About this file
This document is a solicitation amendment for a federal contract opportunity. The USDA Forest Service is seeking bids for the construction/reconstruction of the Trabuco Canyon Bridge located on Trabuco Creek Road in California. The contract duration is 180 calendar days from the notice to proceed date. Bids should be submitted electronically to Freida McClain at freida.mcclain@usda.gov by the bid closing date of June 28, 2024 at 13:00 hours. Permits are covered by the government, but the contractor is responsible for implementing pollution control/erosion control under Water Board permit requirements. All testing required by the specifications, such as soil and aggregate base compaction testing, is the contractor's responsibility. The government may conduct independent testing but is not required to do so. There are no specific sound or dust restrictions beyond OSHA requirements, and no required manufacturers for products.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A-11 Existing and new structure overlay-Model addendum 2 Att 2.pdf | ||
| A-11 Trabuco Canyon Bridge Sites 1 2 and 4 Geotechnical Assessment-adm 2 att 1.pdf | ||
| A-11 12970224R0033 amd 2.pdf | ||
| A-10 12970224R0033-solicitation.pdf | ||
| A-10 12970224R0033-fm.pdf | ||
| A-10 J7-Appendix A_ Bridges_BMPs 2012.docx | DOCX document | |
| A-10 J2- SOI - 129702224R0033.xlsx | XLSX spreadsheet | |
| A-10 J5-Trabuco4_Drawings.pdf | ||
| A-10 J8-Wage Determination.pdf | ||
| A-10 J9-CNF Invasive Weeds List.pdf | ||
| A-10 J3-Trabuco_FSSS_20240215.docx | DOCX document | |
| A-10 J4-Project Map GIS 4.pdf | ||
| A-10 J6-Fire Plan.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12970224R0033 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
WASHINGTON DC 20250-0001
1400 INDEPENDENCE AVE SW MS-1138
SPOC SOUTHWEST
USDA FOREST SERVICE
IIJA05/24/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/24/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Action Type. Solicitation Amendment Notice
GENERAL INFORMATION:
SAM Notice Modification: 1
Solicitation No. 12970224R0033
Modifies:
Description Item(s): (20)
Attachment:
SF 30_129720224R0001
Questions & Answers
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
KLENISE S. WALLACE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
one copyX
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 7
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12970224R0033/0001
Add:
A11. 1-SF 30_12970224R0033-0001
A11. 1-Questions & Answers_12970224R0033
Actual Solicitation Posting Date: 24 May 2024
Solicitation Posting Update 1: 10 June 2024
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Bridge Replacement for Trabuco Canyon Crossing Prebid Questions
1. The Solicitation, Page 4 of 66 states there will be no formal Pre-Bid/Site Visit for this solicitation. However, Page 55 of 66 in the Solicitation states that there will be a site visit on June 12, 2024 at the “Trabuco Creek Picnic Site, Trabuco Creek Rd, Silverado, California 92676.
Questions:
a. Will there be a site visit? Yes
b. If there will be a site visit, when will it be held? June 12, 2024 at 10:30 AM
c. If the pre-bid meeting will be held, Is the pre-bid meeting mandatory? The scheduled pre-bid meeting is not mandatory to allow time flexibility, but a pre-bid site visit is mandatory. The site is 1.6 mi behind locked gate so an individual visit would require some hiking or biking.
2. Box 13 of the SF 1442 states that the bids are required to be delivered in a sealed envelope to the place specified in Box 8 which is, USDA Forest Service, SPOC Southwest, 1400 Independence Ave SW MS-1138, Washington DC 20250-001. In Section L.1, Instructions to Offerors, on Page 54 of 63, Subsection (c), v), it states, “Scanned copy of fully executed Bid Guarantee (Standard Form 24 and Power of Attorney” The language in L.1 seems to imply that the bids will be submitted electronically.
Question:
a. Please clarify if bids will be submitted electronically or as hard copies.
Response: One copy of the proposal should be sent electronically to Freida McClain at freida.mcclain@usda.gov
3. Page 8 of 63, Section B.2 states, “the successful awardee that receives this order shall provide a digitally signed payment bond and performance bond within 15 days of award against the IDIQ contract.”
Question:
a. Is this project part of an IDIQ contract or is this a standalone contract?
Response: The forest has no preference, and the region doesn’t have an IDIQ contract in place that covers bridge construction.
4. Section C4 states, “The contract duration shall be 180 calendar days from the notice to proceed effective date.” Clause 52.211-10 states that the contractor shall, “…complete the entire work rate ready for use not later than 365 days.”
Question:
a. What is the contract duration?
FreidaMcClain Highlight
Response: The Contract Duration is 180 from issuance of the Notice to Proceed
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 days after the NTP. The time stated for completion shall include final cleanup of the premises.
5. Question:
a. Please confirm that if bidders check the box in the clause 52.204-8 subsection (b), (2), (ii), they do not need to fill out representations and certifications to include with their bid.
Response: The offeror can choose which box to select box applies.
6. Section 648 states, “…. Specific culvert installation time restrictions and installation plan requirements are indicated in the contract.
Question:
a. We do not think the plan requirements or the specific culvert installation time restrictions in the contract. Please clarify.
Response: Culverts installation is for traffic bypass to accommodate low flow. No time restrictions other than the culverts, along with temporary bypass, will be removed as part of demobilization after bridge construction is completed.
7. Section 648 addresses work required for “Streambed Simulation”, however, there is not any Streambed Simulation work shown on the drawings.
Question:
a. Please clarify.
Response: There are description and drawing of final channel profile and cross sections.
8. In Section 156.03 the number of minutes of delay at any one time have not been filled in by the government.
Question:
a. Please clarify.
Response: 15 minutes/15 minutes within Forest boundary, follow county and state department of transportation outside Forest boundary.
9. Section 108, which is the section that addresses liquidated damages, is deleted in its entirety.
Question:
a. Are there any liquidated damages associated with this project?
Response:
10. In the changes to section 105.02c there are two sentences that state, “four stream side areas use wood straw or similar in place of rice straw. And receive prior approval from contracting officer for use of Jude netting. However, there are not any details on the drawing related to the use of word or rice straw.
Question:
a. Please clarify the scope of work related to these two (2) sentences.
Response: These sentences help clarify material acceptable to be used for Erosion control for this specific project, refer to Specifications for additional information.
11. Drawing sheet 002 of 012, there is a note under the heading, Geotechnical Report, which states, “Trabuco Canyon bridge sites 1-2 and 4 Geotechnical Assessment REV 1, 2022, is available from the government. Provide two weeks’ notice to the CEO submitting request for copy.”
Question: Will the government please provide the geotechnical report to bidders?
Response: You must request a copy of the report.
12. In the past when USDA has required that bid submittals be submitted as a hard copy in a location that is not in the locale of the project, the USDA provides a means for bidders to modify their pricing schedule or withdraw its bid. Usually, USDA will allow bidders to resubmit their bid prices by email up to the bid closing date and time.
Question: Will USDA please provide a method for bidders to change their bid prices or to withdraw their bid if they have mailed their bid to the address of the bid closing location?
Response: Proposals should be emailed to Freida McClain at freida.mcclain@usda.gov.
by the bid closing date of June 28, 2024, at 13:00 hours.
13. Self-Performance?
Question: Where to submit the Technical and Price Proposals?
Response Proposals should be emailed to Freida McClain at freida.mcclain@usda.gov. by the bid closing date of June 28, 2024, at 13:00 hours.
mailto:freida.mcclain@usda.gov mailto:freida.mcclain@usda.gov
14. Are there any necessary environmental or biological permits needed for construction? If so, will they be included under the Contractor’s Price proposal or would they be provided by the Contracting Officer?
Response: Permits are covered by the government, but the contractor is responsible for implementing pollution control/erosion control under Water Board permit requirements.
15. Are there any necessary testing involved concurrently with construction? If so, will they be included under the Contractor’s Price proposal, or would they be provided by the Contracting Officer?
Response: All testing as required by Specifications for example soil and aggregate base compaction test, asphalt compaction test per Sections 204, 301, 403 is contractor responsibility. The government may conduct independent testing but is not responsible or required to do so.
16. Is there a required Erosion Control Plan?
Response: Yes, under Erosion/Pollution Control requirements per Water Borad permit and Best Management Practices (BMPs).
17. Are there any necessary inspections involved concurrently with construction? If so, will they be included under the Contractor’s Price proposal, or would they be provided by the Contracting Officer? Inspection by the government is independent of construction QC/QA which is the contractor’s responsibility.
18. Is there any required specific manufacturers the Contracting Officer requires the GC to us?
(to use?)
Response: No specific manufacturers required, any products that meet Specifications are acceptable.
19. Are there any sound, dust restrictions?
Response: No specific sound or dust restrictions other than required by OSHA.