Scope of Work/Purchase Description Summary

This is a Scope of Work and Purchase Description for the U.S. Army Corps of Engineers (USACE), Portland District, for the replacement of two stationary scissor lifts at Bonneville Lock and Dam (Contract Number W9127N26QA140). The government requires two stationary scissor lifts to replace existing 1980s-era "MITE-E-LIFT" units that provide personnel access to the ceiling for maintenance work on the bridge crane in Powerhouse II. The lifts must be delivered FOB to Bonneville Lock and Dam, Cascade Locks, Oregon, no later than 40 weeks after contract award. Delivery is restricted to normal business hours (Monday-Thursday, 7:00 a.m. to 4:00 p.m. PST), excluding federal holidays.

The scissor lifts must meet specific technical requirements including a maximum platform height of 19 feet, 1,500-pound capacity, non-slip diamond plate platform, 43-inch high fixed guardrails with 4-inch toe boards, self-closing gates, electrical controls at base and platform with dead-man switch, 110V AC 20-amp power supply, lanyard attachment points, pressure-compensating flow control, manual override for lowering, and compliance with ANSI MH29.1. The units must fit within closed dimensions of 88-113 inches length, 31 inches width, and 81 inches height with base. Contractors must submit assembly drawings and quality documentation for approval prior to fabrication. Supplier requirements include U.S. manufacturing, in-house parts and repair departments, experience with custom/stationary lifts, and up to three past performance examples. A manufacturer's standard one-year warranty on all parts, labor, and workmanship is required. The contractor must provide two maintenance, operations, and parts manuals, forklift pockets under the platform, and required protective coatings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NWP Portland District Bonneville Lock and Dam PH2 Bridge Crane 3 Scissor Lift Replacement

Scope of Work (SOW)/Purchase Description (PD)

W9127N26QA140

1. GENERAL.

The U.S. Army Corps of Engineers (COE), Portland District, Bonneville Lock and Dam require the purchase of two (2) Stationary Scissor Lifts to replace existing failing scissor lifts currently in use on the bridge crane located in Powerhouse II at Bonneville Lock and Dam. These stationary scissor lifts are installed onto the overhead bridge crane at Bonneville Dam to grant personnel access to the ceiling for maintenance work. This requirement is solely for the delivery of the two scissor lifts;

installation will be handled in-house at Bonneville Dam. The scissor lift capability and installed dimensions when closed must fit within the existing installation area, as specified in this SOW/PD.

1.1 Background

Bonneville Lock & Dam requires replacement of the two (2) existing aging and failing stationary "MITE-E-LIFT" scissor lifts that were installed around 1980. The replacement lifts are required to be stationary and not on wheels. The maximum working height is 19 feet (5.8m), with a capacity of 1500-lbs. The size of the lifts must be compliant with the dimensions as listed below:

Length 88-inches, up to 113-inches Width 31-inches Height w/ base 81-inches Height of lift 63.75-inches

The new lift is required to fit in this existing size, when not in use. The contractor is also required to provide a base that the lift can be mounted on.

The existing lifts are original to the 1980s installation, and the dimensions are listed above.

After contract award, the contractor is required to confirm design dimensions with Bonneville engineering prior to lift fabrication.

1.2 Scope of Work.

The Contractor shall furnish and deliver two (2) scissor lifts to Bonneville Lock and Dam by the date shown in section 1.4 of this SOW/PD. The Contractor shall also provide submittals, drawings, and other documentation as stated in section 1.3 this SOW/PD.

1.2.1 Technical Specifications.

SUPPLY

DESCRIPTION MFR MODEL # QTY EST. UNIT

PRICE

EST.

TOTAL

Stationary Scissor Lift per Technical Specifications listed in section

1.2.1 of this PD

The supplied scissor lifts must meet the following requirements:

MAXIMUM PLATFORM HEIGHT: 19-ft PLATFORM FLOOR: Non-slip diamond plate non-slip surface SAFETY RAILS: 43" (1.09m) high fixed guardrails with 4" (0.1) toe boards surrounding the platform ACCESS GATE: Self-closing gate on end of platform. Gates swing inward.

PLATFORM CAPACITY: 1500 lbs.

CONTROLS: Electrical controls required at base and on platform. Include dead-man switch.

POWER SUPPLY: 110V AC, 20 amp PAINT: Required protective coatings be applied.

ADDITIONAL REQUIRED FEATURES:

Lanyard attachment points - allows for the attachment of lanyards by operators Self-closing, self-latching gates - provides completely enclosed platform for operator safety Pressure compensating flow control Manual override control for lower Two (2) maintenance, operations and parts manuals Forklift Pockets provides under platform Unit built to ANSI MH29.1

1.3 Submittals.

The Contractor shall submit the following for approval, prior to fabrication:

1.3.1 Scissor Lift Assembly Drawing.

Contractor shall submit the “Scissor Lift Assembly Drawing” for approval prior to production. The Government will confirm with awarded supplier the suitability of the proposed design.

The drawings shall include materials, dimensions, specifications, vendor name and phone number, and a drawing number that can be referenced for replacement parts on future orders. The drawings shall be provided as PDF digital format so it can be added to the existing drawing database. If available, the CADD version of the drawing shall also be provided.

1.3.2 Scissor Lift Quality Documentation.

Prior to shipping, Contractor shall submit for approval detailed quality documentation and photos showing the scissor lifts measure to match tolerances and acceptance criteria shown in the submitted and approved Scissor Lift Assembly Drawing.

Contractor shall submit test records for each scissor lift prior to shipment.

1.4 Supplier Requirements.

The following details are requirements of the supplier:

1. Manufacturing must be in the United States of America.

2. In-house parts and repair department.

3. Experience with design, manufacture and installation of custom/stationary lifts.

4. Up to three (3) past performance examples of successful custom lifts .

1.5 Warranty.

All items shall be covered by the manufacturer’s standard warranty on all parts, labor, and workmanship from factory defects. Warranty period shall be a minimum of one year.

1.6 Shipment and Delivery.

Deliver free-on-board (FOB) to the project address below no later than 40 weeks after contract award. The contractor shall be responsible for packing and shipping the components in a manner that will ensure undamaged and complete arrival to the powerhouse. No shipments are allowed other than normal business hours of Monday-Thursday 7:00 a.m. to 4:00 p.m. PST, excluding federal holidays. Please note, if a federal holiday occurs on a Sunday, it is observed the Monday after.

All shipments shall be delivered to:

US Army Corps of Engineers Bonneville Lock and Dam Interstate 84 Exit 40 NE Bonneville Way Cascade Locks, OR 97014

2. Invoice Information

Invoice Information Invoices shall be submitted to the following:

USACE FINANCE CENTER

5722 INTEGRITY DRIVE

WILLINGTON, TN 38054-5005

Electronic copy also sent to: USACE, Finance Center at:

CEFC-G2INVOICES@USACE.ARMY.MIL and roger.a.montavon@usace.army.mil

3. Points of Contact (POC) Delivery POC:

Roger Montavon – roger.a.montavon@usace.army.mil Phone: a. (541) 374-3616 b. (541) 419-7052 mailto:CEFC-G2INVOICES@USACE.ARMY.MIL mailto:roger.a.montavon@usace.army.mil mailto:roger.a.montavon@usace.army.mil