This document provides details on a planned replacement integrated design-build initial outfitting multiple award task order contract (iDBIO MATOC) to be awarded by the U.S. Army Corps of Engineers Engineering District Little Rock. The new iDBIO MATOC will have a total capacity of $900 million split between unrestricted and restricted awards, and a period of performance of five years including two base years and three option years. Task orders under the contract are expected to range in size from $12 million to $75 million. The replacement iDBIO MATOC will be used to execute Air Force operations and maintenance-funded medical sustainment, restoration, and modernization requirements and provide capacity for military construction projects at the request of geographic districts and approval of the Air Force Medical Service. Contractors must demonstrate the ability to execute multiple modernization projects simultaneously within active healthcare environments, and provide design-build, integrated initial outfitting, and commodity procurement and installation services. The replacement iDBIO MATOC is anticipated to be awarded in September 2015.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MATOC 5.0 Virtual Industry Day Slides-Final.pdf | ||
| MATOC 5.0 Industry Forum Slides (15May2020).pdf | ||
| Capabilities Survey.pdf | ||
| VID Attendance.pdf | ||
| MATOC VID questions.pdf | ||
| Capability Briefing Instructions post-announcement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING STRONG®
Little Rock District
Air Force Medical Service
Program
Industry Day iDBIO MATOCs
Michael Marlow, P.E.
Chief, Air Force Medical Support Branch
17 September 2014
U.S. Army Corps of Engineers
BUILDING STRONG
Agenda
Overview of Air Force Sustainment, Restoration, Modernization (SRM) Program ► History of Program
► Program Components
► Goals of the AF Medical Facility SRM Program
► iDBIO Methodology
Replacement Integrated Design-Build Initial Outfitting (iDBIO)
MATOC
► Projected Contract Characteristics
► Necessary Contractor Capabilities
► Timeline
History of the Program
► Air Force Health Facilities Division (HFD) and HQ
USACE Signed a Program Management Plan
► Program moved from Fort Worth District to Little Rock
District
► Little Rock District promised to provide dedicated support for the AFMS SRM Program
History of the Program
► Little Rock District awarded a $712M unrestricted
MATOC and a $188M small business MATOC.
► HFD begins working with other USACE Districts to utilize the unrestricted MATOC tool to execute AF
Medical MILCON projects .
AF Medical iDBIO Program
FY11-FY14 iDBIO Program
► SRM* $611M
► MILCON** $374M
►Total $985M
* Includes capacity provided to the Army Medical Command (MEDCOM) for an FY14 Hospital Modernization project.
**Capacity transferred to other USACE Districts. Includes capacity already transferred in support of upcoming FY15 MILCON projects.
AFMS SRM Program Overview
3 Components Integrated Design-Build Initial Outfitting (iDBIO) – Fully integrated design-build process which includes transition services and facility outfitting
Engineering Infrastructure Repair (EIR) – Sustainment &
Repair projects associated with mechanical, electrical, and building envelope
Initial Outfitting – Stand-alone Initial Outfitting projects which are typically support Air Force Medical MILCON projects with furnishings and medical equipment
AF Medical Facility SRM
Design, Construct, Outfit Goals Modernize Air Force medical facilities
► State of the art healthcare operations, patient flow, equipment, furnishings, artwork, etc.
► Not simple facelifts of existing clinics/spaces
► Leverage industry experts
Managed phased construction ► Minimize disruption to critical medical operations
► Detailed transition planning/execution
Fast-track design/construct/outfit schedule
Reduce government risk and responsibility for de-conflicting separate contracts and contractors
Methodology for iDBIO
Performance based, integrated design/build outfitting concept
►Performance Based
►Integrated Design/Build
►Initial Outfitting Integration
AFMS Integrated DBIO Project Delivery Model
SEP 15 SEP 16
DEMO CONSTRUCT
CLOSE
OUT
IO-T: INITIAL
PLANNING
IO-T:
PREFINAL
IO-T:
FINAL
AWARD
(Initial Outfitting
Commodities)
AWARD
(DBIO)
MAR 17SEP 14ADVERTISE
90-100 days 200-365 days
INITIAL
DESIGN
PREFINAL
DESIGN
FINAL
DESIGN
IO-C: AWARD
OPTION
IO-T: PROCURE IO-T: INSTALL
AVG TIME = 31 Months
Equipment Planners, Interior Designers, Low Voltage Consultants & IO Installers
Mechanical/Electrical/Structural and Architectural Builders
Designer of Record (Architect-Engineers)
Contractor Project Manager
ONE CONTRACTOR (designs > builds > outfits)
USACE Project Engineer, QA & Technical Support (Geographic District)
USACE Procurement Contracting Officer/Specialist, Admin Contracting Officer & Project Manager (SWL)
USACE (life-cycle management)
AF Health Facilities Division (HFO)
ALL PHASES OPEN
FOR BUSINESS
Save Time and Money
Average Project Duration
► Design-Bid-Build-Initial Outfitting 61 Months
► Design/Build Initial Outfitting (DBIO) 31 Months
Contract Modifications
► DBIO reduces costly modifications because the general contractor owns the entire process
Teaming
► All team members are involved from cradle to grave, no handoffs
Program Products
Hospital Remodels/Modernization
Clinic Remodels/Modernization
Stand Alone Initial Outfitting
Medical Warehouses
Emergency Infrastructure Repair
Dental Clinics
Vet Clinics
Other items as needed
Initial Outfitting
Initial Outfitting Transition
Initial Outfitting Commodities
Phasing
How We Define IO-Transition
“IO-T” = Services to plan & develop requirements necessary to transition and outfit newly renovated/built medical facilities, including:
IO
P ro je c t
M a n a g e m e n t
T ra n s it io n /R e lo c a ti o n
P la n
S p a c e
R e u s e
P la n
P u b li c R e la ti o n s
/M e d ia
S u p p o rt
R e s o u rc e P ro te c ti o n
D e s ig n
C o m m u n ic a ti o n s
(N o n -C a t
A
D e s ig n
M e d ic a l E q u ip m e n t
R e q u ir e m e n ts
C a s e g o o d s /M il lw rk
(N n -C a t
A
R e q u ir e m e n ts
F u rn it u re
/F u rn is h in g s
D e s ig n
(p ro c u ra b le C
ID
A rt w o rk
D e s ig n
S ig n a g
(n t in c o n s tr u c ti o n c o n tr a c t)
How We Define IO-Commodities
“IO-C” = Goods & services to procure, deliver, install, test/certify & warranty commodities for newly renovated/built medical facilities, including:
C o n tr a c to r
O
P
M a n a g e m e n t
D e li v e ry /I n s ta ll a ti o n
/T e s ti n g
C e rt if ic a ti o n s
/M a n u a ls /T a x e s
E x c e s s in g
W a re h o u s in g
C o m m o d it y S e c u ri ty
A n ti s e p ti c
C le a n in g
R e in s ta ll in g R e u s e
O
M D a ta
L o a d in g
R ib b o n C u tt in g
D e v ic e s
M o v e
/T ra n s it io n
M a n a g e m e n t
C o m m u n ic a ti o n s
M e d ic a l E q u ip m e n t
M o v a b le
W a ll S y s te m s
C a s e g o o d s /M il lw o rk
F u rn it u re
/F u rn is h in s
A rt w o rk
S ig n a
(n n i n c o n s tr u c ti o n c o n tr a c t)
R e s o u rc e P ro te c ti o n
NOT funded w/ IO O&M: communication switches, LAN equipment, or computers, fax machines, printers, and LAN electronics
Replacement iDBIO MATOC
Replaces existing iDBIO Restricted/Unrestricted MATOCs ► Unrestricted awarded July 2013 for $712M
► Restricted awarded September 2013 for $188M
► Projected to run out of capacity in FY16
New Unrestricted iDBIO MATOCs ► CONUS (Contiguous 48 States)
► Projected Total Capacity is $900M
► Split between Restricted and Unrestricted still to be determined
► Five year contract (2 Base & 3 Option)
► Projected Award is fourth quarter of FY15
► Task Order Size can range from $12M to $75M
Proposed Use of new iDBIO
Contract Execute AF O&M-Funded Medical SRM
Requirements
Provide Contract Capacity for MILCONs when Requested by Geographic District and approved by Air Force Medical Service
Required iDBIO Contractor
Capabilities Ability to execute multiple CONUS modernization projects simultaneously
Experience with executing projects within an active healthcare environment
Ability to provide construction, integrated initial outfitting services (planning, transition services) & commodities (purchase and installation).
Contract Timeline
2-Phase Source Selection
Phase 1: Contractor Qualification Evaluation
Phase 2: Technical Evaluation
Solicitation Issue:
Phase 1 RFP April 2015
Phase 2 RFP June 2015
Contract Award September 2015
QUESTIONS?