A-10 J5-Trabuco4_Drawings.pdf

PDF 4 MB Posted

Attached to
Bridge Replacement Trabuco Canyon Crossing AOP #4 Federal contract opportunity
Solicitation number
12970224R0033
Issued by
Department of Agriculture Forest Service

About this file

This document is a set of drawings and specifications for the Trabuco Canyon Crossing #4 bridge replacement project on the Cleveland National Forest in California. The project involves constructing a new precast prestressed concrete box beam bridge, including abutments, approach roadway, streambed work, and railing. Key details include:

The bridge superstructure and bearings are to be designed by the contractor to AASHTO LRFD standards, supporting HL-93 and legal vehicle loads. The bridge will be 68.5 feet long with 4 box beams, and have steel beam railing and approach guardrail. Substantial excavation, embankment, riprap, and streambed work is required. The contractor is responsible for dewatering, erosion control, and other site preparations. The project is located approximately 4.4 miles from the Trabuco Canyon/Trabuco Creek Road intersection in Orange County, California within the Cleveland National Forest. The solicitation number is 12970224R0033.

View the file

Other files for this federal contract opportunity

Other files attached to Bridge Replacement Trabuco Canyon Crossing AOP #4, newest first.
File Type Posted
A-11 Existing and new structure overlay-Model addendum 2 Att 2.pdf PDF
A-11 Trabuco Canyon Bridge Sites 1 2 and 4 Geotechnical Assessment-adm 2 att 1.pdf PDF
A-11 12970224R0033 amd 2.pdf PDF
A11 1amendment0001-12970224R0033.pdf PDF
A-10 12970224R0033-solicitation.pdf PDF
A-10 12970224R0033-fm.pdf PDF
A-10 J7-Appendix A_ Bridges_BMPs 2012.docx DOCX document
A-10 J2- SOI - 129702224R0033.xlsx XLSX spreadsheet
A-10 J8-Wage Determination.pdf PDF
A-10 J9-CNF Invasive Weeds List.pdf PDF
A-10 J3-Trabuco_FSSS_20240215.docx DOCX document
A-10 J4-Project Map GIS 4.pdf PDF
A-10 J6-Fire Plan.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION MAP

PROJECT LOCATION MAP

SHEET OF

United States Department of Agriculture

Forest Service

001 012

PROJECT LOCATION: 33.6752, -117.5189

THE TRABUCO 4 PROJECT SITE IS LOCATED WITHIN THE CLEVELAND NATIONAL FOREST TRABUCO RANGER DISTRICT ON TRABUCO CREEK ROAD, FSR-6S13, AT APPROXIMATELY 4.4 MILES FROM THE INTERSECTION OF TRABUCO CREEK ROAD AND

TRABUCO CANYON ROAD, S19, IN ORANGE COUNTY CALIFORNIA.

RECOMMENDED BY:

APPROVED:

FOREST ENGINEER

DISTRICT RANGER

DATE

DATE

DIRECTOR OF ENGINEERING DATE

FOREST SUPERVISOR DATE

DATE

2/2 3/2

4 1 5:

P

AU

LL

IN

D

C:

\U

SE

RS

\P

AU

LL

IN

D\

BO

X\

EP

_O

NE

ST

OP

SH

OP

\E P

PR

OJ

EC

T

AG

RE

EM

EN

TS

\N

FS

\R

-0

5\0 2-

CL

EV

EL

AN

D\

-E

NG

-0

2-

6\5 _W

OR

KI

NG

F

IL

ES

\T

RA

BU

CO

4\

_D

RA

W

IN

GS

\D

ES

IG

NF

IL

ES

\P

LA

NS

T

RA

BU

CO

4\

TR

AB

UC

O4

0.D

W G;

TRABUCO CANYON CROSSING #4

REGIONAL BRIDGE ENGINEER

CALIFORNIA

ORANGE COUNTY

(R05) PACIFIC SOUTHWEST REGION

CLEVELAND NATIONAL FOREST

TRABUCO RANGER DISTRICT

RD 6S13

INDEX OF SHEETS

SHEET SHEET TITLE DATE

X-01 COVER SHEET

X-02 GENERAL NOTES

X-03 EXISTING SITE PLAN

X-04 SITE PLAN

X-05 ROAD AND STREAM PROFILES

X-06 TYPICAL SECTIONS

X-07 ABUTMENT PLAN & ELEVATION

X-08 ABUTMENT DETAILS

X-09 GIRDER LAYOUT AND TYPICAL SECTIONS

X-10 BRIDGE RAILING LAYOUT

X-11 RAILING DETAILS

X-12 APPROACH RAILING DETAILS

PROJECT LOCATION

R-1709-001

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/2 3/2

4 1 5:

P

AU

LL

IN

D

C:

\U

SE

RS

\P

AU

LL

IN

D\

BO

X\

EP

_O

NE

ST

OP

SH

OP

\E P

PR

OJ

EC

T

AG

RE

EM

EN

TS

\N

FS

\R

-0

5\0 2-

CL

EV

EL

AN

D\

-E

NG

-0

2-

6\5 _W

OR

KI

NG

F

IL

ES

\T

RA

BU

CO

4\

_D

RA

W

IN

GS

\D

ES

IG

NF

IL

ES

\P

LA

NS

T

RA

BU

CO

4\

TR

AB

UC

O4

0.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

TRABUCO

CANYON

CROSSING #4

CLEVELAND NATIONAL

FOREST

TRABUCO RANGER DISTRICT

GENERAL NOTES

02/23/2024

P. LIND

P. LIND

I. ANDERSON

X-02 002 012

SUMMARY OF QUANTITIES

ITEM NO. DESCRIPTION PAY UNIT QUANTITY

15101 Mobilization LS 1

15205 Bridge Surveying and Staking LS 1

15601 Public Traffic, Temporary bypass LS 1

15713 Soil erosion and pollution control LS 1

20101 Clearing and grubbing LS 1

20301 Removal of Structures and Obstructions, Disposal method A LS 1

20405 Roadway Embankment Excavation, tolerance class C CY 10

20415 Embankment Construction, compaction method 1 CY 1210

20701 Earthwork Geosynthetics, Type I-A SY 520

20801 Structure Excavation CY 1280

20859 Structural Backfill CY 610

21102 Roadway obliteration LS 1

25101 Placed Riprap, Class 6, Method A CY 640

30104 Aggregate base, grading D, compaction method D Ton 430

40304 Asphalt Concrete, type Cal Trans 1/2" max. medium, PG-64-10 Ton 95

41201 Asphalt Tack Coat, Grade SS1h LS 1

55201 Structural Concrete, Class A (AE) CY 210

55301 Precast, Prestressed Concrete 2'-6"x 4'-0"x 68'-6" Box Beam; Design, Fabricate, Transport, and Install Ea 4

55401 Reinforcing Steel Lb 21100

55601 Bridge Railing, Steel, Two Rail LF 137

56401 Bearing Device, Elastomeric; Design, Fabricate, Transport, and Install Ea 16

60504 Geocomposite Sheet Drain System SY 190

61701 Guardrail System G4, Type II, Class B Wood Posts LF 100

61702 Terminal Section Type G4-CRT with Concrete Anchor Ea 4

61710 Structure connection Ea 4

62502 Turf Establishment Acre 2

63301 Sign System, 4 - Type 3 Object Markers, 2 - Narrow Bridge signs Ea 6

64801 Streambed Simulation - regrade channel LS 1

R-1709-002

AutoCAD SHX Text GENERAL AND DESIGN NOTES SPECIFICATIONS 1. MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-14), AS MODIFIED FOR THIS PROJECT AND APPLICABLE FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS). DESIGN SPECIFICATIONS 1. THE BRIDGE SUPERSTRUCTURE AND BEARING DESIGN SHALL BE PERFORMED BY THE CONTRACTOR TO THE GEOMETRY SHOWN ON THESE DRAWINGS AND SHALL BE IN THE BRIDGE SUPERSTRUCTURE AND BEARING DESIGN SHALL BE PERFORMED BY THE CONTRACTOR TO THE GEOMETRY SHOWN ON THESE DRAWINGS AND SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS AND THE DESIGN LOADS SHOWN ON THIS DRAWING. 2. THE SUPERSTRUCTURE SHALL BE DESIGNED FOR THE HL-93 DESIGN VEHICLE IN ACCORDANCE WITH THE MOST CURRENT EDITION OF THE AASHTO LRFD BRIDGE DESIGN THE SUPERSTRUCTURE SHALL BE DESIGNED FOR THE HL-93 DESIGN VEHICLE IN ACCORDANCE WITH THE MOST CURRENT EDITION OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS. INCLUDE ADDITIONAL DEAD LOAD FOR FUTURE ASPHALT WEARING SURFACE OVERLAYS, 4" THICK. 3. DESIGN CALCULATIONS SHALL INCLUDE LOAD RATINGS FOR INVENTORY AND OPERATING OF THE HL-93 DESIGN LOAD AND THE TYPE 3, 3S2, 3-3, NRL LEGAL VEHICLES, DESIGN CALCULATIONS SHALL INCLUDE LOAD RATINGS FOR INVENTORY AND OPERATING OF THE HL-93 DESIGN LOAD AND THE TYPE 3, 3S2, 3-3, NRL LEGAL VEHICLES, CALCULATIONS SHALL INCLUDE LOAD RATINGS FOR INVENTORY AND OPERATING OF THE HL-93 DESIGN LOAD AND THE TYPE 3, 3S2, 3-3, NRL LEGAL VEHICLES, AND EMERGENCY VEHICLES EV2 AND EV3 IN ACCORDANCE WITH AASHTO MANUAL FOR BRIDGE EVALUATION, CURRENT ADDITION WITH INTERIMS, USING LRFR METHODOLOGY. LOAD RATING CALCULATIONS AND REPORT SHALL BEAR THE SEAL AND SIGNATURE OF A PROFESSIONAL ENGINEER LICENSED IN THE STATE WHERE THE PROJECT WILL BE CONSTRUCTED. 4. LONGITUDINAL JOINTS IN THE DECK SHALL BE DESIGNED FOR THE LATERAL DISTRIBUTION OF A 16K WHEEL LOAD . LONGITUDINAL JOINTS IN THE DECK SHALL BE DESIGNED FOR THE LATERAL DISTRIBUTION OF A 16K WHEEL LOAD . 5. DESIGN CALCULATIONS AND SHOP DRAWINGS SHALL BE SUBMITTED TO THE CONTRACTING OFFICER (CO) FOR APPROVAL 2 WEEKS PRIOR TO FABRICATION AND SHALL DESIGN CALCULATIONS AND SHOP DRAWINGS SHALL BE SUBMITTED TO THE CONTRACTING OFFICER (CO) FOR APPROVAL 2 WEEKS PRIOR TO FABRICATION AND SHALL BEAR THE SEAL AND SIGNATURE OF A PROFESSIONAL ENGINEER LICENSED IN THE STATE WHERE THE PROJECT WILL BE CONSTRUCTED. GEOTECHNICAL REPORT 1. TRABUCO CANYON BRIDGE SITES 1, 2, AND 4 GEOTECHNICAL ASSESSMENT REV. 1, 2022, IS AVAILABLE FROM THE GOVERNMENT. PROVIDE TWO WEEKS NOTICE TO THE CO TRABUCO CANYON BRIDGE SITES 1, 2, AND 4 GEOTECHNICAL ASSESSMENT REV. 1, 2022, IS AVAILABLE FROM THE GOVERNMENT. PROVIDE TWO WEEKS NOTICE TO THE CO WHEN SUBMITTING REQUEST FOR COPY. HARDWARE AND STRUCTURAL STEEL 1. ALL STEEL SHAPES, PLATES, AND BARS SHALL CONFORM TO AASHTO M270 GRADE 36 (ASTM A36). ALL STEEL SHAPES, PLATES, AND BARS SHALL CONFORM TO AASHTO M270 GRADE 36 (ASTM A36). 2. HARDWARE AND STEEL ELEMENTS ARE TO BE UNCOATED (BLACK). HARDWARE AND STEEL ELEMENTS ARE TO BE UNCOATED (BLACK). CONCRETE 1. PRESTRESSED CONCRETE SHALL BE CLASS P CONCRETE, f'c = 5000 PSI MIN. AT 28 DAYS. PRESTRESSED CONCRETE SHALL BE CLASS P CONCRETE, f'c = 5000 PSI MIN. AT 28 DAYS. 2. REINFORCED CONCRETE SHALL BE CLASS A(AE) CONCRETE, f'c = 4500 PSI MIN. AT 28 DAYS. REINFORCED CONCRETE SHALL BE CLASS A(AE) CONCRETE, f'c = 4500 PSI MIN. AT 28 DAYS. 3. SUPERSTRUCTURE CONCRETE SHALL BE GIVEN A CLASS 1 "ORDINARY SURFACE FINISH". SUPERSTRUCTURE CONCRETE SHALL BE GIVEN A CLASS 1 "ORDINARY SURFACE FINISH". 4. ABUTMENT AND WINGWALL CONCRETE SHALL BE GIVEN A CLASS 2 "RUBBED FINISH" ABUTMENT AND WINGWALL CONCRETE SHALL BE GIVEN A CLASS 2 "RUBBED FINISH" 5. CONCRETE SHALL BE AIR ENTRAINED 5% ± 1%. CONCRETE SHALL BE AIR ENTRAINED 5% ± 1%. 6. ALL CONCRETE SHALL BE MADE IN ACCORDANCE WITH AN APPROVED MIX DESIGN. ALL CONCRETE SHALL BE MADE IN ACCORDANCE WITH AN APPROVED MIX DESIGN. 7. CHAMFER ALL EXPOSED EDGES OF CONCRETE 3/4" UNLESS NOTED OTHERWISE. CHAMFER ALL EXPOSED EDGES OF CONCRETE 3/4" UNLESS NOTED OTHERWISE. 8. ROUGHEN CONCRETE AT CONSTRUCTION JOINTS TO ". ROUGHEN CONCRETE AT CONSTRUCTION JOINTS TO ". 14". REINFORCING STEEL 1. ALL NON-PRESTRESSED REINFORCING SHALL BE OF THE DEFORMED BAR TYPE CONFORMING TO AASHTO M31 (ASTM A615), GRADE 60. ALL NON-PRESTRESSED REINFORCING SHALL BE OF THE DEFORMED BAR TYPE CONFORMING TO AASHTO M31 (ASTM A615), GRADE 60. 2. CONCRETE CLEAR COVER, MEASURED FROM THE FACE OF THE CONCRETE TO THE FACE OF THE REINFORCING BAR, SHALL BE 2", UNLESS SHOWN OTHERWISE ON THE CONCRETE CLEAR COVER, MEASURED FROM THE FACE OF THE CONCRETE TO THE FACE OF THE REINFORCING BAR, SHALL BE 2", UNLESS SHOWN OTHERWISE ON THE PLANS. 3. BENDING AND SPLICING OF REINFORCEMENT SHALL BE IN ACCORDANCE WITH ACI 315 AND AASHTO SPECIFICATIONS. BENDING AND SPLICING OF REINFORCEMENT SHALL BE IN ACCORDANCE WITH ACI 315 AND AASHTO SPECIFICATIONS. 4. ALL DIMENSIONS TO REINFORCING STEEL- EXCEPT CLEAR COVER DIMENSIONS- ARE TO THE CENTERLINE OF BAR. ALL DIMENSIONS TO REINFORCING STEEL- EXCEPT CLEAR COVER DIMENSIONS- ARE TO THE CENTERLINE OF BAR. DIMENSIONS 1. ALL LONGITUDINAL DIMENSIONS FOR THE STRUCTURE ARE MEASURED HORIZONTALLY AND INCLUDE NO CORRECTION FOR GRADE. ALL LONGITUDINAL DIMENSIONS FOR THE STRUCTURE ARE MEASURED HORIZONTALLY AND INCLUDE NO CORRECTION FOR GRADE. STRUCTURE EXCAVATION 1. SHALL BE COMPLETED IN ACCORDANCE WITH FP-14, SECTION 208. SHALL BE COMPLETED IN ACCORDANCE WITH FP-14, SECTION 208. 2. QUANTITIES SHOWN ARE FOR INFORMATION ONLY. CONTRACTOR IS RESPONSIBLE FOR DETERMINING ACTUAL QUANTITIES. QUANTITIES SHOWN ARE FOR INFORMATION ONLY. CONTRACTOR IS RESPONSIBLE FOR DETERMINING ACTUAL QUANTITIES. 3. CONTRACTOR SHALL SUBMIT AN EXCAVATION PLAN, 30 DAYS PRIOR TO THE START OF CONSTRUCTION, TO THE CO FOR APPROVAL. PLAN SHALL INCLUDE DRAWINGS AND CONTRACTOR SHALL SUBMIT AN EXCAVATION PLAN, 30 DAYS PRIOR TO THE START OF CONSTRUCTION, TO THE CO FOR APPROVAL. PLAN SHALL INCLUDE DRAWINGS AND WRITTEN OUTLINE ILLUSTRATING AND DESCRIBING PROPOSED EXCAVATION LIMITS, METHODS, EQUIPMENT, LOCATION OF STOCKPILES, METHODS TO REMOVE THE EXISTING STRUCTURE AND ESTIMATED QUANTITIES, AND COMPLY WITH OSHA EXCAVATION SOIL TYPING AND REQUIREMENTS. CHANGES TO THE EXCAVATION LIMITS SHOWN ON THIS SHEET FOR CONTRACTOR'S DEWATERING METHODS OR OTHER CONTRACTOR CONVENIENCES, MUST BE SHOWN ON THE PLAN AND ARE THE RESPONSIBILITY OF THE CONTRACTOR AND INCIDENTAL TO THE WORK. STRUCTURAL BACKFILL 1. SUITABLE STRUCTURE EXCAVATION MATERIAL MAY BE USED FOR STRUCTURAL BACKFILL MATERIAL. STRUCTURAL BACKFILL MATERIAL SHALL MEET FP-14, 704.04, SUITABLE STRUCTURE EXCAVATION MATERIAL MAY BE USED FOR STRUCTURAL BACKFILL MATERIAL. STRUCTURAL BACKFILL MATERIAL SHALL MEET FP-14, 704.04, STRUCTURAL BACKFILL. STRUCTURE BACKFILL SHALL BE PLACED AND COMPACTED IN ACCORDANCE WITH FP-14, 208.10 AND 208.11 (AASHTO T99, METHOD C AND AASHTO T310). NO ROCK- AS PART OF THE COMPACTED BACKFILL- OVER 3" IN DIAMETER SHALL CONTACT THE STRUCTURE. DEWATERING AND SOIL EROSION CONTROL 1. PROTECT AGAINST SOIL EROSION AND SEDIMENTATION DURING CONSTRUCTION IN ACCORDANCE WITH FP-14, SECTION 157 AND THE PROJECT PERMITS. CONTRACTOR SHALL PROTECT AGAINST SOIL EROSION AND SEDIMENTATION DURING CONSTRUCTION IN ACCORDANCE WITH FP-14, SECTION 157 AND THE PROJECT PERMITS. CONTRACTOR SHALL PREPARE AND SUBMIT A SOIL EROSION AND SEDIMENT CONTROL PLAN TO CO FOR APPROVAL. PLAN SHALL INCLUDE DRAWINGS AND WRITTEN OUTLINE ILLUSTRATING AND DESCRIBING PROPOSED LAYOUT, METHODS AND EQUIPMENT. 2. DEWATER THE EXCAVATION IN ACCORDANCE WITH FP-14 SECTIONS 208 AND 157. DEWATER THE EXCAVATION IN ACCORDANCE WITH FP-14 SECTIONS 208 AND 157. 3. CONTRACTOR SHOULD ANTICIPATE WATER INFILTRATING THE EXCAVATIONS. CONTRACTOR SHOULD ANTICIPATE WATER INFILTRATING THE EXCAVATIONS. 4. SUBGRADE EXCAVATION, FOOTING PLACEMENT, RIPRAP PLACEMENT, AND BACKFILL ARE TO BE COMPLETED PER THE CONTRACT SUBGRADE EXCAVATION, FOOTING SUBGRADE EXCAVATION, FOOTING PLACEMENT, RIPRAP PLACEMENT, AND BACKFILL ARE TO BE COMPLETED PER THE CONTRACT SUBGRADE EXCAVATION, FOOTING PLACEMENT, RIPRAP PLACEMENT, AND BACKFILL ARE TO BE COMPLETED PER THE CONTRACT SPECIFICATIONS AND STANDING OR RUNNING WATER IN THE WORK AREA DOES NOT RELIEVE THE CONTRACTOR FROM MEETING THE SPECIFICATIONS. 5. DEWATERING IS THE RESPONSIBILITY OF THE CONTRACTOR AND THE CONTRACTOR SHALL SUBMIT A DEWATERING AND EROSION & SEDIMENT CONTROL PLAN, 30 DAYS DEWATERING IS THE RESPONSIBILITY OF THE CONTRACTOR AND THE CONTRACTOR SHALL SUBMIT A DEWATERING AND EROSION & SEDIMENT CONTROL PLAN, 30 DAYS PRIOR TO THE START OF CONSTRUCTION, TO THE CO FOR APPROVAL WITH THE EXCAVATION PLAN. CONTRACTOR SHALL DEVELOP THEIR OWN PROJECT SPECIFIC DEWATERING PLAN AND SHALL INCLUDE DRAWINGS AND WRITTEN OUTLINE ILLUSTRATING AND DESCRIBING PROPOSED LAYOUT, METHODS, EQUIPMENT AND ANTICIPATED STREAM FLOW VOLUMES. APPROVAL OF THE DEWATERING PLAN BY THE CO DOES NOT RELIEVE THE CONTRACTOR FROM COMPLETING THE WORK AS SPECIFIED. IF CONTRACTOR'S IDENTIFIED DEWATERING METHODS ARE NOT PRODUCING DESIRED RESULTS, CONTRACTOR SHALL RE-EVALUATE AND SUBMIT ANOTHER PLAN TO CO FOR APPROVAL AND IS INCIDENTAL TO THE WORK. 6. WORK TO COMPLETE RE-GRADING THE STEAM SHALL BE INCLUDED IN THE CONTRACTOR'S EROSION CONTROL PLAN.WORK TO COMPLETE RE-GRADING THE STEAM SHALL BE INCLUDED IN THE CONTRACTOR'S EROSION CONTROL PLAN.

AutoCAD SHX Text NOTES 1. THE CONTRACTOR SHALL AT ONCE REPORT TO THE CONTRACTING OFFICER (CO) ANY ERRORS, INCONSISTENCIES OR OMISSIONS DISCOVERED IN THE CONTRACT DOCUMENTS AND WITH INFORMATION THE CONTRACTOR SHALL AT ONCE REPORT TO THE CONTRACTING OFFICER (CO) ANY ERRORS, INCONSISTENCIES OR OMISSIONS DISCOVERED IN THE CONTRACT DOCUMENTS AND WITH INFORMATION FURNISHED BY THE U.S. FOREST SERVICE. IF THE CONTRACTOR PERFORMS ANY CONSTRUCTION ACTIVITY KNOWING IT INVOLVED A RECOGNIZED ERROR, WITHOUT SUCH NOTICE TO THE CONTRACTING OFFICER, THE CONTRACTOR SHALL ASSUME APPROPRIATE RESPONSIBILITY FOR SUCH PERFORMANCE AND SHALL BEAR AN APPROPRIATE AMOUNT OF THE ATTRIBUTABLE COSTS FOR CORRECTION. 2. IT IS HIGHLY RECOMMENDED THAT CONTRACTOR VISIT THE SITE TO CLARIFY SITE ACCESS FOR ALL EQUIPMENT AND MATERIAL DELIVERIES. ALL EXISTING SITE FEATURES ARE APPROXIMATE AND SHALL BE IT IS HIGHLY RECOMMENDED THAT CONTRACTOR VISIT THE SITE TO CLARIFY SITE ACCESS FOR ALL EQUIPMENT AND MATERIAL DELIVERIES. ALL EXISTING SITE FEATURES ARE APPROXIMATE AND SHALL BE VERIFIED BY THE CONTRACTOR. 3. TRABUCO CANYON ROAD SHALL BE KEPT OPEN TO PUBLIC TRAFFIC DURING CONSTRUCTION IN ACCORDANCE WITH FOREST SERVICE SUPLEMENTAL SPECIFICATION (FSSS) 156-PUBLIC TRAFFIC. TRABUCO CANYON ROAD SHALL BE KEPT OPEN TO PUBLIC TRAFFIC DURING CONSTRUCTION IN ACCORDANCE WITH FOREST SERVICE SUPLEMENTAL SPECIFICATION (FSSS) 156-PUBLIC TRAFFIC. 4. CONCRETE WASHOUT LOCATION SHALL BE APPROVED BY CO. CONCRETE WASHOUT LOCATION SHALL BE AT A MINIMUM 50 FEET AWAY FROM ANY DRAIN INLETS, OPEN DRAINAGE FACILITIES, AND WATER CONCRETE WASHOUT LOCATION SHALL BE APPROVED BY CO. CONCRETE WASHOUT LOCATION SHALL BE AT A MINIMUM 50 FEET AWAY FROM ANY DRAIN INLETS, OPEN DRAINAGE FACILITIES, AND WATER COURSES. WASHOUT SHALL BE WATERTIGHT AND MAINTAINED BY THE CONTRACTOR. 5. NO WATER WILL BE AVAILABLE FOR CONTRACTOR USE. ALL WATER IS CONSIDERED INCIDENTAL TO INDIVIDUAL WORK ITEMS. CONTRACTOR SHALL SECURE THEIR OWN WATER SOURCE AND WATER SECURED NO WATER WILL BE AVAILABLE FOR CONTRACTOR USE. ALL WATER IS CONSIDERED INCIDENTAL TO INDIVIDUAL WORK ITEMS. CONTRACTOR SHALL SECURE THEIR OWN WATER SOURCE AND WATER SECURED SHALL BE FREE OF ALL DELETERIOUS MATERIAL. 6. CONTRACTOR SHALL NOT PARK OR STORE MATERIAL IN STREAMBED, PRIOR TO CONSTRUCTION. THE CONTRACTING OFFICER WILL FLAG APPROPRIATE AREAS FOR PARKING, STORING AND MATERIAL CONTRACTOR SHALL NOT PARK OR STORE MATERIAL IN STREAMBED, PRIOR TO CONSTRUCTION. THE CONTRACTING OFFICER WILL FLAG APPROPRIATE AREAS FOR PARKING, STORING AND MATERIAL STOCKPILE AREAS. 7. NO TELEPHONE OR SANITARY FACILITIES WILL BE AVAILABLE FOR CONTRACTOR USE. NO TELEPHONE OR SANITARY FACILITIES WILL BE AVAILABLE FOR CONTRACTOR USE. 8. THE PROJECT LIMITS SHOWN ON THE DRAWINGS ARE APPROXIMATE AND WILL BE FLAGGED ON THE GROUND BY THE FOREST SERVICE PRIOR TO COMMENCING WORK. THE PROJECT LIMITS SHOWN ON THE DRAWINGS ARE APPROXIMATE AND WILL BE FLAGGED ON THE GROUND BY THE FOREST SERVICE PRIOR TO COMMENCING WORK. 9. INSTALL NARROW BRIDGE SIGNS (W5-2) A MINIMUM 150 FROM BRIDGE ON BOTH ENDS ALONG APPROACH ROAD IN ACCORDANCE WITH MUTCD REQUIREMENTS. INSTALL NARROW BRIDGE SIGNS (W5-2) A MINIMUM 150 FROM BRIDGE ON BOTH ENDS ALONG APPROACH ROAD IN ACCORDANCE WITH MUTCD REQUIREMENTS. 10. ALL STAGING AREAS, BYPASS LOCATION AND OTHER AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE RESTORED TD PREVIOUS CONDITION AND APPROVED BY CO. ALL STAGING AREAS, BYPASS LOCATION AND OTHER AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE RESTORED TD PREVIOUS CONDITION AND APPROVED BY CO. 11. NOXIOUS WEED CONTROL; ALL CONSTRUCTION EQUIPMENT SHALL BE CLEANED AND PWER WASHED AND FREE FOR DIRT AND DEBRIS PRIOR TO ENTRY ON NATIONAL FOREST. NOXIOUS WEED CONTROL; ALL CONSTRUCTION EQUIPMENT SHALL BE CLEANED AND PWER WASHED AND FREE FOR DIRT AND DEBRIS PRIOR TO ENTRY ON NATIONAL FOREST. 12. ARCHEOLOGICAL SITES; SHOULD ARCHEOLOGICAL OR PALENTOLOGICAL REMAINS OR SPECIMENS BE DISCOVERED, SUSPEND OPERATIONS AT THE DISCOVERY SITE AND NOTIFY THE CO. ARCHEOLOGICAL SITES; SHOULD ARCHEOLOGICAL OR PALENTOLOGICAL REMAINS OR SPECIMENS BE DISCOVERED, SUSPEND OPERATIONS AT THE DISCOVERY SITE AND NOTIFY THE CO. 13. SALVAGE; ALL EXCESS MATERIALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR, UNLESS OTHERWISE DIRECTED BY THE CO, AND SHALL BE REMOVED FROM THE NATIONAL FOREST LAND IN SALVAGE; ALL EXCESS MATERIALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR, UNLESS OTHERWISE DIRECTED BY THE CO, AND SHALL BE REMOVED FROM THE NATIONAL FOREST LAND IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL LAWS. 14. TOPSOIL; TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 4" AND STOCKPILED AS DIRECTED BY THE CO. EXPOSED SOIL SHALL RECEIVE 2" TO 3" OF TOPSOIL TO THE EXTENT ALLOWED BY THE TOPSOIL; TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 4" AND STOCKPILED AS DIRECTED BY THE CO. EXPOSED SOIL SHALL RECEIVE 2" TO 3" OF TOPSOIL TO THE EXTENT ALLOWED BY THE EVEN DISTRIBUTION OF THE STOCKPILE. 15. CONTOURS SHOWN ARE APPROXIMATE. IF THERE IS A DISCREPANCY BETWEEN THE ELEVATION SHOWN FOR A POINT AND THE ADJACENT CONTOURS, THE POINT ELEVATION WILL BE CONSIDERED CORRECT. CONTOURS SHOWN ARE APPROXIMATE. IF THERE IS A DISCREPANCY BETWEEN THE ELEVATION SHOWN FOR A POINT AND THE ADJACENT CONTOURS, THE POINT ELEVATION WILL BE CONSIDERED CORRECT. 16. WORK HOURS ARE BETWEEN 7:00 AM TO 5:00 PM, LOCAL TIME, MONDAY THROUGH FRIDAY EXCEPT FEDERAL HOLIDAYS AND THE WEEKS OF THANKSGIVING AND CHRISTMAS. WEEKEND EQUIPMENT WORK WORK HOURS ARE BETWEEN 7:00 AM TO 5:00 PM, LOCAL TIME, MONDAY THROUGH FRIDAY EXCEPT FEDERAL HOLIDAYS AND THE WEEKS OF THANKSGIVING AND CHRISTMAS. WEEKEND EQUIPMENT WORK IS NOT ALLOWED AT ANY TIME DURING THE WORK. NO FEDERAL HOLIDAYS OR WEEKEND WORK WITHOUT PRIOR APPROVAL BY THE CO.

AutoCAD SHX Text HYDROLOGY AND HYDRAULICS MANNING'S COEFFICIENT n = 0.060 = 0.060 0.060 DRAINAGE AREA = 9.1 sq. mi. = 9.1 sq. mi. 9.1 sq. mi. STREAM SLOPE = 4.6% = 4.6% 4.6% PRECIPITATION, P = 24" = 24" 24" 100-YEAR FLOW = 3720 cfs = 3720 cfs 3720 cfs ELEVATION = 1687' = 1687' 1687' VELOCITY, V = 15 fps= 15 fps15 fps

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

F L O

W

EXISTING ROAD

EXISTING CONCRETE FORD, USE

AS TRAFFIC BYPASS. DEMOLISH

AFTER BRIDGE CONSTRUCTED.

D

R

I

V

E

W

A

Y

D

R

I

V

E

W

A

Y

T

R

A

B

U

C

O

R

E

K

D

EXISTING PARKING

EXISTING PARKING,

DEMOLISH EXISTING

PIPE RAILING

PROVIDE ACCESS TO

EXISTING DRIVEWAYS

DURING CONSTRUCTION

F L O

W

F L O

W

TRABUCO CANYON

RD / S19: 4.4 MI

T

R

A

B

U

O

E

D

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/2 3/2

4 1 5:

P

AU

LL

IN

D

C:

\U

SE

RS

\P

AU

LL

IN

D\

BO

X\

EP

_O

NE

ST

OP

SH

OP

\E P

PR

OJ

EC

T

AG

RE

EM

EN

TS

\N

FS

\R

-0

5\0 2-

CL

EV

EL

AN

D\

-E

NG

-0

2-

6\5 _W

OR

KI

NG

F

IL

ES

\T

RA

BU

CO

4\

_D

RA

W

IN

GS

\D

ES

IG

NF

IL

ES

\P

LA

NS

T

RA

BU

CO

4\

TR

AB

UC

O4

0.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

TRABUCO

CANYON

CROSSING #4

CLEVELAND NATIONAL

FOREST

TRABUCO RANGER DISTRICT

EXISTING

SITE PLAN

02/23/2024

P. LIND

P. LIND

I. ANDERSON

X-03 003 012

NOTES:

1. COORDINATE SYSTEM; NAD83 CALIFORNIA STATE PLANES, ZONE VI, US FOOT

2. CONTOURS FROM 2018 LIDAR.

3. FEATURES IDENTIFIED FROM 2022 FIELD SURVEY.

4. THE CONTROL POINT SYMBOL USED CONSISTS OF A CIRCLE WITHIN AN EQUILATERAL

TRIANGLE. THE ASSOCIATED POINT NUMBER IS LOCATED TO THE RIGHT OF THE SYMBOL.

5. CONTROL POINT 11 IS LOCATED APPROXIMATELY 206' TO THE NORTHEAST OF POINT 10 ON

THE NORTH SIDE OF THE EXISTING ROAD.

Feet

0 50 100

R-1709-003

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

ABUT. 2

ABUT. 1

0 3

P I

P I

P I

P C

P

T

P

C

P

T

P

I

P

I

N

E

N

E

N '5

E

.4

N89°08'42"E

13.44'

S88°18'26"E

N

E

N

E

L

Δ

L

Δ

P

C

P T

P C

P

T

P

I

S

W

S '0

"W

.3

N

W

L

Δ

R

L

24.6

Δ

21.7

R: 65.00

PI STA: 5+50.90

NORTHING: 2191733.61

EASTING: 6175647.29

PI STA: 3+83.78

NORTHING: 2191563.98

EASTING: 6175597.32

PI STA: 3+42.85

NORTHING: 2191691.74

EASTING: 6175499.58

PI STA: 0+68.15

NORTHING: 2191641.66

EASTING: 6175766.12

PI STA: 1+41.78

NORTHING: 2191634.84

EASTING: 6175692.75

PI STA: 2+23.88

NORTHING: 2191548.33

EASTING: 6175438.19

PI STA: 6+66.88

NORTHING: 2191792.71

EASTING: 6175749.79

℄ NEW CHANNEL

CONSTRUCTION

℄ NEW ROAD/BRIDGE

CONSTRUCTION

RIPRAP

RIPRAP

SHOULDER

NEW ROAD

SHOULDER

NEW ROAD

EXISTING

ROAD EDGE

NEW ROAD

SHOULDER

NEW ROAD

SHOULDER

EXIS

TING

DRIV

EWAY

EXIS

TING

DRIV

EWAY

EXISTING

ROAD EDGE

F L O

W

APPROXIMATE

PROJECT LIMITS

APPROXIMATE

PROJECT LIMITS

NARROW BRIDGE SIGN,

SEE NOTE 9 SHEET X-2

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/2 3/2

4 1 5:

P

AU

LL

IN

D

C:

\U

SE

RS

\P

AU

LL

IN

D\

BO

X\

EP

_O

NE

ST

OP

SH

OP

\E P

PR

OJ

EC

T

AG

RE

EM

EN

TS

\N

FS

\R

-0

5\0 2-

CL

EV

EL

AN

D\

-E

NG

-0

2-

6\5 _W

OR

KI

NG

F

IL

ES

\T

RA

BU

CO

4\

_D

RA

W

IN

GS

\D

ES

IG

NF

IL

ES

\P

LA

NS

T

RA

BU

CO

4\

TR

AB

UC

O4

0.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

TRABUCO

CANYON

CROSSING #4

CLEVELAND NATIONAL

FOREST

TRABUCO RANGER DISTRICT

SITE PLAN

02/23/2024

P. LIND

P. LIND

I. ANDERSON

X-04 004 012

Feet

0 30 60

R-1709-004

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

L E

V A

T I O

N

F

E E

T

E L E

V A

T I O

N

F

E E

T

STATION (FEET)

NEWROAD PROFILE

2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00

2.34%

.5

0.00%

-8 .5

1.90%

V

S

A

E

V

A

E

V

PVI STA: 5+33.00

PVI ELEV: 1693.25

K: 5.88

LVC: 50.00

A

E

V

A

E

V

PVI STA: 4+05.00

PVI ELEV: 1693.25

K: 4.76

LVC: 50.00

A

E

V

A

E

V

PVI STA: 6+13.00

PVI ELEV: 1686.45

K: 4.58

LVC: 47.62

A

E

V

A

E

V

PVI STA: 2+80.00

PVI ELEV: 1680.12

K: 8.58

LVC: 70.00

ABUTMENT 1 LOL STA: 4+36.25

FINISH GRADE ELEV: 1693.25

ABUTMENT 2 LOL STA: 5+01.75

FINISH GRADE ELEV: 1693.25

PRESTRESSED CONCRETE BRIDGE

CAST-IN-PLACE CONCRETE ABUTMENTS

(RAILING NOT SHOWN)

EXCAVATE & REMOVE

LAYBACK SLOPES

CLASS 6 RIPRAP

SEE TYPICAL SECTION

NEW STREAM BED

SEE DETAILS X-06

BOF ELEV: 1671.17 BOF ELEV: 1671.17

Q100 ELEV: 1687.1℄ NEW CHANNEL

STA: 4+69.00

EXISTING GROUND

FINISHED GRADE

E L

E V

A T

I O

N

F

E E

T

E L

E V

A T

I O

N

F

E E

T

STATION (FEET)

NEWCHANNEL PROFILE

0+55 1+00 1+50 2+00 2+50 3+00 3+20

-2.50% -5.29%

-4.17%

-3.42%

-1.95%

-3.88%

9.95%-3.90%

-5.00%

-5.00% -10.00%-7.70%

G R

A D

E

B

R E

A

E

G R

A D

E

B

R E

E

G R

A D

E

B

R E

E

G R

A D

E

B

R E

E

G R

A D

E

B

R E

E

G R

A D

E

B

R E

E

G R

A D

E

B

R E

E

G R

A D

E

B

R E

E

G R

A D

E

B

R E

E

G R

A D

E

B

R E

G R

A D

E

B

R E

FINISHED GRADE

EXISTING GROUND

℄ NEW BRIDGE

STA: 2+12.99

FILLEXCAVATE & REMOVE

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/2 3/2

4 1 5:

P

AU

LL

IN

D

C:

\U

SE

RS

\P

AU

LL

IN

D\

BO

X\

EP

_O

NE

ST

OP

SH

OP

\E P

PR

OJ

EC

T

AG

RE

EM

EN

TS

\N

FS

\R

-0

5\0 2-

CL

EV

EL

AN

D\

-E

NG

-0

2-

6\5 _W

OR

KI

NG

F

IL

ES

\T

RA

BU

CO

4\

_D

RA

W

IN

GS

\D

ES

IG

NF

IL

ES

\P

LA

NS

T

RA

BU

CO

4\

TR

AB

UC

O4

0.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

TRABUCO

CANYON

CROSSING #4

CLEVELAND NATIONAL

FOREST

TRABUCO RANGER DISTRICT

ROAD AND STREAM

PROFILES

02/23/2024

P. LIND

P. LIND

I. ANDERSON

X-05 005 012

R-1709-005

AutoCAD SHX Text 8.00'

AutoCAD SHX Text 2+40.00

AutoCAD SHX Text R

AutoCAD SHX Text NEW ROAD SHOULDER OFFSETS SIDE START STATION END STATION OFFSET FROM CENTERLINESIDE START STATION END STATION OFFSET FROM CENTERLINE

AutoCAD SHX Text 3+84.42

AutoCAD SHX Text 13.75'

AutoCAD SHX Text 4+08.00

AutoCAD SHX Text R

AutoCAD SHX Text 4+11.75

AutoCAD SHX Text 20.00'

AutoCAD SHX Text 5+27.25

AutoCAD SHX Text R

AutoCAD SHX Text 5+28.75

AutoCAD SHX Text 8.00'

AutoCAD SHX Text 6+13.75

AutoCAD SHX Text R

AutoCAD SHX Text 6+50.00

AutoCAD SHX Text 8.00'

AutoCAD SHX Text 2+40.00

AutoCAD SHX Text L

AutoCAD SHX Text 2+83.34

AutoCAD SHX Text 17.00'

AutoCAD SHX Text 3+43.34

AutoCAD SHX Text L

AutoCAD SHX Text 3+50.00

AutoCAD SHX Text 20.00'

AutoCAD SHX Text 4+06.50

AutoCAD SHX Text L

AutoCAD SHX Text 4+08.00

AutoCAD SHX Text 13.50'

AutoCAD SHX Text 5+27.25

AutoCAD SHX Text L

AutoCAD SHX Text 5+28.90

AutoCAD SHX Text 8.00'

AutoCAD SHX Text 5+53.90

AutoCAD SHX Text L

AutoCAD SHX Text 6+50.00

AutoCAD SHX Text NOTE: PROVIDE A SMOOTH TRANSITION TO MATCH SHOULDER LINES SHOWN ON SITE PLAN IN AREAS WHERE SHOULDER OFFSET VARIES, THROUGH LINEAR AND/OR CURVED TRANSITIONS, BETWEEN STATIONING WITH CONSTANT OFFSET SHOWN ON TABLE.

AutoCAD SHX Text

28.90' TO 32.33'

AutoCAD SHX Text 0+65.00

AutoCAD SHX Text R

AutoCAD SHX Text NEW CHANNEL BANK TOE OFFSETS SIDE START STATION END STATION OFFSET FROM CENTERLINESIDE START STATION END STATION OFFSET FROM CENTERLINE

AutoCAD SHX Text 0+77.94

AutoCAD SHX Text 35.00'

AutoCAD SHX Text 0+88.00

AutoCAD SHX Text R

AutoCAD SHX Text 1+55.00

AutoCAD SHX Text 37.50'

AutoCAD SHX Text 1+65.00

AutoCAD SHX Text R

AutoCAD SHX Text 1+68.00

AutoCAD SHX Text 38.50'

AutoCAD SHX Text 1+74.85

AutoCAD SHX Text R

AutoCAD SHX Text 1+79.03

AutoCAD SHX Text 23.40'

AutoCAD SHX Text 1+94.13

AutoCAD SHX Text R

AutoCAD SHX Text 1+94.64

AutoCAD SHX Text 21.57'

AutoCAD SHX Text 2+01.99

AutoCAD SHX Text R

AutoCAD SHX Text 2+23.99

AutoCAD SHX Text 25.19'

AutoCAD SHX Text 2+33.12

AutoCAD SHX Text R

AutoCAD SHX Text 2+33.62

AutoCAD SHX Text 28.00'

AutoCAD SHX Text 2+41.50

AutoCAD SHX Text R

AutoCAD SHX Text 2+52.14

AutoCAD SHX Text 37.00'

AutoCAD SHX Text 2+66.00

AutoCAD SHX Text R

AutoCAD SHX Text 2+81.15

AutoCAD SHX Text 29.00'

AutoCAD SHX Text 2+91.15

AutoCAD SHX Text R

AutoCAD SHX Text 3+04.00

AutoCAD SHX Text 10.00'

AutoCAD SHX Text L

AutoCAD SHX Text 1+50.00

AutoCAD SHX Text 24.44'

AutoCAD SHX Text 1+92.00

AutoCAD SHX Text L

AutoCAD SHX Text 1+94.14

AutoCAD SHX Text 21.57'

AutoCAD SHX Text 2+01.98

AutoCAD SHX Text L

AutoCAD SHX Text 2+23.99

AutoCAD SHX Text 23.59'

AutoCAD SHX Text 2+33.12

AutoCAD SHX Text L

AutoCAD SHX Text 2+33.62

AutoCAD SHX Text 26.00'

AutoCAD SHX Text 2+43.00

AutoCAD SHX Text L

AutoCAD SHX Text 2+60.00

AutoCAD SHX Text 36.63'

AutoCAD SHX Text 2+81.35

AutoCAD SHX Text L

AutoCAD SHX Text 22.75'

AutoCAD SHX Text 3+11.00

AutoCAD SHX Text R

AutoCAD SHX Text NOTE: PROVIDE A SMOOTH TRANSITION IN AREAS WHERE BANK TOE OFFSET VARIES BETWEEN STATIONING WITH CONSTANT OFFSET SHOWN ON TABLE.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/2 3/2

4 1 5:

P

AU

LL

IN

D

C:

\U

SE

RS

\P

AU

LL

IN

D\

BO

X\

EP

_O

NE

ST

OP

SH

OP

\E P

PR

OJ

EC

T

AG

RE

EM

EN

TS

\N

FS

\R

-0

5\0 2-

CL

EV

EL

AN

D\

-E

NG

-0

2-

6\5 _W

OR

KI

NG

F

IL

ES

\T

RA

BU

CO

4\

_D

RA

W

IN

GS

\D

ES

IG

NF

IL

ES

\P

LA

NS

T

RA

BU

CO

4\

TR

AB

UC

O4

0.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

TRABUCO

CANYON

CROSSING #4

CLEVELAND NATIONAL

FOREST

TRABUCO RANGER DISTRICT

TYPICAL SECTIONS

02/23/2024

P. LIND

P. LIND

I. ANDERSON

X-06 006 012

R-1709-006

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ABUTMENT, WINGWALL, AND/OR TOP EMBANKMENT

AutoCAD SHX Text

STREAM BED

AutoCAD SHX Text PLACED RIPRAP, CLASS 6 SECTION 705.02 WITH CLASS 1 TYPE A GEOTEXTILE ESTIMATED QUANTITY 560 SY

AutoCAD SHX Text

TYPICAL RIPRAP INSTALLATION NO SCALE

AutoCAD SHX Text 1V:1.5H

AutoCAD SHX Text 1V:1.5H

AutoCAD SHX Text 1V:3H

AutoCAD SHX Text 2%%%

AutoCAD SHX Text 2%%%

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text TYPICAL PAVED ROAD SECTION AT BRIDGE 4+09.75 TO 4+34.75 5+03.25 TO 5+28.25 NO SCALE

AutoCAD SHX Text 1V:1.5H

AutoCAD SHX Text 1V:1.5H

AutoCAD SHX Text 1V:1.5H

AutoCAD SHX Text 2%%%

AutoCAD SHX Text 2%%%

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text TYPICAL PAVED ROAD SECTION STA: 3+84.75 TO STA: 4+09.75 STA: 5+28.25 TO STA:5+53.25 NO SCALE

AutoCAD SHX Text 1V:1.5H

AutoCAD SHX Text 1V:1.5H

AutoCAD SHX Text 1V:1.5H

AutoCAD SHX Text 2%%%

AutoCAD SHX Text 2%%%

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text TYPICAL PAVED ROAD SECTION STA: 2+84.75 TO STA: 3+84.75 STA: 5+53.25 TO STA: 6+23.25 NO SCALE

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text 1V:1.5H

AutoCAD SHX Text 2%

AutoCAD SHX Text 2%

AutoCAD SHX Text TYPICAL ROAD SECTION STA: 2+40 TO STA: 2+84.75 STA: 6+23.25 TO STA: 6+50 NO SCALE NOTE: PROVIDE SMOOTH TRANSITION FROM FULL SECTION FOR TIE-IN TO EXISTING ROAD AT STA: 2+28 AND STA: 6+70, INCLUDING FOR DRIVEWAY ON LEFT SIDE AT APPROX. STA: 6+50 TO 6+70.

AutoCAD SHX Text 1V:1.5H

AutoCAD SHX Text

TYPICAL FILL SLOPE

AutoCAD SHX Text

TYPICAL CUT SLOPE

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text 6.5%%%

AutoCAD SHX Text 6.5%%%

AutoCAD SHX Text 1V:1.8H

AutoCAD SHX Text 1V:2H

AutoCAD SHX Text 1V:1.8H

AutoCAD SHX Text 1V:2H

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text 2%

AutoCAD SHX Text 2%

AutoCAD SHX Text TYPICAL STREAM SECTION RIGHT SIDE STA: 1+50.00 TO STA: 3+11.00 LEFT SIDE STA:1+50.00 TO STA: 2+81.35 NO SCALE

AutoCAD SHX Text 6.5%%%

AutoCAD SHX Text 6.5%%%

AutoCAD SHX Text 2%

AutoCAD SHX Text 1V:1.8H

AutoCAD SHX Text

TYPICAL STREAM SECTION STA: 0+65.00 TO STA: 0+90.00 NO SCALE

AutoCAD SHX Text 1V:2H

AutoCAD SHX Text 6.5%%%

AutoCAD SHX Text 6.5%%%

AutoCAD SHX Text 1V:1.8H

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text

TYPICAL STREAM SECTION STA: 0+90.00 TO STA: 1+50.00 NO SCALE

AutoCAD SHX Text 2%

AutoCAD SHX Text 1V:1.8H

AutoCAD SHX Text 1V:2H

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text

BANK TOE

AutoCAD SHX Text

BANK TOE

AutoCAD SHX Text

BANK TOE

AutoCAD SHX Text

BANK TOE

AutoCAD SHX Text STREAM SECTION NOTES: 1. PROVIDE SMOOTH TRANSITION FOR TIE-IN TO ADJOINING SECTIONS AND AT TIE-IN TO EXISTING CHANNEL AT PROVIDE SMOOTH TRANSITION FOR TIE-IN TO ADJOINING SECTIONS AND AT TIE-IN TO EXISTING CHANNEL AT STA: 0+65.00 AND 3+11.00. 2. SEE CONTOURS FOR RIGHT SIDE GRADING BETWEEN STA: 0+70.00 AND STA:0+90.00. SEE CONTOURS FOR RIGHT SIDE GRADING BETWEEN STA: 0+70.00 AND STA:0+90.00. 3. SEE CONTOURS FOR LEFT SIDE GRADING BETWEEN STA: 2+81.35 AND 3+11.00 SEE CONTOURS FOR LEFT SIDE GRADING BETWEEN STA: 2+81.35 AND 3+11.00 4. PROVIDE RIPRAP IN AREAS SHOWN ON SITE PLAN. PROVIDE RIPRAP IN AREAS SHOWN ON SITE PLAN. 5. USE EXCESS MATERIAL FROM CHANNEL GRADING FOR CHANNEL FILL, PLACE IN ACCORDANCE WITH FSSS 648. USE EXCESS MATERIAL FROM CHANNEL GRADING FOR CHANNEL FILL, PLACE IN ACCORDANCE WITH FSSS 648. 6. STREAMBED FINISHED GRADE SHALL BE PLACED IN AN IRREGULAR PATTERN TO PROVIDE FOR LOW FLOW STREAMBED FINISHED GRADE SHALL BE PLACED IN AN IRREGULAR PATTERN TO PROVIDE FOR LOW FLOW PASSAGE. 7. STREAM SIMULATION BED SHALL BE APPROVED BY THE CO PRIOR TO PAYMENT. STREAM SIMULATION BED SHALL BE APPROVED BY THE CO PRIOR TO PAYMENT. 8. USE SUITABLE EXCESS MATERIAL LEFTOVER FROM CHANNEL GRADING FOR ROAD EMBANKMENT.USE SUITABLE EXCESS MATERIAL LEFTOVER FROM CHANNEL GRADING FOR ROAD EMBANKMENT.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

2'-6"

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/2 3/2

4 1 5:

P

AU

LL

IN

D

C:

\U

SE

RS

\P

AU

LL

IN

D\

BO

X\

EP

_O

NE

ST

OP

SH

OP

\E P

PR

OJ

EC

T

AG

RE

EM

EN

TS

\N

FS

\R

-0

5\0 2-

CL

EV

EL

AN

D\

-E

NG

-0

2-

6\5 _W

OR

KI

NG

F

IL

ES

\T

RA

BU

CO

4\

_D

RA

W

IN

GS

\D

ES

IG

NF

IL

ES

\P

LA

NS

T

RA

BU

CO

4\

TR

AB

UC

O4

0.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

TRABUCO

CANYON

CROSSING #4

CLEVELAND NATIONAL

FOREST

TRABUCO RANGER DISTRICT

ABUTMENT PLAN

& ELEVATION

02/23/2024

P. LIND

P. LIND

I. ANDERSON

X-07 007 012

R-1709-007

AutoCAD SHX Text

A2 ELEV: 1,671.17

AutoCAD SHX Text

A1 ELEV: 1,671.17

AutoCAD SHX Text

ABUT LOL

AutoCAD SHX Text

#4 HORIZONTAL @ 12"

AutoCAD SHX Text #6 @ 9"

AutoCAD SHX Text

CONSTRUCTION JOINT

AutoCAD SHX Text

# 7 @ 12" FULL HEIGHT

AutoCAD SHX Text

BOTHWAYS

AutoCAD SHX Text

#4 @ 12" CONT

AutoCAD SHX Text #4 @ 12"

AutoCAD SHX Text

SLOPE TO DRAIN

AutoCAD SHX Text

4" DIA DRAIN

AutoCAD SHX Text

BOTTOM OF RIPRAP

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

"AMERIDRAIN TOTAL

AutoCAD SHX Text

STRUCTURAL BACKFILL

AutoCAD SHX Text

AutoCAD SHX Text

WATERSTOP

AutoCAD SHX Text

DRAIN SYSTEM"

AutoCAD SHX Text

@ 4'-0" HORIZONTAL

AutoCAD SHX Text

#4 @ 6'-0" VERTICAL

AutoCAD SHX Text

ABUT LOL

AutoCAD SHX Text 1 1/4" %%C x 5'-0" DOWEL

AutoCAD SHX Text #8 @ 12"

AutoCAD SHX Text

TOP & BOT TOT 30

AutoCAD SHX Text

AutoCAD SHX Text

# 7 @ 12" PARTIAL HEIGHT

AutoCAD SHX Text

CUTOFF 11'-8" ABOVE TOF

AutoCAD SHX Text

# 7 @ 6" LAP TO STEM 7 BARS LAP LENGTH 4'-0"

AutoCAD SHX Text

SECTION A-A NO SCALE

AutoCAD SHX Text

SMOOTH DOWEL, LOCATE ON CENTERLINE OF BEAM/SLAB

AutoCAD SHX Text

1 " THICK 12" THICK EXPANSION JOINT MATERIAL

AutoCAD SHX Text 1 "x 8"x 8" LAMINATED 12"x 8"x 8" LAMINATED ELASTOMERIC BEARING PAD, 60 DUROMETER.

AutoCAD SHX Text

DETAIL "C" NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BEARINGSBEARINGS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ABUT 1 ELEV: 1,693.50' ABUT 2 ELEV: 1,693.50'

AutoCAD SHX Text

ABUT 1 US ELEV: 1,688.79 ABUT 2 DS ELEV: 1,687.69'

AutoCAD SHX Text

ABUT 1 DS ELEV: 1,688.56' ABUT 2 US ELEV: 1,689.36'

AutoCAD SHX Text 1 " x 5'-0" SMOOTH 14" x 5'-0" SMOOTHDOWELS LOCATE ON CENTERLINE OF EACH BEAM/SLAB AT BOTH ABUTMENTS.

AutoCAD SHX Text

CENTERLINE BRIDGE/ROAD CONSTRUCTION

AutoCAD SHX Text

ELEVATION VIEW NO SCALE (ABUTMENT 2 SHOWN, ABUTMENT 1 SIMILAR)

AutoCAD SHX Text

#7 @ 6" BACK FACE, LAP TO #7 STEM BARS

AutoCAD SHX Text

#4 @ 12 BACK FACE

AutoCAD SHX Text 4" DIA DRAIN, 5 REQUIRED, 8' ON CENTER, ALONG BACK FACE, FROM CENTERLINE BRIDGE CONSTRUCTION, BOTH ABUTMENTS.

AutoCAD SHX Text

SLOPE BRIDGE SEAT -1% TOWARD ABUTMENT FACE ALONG ROAD PROFILE.

AutoCAD SHX Text

AutoCAD SHX Text

#7 @ 12" BACK FACE FULL HEIGHT

AutoCAD SHX Text

#4 @ 12 FRONT FACE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

#7 @ 12" BACK FACE PARTIAL HEIGHT, CUT OFF @ 11'-8" ABOVE TOF

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

AutoCAD SHX Text 8 "AMERIDRAIN" PREFABRICATED SHEET DRAIN AS "AMERIDRAIN" PREFABRICATED SHEET DRAIN AS MANUFACTURED BY A.W.D. AMERICAN WICK DRAIN CORPORATION OR EQUAL. INSTALL IN ACCORDANCE WITH THE MANUFACTURERS' RECOMMENDATIONS ON THE BACKFACE OF ALL WINGWALLS AND ABUTMENTS FOR A "TOTAL DRAIN SYSTEM". PLATE TO BRIDGE WEEP HOLE DRAIN. CUT BACK OF BLACK PLASTIC ON SHEET DRAIN TO MATCH SIZE OF WEEP HOLE. DO NOT CUT FILTER FABRIC.

AutoCAD SHX Text

1" PREMOLDED EXPANSION JOINT MATERIAL ALL AROUND.

AutoCAD SHX Text

1.5" PREMOLDED EXPANSION JOINT MATERIAL ALL AROUND EXCEPT AT BEARING PADS.

AutoCAD SHX Text

CONTROL JOINT - SEE DETAIL "D" THIS SHEET.

AutoCAD SHX Text COVER TOP OF VERTICAL JOINT WITH ROOFING TAR OR EQUAL TO PREVENT WATER AND DEBRIS FROM ENTERING.

AutoCAD SHX Text

WATER STOP - SEE DETAIL SHEET X-08.

AutoCAD SHX Text

SEE NOTE SHEET X-02.

AutoCAD SHX Text 1 "x 8"x 8" LAMINATED ELASTOMERIC 12"x 8"x 8" LAMINATED ELASTOMERIC BEARING PAD, 60 DUROMETER.

AutoCAD SHX Text

AutoCAD SHX Text SCARIFY BOTTOM OF EXCAVATION 6" DEEP BELOW BOTTOM OF FOOTING, BRING TO 1% ABOVE OPTIMUM MOISTURE CONTENT, AND COMPACT TO 95% MAXIMUM DENSITY.

AutoCAD SHX Text

AutoCAD SHX Text 18"x 1 " MASONITE OR 12" MASONITE OR EQUAL. FULL HEIGHT WITH 2 - " CHAMFERS34" CHAMFERS

AutoCAD SHX Text

REINFORCEMENT STEEL

AutoCAD SHX Text

BACK FACE OF WINGWALL

AutoCAD SHX Text

FRONT FACE OF WINGWALL

AutoCAD SHX Text

DETAIL "D" NO SCALE

AutoCAD SHX Text

CENTERLINE BRIDGE/ROAD CONSTRUCTION

AutoCAD SHX Text

ABUTMENT LOL

AutoCAD SHX Text

ABUTMENT LOL

AutoCAD SHX Text

WINGWALL LOL

AutoCAD SHX Text

WINGWALL LOL

AutoCAD SHX Text

PLAN VIEW-ABUTMENT NO SCALE (ABUTMENT 2 SHOWN, ABUTMENT 1 SIMILAR)

AutoCAD SHX Text

ABUTMENT 1 LOL STA. 4+36.25 ABUTMENT 2 LOL STA. 5+01.75

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ABUT 2 DS 12'-6"

AutoCAD SHX Text

ABUT 1 DS 12'-6"

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text

BRIDGE SEAT

AutoCAD SHX Text

SEE DETAIL C

AutoCAD SHX Text B

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

3"

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/2 3/2

4 1 5:

P

AU

LL

IN

D

C:

\U

SE

RS

\P

AU

LL

IN

D\

BO

X\

EP

_O

NE

ST

OP

SH

OP

\E P

PR

OJ

EC

T

AG

RE

EM

EN

TS

\N

FS

\R

-0

5\0 2-

CL

EV

EL

AN

D\

-E

NG

-0

2-

6\5 _W

OR

KI

NG

F

IL

ES

\T

RA

BU

CO

4\

_D

RA

W

IN

GS

\D

ES

IG

NF

IL

ES

\P

LA

NS

T

RA

BU

CO

4\

TR

AB

UC

O4

0.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

TRABUCO

CANYON

CROSSING #4

CLEVELAND NATIONAL

FOREST

TRABUCO RANGER DISTRICT

ABUTMENT DETAILS

02/23/2024

P. LIND

P. LIND

I. ANDERSON

X-08 008 012

R-1709-008

AutoCAD SHX Text

#4 @ 9" BOT. OF FOOTING

AutoCAD SHX Text

#4 @ 12" LAP W/FRONT & BACK FACE REINFORCEMENT

AutoCAD SHX Text

#7 @ 18" FULL HEIGHT BACK FACE

AutoCAD SHX Text

BELOW BRIDGE SEAT

AutoCAD SHX Text

FOOTING CORNER DETAIL

AutoCAD SHX Text

WINGWALL ELEVATION

AutoCAD SHX Text 3"

AutoCAD SHX Text

LIMIT OF BONDING

AutoCAD SHX Text

FOLD NEOPRENE

AutoCAD SHX Text

INTO DEPRESSION

AutoCAD SHX Text 1"

AutoCAD SHX Text

MINIMUM OVERLAP

AutoCAD SHX Text

PROTECTIVE COVER

AutoCAD SHX Text

( HARDBOARD OR OTHER

AutoCAD SHX Text

SUITABLE MATERIAL )

AutoCAD SHX Text

1/8" X 12" FLEXIBLE NEOPRENE

AutoCAD SHX Text

BONDED 3" MIN. WIDTH ON EACH

AutoCAD SHX Text

SIDE OF JOINT.

AutoCAD SHX Text

EXPANSION JOINT

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

1" CHAMFER TYPICAL

AutoCAD SHX Text

WATERSTOP DETAIL

AutoCAD SHX Text

#3 @ 9" TOTAL 4

AutoCAD SHX Text

SEE CORNER

AutoCAD SHX Text

DETAIL

AutoCAD SHX Text

#5 TOTAL 2

AutoCAD SHX Text

#4 HORIZ @ 12"

AutoCAD SHX Text

BACK FACE

AutoCAD SHX Text

#4 HORIZ @ 12"

AutoCAD SHX Text

FRONT FACE

AutoCAD SHX Text

#4 VERT @ 12"

AutoCAD SHX Text

FRONT FACE

AutoCAD SHX Text

TRANSVERSE REINF.

AutoCAD SHX Text

TRANSVERSE REINFORCEMENT

AutoCAD SHX Text

#6 @ 9" TOP OF FOOTING

AutoCAD SHX Text

#8 @ 12" BOT. OF FOOTING

AutoCAD SHX Text

B-B THIS SHEET

AutoCAD SHX Text

#7 BARS SEE SECTION

AutoCAD SHX Text

#4 HORIZ @ 12"

AutoCAD SHX Text

BACK FACE

AutoCAD SHX Text

#4 VERT @ 12" FRONT FACE

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

WALL CORNER DETAIL

AutoCAD SHX Text

#8 @ 12" TOP OF FOOTING

AutoCAD SHX Text

#4 CONT. TOTAL 26

AutoCAD SHX Text

WINGWALL REINFORCEMENT

AutoCAD SHX Text

#4 CONT. TOTAL 30

AutoCAD SHX Text

ABUTMENT REINFORCEMENT

AutoCAD SHX Text

#7 BARS SEE SECTION

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

#4 HORIZ @ 12"

AutoCAD SHX Text

FRONT FACE

AutoCAD SHX Text

FOR BACK FACE

AutoCAD SHX Text

ABOVE BRIDGE SEAT

AutoCAD SHX Text

BACK FACE

AutoCAD SHX Text

BRIDGE SEAT

AutoCAD SHX Text

FRONT FACE

AutoCAD SHX Text

#4 VERT @ 12"

AutoCAD SHX Text

FRONT FACE

AutoCAD SHX Text

WATERSTOP DETAIL

AutoCAD SHX Text #3 @ 9"

AutoCAD SHX Text

TOTAL 4

AutoCAD SHX Text

WALL CORNER DETAIL

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text #7 @ 18"

AutoCAD SHX Text

#4 HORIZ @ 12"

AutoCAD SHX Text

BACK FACE

AutoCAD SHX Text

REINFORCING AND SPACING

AutoCAD SHX Text

A-A SHEET X-7

AutoCAD SHX Text

FOR BACK FACE

AutoCAD SHX Text

REINFORCING AND SPACING

AutoCAD SHX Text

BRIDGE SEAT

AutoCAD SHX Text

BACK FACE

AutoCAD SHX Text #7 @ 18"

AutoCAD SHX Text

#4 VERT @ 12"

AutoCAD SHX Text

FRONT FACE

AutoCAD SHX Text

#4 HORIZ @ 12"

AutoCAD SHX Text

#4 HORIZ @ 12"

AutoCAD SHX Text

BACK FACE

AutoCAD SHX Text

FRONT FACE

AutoCAD SHX Text

#4 VERT @ 12"

AutoCAD SHX Text

FRONT FACE

AutoCAD SHX Text

#4 HORIZ @ 12"

AutoCAD SHX Text #4 @ 12"

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text

TOP & BOT

AutoCAD SHX Text

AT FACE

AutoCAD SHX Text

#4 VERTICAL 5'-0"

AutoCAD SHX Text

#4 VERTICAL 5'-0"

AutoCAD SHX Text

#7 @ 18 PARTIAL HEIGHT BACK FACE

AutoCAD SHX Text

#7 @ 9" BACK FACE LAP TO STEM #7 BARS

AutoCAD SHX Text

A2 ELEV: 1,671.17

AutoCAD SHX Text

A1 ELEV: 1,671.17

AutoCAD SHX Text

WW LOL

AutoCAD SHX Text #4 @ 12

AutoCAD SHX Text

BOTHWAYS

AutoCAD SHX Text #4 @ 12"

AutoCAD SHX Text

# 7 @ 18" PARTIAL HEIGHT

AutoCAD SHX Text

#4 HORIZONTAL @ 12"

AutoCAD SHX Text #8 @ 12"

AutoCAD SHX Text

CONSTRUCTION JOINT

AutoCAD SHX Text

CUTOFF 8'-0" ABOVE TOF

AutoCAD SHX Text

# 7 @ 18" FULL HEIGHT

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 12"

AutoCAD SHX Text

@ 4'-0" HORIZONTAL

AutoCAD SHX Text

#4 @ 6'-0" VERTICAL

AutoCAD SHX Text

WINGWALL (WW) LOL

AutoCAD SHX Text #4 @ 9"

AutoCAD SHX Text

#5 TOTAL 2

AutoCAD SHX Text

(TYP)

AutoCAD SHX Text

1" CHAMFER

AutoCAD SHX Text

SECTION B-B NO SCALE (SEE SHEET X-7)

AutoCAD SHX Text

BOTTOM OF RIPRAP

AutoCAD SHX Text

AutoCAD SHX Text

STRUCTURAL BACKFILL

AutoCAD SHX Text

AutoCAD SHX Text

"AMERIDRAIN TOTAL

AutoCAD SHX Text

DRAIN SYSTEM"

AutoCAD SHX Text

SLOPE TO DRAIN

AutoCAD SHX Text

4" DIA DRAIN

AutoCAD SHX Text

CONT TOT 26

AutoCAD SHX Text

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

# 7 @ 9" LAP TO STEM 7 BARS LAP LENGTH 3'-6"

AutoCAD SHX Text

ABUT LOL

AutoCAD SHX Text 1 " x 5'-0" SMOOTH DOWEL PER ASTM 14" x 5'-0" SMOOTH DOWEL PER ASTMA-449 (GALVANIZED). LOCATE ONE AT CENTER OF EACH BOX BEAM AT BOTH ABUTMENTS. EXTEND 2'-3' ABOVE BRIDGE SEAT. 2" HOLE MAY BE CORE DRILLED AFTER BRIDGE SEAT IS CONSTRUCTED TO FACILITATE BOX BEAM ALIGNMENT. AS ALTERNATIVE 2" HOLE MAY BE PREFORMED INTO CONCRETE SEAT. GROUT DOWELS INTO HOLES WITH NON-SHRINK GROUT

AutoCAD SHX Text 1 " x 1'-5" EXPANDED POLYSTYRENE 12" x 1'-5" EXPANDED POLYSTYRENEMATERIAL UNDER BOX BEAMS AND AROUND BEARING PADS. SECURE TO BRIDGE SEAT WITH ADHEASIVE.

AutoCAD SHX Text

BRG.BRG.

AutoCAD SHX Text 3" x 2'-6" SLEEVE IN BOX. AT ABUT 1ONLY, FILL EACH SLEEVE WITH NON-SHRINK GROUT, LEAVING THE TOP 1" OF TH EDOWEL EXPOSED, THEN FILL TO THE TOP OF EACH SLEEVE WITH POURED RUBBER JOINT SEALER. AT ABUT 2, DO NOT GROUT THE SLEEVES. PLUG EACH SLEEVE WITH PREFORMED 3" x1" POLYSTYRENE ON TOP OF THE DOWEL, THEN FILL TO THE TOP OF EACH SLEEVE WITH POURED RUBBER JOINT SEALER.

AutoCAD SHX Text 1 " x 8" x 8" 12" x 8" x 8" ELASTOMERIC PADS. SECURE TO BRIDGE SEAT WITH APPROVED ADHEASIVE

AutoCAD SHX Text

ABUTMENT

AutoCAD SHX Text

ASPHALT WEARING SURFACE

AutoCAD SHX Text

BOX BEAM AT ABUTMENT NO SCALE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

NO SCALE

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/2 3/2

4 1 5:

P

AU

LL

IN

D

C:

\U

SE

RS

\P

AU

LL

IN

D\

BO

X\

EP

_O

NE

ST

OP

SH

OP

\E P

PR

OJ

EC

T

AG

RE

EM

EN

TS

\N

FS

\R

-0

5\0 2-

CL

EV

EL

AN

D\

-E

NG

-0

2-

6\5 _W

OR

KI

NG

F

IL

ES

\T

RA

BU

CO

4\

_D

RA

W

IN

GS

\D

ES

IG

NF

IL

ES

\P

LA

NS

T

RA

BU

CO

4\

TR

AB

UC

O4

0.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

TRABUCO

CANYON

CROSSING #4

CLEVELAND NATIONAL

FOREST

TRABUCO RANGER DISTRICT

GIRDER LAYOUT AND

TYPICAL SECTION

02/23/2024

P. LIND

P. LIND

I. ANDERSON

X-09 009 012

R-1709-009

AutoCAD SHX Text

CENTERLINE BRIDGE CONSTRUCTION

AutoCAD SHX Text BITUMINOUS WEAR SURFACE 2" THICK AT CENTERLINE AND 1" THICK AT FACE OF RAIL POSTS.

AutoCAD SHX Text

TYPICAL SECTION NO SCALE

AutoCAD SHX Text

PRECAST/PRESTRESSED CONCRETE BOX BEAMS SEE SHEET X-02 FOR SPECIFICATIONS.

AutoCAD SHX Text

METAL BEAM BRIDGE RAIL AND POST SEE SHEET X-10 AND X-11

AutoCAD SHX Text

34" DRIP GROOVE TYP.

AutoCAD SHX Text

AutoCAD SHX Text

1 SEE NOTE 1 SHEET X-02.

AutoCAD SHX Text SPECIAL NOTES TIE RODS 1) TIE RODS SHALL BE 1 " DIA. ASTM A-449 HIGH STRENGTH RODS. TIE RODS SHALL BE 1 " DIA. ASTM A-449 HIGH STRENGTH RODS. 14" DIA. ASTM A-449 HIGH STRENGTH RODS. 2) TIE RODS SHALL HAVE AN INITIAL MINIMUM TENSION OF 40 KIPS. TIE RODS SHALL HAVE AN INITIAL MINIMUM TENSION OF 40 KIPS. 3) BOLT TENSION SHALL BE MEASURED BY THE USE OF DIRECT TENSION INDICATORS. THE D.T.I. SHALL CONFORM TO ASTM F-959. BOLT TENSION SHALL BE MEASURED BY THE USE OF DIRECT TENSION INDICATORS. THE D.T.I. SHALL CONFORM TO ASTM F-959. 4) HARDENED STEEL WASHERS SHALL CONFORM TO ASTM F-436. HARDENED STEEL WASHERS SHALL CONFORM TO ASTM F-436. 5) NUTS SHALL CONFORM TO ASTM A-563, GRADE DH. NUTS SHALL CONFORM TO ASTM A-563, GRADE DH. 6) TIE RODS, NUTS, WASHERS AND BEARING PLATES SHALL BE HOT DIPPED GALVANIZED AFTER FABRICATION. AN ANTI-GALLING LUBRICANT TIE RODS, NUTS, WASHERS AND BEARING PLATES SHALL BE HOT DIPPED GALVANIZED AFTER FABRICATION. AN ANTI-GALLING LUBRICANT SHALL BE APPLIED TO THE THREADS PRIOR TO TENSIONING THE TIE RODS.

AutoCAD SHX Text GROUT 7) GROUT SHALL BE HIGH STRENGTH NON-SHRINK GROUT AS SPECIFIED IN SUBSECTION 725.22(d). GROUT SHALL BE HIGH STRENGTH NON-SHRINK GROUT AS SPECIFIED IN SUBSECTION 725.22(d). 8) KEYWAYS AND BLOCKOUTS SHALL BE SANDBLASTED, CLEANED, AND GROUTED LEVEL WITH SURROUNDING GIRDER SURFACES. A BACKER ROD KEYWAYS AND BLOCKOUTS SHALL BE SANDBLASTED, CLEANED, AND GROUTED LEVEL WITH SURROUNDING GIRDER SURFACES. A BACKER ROD SHALL BE USED AS A SEAL FOR THE GROUT. 9) NO VEHICULAR TRAFFIC SHALL BE ALLOWED ON THE STRUCTURE UNTIL THE GROUT HAS ATTAINED A MINIMUM STRENGTH OF 5000 psi.NO VEHICULAR TRAFFIC SHALL BE ALLOWED ON THE STRUCTURE UNTIL THE GROUT HAS ATTAINED A MINIMUM STRENGTH OF 5000 psi.

AutoCAD SHX Text SUPERSTRUCTURE CONSTRUCTION SEQUENCE: : 1) SET BOX BEAMS SET BOX BEAMS 2) TENSION TIE RODS. TENSION TIE RODS. 3) GROUT 3 " DIA VERTICAL DOWEL HOLES AT ABUTMENTS. GROUT 3 " DIA VERTICAL DOWEL HOLES AT ABUTMENTS. 12" DIA VERTICAL DOWEL HOLES AT ABUTMENTS. 4) GROUT KEYWAYS.GROUT KEYWAYS.

AutoCAD SHX Text

AutoCAD SHX Text

TRABUCO ARROYO

AutoCAD SHX Text

CENTERLINE BRIDGE CONSTRUCTION

AutoCAD SHX Text 3" DIA. HOLE THRU AT CENTERLINE GIRDER, AT CENTERLINE SPAN, QUARTER POINTS, AND NEAR ABUTMENTS.

AutoCAD SHX Text

EDGE OF DECK

AutoCAD SHX Text

ABUT. 2 L.O.L. STA: 5+01.75

AutoCAD SHX Text

ABUT. 1 L.O.L. STA: 4+36.25

AutoCAD SHX Text

GIRDER LAYOUT

AutoCAD SHX Text

EDGE OF DECK

AutoCAD SHX Text

AutoCAD SHX Text INSTALL 1 " DIA. TIE-ROD AT EACH HOLE THROUGH BLOCKOUT, 5 TOTAL. 14" DIA. TIE-ROD AT EACH HOLE THROUGH BLOCKOUT, 5 TOTAL. SEE DETAILS THIS SHEET.

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

GIRDERS

AutoCAD SHX Text

CENTERLINE GIRDER

AutoCAD SHX Text 10 "12"

AutoCAD SHX Text 5 "12"

AutoCAD SHX Text

3" DIA HOLE THRU GIRDER(SLAB)

AutoCAD SHX Text

RECESSED 2 " TYP12" TYP

AutoCAD SHX Text

1 " DIA TIE ROD14" DIA TIE ROD

AutoCAD SHX Text

3" DIA HOLE THRU

AutoCAD SHX Text

1" PLATE WASHER

AutoCAD SHX Text 2 "12"

AutoCAD SHX Text 2 "34"

AutoCAD SHX Text 2 "34"

AutoCAD SHX Text

CENTERLINE GIRDER

AutoCAD SHX Text 2 "12"

AutoCAD SHX Text 5 "12"

AutoCAD SHX Text 10 "12"

AutoCAD SHX Text 2 "12"

AutoCAD SHX Text

EXTERIOR GIRDER BLOCKOUT DETAIL

AutoCAD SHX Text

INTERIOR GIRDER BLOCKOUT DETAIL

AutoCAD SHX Text

CENTERLINE BOX BEAM

AutoCAD SHX Text

G…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .