A. 17th North PWS.pdf
PDF 138 KB Posted
- Attached to
- 17th STB Post Yellow Ribbon North
- Solicitation number
- W9124X25QA011
About this file
This Performance Work Statement (PWS) details requirements for a Yellow Ribbon Event for the Nevada National Guard on September 13-14, 2025, in Reno, NV. The contractor must provide a venue with conference room meeting space and banquet meals to accommodate approximately 115 National Guard Service Members and their spouses/significant others. Specific requirements include:
Venue specifications mandate a four-star hotel within 20 miles of Reno, with three conference rooms (one main space for 115 guests, one break-out room for 60 support staff, and one childcare room). The contractor must provide round table seating, A/V equipment including a podium, microphone, speakers, projector, and screen, and an elevated stage. Meal requirements include a full breakfast with multiple options, plated lunch with three entrée choices, and accommodations for dietary restrictions. Additional services include on-site parking, beverage services, on-site staff representative, emergency evacuation plans, and proximity to a hospital. Childcare for 4 children (ages 5, 6, 10, and 12) is also required.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS) FOR
Yellow Ribbon Event, Reno, NV September 13-14, 2025
PART I: GENERAL INFORMATION
1. Introduction The Nevada National Guard has a requirement for conference room meeting space and banquet meals to facilitate a Yellow Ribbon Event, on September 13 and 14, 2025. The facility will accommodate a dining and training space for approximately 115 Nevada National Guard Service Members, Spouse/Significant Other in Reno, NV.
1.1 Scope
The contractor shall provide adequate conference space, plated breakfast, plated lunch, refreshments, tables and chairs, A/V support equipment, restrooms, team building exercise or access to pool (if available) and parking necessary to meet criteria defined in this Performance Work Statement (PWS) to hold a Yellow Ribbon Event. Contractor shall provide childcare, for 4 kids, (5,6,10,12).
1.2 Background
Authorized by the National Defense Authorization Act of 2008, the Department of Defense (DoD) Yellow Ribbon Reintegration Program (YRRP) will provide National Guard and Reserve Members and their Families with information, services, referral and proactive outreach opportunities throughout the entire deployment cycle: Pre-Deployment, Deployment, Demobilization and Post-Deployment-Reconstitution. It is the intent of the National Guard Bureau to establish a DoD YRRP that provides a continuum of support and high standard of care for the Army and Air National Guard members and their Families.
1.3 Period of Performance (PoP)
The Yellow Ribbon Event shall take place on September 13 and 14, 2025.
1.4 Place of Performance
The performance shall be at a venue with a minimum rating of Four Stars within a 20-mile radius of the Reno area.
1.5 Hours of Operation
The contractor shall provide a ballroom/training space from approximately 7:00 am Pacific Time September 13, 2025 to 6:00 pm Pacific Time September 14, 2025.
PART II: GENERAL REQUIREMENTS
2. This section describes general requirements for the Yellow Ribbon Event, Reno.
2.1 The Contractor shall ensure compliance of the following during the event:
PWS
SUBJECT: Yellow Ribbon Event, Reno September 13-14, 2025
2.1.1 The Contractor must provide an on-site representative at the venue during the event (event coordinator). Venue staff shall either carry proper identification or wear clothing with venue logo which identifies them as staff for the venue at all times during the event.
2.1.2 All contractor food service employees must have the required training and food handler’s permits in accordance with location regulations, on file and available for review during the event.
2.1.3 Contractor shall have clear standard emergency evacuation notices posted in all conference rooms.
2.1.4 Contractor shall provide a facility site map/layout that includes floor plans of conference room(s).
2.1.5 Contractor shall provide access to facility for support staff during the week prior to the event for a walk through. This will be to plan/coordinate outside resources (pop-up tables, extension cords, etc.) that the support staff plans to bring.
PART III: PERFORMANCE REQUIREMENTS
3. Specific Tasks and Work Requirements The contractor shall perform the following tasks to deliver the required services. The contractor shall meet these specifications to demonstrate its technical, operational, and administrative expertise in support of the Nevada National Guard Yellow Ribbon Reintegration Program objectives.
3.1 Event Setting
3.1.1 Contractor shall provide conference space that is conducive to safety and learning.
3.1.2 Venue location shall be within a 20 mile radius of the Reno area, and meet a minimum rating of Four Stars.
3.1.3 Onsite parking for all Event attendees and support staff, shall be provided.
3.1.4 Location shall be approximately 10 miles from a hospital or emergency room.
3.1.5 The contractor shall provide all conference/training area locations. All costs or fees required to access conference/training locations shall be included in the purchase price.
3.1.6 A deposit or tax for the conference room and meals cannot be required.
3.2 Conference/Meeting Services: These requirements are for the duration of the Event.
3.2.1 Three (3) conference rooms. One main conference space to accommodate up to 115 guests to be used for general training sessions and meals. One break-out room to accommodate up to 60 guests to be used for support staff. One room for childcare.
3.2.2 Conference room space must be size appropriate for personnel to move around freely from the tables and chairs.
3.2.3 Set-up round tables with chairs of 8 per table in each conference room.
3.2.4 A/V Equipment
3.2.4.1 Main conference rooms must be equipped with a podium, mic, speakers, projector, and screen. The main conference room will need an elevated stage. Additionally, each room must include a 25 ft extension cord, grounded power strip, Wi-Fi accessibility, and HDMI cable.
3.2.5 The contractor shall provide beverage services to the conference space, to include ice water, and coffee throughout the event.
3.3 Meals
The Contractor with NV ARNG cannot charge an explicit or implicit Food and Beverage Minimum charge for the event.
3.3.1 Buffet style or plated breakfast, snack bar provided during breaks (10:00 am and 2:00
pm) and lunch shall be provided by the contractor on September 6 and 7, 2025.
3.3.2 A full breakfast to include: Eggs; multiple meat selections; pancakes, waffles or biscuits;
fruit selections; cereal; selection of beverages to include coffee, tea, hot and iced water, juice, milk, etc.
3.3.2 A plated lunch meal to include: choice of 3 main entrée selections; 2 side dishes (potato or rice and vegetable), choice of salads with selection of dressings and condiments; breads;
selection of beverages to include coffee, tea, hot and iced water, juice, etc. The main entrée selection(s) will be selected by the Government prior to the event.
3.3.3 Meal options must be available for vegan, gluten and dairy-free.
3.3.4 Contractor shall ensure that meals have enough food for 115 adults.
3.3.5 All standard serving dishes, plates/glasses, utensils and linens shall be provided by the contractor.
3.3.6 Beverage service (see 3.2.5) must be available for the duration of the Event.
PART IV: SPECIAL REQUIREMENTS
4. This section describes general requirements for the Yellow Ribbon Event, Reno.
4.1. Food Handlers Permit. At a minimum, all food servers and kitchen staff must possess and maintain a current food handler’s permit, in accordance with their local regulations. Copies of these permits must be onsite and available for review during the duration of the Event.
4.2 Food Service license. At a minimum, the contractor will hold and maintain a valid food service license, in accordance with their local regulations. Copies of these licenses must be onsite and available for review during the duration of the Event.
4.3 Business license. At a minimum, the contractor will hold and maintain a valid business and operator’s license, in accordance with their local regulations. A copy of this license/s must be onsite and available for review during the duration of the Event.
4.4 Compliance. The contractor shall comply with all federal, state and local laws, codes and regulations applicable to his/her performance under this contract and shall be solely responsible for all costs associated with said compliance. Any and all licenses associated with the Contractor and the location must be available for the duration of the event and provided upon request of the Government Point of Contact.
4.5 Location shall be approximately 10 miles from a hospital or emergency room.
4.6 Meal Rates. The rate shall be tax exempt.
PART V: SAFETY AND SECURITY
5. This section describes the security and safety for the Yellow Ribbon Event. The following sub-section provide details of various considerations for this event.
5.1 Safety
Contractor Compliance: The contractor and its subcontractors shall comply with Public Law 91- 596 (Occupational Safety and Health Act (OSHA)). This requirement shall be incorporated into the contractor’s safety and health program. The Department of Defense (DOD) participates in the OSHA Voluntary Protection Program (VPP).
PART VI: QUALITY
6. Quality Assurance Surveillance Plan (QASP)
The Government shall monitor the Contractor’s performance under this Purchase Order in accordance with the Government’s QASP for Acceptable Quality Level for performance (see Appendix 1).
PART VII: DELIVERABLES
Identifier Name Description
1.3 Period of Performance Provide performance date to coincide with the required date of September 13th and the 14th and time of 7:00am-6:00pm.
1.4 Place of Performance Provide google map or similar to show that location is within the Reno area.
2.1.1 Staff identification plan Provide information on how contractor’s staff will be readily identified at the Event.
2.1.2 Employee permits All food servers to have a food handler’s permit on file and available for review during Event.
2.1.3 Emergency Evacuation
procedures
All rooms to have Emergency Evacuation Procedures posted.
2.1.4 Facility site map Provide a facility site map.
2.1.5 Facility Walkthrough Provide support staff an opportunity to walkthrough and identify the areas to be used.
3.1.2 Location Provide a google map identifying location.
3.1.3 Parking Provide parking for all Event attendees and
support staff.
3.2 Meeting room description Provide a site map/floor plan of the proposed conference room, set-up, and dimensions.
3.2.5 A/V Equipment Provide a list of A/V equipment available during the Event.
3.3 Meals Provide a plated breakfast and lunch menu which
indicates substitutions for food allergies and food limitations.
4.1 4.2 4.3 4.4
Permits and licenses Copies of permits and licenses must be onsite and available for review during the Event.
4.5 Hospital/emergency room
location
Provide a google map of the hotel proximity to a hospital and/or emergency room.
Appendix 1 Performance Requirements Summary This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
Performance Statements
Standards / Acceptable Quality Levels (AQLs)
Inspections Ratings
1.3 Period of Performance
September 13 and 14, AQL: 100%
How: Provided in proposal
Who: GOV POC
1.4 Location of venue
within the Reno Area
How: Provided in
AQL: 100% Who: GOV POC
2.1.1 Staff Identification Plan
AQL: 100%
2.1.3 Emergency Evacuation
Plan
AQL: 100%
How: Provided in
2.1.4 Facility Site Map
3.1.3 Parking
How: Inspected by
YRRP
Who: Child & Youth Program Coordinator
(CYPC)
3.2.3 Meeting room site map
YRRP
Who: CYPC
3.2.5 A/V Equipment
Who: CYPC
3.3 Meal Plan with allergy
and food limitations
Substitutions AQL: 100% Who: GOV POC 4.1 4.2
Permits & Licenses How: Inspected by
4.3 4.4
AQL: 100%
Who: GOV POC
4.5 Proximity to Hospital
or Emergency Room
AQL: 100%
How: Provided in
File details come from the government source that posted it. Updated .