A.02.17.3 SOW Att#3 Annotated drawings.pdf

PDF 1004 KB Posted

Attached to
Renovation of Kalvarija Fire Brigade Station, Lithuania
Solicitation number
W912GB21R0017
Issued by

About this file

This document includes annotated drawings and details for the Renovation of Kalvarija Fire Brigade Station in Lithuania. The US Army Corps of Engineers Europe District intends to select one contractor through a Design-Build contract to renovate the Kalvarija Fire Brigade Station located in Kalvarija, Lithuania. Attachment 3 of the solicitation provides existing and proposed floor plans for the renovation, noting structural elements and spaces. The solicitation number is W912GB21R0017 and responses are due to the Department of the Army European Command. The renovation aims to upgrade the facility for the Kalvarija Fire Brigade.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kalvarija Brigade Station OHASIS ID# 39004 Kalvarija, Lithuania

Kalvarija Brigade Station Kalvarija, Lithuania

ATTACHMENT#3: ANNOTATED DRAWINGS

SUTARTINIAI ZYMEJIMAI (marl<ings):

'\).\\ ,yS§S-...\ '- · Esamos sienos {existing walls)

===== . Numatomos naujos sienos (new walls}

:: : :- : : : : :- : • Panaikinamos esamos sienos (removed walls)

• Uttaisomos esamos angos (removed holes)

� - !va:!iavimai i pastatc\ (driving in the building}

� - J�jimai i pastatc\ (entry in the building)

PROPOSED FLOOR PLAN

�£1 e.�1 d il'!'SI

Garatas (Garage)

.......A5!L________r -t

;i· ':%: I /, I :;,, Jrtt-f.,;

11:nci g=

Gara.las (Garage)

1//

OHASIS ID# 39004

Eksplikacija -.

Pat Pavadinimas Platas, Nr. m'

1.01 Koridorius 2.36

1.02 Budelojo petalpa Ir poilslo patalpa 24.98

1.03 Komanelos vado kebinetas 12.64

1.04 Persirengimo pala!pa 22.06

1.05 Du�es 2.58

1.06 WC 3.37

1.07 Vatyrno priemoniti patalpa 2.22

1.08 Kcmandos poilslo pate!pa 35.43

1.09 Gara2:as 117.08

1.10 Trenyru�h,1 patalpa 29.49

1.11 2:am4 plovimo ir dtlovinlmo palalpa 15.79

1.12 Jrengl nllj prlebOros Ir sandelevimo 33.70

palalpa

1.13 Technine petelpa, katiline 15.29

Bendras patalpq pld:as: 316.99

Explication

Room Room name Area, No.

1.01 1.02 1.03 1.04 1.05 1.06

1.07 1.08 1.09 1.10 1.11

1.12

7"1 3 m' Corridor 2.36 Guard room end rest room 24.98 Team leader's office 12.64 Clothing change room 22.06 ShaNer 2.58

WC 3.37

Cleaner room 2.22 Team rest room 35.43 Garasie 117.08 G)mroom 29.49 Fire hose washing end drying 15.79 r0001 Equipment maintenance end 33.70 staage room Technical room, heater room 15.29 Tol:el area of rooms: 316.99

NOTE: DRAWINGS ARE PROVIDED FOR REFERENCE ONLY.

CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL

EXISTING CONDITIONS. CONTRACTOR IS RESPONSIBLE

FOR PROVIDING A DESIGN THAT MEETS ALL APPLICABLE

CODES AND REQUIREMENTS OF THE SOIJ.

m US Army Corps of Engineers®

Ii hi 11 °ffi 8 �i a"�• > os

���� �t

Ii

SHEET 10

I��

A-102

li11_Att#3_Existing Floor Plan
li11_Att#3_Proposed Floor Plan

File details come from the government source that posted it. Updated .