A-2 Schedule of Services.xlsx
XLSX spreadsheet 28 KB Posted
- Solicitation number
- SP3300-25-Q-0035
- Issued by
-
Defense Logistics Agency Distribution
About this file
This is a pricing schedule spreadsheet for a hybrid firm-fixed-price and time & materials contract for preventative maintenance and corrective maintenance of weigh scales at DLA Distribution Warner Robins Georgia. The contract includes a base year (3/1/2025 - 2/28/2026) and four option years through 2/28/2030.
Each contract year consists of three CLINs: 1) Annual calibration and preventative maintenance services for 149 weigh scales as a firm-fixed-price job, 2) Hourly labor for corrective maintenance repairs with an estimated 50 hours per year, and 3) Replacement parts for corrective maintenance with a ceiling of $15,000 per year. The total ceiling price across all five years is $75,000 ($15,000 per year). The solicitation (SP3300-25-Q-0035) is unrestricted with HUBZone price evaluation preference. Bidders must complete unit pricing in the green blocks, rounded to two decimal places.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SP3300-25-Q-0035 0001.pdf | ||
| CSS SP3300-25-Q-0035.pdf | ||
| A-3 Scales Equipment List.xlsx | XLSX spreadsheet | |
| A-4 DoL Wage Determination 2015-4495.pdf | ||
| A-1 SOW - Scales.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BaseYear
| Only complete blocks in Green | |||||
| Prices must be rounded to two decimal places | |||||
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE | |
| Base Year: 3/1/2025 - 2/28/2026 |
| Firm-Fixed-Price | ||||
| CLIN 0001 | Annual Calibration and Preventive Maintenance (PM) Service for Weigh Scales IAW Paragraph 1.0 in the Statement of Work. (Quantity: 149 units = 1 JB, 1 calibration and inspection job per year.) | 1 | JB | $0.00 |
Total Firm-Fixed-Price $0.00
| Time and Material CLINs | Ceiling Price | |||
| CLIN 0002 | Hourly labor rate to perform equipment repairs in conjunction with corrective maintenance (CM) IAW Paragraph 2.0 in the Statement of Work. The number of hours shown is an estimate only. Contractor will be paid only for the actual number of hours worked. | 50 | HR | $0.00 |
| CLIN 0003 | Replacement parts for equipment repairs in conjunction with corrective maintenance. This is an estimated amount for replacement parts required for corrective maintenance of the weigh scales. Contractor will be reimbursed for the actual cost of replacement parts IAW Paragraph 4.0 in the Statement of Work. | $15,000.00 |
Total Time and Material $15,000.00
TOTAL BASE YEAR CEILING PRICE $15,000.00
| Total Base Year | $15,000.00 | |
| Total Option Year 1 | $15,000.00 | |
| Total Option Year 2 | $15,000.00 | |
| Total Option Year 3 | $15,000.00 | |
| Total Option Year 4 | $15,000.00 | |
| Total Base and Option Years | $75,000.00 | |
| Controlled by: | ||
| Controlled by: |
| CUI Category: PROCURE |
| Distribution/Dissemination Control: FEDCON ONLY |
| POC: |
&"Arial,Bold"&12CUI
&"Arial,Bold"SOURCE SELECTION INFORMATION
SEE FAR 2.101 AND 3.104
CUI
Option Year 1
| Only complete blocks in Green | |||||
| Prices must be rounded to two decimal places | |||||
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE | |
| OY 1: 3/1/2026 - 2/28/2027 |
| Firm-Fixed-Price | ||||
| CLIN 1001 | Annual Calibration and Preventive Maintenance (PM) Service for Weigh Scales IAW Paragraph 1.0 in the Statement of Work. (Quantity: 149 units = 1 JB, 1 calibration and inspection job per year.) | 1 | JB | $0.00 |
Total Firm-Fixed-Price $0.00
| Time and Material CLINs | Ceiling Price | |||
| CLIN 1002 | Hourly labor rate to perform equipment repairs in conjunction with corrective maintenance (CM) IAW Paragraph 2.0 in the Statement of Work. The number of hours shown is an estimate only. Contractor will be paid only for the actual number of hours worked. | 50 | HR | $0.00 |
| CLIN 1003 | Replacement parts for equipment repairs in conjunction with corrective maintenance. This is an estimated amount for replacement parts required for corrective maintenance of the weigh scales. Contractor will be reimbursed for the actual cost of replacement parts IAW Paragraph 4.0 in the Statement of Work. | $15,000.00 |
Total Time and Material $15,000.00
TOTAL OPTION YEAR CEILING PRICE $15,000.00
| Controlled by: |
| Controlled by: |
| CUI Category: PROCURE |
| Distribution/Dissemination Control: FEDCON ONLY |
| CUI Category: SSL |
| Distribution/Dissemination Control: FEDCON ONLY |
| POC: |
&"Arial,Bold"&12CUI
&"Arial,Bold"SOURCE SELECTION INFORMATION
CUI
Option Year 2
| Only complete blocks in Green | |||||
| Prices must be rounded to two decimal places | |||||
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE | |
| OY 2: 3/1/2027 2/29/2028 |
| Firm-Fixed-Price | ||||
| CLIN 2001 | Annual Calibration and Preventive Maintenance (PM) Service for Weigh Scales IAW Paragraph 1.0 in the Statement of Work. (Quantity: 149 units = 1 JB, 1 calibration and inspection job per year.) | 1 | JB | $0.00 |
Total Firm-Fixed-Price $0.00
| Time and Material CLINs | Ceiling Price | |||
| CLIN 2002 | Hourly labor rate to perform equipment repairs in conjunction with corrective maintenance (CM) IAW Paragraph 2.0 in the Statement of Work. The number of hours shown is an estimate only. Contractor will be paid only for the actual number of hours worked. | 50 | HR | $0.00 |
| CLIN 2003 | Replacement parts for equipment repairs in conjunction with corrective maintenance. This is an estimated amount for replacement parts required for corrective maintenance of the weigh scales. Contractor will be reimbursed for the actual cost of replacement parts IAW Paragraph 4.0 in the Statement of Work. | $15,000.00 |
Total Time and Material $15,000.00
TOTAL OPTION YEAR CEILING PRICE $15,000.00
| Controlled by: |
| Controlled by: |
| CUI Category: PROCURE |
| Distribution/Dissemination Control: FEDCON ONLY |
| CUI Category: SSL |
| Distribution/Dissemination Control: FEDCON ONLY |
| POC: |
&"Arial,Bold"&12CUI
CUI
Option Year 3
| Only complete blocks in Green | |||||
| Prices must be rounded to two decimal places | |||||
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE | |
| OY 3: 3/1/2028 - 2/28/2029 |
| Firm-Fixed-Price | ||||
| CLIN 3001 | Annual Calibration and Preventive Maintenance (PM) Service for Weigh Scales IAW Paragraph 1.0 in the Statement of Work. (Quantity: 149 units = 1 JB, 1 calibration and inspection job per year.) | 1 | JB | $0.00 |
Total Firm-Fixed-Price $0.00
| Time and Material CLINs | Ceiling Price | |||
| CLIN 3002 | Hourly labor rate to perform equipment repairs in conjunction with corrective maintenance (CM) IAW Paragraph 2.0 in the Statement of Work. The number of hours shown is an estimate only. Contractor will be paid only for the actual number of hours worked. | 50 | HR | $0.00 |
| CLIN 3003 | Replacement parts for equipment repairs in conjunction with corrective maintenance. This is an estimated amount for replacement parts required for corrective maintenance of the weigh scales. Contractor will be reimbursed for the actual cost of replacement parts IAW Paragraph 4.0 in the Statement of Work. | $15,000.00 |
Total Time and Material $15,000.00
TOTAL OPTION YEAR CEILING PRICE $15,000.00
| Controlled by: |
| Controlled by: |
| CUI Category: PROCURE |
| Distribution/Dissemination Control: FEDCON ONLY |
| CUI Category: SSL |
| Distribution/Dissemination Control: FEDCON ONLY |
| POC: |
&"Arial,Bold"&12CUI
CUI
Option Year 4
| Only complete blocks in Green | |||||
| Prices must be rounded to two decimal places | |||||
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE | |
| OY 4: 3/1/2029 - 2/28/2030 |
| Firm-Fixed-Price | ||||
| CLIN 4001 | Annual Calibration and Preventive Maintenance (PM) Service for Weigh Scales IAW Paragraph 1.0 in the Statement of Work. (Quantity: 149 units = 1 JB, 1 calibration and inspection job per year.) | 1 | JB | $0.00 |
Total Firm-Fixed-Price $0.00
| Time and Material CLINs | Ceiling Price | |||
| CLIN 4002 | Hourly labor rate to perform equipment repairs in conjunction with corrective maintenance (CM) IAW Paragraph 2.0 in the Statement of Work. The number of hours shown is an estimate only. Contractor will be paid only for the actual number of hours worked. | 50 | HR | $0.00 |
| CLIN 4003 | Replacement parts for equipment repairs in conjunction with corrective maintenance. This is an estimated amount for replacement parts required for corrective maintenance of the weigh scales. Contractor will be reimbursed for the actual cost of replacement parts IAW Paragraph 4.0 in the Statement of Work. | $15,000.00 |
Total Time and Material $15,000.00
TOTAL OPTION YEAR CEILING PRICE $15,000.00
| Controlled by: |
| Controlled by: |
| CUI Category: PROCURE |
| Distribution/Dissemination Control: FEDCON ONLY |
| CUI Category: SSL |
| Distribution/Dissemination Control: FEDCON ONLY |
| POC: |
&"Arial,Bold"&12CUI
CUI
File details come from the government source that posted it. Updated .