURRENT NATIONAL ENVIRONMENTAL LABORATORY ACCREDITATION
PROGRAM (NELAP) OR DEPARTMENT OF DEFENSE ENVIRONMENTAL LABORATORY ACCREDITATION PROGRAM (DOD ELAP) ACCREDITATION IN GOOD STANDING FOR ALL
APPROPRIATE FIELDS-OF-TESTING.
WATER POLLUTION AND HOUSEKEEPING NOTES
1. MATERIALS POLLUTION PREVENTION PLAN:
A. MATERIAL MANAGEMENT PRACTICES SHALL BE USED TO REDUCE THE RISK OF SPILLS OR OTHER ACCIDENTAL EXPOSURE OF MATERIALS AND SUBSTANCES TO
STORM WATER RUNOFF. AN EFFORT SHALL BE MADE TO STORE ONLY ENOUGH PRODUCT AS IS REQUIRED TO DO THE JOB.
B. ALL MATERIALS STORED ONSITE SHALL BE STORED IN A NEAT, ORDERLY MANNER IN THEIR APPROPRIATE CONTAINERS AND IF POSSIBLE, UNDER A ROOF OR OTHER
ENCLOSURE.
C. PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE ORIGINAL MANUFACTURER'S LABEL.
D. SUBSTANCES SHALL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER.
E. WHENEVER POSSIBLE, A PRODUCT SHALL BE USED UP COMPLETELY BEFORE DISPOSING OF THE CONTAINER.
F. MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL SHALL BE FOLLOWED.
G. THE CONTRACTOR SHALL CONDUCT A DAILY INSPECTION TO ENSURE PROPER USE AND DISPOSAL OF MATERIALS ONSITE.
2. ONSITE AND OFFSITE PRODUCTS SPECIFIC PLAN:
A. THE FOLLOWING PRODUCT SPECIFIC PRACTICES SHALL BE FOLLOWED ONSITE:
1. PETROLEUM BASED PRODUCTS: ALL ONSITE VEHICLES SHALL BE MONITORED FOR LEAKS AND RECEIVE REGULAR PREVENTATIVE MAINTENANCE TO REDUCE THE
CHANCE OF LEAKAGE. PETROLEUM PRODUCTS SHALL BE STORED IN TIGHTLY SEALED CONTAINERS WHICH ARE CLEARLY LABELED. ANY ASPHALT SUBSTANCES USED
ONSITE SHALL BE APPLIED ACCORDING TO THE MANUFACTURER'S RECOMMENDATION.
2. PAINTS: ALL CONTAINERS SHALL BE TIGHTLY SEALED AND STORED WHEN NOT REQUIRED FOR USE. EXCESS PAINT SHALL NOT BE DISCHARGED TO THE DRAINAGE
SYSTEM BUT SHALL BE PROPERLY DISPOSED OF ACCORDING TO MANUFACTURER'S INSTRUCTIONS OR FEDERAL, STATE AND LOCAL REGULATIONS.
3. CONCRETE TRUCKS: CONCRETE TRUCKS SHALL BE ALLOWED TO WASH OUT OR DRUM WASH WATER ONLY AT DESIGNATED SITE. WATER SHALL NOT BE DISCHARGED IN
THE DRAINAGE SYSTEM OR WATERS OF THE UNITED STATES. THE CONTRACTOR SHALL CLEAN DISPOSAL SITE AS REQUIRED OR AS REQUESTED BY THE CONTRACTING
OFFICER.
G-004
C O
N S
T R
U C
T I O
N
A
N D
E N
V I R
O N
M E
N T
T
E S
D
M
U N
N E
L L
J
J A
C O
B I
D
M
U N
N E
L L
M
F
U R
R
F Y
A
M R
G
D
W G
EROSION CONTROL AND BEST MANAGEMENT PRACTICE (BMP) NOTES
1. MEASURES TO CONTROL EROSION AND OTHER POLLUTANTS SHALL BE IN PLACE BEFORE ANY EARTHWORK IS INITIATED.
2. SLOPE PROTECTION IS REQUIRED ON AREAS WITH SLOPES GREATER THAN 15% AND ON AREAS OF MODERATE SLOPE THAT ARE PRONE TO EROSION UNLESS THEY ARE BEING
ACTIVELY WORKED. USE DIVERSION UPSTREAM OF SLOPE (DIKES, SWALES, SLOPE DRAINS) TO DIVERT WATER AROUND THE SLOPE. PROVIDE A 10-FOOT BUFFER ZONE AT THE
TOE OF SLOPE. ONLY 5 ACRES MAY BE DISTURBED AT ANY TIME ON SLOPES GREATER THAN 15%.
3. TEMPORARY STABILIZATION IS REQUIRED ON DISTURBED AREAS WHICH ARE AT FINAL GRADE OR WHEN THE DISTURBED AREA WILL NOT BE WORKED FOR 14 CONSECUTIVE
DAYS OR MORE.
4. PERMANENTLY STABILIZE ALL DISTURBED AREAS USING VEGETATIVE COVERING, PAVEMENT, OR EQUIVALENT, PRIOR TO REMOVING EROSION AND SEDIMENT CONTROL
MEASURES. TRAPPED SEDIMENT AND AREAS OF DISTURBED SOIL WHICH RESULT FROM THE REMOVAL OF THE TEMPORARY MEASURES SHALL BE IMMEDIATELY AND
PERMANENTLY STABILIZED.
5. PRESERVE EXISTING VEGETATION. CLEARLY MARK THE AREAS TO BE PRESERVED WITH FLAGS OR TEMPORARY FENCING. WHEN TEMPORARY FENCING IS USED, FENCING MUST
BE ADEQUATELY SUPPORTED BY POSTS AND MAINTAINED IN AN UPRIGHT POSITION.
6. MINIMIZE SOIL COMPACTION IN AREAS WHERE FINAL STABILIZATION WITH VEGETATION OR INFILTRATION PRACTICES WILL BE INSTALLED. PROTECT AREAS FROM EXCESSIVE
COMPACTION DURING CONSTRUCTION. VEHICLE AND EQUIPMENT USE SHALL BE RESTRICTED OR TECHNIQUES TO CONDITION THE SOIL TO SUPPORT VEGETATION SHALL BE
IMPLEMENTED IN THE AREAS THAT HAVE BEEN COMPACTED AND ARE DESIGNATED TO REMAIN VEGETATIVE OR POST-CONSTRUCTION INFILTRATION AREAS. CLEARLY MARK THE
AREAS TO BE AVOIDED WITH FLAGS OR TEMPORARY FENCING, WHERE TEMPORARY FENCING IS USED, FENCING MUST BE ADEQUATELY SUPPORTED BY POSTS AND MAINTAINED
IN AN UPRIGHT POSITION.
7. PERIMETER CONTROLS ARE REQUIRED FOR DOWNSLOPE OF ALL DISTURBED AREAS. MAINTAIN DOWNSTREAM VEGETATED BUFFER AREA.
8. SEDIMENT FENCES OR BARRIERS SHALL BE USED DOWN SLOPE OF ALL DISTURBED AREAS. UNTIL SLOPES ARE STABILIZED A SEDIMENT FENCE OR BARRIER SHALL BE
INSTALLED AT THE TOE OF THE SLOPE AND ON CONTOURS AT THE FOLLOWING SPACING:
SLOPE > 2H:1V 10 FEET SPACING
SLOPE > 4H:1V AND < 2H:1V 15 FEET SPACING
SLOPE < 4H:1V 20 FEET SPACING
9. INLET PROTECTION MEASURES.
A. ALL STORM DRAIN INLETS ONSITE AND THOSE OFFSITE WHICH MAY RECEIVE RUNOFF FROM THE SITE SHALL USE AN INLET PROTECTION DEVICE UNLESS THEY ARE
DIRECTED TO A SEDIMENT BASIN.
B. SEDIMENT LEVELS MAY NOT EXCEED ONE THIRD OF THE HEIGHT OF SEDIMENT BARRIER OR INLET PROTECTION DEVICE AT ANY POINT ALONG THE LENGTH OF THE
SEDIMENT BARRIER OR THE INLET PROTECTION DEVICE.
C. SEDIMENT BARRIERS AND INLET PROTECTION DEVICES MUST BE UNCLOGGED AND CLEANED WHEN PERFORMANCE IS COMPROMISED.
D. TORN, WEATHERED OR SAGGING SEDIMENT BARRIERS OR INLET PROTECTION DEVICES MUST BE REPAIRED OR REPLACED IMMEDIATELY.
10. SEDIMENT BASINS MUST BE KEPT IN EFFECTIVE OPERATING CONDITION AND SEDIMENT SHALL BE REMOVED TO MAINTAIN AT LEAST ONE HALF OF THE DESIGN CAPACITY AT ALL
TIMES.
11. TRACKING CONTROL MEASURES.
A. MINIMIZE SEDIMENT TRACK-OUT ONTO OFF-SITE STREETS, OTHER PAVED AREAS, AND SIDEWALKS FROM VEHICLES EXITING THE CONSTRUCTION SITE BY RESTRICTING
VEHICLE TRAFFIC TO PROPERLY DESIGNATED AREAS AND USING ADDITIONAL CONTROLS TO REMOVE SEDIMENT FROM VEHICLE TIRES PRIOR TO EXITING THE SITE.
B. VEHICULAR PARKING AND MOVEMENT ON PROJECT SITES MUST BE CONFINED TO PAVED SURFACES OR PREDEFINED PARKING AREAS AND VEHICLE PATHS, WHICH SHALL
BE MARKED WITH FLAGS OR BOUNDARY FENCING.
C. ALL POLLUTANTS AND MATERIALS THAT ARE DROPPED, WASHED, TRACKED, SPILLED, OR OTHERWISE DISCHARGED FROM A PROJECT SITE TO OFF-SITE STREETS, OTHER
PAVED AREAS, SIDEWALKS OR THE MS4 MUST BE CLEANED USING DRY METHODS SUCH AS SWEEPING OR VACUUMING.
D. WASHING POLLUTANTS AND MATERIALS THAT ARE DISCHARGED FROM THE PROJECT SITE TO THE MS4 INTO DRAIN INLETS OR CATCH BASINS IS PROHIBITED UNLESS THE
MATERIAL IS SEDIMENT AND THE INLETS ARE DIRECTED TO A SEDIMENT BASIN OR SEDIMENT TRAP.
12. BEST MANAGEMENT PRACTICES (BMPs) SHALL NOT BE REMOVED UNTIL FINAL STABILIZATION IS COMPLETE FOR THAT PHASE.
RAIN RESPONSE PLAN
1. THE FOLLOWING WILL BE PERFORMED WHEN HEAVY RAINS, STORM OR HURRICANE IS IMMINENT OR IS FORECASTED IN THE NEXT 48 HOURS:
2. TEMPORARY SUSPENSION OF ACTIVE GRADING, GRUBBING AND TRENCHING.
3. INSPECT ALL SEDIMENT BASINS, TEMPORARY DITCHES/SWALES, PERIMETER CONTROLS, AND INLET PROTECTION DEVICES, AND MAINTAIN AS NEEDED. REINSTALL ANY
PERIMETER CONTROLS THAT WERE REMOVED DUE TO ACTIVE WORK IN THE AREA. IF A SEVERE STORM IS EXPECTED, REMOVE INLET PROTECTION DEVICES TO PREVENT
FLOODING ON SURROUNDING STREETS.
4. COVER OR RELOCATE MATERIAL STOCKPILES AND LIQUID MATERIAL CONTAINERS TO AVOID CONTACT WITH RAINWATER.
5. PLACE SPILL PANS OR OIL-ONLY SPILL PADS UNDER CONSTRUCTION VEHICLES TO PREVENT RUNOFF FROM CONTACTING ANY SPILLED PETROLEUM PRODUCTS. PROPERLY
DISPOSE OF ANY ACCUMULATED OILY WATER AFTER THE RAIN EVENT.
6. RE-INSPECT AFTER THE APPROACHING HEAVY RAINS, STORM OR HURRICANE, AND REPLACE OR MAINTAIN BMPs AS NEEDED.
6/15/2021
NO. 23905
PROFESSIONAL
R
E
G
I S
T E
R
E
D
E
N
G
I N E
E
R
D
O
U
G
L
A
S
G
E
O
R G
I
A
M
U
N
N
E
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
DESIGN COMPLETE
J U
W A
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I C
T
F O
A
F T
E R
O
A H
U
H
A W
A I I
F Y
R
E P
A
P
L A
P
C
O V
E R
Y
S Y
S T
E M
U
N D
E R
G R
O U
O
R A
N
K S
A
N D
P I P
I N
G
A
T
G
A
T I O
N
A
O
A H
U
H
A W
A I I
G-005
C O
N S
T R
U C
T I O
N
A
N D
E N
V I R
O N
M E
N T
T
E S
D
M
U N
N E
L L
J
J A
C O
B I
D
M
U N
N E
L L
M
F
U R
R
F Y
A
M R
G
D
W G
GOOD HOUSEKEEPING BEST MANAGEMENT PRACTICES (BMPs)
1. STREET SWEEPING AND VACUUMING. ALL POLLUTANTS DISCHARGED FROM THE CONSTRUCTION SITE TO OFF0SITE AREAS MUST BE SWEPT OR VACUUMED EACH DAY
BEFORE LEAVING THE JOB SITE..
2. MATERIALS DELIVERY, STORAGE AND USE MANAGEMENT. PREVENT, REDUCE, OR ELIMINATE THE DISCHARGE OF POLLUTANTS FROM MATERIAL DELIVERY, STORAGE, AND USE TO THE STORM WATER SYSTEM OR WATERCOURSES BY MINIMIZING THE STORAGE OF HAZARDOUS MATERIALS ONSITE, STORING MATERIALS IN A DESIGNATED
AREA AND INSTALLING SECONDARY CONTAINMENT. CONSTRUCTION MATERIALS, WASTE, TOXIC AND HAZARDOUS SUBSTANCES, STOCKPILES AND OTHER SOURCES OF
POLLUTION SHALL NOT BE STORED IN BUFFER AREAS, NEAR AREAS OF CONCENTRATED FLOW, OR AREAS ABUTTING THE STORM SEWER SYSTEM, RECEIVING WATERS, OR DRAINAGE IMPROVEMENTS THAT DISCHARGE OFF-SITE. PRIMARY AND SECONDARY CONTAINMENT CONTROLS AND COVERS SHALL BE IMPLEMENTED TO THE
MAXIMUM EXTENT PRACTICABLE.
3. SPILL PREVENTION AND CONTROL. CREATE AND IMPLEMENT SPILL PREVENTION AND RESPONSE PLANS TO ELIMINATE AND MINIMIZE THE DISCHARGE OF POLLUTANTS TO
THE STORM SEWER SYSTEM AND RECEIVING WATERS FROM LEAKS AND SPILLS BY REDUCING THE CHANCE FOR SPILLS, ABSORBING, CONTAINING, AND CLEANING UP
SPILLS AND PROPERLY DISPOSING OF SPILL MATERIALS. AT A MINIMUM, ALL PROJECTS SHALL CLEANUP ALL LEAKS AND SPILLS IMMEDIATELY.
4. HAZARDOUS MATERIALS. PREVENT OR REDUCE THE DISCHARGE OF POLLUTANTS TO STORM WATER FROM HAZARDOUS WASTE THROUGH PROPER MATERIAL USE AND
WASTE DISPOSAL. IN THE EVENT THAT HAZARDOUS MATERIALS ARE DISCHARGED TO THE STORM SEWER SYSTEM, IMMEDIATELY NOTIFY THE CONTRACTING OFFICER
REPRESENTATIVE (COR) OF THE DISCHARGE. A WRITTEN REPORT DESCRIBING THE POLLUTANTS THAT WERE DISCHARGED, THE REASONS FOR THE DISCHARGE, AND
THE MEASURES THAT HAVE BEEN TAKEN OR WILL BE TAKEN TO PREVENT A REOCCURRENCE OF THE DISCHARGE SHALL BE SUBMITTED TO THE COR NO LESS THAN 3
DAYS AFTER NOTIFICATION.
5. NONHAZARDOUS MATERIALS. IN THE EVENT THAT NONHAZARDOUS MATERIALS ARE DISCHARGED TO THE STORM SEWER SYSTEM, NOTIFY THE COR NO LATER THAN THE
NEXT BUSINESS DAY. A WRITTEN REPORT DESCRIBING THE POLLUTANTS THAT WERE DISCHARGED, THE REASONS FOR THE DISCHARGE, AND THE MEASURES THAT HAVE
BEEN TAKEN OR WILL BE TAKEN TO PREVENT A REOCCURRENCE OF THE DISCHARGE SHALL BE SUBMITTED TO THE COR NO LESS THAN 3 DAYS AFTER NOTIFICATION.
6. VEHICLE AND EQUIPMENT CLEANING. ELIMINATE AND MINIMIZE THE DISCHARGE OF POLLUTANTS TO STORM WATER FROM VEHICLE AND EQUIPMENT CLEANING
OPERATIONS BY USING OFF-SITE FACILITIES WHEN FEASIBLE, WASHING IN DESIGNATED, CONTAINED AREAS ONLY, AND ELIMINATING DISCHARGES TO THE STORM DRAIN
SYSTEM BY EVAPORATING AND/OR TREATING WASH WATER, AS APPROPRIATE OR INFILTRATING WASH WATER FOR EXTERIOR CLEANING ACTIVITIES THAT USE WATER
ONLY.
7. VEHICLE AND EQUIPMENT FUELING. PREVENT FUEL SPILLS AND LEAKS BY USING OFF-SITE FACILITIES, FUELING ONLY IN DESIGNATED AREAS, ENCLOSING OR COVERING
STORED FUEL, AND IMPLEMENTING SPILL CONTROLS SUCH AS SECONDARY CONTAINMENT AND ACTIVE MEASURES USING SPILL RESPONSE KITS.
8. VEHICLE AND EQUIPMENT MAINTENANCE. ELIMINATE AND MINIMIZE THE DISCHARGE OF POLLUTANTS TO STORM WATER FROM VEHICLE AND EQUIPMENT MAINTENANCE
OPERATIONS BY USING OFF-SITE FACILITIES WHEN FEASIBLE, PERFORMING WORK IN DESIGNATED AREAS ONLY, USING SPILL PADS UNDER VEHICLES AND EQUIPMENT, CHECKING FOR LEAKS AND SPILLS, AND CONTAINING AND CLEANING UP SPILLS IMMEDIATELY.
9. SOLID WASTE MANAGEMENT. PREVENT OR REDUCE DISCHARGE OF POLLUTANTS TO THE LAND, GROUNDWATER, AND IN STORM WATER FROM SOLID WASTE OR
CONSTRUCTION AND DEMOLITION WASTE BY PROVIDING DESIGNATED WASTE COLLECTION AREAS, COLLECT SITE TRASH DAILY, AND ENSURING THAT CONSTRUCTION
WASTE IS COLLECTED, REMOVED AND DISPOSED OF ONLY AT AUTHORIZED DISPOSAL AREAS.
10. SANITARY/SEPTIC WASTE MANAGEMENT. TEMPORARY AND PORTABLE SANITARY AND SEPTIC WASTE SYSTEMS SHALL BE MOUNTED OR STAKED IN, WELL-MAINTAINED
AND SCHEDULED FOR REGULAR WASTE DISPOSAL AND SERVICING. SOURCES OF SANITARY AND/OR SEPTIC WASTE SHALL NOT BE STORED NEAR THE STORM SEWER
SYSTEM OR RECEIVING WATERS.
11. STOCKPILE MANAGEMENT. STOCKPILES SHALL NOT BE LOCATED IN DRAINAGE WAYS, WITHIN 50 FEET FROM AREAS OF CONCENTRATED FLOWS, AND ARE NOT ALLOWED
IN THE ROAD. SEDIMENT BARRIERS, SILT FENCES OR COMPOST FILTER SOCKS SHALL BE USED AROUND THE BASE OF ALL STOCKPILES. STOCKPILES SHALL NOT EXCEED
15 FEET IN HEIGHT. STOCKPILES GREATER THAN 15 FEET IN HEIGHT SHALL REQUIRE 8 FOOT WIDE BENCHES AT 15 FOOT INCREMENTS. STOCKPILES MUST BE COVERED
WITH PLASTIC SHEETING OR A COMPARABLE MATERIAL OF THEY WILL NOT BE ACTIVELY USED WITHIN 7 DAYS.
12. LIQUID WASTE MANAGEMENT. LIQUID WASTE SHALL BE CONTAINED IN A CONTROLLED AREA SUCH AS A HOLDING PIT, SEDIMENT BASIN, ROLL-OFF BIN, OR PORTABLE
TANK OF SUFFICIENT VOLUME AND TO CONTAIN THE LIQUID WASTE GENERATED. CONTAINMENT AREAS OR DEVICES MUST BE IMPERMEABLE AND LEAK FREE AND
SHOULD NOT BE LOCATED WHERE ACCIDENTAL RELEASE OF THE CONTAINED LIQUID CAN DISCHARGE TO WATER BODIES, CHANNELS, OR STORM DRAINS.
13. CONCRETE WASTE MANAGEMENT. PREVENT OR REDUCE THE DISCHARGE OF POLLUTANTS TO STORM WATER FROM CONCRETE WASTE BY CONDUCTING WASHOUT
OFFSITE OR PERFORMING ONSITE WASHOUT IN A DESIGNATED AREA CONSTRUCTED AND MAINTAINED IN SUFFICIENT QUANTITY AND SIZE TO CONTAIN ALL LIQUID AND
CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS. PLASTIC LINING MATERIALS SHALL BE A MINIMUM OF 10 MILLIMETERS POLYETHYLENE SHEETING AND
SHOULD BE FREE OF HOLES, TEARS, OR OTHER DEFECTS THAT COMPROMISE THE IMPERMEABILITY OF THE MATERIAL. CONTAINMENT AREAS OR DEVICES SHOULD NOT
BE LOCATED WHERE ACCIDENTAL RELEASE OF THE CONTAINED LIQUID CAN DISCHARGE TO WATER BODIES, CHANNELS, OR STORM DRAINS. WASHOUT FACILITIES MUST
BE CLEANED, OR NEW FACILITIES MUST BE CONSTRUCTED AND READY FOR USE ONCE THE WASHOUT IS 75 PERCENT FULL. ONCE CONCRETE WASTES ARE WASHED INTO
THE DESIGNATED AREA AND ALLOWED TO HARDEN, THE CONCRETE SHOULD BE BROKEN UP, REMOVED AND DISPOSED OF AS SOLID WASTES.
14. CONTAMINATED SOIL MANAGEMENT. AT MINIMUM CONTAIN CONTAMINATED MATERIAL SOIL BY SURROUNDING WITH IMPERMEABLE LINED BERMS OR COVER EXPOSED
CONTAMINATED MATERIAL WITH PLASTIC SHEETING. CONTAMINATED SOIL SHOULD BE DISPOSED OF PROPERLY IN ACCORDANCE WITH ALL APPLICABLE REGULATIONS.
6/15/2021
NO. 23905
PROFESSIONAL
R
E
G
I S
T E
R
E
D
E
N
G
I N E
E
R
D
O
U
G
L
A
S
G
E
O
R G
I
A
M
U
N
N
E
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
DESIGN COMPLETE
J U
W A
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I C
T
F O
A
F T
E R
O
A H
U
H
A W
A I I
F Y
R
E P
A
P
L A
P
C
O V
E R
Y
S Y
S T
E M
U
N D
E R
G R
O U
O
R A
N
K S
A
N D
P I P
I N
G
A
T
G
A
T I O
N
A
O
A H
U
H
A W
A I I
PROJECT
LOCATION
A5 CONTRACTOR ACCESS ROUTE PLAN
NTS
HAUL
ROUTE
ENTRY
GATE
B
O
U
G
A
I
N
V
I
L
L
E
G-006
C O
N T
R A
C T
C
E S
S
R
O U
T E
D
M
U N
N E
L L
J
J A
C O
B I
D
M
U N
N E
L L
M
F
U R
R
F Y
A
M R
G
D
W G
PLAN NORTH
B O
U G
A
IN
V
IL
L E
A
A
L
I
A
M
A
N
U
L
O
O
P
D
R
I V
E
D
R
I
V
E
CONTRACTOR'S
OPERATION
AND STORAGE
AREA (COSA)
NOTE:
1. ALTERNATE ROUTES CAN BE DISCUSSED
PRIOR TO CONSTRUCTION.
6/15/2021
NO. 23905
PROFESSIONAL
R
E
G
I S
T E
R
E
D
E
N
G
I N E
E
R
D
O
U
G
L
A
S
G
E
O
R G
I
A
M
U
N
N
E
NTS
PHOTO #7
A2
NTS
PHOTO #4
C2
NTS
PHOTO #1
E2
NTS
PHOTO #8
A5
NTS
PHOTO #5
C5
NTS
PHOTO #2
E5
NTS
PHOTO #9
A8
NTS
PHOTO #6
C8
NTS
PHOTO #3
E8
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
DESIGN COMPLETE
J U
W A
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I C
T
F O
A
F T
E R
O
A H
U
H
A W
A I I
F Y
R
E P
A
P
L A
P
C
O V
E R
Y
S Y
S T
E M
U
N D
E R
G R
O U
O
R A
N
K S
A
N D
P I P
I N
G
A
T
G
A
T I O
N
A
O
A H
U
H
A W
A I I
G-007
P H
O T
O S
D
M
U N
N E
L L
J
J A
C O
B I
D
M
U N
N E
L L
M
F
U R
R
F Y
A
M R
G
D
W G
6/15/2021
NO. 23905
PROFESSIONAL
R
E
G
I S
T E
R
E
D
E
N
G
I N E
E
R
D
O
U
G
L
A
S
G
E
O
R G
I
A
M
U
N
N
E
Monkey Pod
D=2'
H=25'
S=30'
T=71.48
B=70.98
T=71.42
B=71.22
T=71.99
B=71.89
T=72.63
B=72.53
EB
WV
"No Access
Aisle" Sign
OPW MH
OPW HH(2)
OPW MH
OPW
HH(2)
OPW HH(2)
OPW MH
"Reserved
Parking" Sign
TC=70.99
BC=70.49
TC=71.25
BC=70.75
TC=71.78
BC=71.28
TC=72.30
BC=71.80
TC=73.32
BC=72.82
TC=73.64
BC=73.14
TC=74.01
BC=73.51
TC=74.69
BC=74.29
TC=74.51
BC=74.21
TC=74.20
BC=73.90
TC=74.22
BC=73.92
TC=74.02
BC=73.52
TC=73.90
BC=73.40
TC=72.76
BC=73.26
TC=73.62
BC=73.12
TC=73.65
BC=73.15
TC=74.23
BC=73.73
TC=74.38
BC=73.88
T=73.41
B=73.31
T=73.85
B=73.75
T=74.10
B=74.00
TC=71.91
BC=71.51
TC=71.94
BC=71.44
TC=71.66
BC=71.26
TC=71.52
BC=71.02
TC=71.80
BC=71.30
TC=72.03
BC=71.63
TC=71.52
BC=71.02
TC=71.97
BC=71.77
TC=71.91
BC=71.61
LP
EPB
"STOP"
SIGN
"SPEED
LIMIT 15"
SIGN
TC=73.09
BC=72.89
TC=73.38
BC=72.18
TC=72.05
BC=71.85
TC=71.81
BC=71.61
TC=71.59
BC=71.39
TC=72.44
BC=72.14
TC=73.47
BC=72.97
TC=73.39
BC=72.89
TC=73.50
BC=73.00
TC=73.14
BC=72.94
TC=73.94
BC=73.24
TC=73.75
BC=73.05
TC=73.67
BC=73.17
T=73.71
B=73.61
TC=73.24
BC=72.74
TC=72.94
BC=72.44
TC=72.69
BC=72.19
TC=72.75
BC=72.25
TC=72.65
BC=72.15
TC=73.14
BC=72.94
TC=73.52
BC=73.02
TC=73.21
BC=72.91
TC=71.75
BC=71.25
TC=72.89
BC=72.89
LP
"EXIT ONLY"
SIGN
S
P
E
B
M
P
TC=71.88
BC=71.58
TC=71.81
BC=71.51
TC=72.24
BC=71.84
TC=72.27
BC=71.77
TC=72.81
BC=72.51
TC=72.84
BC=72.54
BOL(2)
H=3.6'
BOL(3)
H=4.2'
BOL(2)
H=3.4'
VAC
TC=71.57
BC=71.27
DMH
TC=71.40
BC=71.20
BOL(2)
H=3.6'
TC=71.82
BC=71.52
P
O
S
T
GAS
PUMP
P
O
S
T
TC=71.77
BC=71.47
GAS
PUMP
HANDICAPPED
PUSHBUTTON
TC=71.79
BC=71.49
TC=71.82
BC=71.52
TC=71.83
BC=71.53
TC=71.83
BC=71.53
P
O
S
T
P
O
S
T
BOL(2)
H=3.6'
HANDICAPPED
PUSHBUTTON
GAS
PUMP
BOL(2)
H=3.6'
TC=71.91
BC=71.41
TC=71.81
BC=71.51
GAS
PUMP
TC=71.84
BC=71.54
TC=71.82
BC=71.52
TC=71.97
BC=71.47
TC=71.61
BC=71.31
TC=73.20
BC=73.20
TC=71.84
BC=71.74
TC=71.83
BC=71.63
TC=71.72
BC=71.52
CNI MH
DS
TC=71.56
BC=71.36
TC=71.61
BC=71.41
VALVES
AIR AND WATER
DISPENSER ON
CONC. PAD
BUS STOP
B
U
M
P
B
U
M
P
B
U
M
P
DRAIN
GUTTER
DRAIN GUTTER, TYP.
M
E
T
A
L
C
O
V
E
R
WS
WS
M
E
T
A
L
C
O
V
E
R
DS
BUILDING
WOOD PILLAR
WOOD PILLAR
72.99
70.89
70.83
71.41
71.51
71.02
72.46
73.91
72.36
72.39
72.92
71.83
72.07
72.37
72.31
71.93
71.69
72.32
71.98
71.89
72.17
72.65
72.46
71.70
71.27
71.44
71.45
71.53
71.47
71.41
71.60
71.55
71.78
71.78
71.97
71.67
71.30
71.31
71.11
71.21
71.21
71.27
71.77
71.40
71.43
71.48
71.91
71.90
71.81
71.89
71.87
71.76
71.97
71.37
71.24
71.16
71.16
71.29
71.44
71.38
71.27
71.20
73.12
73.37
71.50
71.27
71.13
70.97
70.80
70.63
70.97
71.08
71.29
73.69
73.75
73.21
72.72
72.71
71.59
71.61
72.11
72.26
72.31
71.54
71.54
71.55
71.78
71.40
71.41
71.29
71.73
71.58
71.42
71.41
71.43
71.53
71.50
71.35
71.51
71.29
71.31
71.48
71.58
71.56
71.64
71.83
72.58
72.67
72.79
72.90
72.64
72.49
72.35
72.31
72.51
72.64
72.58
72.78
72.94
72.96
72.82
72.87
72.69
72.67
72.46
72.49
72.42
72.39
72.28
73.80
72.60
72.80
72.95
73.02
73.04
73.05
72.99
72.97
73.62
73.58
73.35
73.32
73.25
73.10
72.88
73.51
73.46
73.47
73.52
S
D x
S
D x
D
CBMH
T=73.87
INV=66.52(D24)
DI
T=73.39
INV=65.79(D24)
INV=63.04(D36)
INV=62.97(D36)
DI
T=73.04
INV=61.46(D36&D48)
S D x
S D x
S D x
D
D
S
S6
SMH
T=73.63
INV=67.48(S6)
INV=67.28(S6)
INV=66.88(S6)
MAG NAIL
STA ALIA2
N: 70,813.97
E: 1,668,492.57
ELEV.=72.93
" + " CUT
STA ALIA4
N: 70,890.54
E: 1,668,554.85
ELEV.=75.51
60D NAIL
STA ALIA3
N: 70,842.05
E: 1,668,670.11
ELEV.=72.11
AC ROLLOVER CURB
AC ROLLOVER
CURB
AC ROLLOVER CURB
TRENCH DRAIN
TRENCH DRAIN
SHOPETTE
BUILDING
CONCRETE
SIDEWALK
PAVEMENT
MARKINGS
(TYP.)
6K GAL. U.G. TANKS
(APPROX. LOCATION)
10K GAL. U.G. TANK
(APPROX. LOCATION)
CANOPY COLUMN
(TYP. 4)
FUEL DISPENSER
(TYP. 4)
FUEL DELIVERY TRUCK
OFFLOAD AREA
BOLLARDS
(TYP. 8)
DISPENSER ISLAND
(CONCRETE, TYP. 2)
BOUGAIN
VILLEA LOOP
B
O
U
G
A
I N
V
I L
L
O
P
E2
E5
E8
C2
A5
A8
P L U
M E
R
O P
C8
C5
A2
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
DESIGN COMPLETE
J U
W A
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I C
T
F O
A
F T
E R
O
A H
U
H
A W
A I I
F Y
R
E P
A
P
L A
P
C
O V
E R
Y
S Y
S T
E M
U
N D
E R
G R
O U
O
R A
N
K S
A
N D
P I P
I N
G
A
T
G
A
T I O
N
A
O
A H
U
H
A W
A I I
NOTES:
1. INFORMATION SHOWN HERE WAS OBTAINED FROM A SURVEY
BY RM TOWILL CORPORATION. AUGUST 2020.
2. COORDINATES ARE REFERRED TO NAD83/2011 HAWAII STATE
PLANE COORDINATE SYSTEM, ZONE 3, US FOOT.
3. ELEVATIONS ARE BASED ON HCTC-39 HAVING AN ELEVATION
OF 97.01 MEAN SEA LEVEL (MSL).
4. ALL VISIBLE UTILITY STRUCTURES WITHIN THE PROPERTY
HAVE BEEN LOCATED IN THE FIELD, HOWEVER, CONNECTION
OF UNDERGROUND UTILITY LINES AS SHOWN ARE
UNVERIFIED AND COMPILED FROM EXISTING DATA.
5. UNDERGROUND UTILITIES SHOWN HEREON ARE FOR
INFORMATION PURPOSES ONLY, HAVING BEEN OBTAINED
FROM THE BEST AVAILABLE SOURCES. THEREFORE NO
GUARANTEE IS MADE ON THE ACCURACY OR COMPLETENESS
OF SAID INFORMATION.
A5 EXISTING CONDITIONS PLAN
SCALE: 1" = 10'
GRAPHIC SCALE
1. SEE DRAWING G-007 FOR PHOTOS.
NOTE
PLAN NORTH
C-101
E X
I S
T I N
G
C
O N
D I T
I O
A
N
D
M
U N
N E
L L
J
J A
C O
B I
D
M
U N
N E
L L
M
F
U R
R
F Y
A
M R
C
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D
S
D x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
D
D
S
S6
REMOVE CONCRETE
PAVEMENT
SHOPPETTE
BUILDING
CONCRETE PAVEMENT
REMOVAL FOR ELECTRICAL
SERVICE INSTALLATION.
WIDTH = 1.5'
REMOVE
BOLLARDS
REMOVE
BOLLARDS
B
O
U
G
A
I N
V
I L
L
O
P
BOUGAIN
VIL
LEA L
OOP
P L U
M
E R
O P
LIMITS OF
EXCAVATION
CONTRACTOR
OPERATION AND
STORAGE AREA
LOCATE COLD
JOINT PRIOR
TO SAWCUT.
(TYP 4)
C9
C-501
TEMPORARY STEEL FENCE
WITH DUST CONTROL FABRIC
A5
C-501
REMOVE CONCRETE
PAVEMENT
REMOVE
CONCRETE CURB
D5
C-501
SAFETY SIGN
(QUANTITY/
LOCATIONS
AS REQUIRED)
D5
C-501
SAFETY SIGN
(QUANTITY/
LOCATIONS
AS REQUIRED)
D5
C-501
SAFETY SIGN
(QUANTITY/
LOCATIONS
AS REQUIRED)
E7
C-504
DRAIN INLET
PROTECTION
SET INSIDE
TRENCH DRAINS
E5
C-501
REMOVE ASPHALT
PAVEMENT
REMOVE U.G. FUEL TANKS AND
PIPING. SEE DEMO NOTE 1.
REMOVE
CONCRETE SLAB
REMOVE
ASPHALT
ROLLOVER
CURB
REMOVE
RETAINING WALL
L = 59'
REMOVE TRENCH DRAIN
(SAVE GRATE)
REMOVE ASPHALT
PAVEMENT
PROTECT
ELECTRIC
BOX
END OF RET.
WALL REMOVAL
E8
C-501
FILLABLE
PLASTIC BARRIER
A7
C-504
FILTER
SOCK
(TYP.)
REMOVE DISPENSERS
(TYP 4) SEE DEMO NOTE 2.
REMOVE CONCRETE
PAVEMENT
REMOVE DISPENSER
ISLAND CONCRETE
(TYP 4)
PROTECT CANOPY
COLUMNS (TYP 4)
D5
C-501
SAFETY SIGN
(QUANTITY/
LOCATIONS
AS REQUIRED)
A7
C-504
FILTER
SOCK
(TYP.)
A7
C-504
FILTER
SOCK
(TYP.)
E9
C-502
ELECTRICAL DUCTS
TRENCH DETAIL
CONCTRETE
WASHOUT
AREA
STOCKPILE
AREA
AMR 880 UST #1
AMR 880 UST #2
AMR 880 UST #3
DEMOLITION NOTES:
1. LOCATION AND DEPTH OF UNDERGROUND FUEL PIPING IS
UNKNOWN. FIELD VERIFY PRIOR TO REMOVAL. FUEL PIPING
ASSOCIATED WITH EXISTING TANKS TO BE CUT AND
ABANDONED IN PLACE IF LOCATED BEYOND THE LIMITS OF
CONSTRUCTION INDICATED ON THIS PLAN. AMR 880 UST #1
(6,000 GALLONS / 92 OCTANE GASOLINE) AND AMR 880 UST #2
(6,000 GALLONS / 87 OCTANE GASOLINE) HAVE ALREADY BEEN
CLOSED AND FUEL HAS BEEN PUMPED OUT TO BELOW ONE (1)
INCH. CONTRACTOR WILL BE REQUIRED TO PROVIDE 2-WEEK
NOTIFICATION TO THE AMR 880 STORE MANAGER; THE
GOVERNMENT WILL DRAIN AMR 880 UST #3 (10,000 GALLONS / 87
OCTANE GASOLINE). CONTRACTOR TO ASSUME 100 GALLONS ±
OF RESIDUAL WASTE FUEL IN EACH TANK FOR DISPOSAL / TANK
CLEANING CONSIDERATIONS.
2. DISPENSER TO BE REINSTALLED AFTER UNDER DISPENSER
SUMP INSTALLATION. CONCRETE CUT TO FOLLOW EXISTING
COLD JOINT BETWEEN DISPENSER AND COLUMN.
3. REMOVE FUEL FROM ANY PIPE TO BE ABANDONED. CAP
ABANDONED PIPE AT ENDS.
4. TANKS AND PIPING TO BE CLEANED IN ACCORDANCE WITH
UFGS 33 01 50.60 PRIOR TO REMOVAL.
5. PAVEMENT MARKINGS ARE NOT KNOWN TO CONTAIN ANY LEAD.
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
DESIGN COMPLETE
J U
W A
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I C
T
F O
A
F T
E R
O
A H
U
H
A W
A I I
F Y
R
E P
A
P
L A
P
C
O V
E R
Y
S Y
S T
E M
U
N D
E R
G R
O U
O
R A
N
K S
A
N D
P I P
I N
G
A
T
G
A
T I O
N
A
O
A H
U
H
A W
A I I
A5 DEMOLITION PLAN
SCALE: 1" = 10'
GRAPHIC SCALE
PLAN NORTH
TRAFFIC CONTROL NOTES:
1. CONTRACTOR SHALL HIRE A LICENSED CIVIL ENGINEER WITH A MIN 5 YEARS TRAFFIC
CONTROL/ENGRG DESIGN EXPERIENCE TO PREPARE TRAFFIC CONTROL AND PHASING PLANS FOR
ALL PROPOSED ROAD AND/OR PARKING LOT CLOSURES.
A. TRAFFIC CONTROL PLAN SHALL BE DONE IN ACCORDANCE WITH THE "MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES, PART 6 TEMPORARY TRAFFIC CONTROL" (LATEST EDITION) AND
TRAFFIC CONTROL PLANS ABOVE.
B. FOUR (4) COPIES OF CONTRACTOR PROPOSED TRAFFIC CONTROL & PHASING PLANS SHALL BE
SUBMITTED FOR GOVERNMENT APPROVAL IN ACCORDANCE WITH SPECIFICATION SECTION 01
33 00. SUBMITTAL AND APPROVAL OF TRAFFIC CONTROL PLANS SHALL BE OBTAINED IN
SUFFICIENT TIME TO ALLOW A MINIMUM OF 30 DAYS WRITTEN NOTICE TO THE CONTRACTING
OFFICER'S REPRESENTATIVE (COR) PRIOR TO CLOSURE OF ANY EXISTING ROAD/LANE AND/OR
EXISTING AC PAVEMENT PARKING LOT IN ACCORDANCE WITH SPECIFICATION SECTION 01 33
00.
C. CONTRACTOR'S TRAFFIC ENGINEER SHALL REVIEW AND APPROVE THE INSTALLATION OF
TRAFFIC CONTROL DEVICES TO BE USED FOR ROAD CLOSURE.
D. CONTRACTOR SHALL PREPARE, COORDINATE, AND OBTAIN A DPW TRAFFIC CONTROL PLAN
PERMIT PRIOR TO COMMENCING ANY ROAD/LANE CLOSURE ACTIVITIES ON THE INSTALLATION.
APPROVAL OF PROPOSED ROAD/LANE AND/OR PKG LOT CLOSURES SHALL BE OBTAINED FROM
DPW MASTER PLANNER AND OAHU BASE SUPPORT BTW (OBSB).
2. TRAFFIC CONTROL PLAN SHALL ENSURE THAT VEHICULAR AND PEDESTRIAN ACCESS IS MAINTAINED
AT ALL TIMES TO ALL EXISTING BUILDINGS.
3. ROAD/PARKING LOT CLOSURE REQUIREMENTS:
A. ONLY ONE SECTION OF ROADWAY SHALL BE ALLOWED TO BE CLOSED OFF AT ONE TIME FOR
PARKING LOT CONSTRUCTION WORK. (PROPOSED DETOUR ROUTES FOR ALL RD CLOSURES
SHALL BE SUBMITTED WITH THE CONTRACTOR'S TRAFFIC CONTROL PLAN. BOTH PLANS SHALL
BE APPROVED BY THE CONTRACTING OFFICER).
B. FOR ALL UTILITY AND OTHER WORK AFFECTING EXISTING ROADS (NOT OTHERWISE AFFECTED
BY CONSTRUCTION WORK): NO MORE THAN ONE BLOCK OF ROADWAY SHALL BE BLOCKED OFF
AT ONE TIME AND ONE LANE OF TRAFFIC SHALL BE MAINTAINED AT ALL TIMES. FLAGMEN
SHALL BE USED, AS REQUIRED, TO DIRECT TRAFFIC AROUND THE WORK SITE.
C. ALL ROADS AND PARKING LOTS REQUIRING CLOSURE TO FACILITATE CONSTRUCTION
OPERATIONS SHALL BE REOPENED AT THE END OF EACH WORK DAY.
4. THE CONTRACTOR SHALL OBTAIN ALL THE REQUIRED APPROVALS PRIOR TO START OF
CONSTRUCTION.
5. CONTRACTOR SHALL PROVIDE THE APPROPRIATE NUMBER OF FLAGMEN, EQUIPPED WITH THE
PROPER SAFETY CLOTHING, EQUIPMENT, AND/OR COMMUNICATION DEVICES TO CONDUCT,
CONTROL, AND MANAGE THE TRAFFIC ENTERING CONTRACTOR WORK SITE.
6. CONTRACTOR SHALL PROVIDE THE APPROPRIATE NUMBER OF ROAD SIGNS, I.E., ROAD CLOSED, DETOUR SIGNS, INFORMATION SIGNS OF UPCOMING AND/OR DURATION OF ROAD/LANE CLOSURE
SIGNS TO PROPERLY ADVISE AND REROUTE THE INCOMING TRAFFIC AWAY FROM THE
CONSTRUCTION SITE AND ALLOW FOR LOCAL TRAFFIC SERVICE INTO THE CONSTRUCTION AREAS.
7. CLOSURE OF MAJOR ROADWAYS, INTERSECTIONS, AND BASE ENTRANCES WILL REQUIRE THE
CONTRACTOR TO PROVIDE SEVERAL ELECTRONIC MESSAGE BOARDS SURROUNDING THE
CONSTRUCTION SITE AND SIGNS POSTED A MINIMUM OF 30 DAYS IN ADVANCE OF THE CLOSURE
WORK.
8. IN THE EVENT THE REQUESTED LANE/ROAD CLOSURE NEEDS TO BE EXTENDED DUE TO UNFORSEEN
WORK, ADVERSE WEATHER, ETC., THE CONTRACTOR SHALL SUBMIT IN WRITING A MINIMUM TWO (2)
WEEKS PRIOR TO THE PERMIT EXPIRATION DATE TO SEEK A PERMIT EXTENSION FROM DPW
TRAFFIC ENGINEER, KENNETH NAKASHIMA, (808)-656-1965.
9. TRAFFIC CONTROL PERMIT SHALL BE RENEWED ONE YEAR FROM THE START DATE OF THE
PERFORMANCE PERIOD (POP), AND ANNUALLY THEREAFTER.
10. CONTRACTOR TRAFFIC CONTROL PROCEDURES SHALL INCORPORATE THE FOLLOWING:
A. A MINIMUM ROADWAY WIDTH OF 10 FEET SHALL BE OPEN AT ALL TIMES
B. AT THE END OF EACH DAY'S WORK OR AS SOON AS THE WORK IS COMPLETED, THE
CONTRACTOR SHALL REMOVE ALL TRAFFIC CONTROL DEVICES NO LONGER NEEDED TO
PERMIT FREE AND SAFE PASSAGE OF PUBLIC TRAFFIC.
C. PROVIDE ADEQUATE, SAFE, NONSKID BRIDGING MATERIAL OVER TRENCHES IN PAVEMENT
AREAS TO HANDLE HS20-44 VEHICULAR TRAFFIC.
D. SAFE PEDESTRIAN TRAFFIC SHALL BE MAINTAINED AT ALL TIMES DURING THE CONSTRUCTION
PERIOD.
E. TRAFFIC CONTROL PLAN SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF MUTCD AND
U.S. ARMY GARRISON HAWAII REQUIREMENTS.
11. EROSION CONTROL MEASURES SHOWN ON THIS DRAWING ARE THE MINIMUM. CONTRACTOR SHALL
COMPLY WITH ALL CITY & COUNTY OF HONOLULU STANDARDS AND THE NOTES ON G-003 THROUGH
G-005. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THESE EROSION CONTROL
INSTALLATIONS AND TO ADD AND ADJUST EROSION CONTROL BMPs AS THE NEED ARISES.
12. ONE COURSE OF SILT FENCE MATERIAL TO BE CONNECTED TO THE BOTTOM OF THE
CONSTRUCTION FENCE FOR DUST CONTROL.
13. PROTECT THE CONSTRUCTION FENCE ON EACH TRAFFIC FACING SIDE WITH MUTCD TYPE 3
BARRICADES.
14. PORTABLE TOILETS SHALL NOT BE PLACED WITHIN THE VICINITY OF A STORM DRAIN AND SHALL BE
SECURED TO PREVENT TIPPING.
C-102
D E
M O
L I T
I O
N
P
L A
N
D
M
U N
N E
L L
J
J A
C O
B I
D
M
U N
N E
L L
M
F
U R
R
F Y
A
M R
C
D
W G
6/15/2021
NO. 23905
PROFESSIONAL
R
E
G
I S
T E
R
E
D
E
N
G
I N E
E
R
D
O
U
G
L
A
S
G
E
O
R G
I
A
M
U
N
N
E x
D
S D x
S D x
S D x
D
D
S
S6
A4
C-401
ENLARGED
SITE PLAN
2- 2" Ø DOUBLE WALL
PRODUCT PIPE W/ 4"
ACCESS PIPE
3- 2" Ø VENT PIPE
10K GAL
FUEL TANK
6K GAL FUEL TANK
VENT
RISER
SHOPETTE
BUILDING
BOUGAINVILLEA LOOP
B
O
U
G
A
I
N
V
I
L
L
O
P
P L U
M
E R
O
P
PROJECT
LIMITS
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
DESIGN COMPLETE
J U
W A
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I C
T
F O
A
F T
E R
O
A H
U
H
A W
A I I
F Y
R
E P
A
P
L A
P
C
O V
E R
Y
S Y
S T
E M
U
N D
E R
G R
O U
O
R A
N
K S
A
N D
P I P
I N
G
A
T
G
A
T I O
N
A
O
A H
U
H
A W
A I I
A5 OVERALL SITE PLAN
SCALE: 1" = 10'
GRAPHIC SCALEPLAN NORTH
C-103
O V
E R
A L
L
S
I T
E
P
L A
N
D
M
U N
N E
L L
J
J A
C O
B I
D
M
U N
N E
L L
M
F
U R
R
F Y
A
M R
C
D
CONCRETE PAVEMENT
8" CONCRETE
PAVEMENT
8" CONCRETE
PAVEMENT (ELEC.
INSTALLATION)
REBUILD ISLAND AROUND
EACH SUMP (MATCH
EXISTING, TYP. 4)
SEE NOTE 2
FUEL DISPENSER
SUMP (TYP 4). SEE
SHEET M-501
E7
C-503
AC ROLLOVER
CURB
E1
C-503
TRENCH DRAIN
(REUSE GRATE)
E9
C-503
4" Ø BOLLARD
(TYP 4)
A1
C-502
8" CONCRETE
PAVEMENT
A1
C-502
8" CONCRETE
PAVEMENT
R
E
B
U
I
R
E
T
A
I N
I
L
L
C7
C-503
8" RETAINING
WALL
D9
C-503
6" CONCRETE
CURB
C4
C-503
6" HEADER
CURB
A4
C-502
ASPHALTIC CONCRETE
PAVEMENT
A4
C-502
ASPHALTIC CONCRETE
PAVEMENT
4" SIDEWALK
CONCRETE REPAIR
(ELEC. INSTALLATION)
SEE NOTE 1
SHOPPETTE
E4
C-503
12" CONCRETE DISPENSER
ISLAND. REBUILD AROUND
EACH SUMP (SEE NOTE 2)
VENT RISER
SEE SHEET M-502
.1
5.6'±
1.50'
4.65'
4.62'
6.00'
2.12'
2.00'
5.6'±
5.6'±
A2
C-503
TRAFFIC
ARROW
A5
C-503
EDGE
STRIPE
B
O
U
G
A
I N
V
I L
L
O
P
PROVIDE STRAIGHT
LINE BETWEEN
EXISTING JOINTS ON
ISLANDS
EXISTING JOINT ON
ISLAND (TYP)
EXISTING JOINT ON
ISLAND (TYP)
E9
C-502
ELECTRICAL DUCTS
TRENCH DETAIL
0.50'
0.50'
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
DESIGN COMPLETE
J U
W A
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I C
T
F O
A
F T
E R
O
A H
U
H
A W
A I I
F Y
R
E P
A
P
L A
P
C
O V
E R
Y
S Y
S T
E M
U
N D
E R
G R
O U
O
R A
N
K S
A
N D
P I P
I N
G
A
T
G
A
T I O
N
A
O
A H
U
H
A W
A I I
A4 ENLARGED SITE PLAN
SCALE: 1" = 5'
GRAPHIC SCALE
PLAN NORTH
C-401
E N
L A
R G
T
E
P
L A
N
D
M
U N
N E
L L
J
J A
C O
B I
D
M
U N
N E
L L
M
F
U R
R
F Y
A
M R
C
D
W G
19.00'
NOTES:
1. 5,000 PSI SIDEWALK CONCRETE. 4" MINIMUM CONCRETE OR MATCH EXISTING
DEPTH, 6" MINIMUM AGGREGATE BASE OR MATCH EXISTING DEPTH, ETC.
2. ISLANDS TO BE PAINTED BLUE TO MATCH EXISTING.
R
E
T
A
I N
I
N
G
T
H
CONCRETE PAVEMENT
8" CONCRETE
PAVEMENT
8" CONCRETE
PAVEMENT (ELEC.
INSTALLATION)
REBUILD ISLAND
AROUND EACH SUMP
(MATCH EXISTING, TYP.
4)
FUEL DISPENSER
SUMP (TYP 4). SEE
SHEET M-501
E7
C-503
AC ROLLOVER
CURB
E1
C-503
TRENCH DRAIN
3' THICKENED EDGE
(REUSE GRATE)
E9
C-503
4" Ø BOLLARD
(TYP 4)
A1
C-502
8" CONCRETE
PAVEMENT
D9
C-503
6" CONCRETE
CURB
A4
C-502
ASPHALTIC CONCRETE
PAVEMENT
A4
C-502
ASPHALTIC CONCRETE
PAVEMENT
4" SIDEWALK
CONCRETE REPAIR
SEE NOTE 1
(ELEC.
INSTALLATION)
E4
C-503
12" CONCRETE DISPENSER
ISLAND. REBUILD AROUND
EACH SUMP
F
A
A
A
A
A
A
A
A
A
A
A
A
A
E
E
E
E
J
J
J
J
J
J
J
J
C
N:70,798.09
E:1,668,504.37
C
N:70,799.93
E:1,668,514.15
C
N:70,811.75
E:1,668,542.75
AC
N:70,780.68
E:1,668,502.52
J
J
A1
C-502
8" CONCRETE
PAVEMENT
VB
N:70,810.53
E:1,668,487.00
VB
N:70,805.10
E:1,668,492.35
E
C
N:70,806.55
E:1,668,502.78
C
N:70,808.39
E:1,668,512.56
C
N:70,808.12
E:1,668,523.47
N:70,809.86
E:1,668,546.91
B
O
U
G
A
I
N
V
I
L
L
O
P
N:70,788.22
E:1,668,493.98
J
J
J
J
N:70,817.91
E:1,668,488.13
N:70,835.16
E:1,668,581.12
N:70,827.70
E:1,668,576.31
N:70,811.88
E:1,668,492.16
N:70,818.71
E:1,668,488.93
N:70,835.88
E:1,668,580.24
N:70,819.51
E:1,668,535.45
N:70,815.72
E:1,668,515.33
N:70,813.45
E:1,668,503.26
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
DESIGN COMPLETE
J U
W A
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I C
T
F O
A
F T
E R
O
A H
U
H
A W
A I I
F Y
R
E P
A
P
L A
P
C
O V
E R
Y
S Y
S T
E M
U
N D
E R
G R
O U
O
R A
N
K S
A
N D
P I P
I N
G
A
T
G
A
T I O
N
A
O
A H
U
H
A W
A I I
A3 JOIN LAYOUT / HORIZONTAL CONTROL
SCALE: 1" = 5'
GRAPHIC SCALE
PLAN NORTH
C-402
J O
I N
T
L
A Y
O U
T
A
R
I Z
O N
T A
L
C O
N T
R O
L
D
M
U N
N E
L L
J
J A
C O
B I
D
M
U N
N E
L L
M
F
U R
R
F Y
A
M R
C
D
W G
LEGEND
A CONTRACTION JOINT
E EXPANSION JOINT
F RIGID TO FLEXIBLE
JOINT.
J NEW TO EXISTING
CONCRETE JOINT.
C-502
F4
C-502
F7
C-502
A9
C-502
E8
ABBREVIATIONS
VB VENT SUMP BOX
C CENTER (MANWAY)
AC ASPHALTIC CONCRETE
NOTES:
1. DOWELS WILL NOT BE PLACED AT SIDEWALKS.
JOINT DESIGNATION PROVIDED FOR JOINT
SEALANT INFORMATION ONLY.
CONCRETE
PAVEMENT
FUEL DISPENSER
SUMP (TYP 4). SEE
SHEET M-501
E7
C-503
AC ROLLOVER
CURB
E1
C-503
TRENCH DRAIN
D9
C-503
6" CONCRETE
CURB
SHOPPETTE
VENT RISER
SEE SHEET M-502
T
C
T
C
T
C
B
W
B
W
1T
C
MATCH EXISTING
MATCH
EXISTING
MATCH
EXISTING
MATCH
EXISTING
ASPHALTIC
CONCRETE
MATCH
EXISTING
B8
M-501
SUMP PUMP FRAME AND COVER.
1 1/2" ABOVE SURROUNDING
FINISHED GRADE (TYP 3)
ASPHALTIC
CONCRETE
PIPING CONNECTIONS
1" ABOVE SURROUNDING
GRADE. SEE M-502
MATCH EXISTING
(TYP 4)
T
C
B
C
MATCH
EXISTING
MATCH
EXISTING
MATCH
EXISTING
B
W
T
C
E4
C-503
CONCRETE
DISPENSER ISLAND
MATCH
EXISTING
MATCH
EISXTING
MATCH
EXISTING
.0
B
O
U
G
A
I N
V
I L
L
O
P
B
W
B
W
B
W
B
C
B
C
B
C
C4
C-503
6" HEADER
CURB
T
C
T
C
TAPER CURB
TO MATCH
EXISTING
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
DESIGN COMPLETE
J U
W A
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I C
T
F O
A
F T
E R
O
A H
U
H
A W
A I I
F Y
R
E P
A
P
L A
P
C
O V
E R
Y
S Y
S T
E M
U
N D
E R
G R
O U
O
R A
N
K S
A
N D
P I P
I N
G
A
T
G
A
T I O
N
A
O
A H
U
H
A W
A I I
A4 ENLARGED SITE PLAN
SCALE: 1" = 5'
GRAPHIC SCALE
PLAN NORTH
C-403
G R
A D
I N
G
P
L A
N
D
M
U N
N E
L L
J
J A
C O
B I
D
M
U N
N E
L L
M
F
U R
R
F Y
A
M R
C
D
W G
19.00'
LEGEND
EXISTING SPOT ELEVATION
NEW SPOT ELEVATION
X 100.00
X 100.00
EXISTING ASPHALT
FINAL SAWCUT
IMMEDIATELY PRIOR
TO NEW PAVING
EXISTING BASE
LIMITS AS SHOWN
ON PLAN
ACTUAL DEMO
12"
INITIAL SAWCUT
NEW PAVEMENT
E5
NTS
ASPHALT DEMOLITION JOINT DETAIL
NEW
AGGREGATE
BASE
E8
NTS
FILLABLE PLASTIC JERSEY BARRIER DETAIL
C9
NTS
TEMPORARY STEEL FENCE
M
I N
M
A
X
FINAL SAW CUT (TYP.)
NOTES:
INITIAL SAW CUT (TYP.)
SEE PAVEMENT REMOVAL/REPLACEMENT
DETAILS FOR DIMENSIONS
STAGES AS SHOWN IN THE SECTION "PAVEMENT REMOVAL DETAIL".
THE EXISTING CONCRETE SHALL BE SAW CUT AND REMOVED IN TWO
TO MINIMIZE SPALLING AND CHIPPING CAUSED BY BREAKING UP EXISTING
CONCRETE, FULL DEPTH SAW CUTS SHALL BE REQUIRED. THE INITIAL CUTS
SHALL BE AT LOCATIONS SHOWN IN THE DETAIL. THE FINAL CUT SHALL
BE AT THE LOCATIONS SHOWN IN THE DETAIL.
1.
2.
SECTION A-A
BASE
JOINT
EXISTING
90°
2'
SEE PLAN
DIMENSION VARIES
BE REMOVED
PAVEMENT TO
EXISTING PORTLAND CEMENT
2'
BY HAND
CONCRETE PVMT.
2'
FINAL SAWCUT
D I M
E N
S I O
N
V
A R
I E
S
PAVEMENT REMOVAL
(BY HAND METHOD)
PAVEMENT
CONCRETE
A
2'
S E
E
P
L A
N
(TYP.)
OVERCUT
AVOID
90°
A
PLAN
FINAL CONCRETE
REMOVAL
INITIAL
INITIAL SAWCUT SHALL BE PERFORMED WITH A DIAMOND BLADE SAW.
3.
SAWCUTS SHALL BE FULL DEPTH.
4.
FINAL SAWCUT SHALL BE WITH A WHEEL SAW.
5.
A5
NTS
CONCRETE PAVEMENT REMOVAL DETAIL
EXISTING
JOINT
ALONG THE JOINT LINE.
D5
NTS
SAFETY SIGN
2" MAX
MESH
SIZE
14"
NOTE:
FOR DUST CONTROL, USE A UV STABLE DUST CONTROL FABRIC FOR
1.
THE FULL HEIGHT OF THE FENCE.
1"Ø DRAIN
WITH PLUG
FORK LIFT SLOTS
7" LIGHT
MOUNT
3"
2"
2"
8'-0"
SECTION A-A
PLAN
ELEVATION
8'-0"
2.5"Ø FILL PORT
ISOMETRIC VIEW
5"
3.5"
3"
2"
5"
3"
10"
16"
FILL PORT
YELLOW
LIGHT (TYP.)
YELLOW
LIGHT
(TYP.)
NOTE:
OF ULTRA VIOLET RESISTANT POLYETHYLENE
ORANGE COLORED 24" JERSEY BARRIER MADE
1.
WITH APPROXIMATELY 1/4" WALL THICKNESS.
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
DESIGN COMPLETE
J U
W A
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I C
T
F O
A
F T
E R
O
A H
U
H
A W
A I I
F Y
R
E P
A
P
L A
P
C
O V
E R
Y
S Y
S T
E M
U
N D
E R
G R
O U
O
R A
N
K S
A
N D
P I P
I N
G
A
T
G
A
T I O
N
A
O
A H
U
H
A W
A I I
C-501
D E
M O
L I T
I O
N
D
E T
A I L
S
D
M
U N
N E
L L
J
J A
C O
B I
D
M
U N
N E
L L
M
F
U R
R
F Y
A
M R
C
D
W G
6/15/2021
NO. 23905
PROFESSIONAL
R
E
G
I S
T E
R
E
D
E
N
G
I N E
E
R
D
O
U
G
L
A
S
G
E
O
R G
I
A
M
U
N
N
E
8"
4"
CLR
DEPTH OF SEALANT =
1.0 TO 1.5 TIMES THE WIDTH
OF SEALANT RESERVOIR
1/2" TO 5/8"
POURED JOINT
SEALANT RECESSED 1/8"
TO 1/4" BELOW TOP OF
PAVEMENT (SEE NOTE 1)
NON-MOISTURE ABSORPTIVE
NON-REACTIVE BACKER ROD
TO FIT SNUG IN JOINT
1/2" TO 5/8"
SAWCUT
COMPLETED SAWCUT JOINT
DEPTH OF SAWCUT AS REQ'D FOR
SEALANT, SEALANT RECESS
AND BACKER ROD
FINAL SAWCUT FOR
JOINT SEALANT
RESERVOIR
1/8" MINIMUM INITIAL SAWCUT
T = PAVEMENT THICKNESS
T/4
JOINT
SEALANT
A
E8
CONTRACTION JOINT
NTS
CONTRACTION JOINT SEALANT
NTS
NOTE:
1. ALL NEW…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .