A_-_City_Hall_3rd_Floor_Attachments.pdf

PDF 908 KB Posted

Attached to
City Hall 3rd Floor Renovations
Solicitation number
2026-135
Issued by
Polk County, Florida

About this file

This document contains attachment materials supporting a renovation solicitation from the City of St. Cloud, Florida for third-floor improvements to City Hall located at 1300 9th Street, St. Cloud, Florida 34769. The project scope involves converting the City Clerk's storage room into a break room and conference room, as well as modifications to the City Attorney/City Clerk's area including installation of a new wall and removal of a door. Renovation services encompass new flooring, painting, electrical work, cabinets, and carpentry in the break room and conference room, while the City Attorney/City Clerk's area improvements include painting, electrical work, and carpentry. The solicitation seeks one qualified contractor to complete these comprehensive renovation services for the City Manager's Department.

The attachment materials provided support the main solicitation but do not specify pricing terms, contract award dates, site visit requirements, bid submission deadlines, or funding amounts within the content referenced. Additional documentation such as detailed scope of work specifications, project drawings, or bidders' conference information would be contained within the complete attachment package to guide potential contractors in preparing accurate proposals and bids for this renovation project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City Manager Office Interior Space Reconfiguration - Scope of Work

WALL TO EXTEND FULL

HEIGHT TO THE LIFT

EXISTING DOOR TO REMAIN IN

RELOCATE EXISTING 220V

RECEPTACLE TO LEFT

SIDE OF WALL. CABINETS,

SINK, AND

REFRIGERATOR TO BE

LOCATED ALONG THIS

WALL. EXISTING

PLUMBING AND DRAIN

CONNECTIONS ARE

AVAILABLE; THIS WALL IS

BACK-TO-BACK WITH THE

EXISTING PLUMBING

LOCATION.

REMOVE EXISTING CARPET AND

BASEBOARDS. INSTALL

COMMERCIAL-GRADE LAMINATE

FLOORING WITH 4-INCH VINYL

BASE, OR INDUSTRY-STANDARD

HEIGHT.

EXISTING CABINET SYSTEM TO

BE REMOVED BY CITY PRIOR TO

CONSTRUCTION.

NEW CONFERENCE ROOM

CARPET TO BE APPROVED BY

THE CITY PRIOR TO

INSTALLATION.

Transition in flooring from carpet to Laminate

Location wall for new TV

This portion of the wall needs to be removed and column behind it is to remain

This wall extends across and the existing door in photo becomes another entrance into the conference room.

CONSTRUCT NEW WALL BEHIND EXISTING DOOR TO

CREATE SEPARATION FROM THE ADJACENT OFFICE

AREA. PROVIDE ELECTRICAL RECEPTACLES ALONG THE

NEW WALL AS REQUIRED. PROVIDE DEDICATED LIGHT

SWITCHES, PREFERABLY LOCATED NEAR THE NEW

ENTRY DOOR. INSTALL LED LIGHTING THROUGHOUT

THE NEWLY CONFIGURED OFFICE SPACE.

ADD NEW DOOR

CONSTRUCT NEW WALL TO CONNECT

WITH THE ADJACENT NEW PARTITION

WALL. RELOCATE EXISTING ACCESS-

CONTROL PAD TO THE NEW WALL.

FIELD VERIFY EXISTING HALLWAY

LIGHTING AND DETERMINE WHETHER A

SEPARATE LIGHTING CIRCUIT OR

SWITCHING IS REQUIRED. COORDINATE

FINAL REQUIREMENTS WITH THE CITY

PRIOR TO INSTALLATION.

Access pad gets move to this wall and wall outlets to be provided on inside of wall for new office space.

REMOVE EXISTING DOOR AND

FRAME. REUSE DOOR AND/OR

FRAME IF SERVICEABLE AND

APPROVED BY THE CITY. INFILL

THE EXISTING DOOR OPENING TO

MATCH ADJACENT WALL

CONSTRUCTION. PATCH, FINISH,

PRIME, AND PAINT THE ENTIRE

AFFECTED WALL TO MATCH

EXISTING FINISHES.

BASE SCOPE - GENERAL REQUIREMENTS
The project consists of two primary room conversions and associated office-area reconfiguration: (1) conversion of the existing file storage room into the new conference room; (2) conversion of the existing conference room into the new breakroom; and ...
1.1 Site Verification and Existing Conditions
1.2 Permits, Inspections, and Code Compliance
1.3 Protection and Coordination
2. EXISTING FILE STORAGE ROOM TO NEW CONFERENCE ROOM
2.1 Demolition and Room Preparation
2.2 Doors, Frames, and Openings
2.3 Conference Room Flooring
2.4 Conference Table Floor Electrical Boxes/Electrical Receptacles
2.5 Existing Television Relocation
2.6 Conference Room Finishes
3. EXISTING CONFERENCE ROOM TO NEW BREAKROOM
3.1 Demolition and Preparation
3.2 Cabinetry
3.3 Countertop and Backsplash
3.4 Sink and Plumbing
3.5 Refrigerator Provisions
3.6 Stovetop/Oven and Existing 220V Receptacle
3.7 Additional Breakroom Electrical
3.8 Commercial Laminate Flooring
3.9 Vinyl Cove Base
3.10 Breakroom Painting and Finishes
4. ADJACENT OFFICE / HALLWAY RECONFIGURATION
Provide the additional interior reconfiguration work within the adjacent office and storage areas as indicated by the City and Field Addendum. Work includes construction of a new partition wall within the existing office area, creation/modification of...
4.1 New Partitions and Wall Modifications
4.2 New Door Opening
4.3 Door A-351 Removal and Wall Infill
4.4 Access-Control Pad Relocation
4.5 Electrical Receptacles
4.6 Lighting and Switching
4.7 Office / Hallway Finishes
5. FIRE PROTECTION AND LIFE SAFETY
6. FINISH MATCHING AND CITY APPROVAL
7. PATCHING AND RESTORATION
8. CLEANUP, TESTING, WARRANTY, AND CLOSEOUT