A_04_PV_Heater_Repair_SOW_REVISED.pdf

PDF 865 KB Posted

Attached to
Gas Heater Repair Palomino Valley Fire Station
Solicitation number
140L3926Q0002
Issued by

About this file

This Statement of Work (SOW) details a mechanical repair project for a Reznor UDAP60 unit heater at the Palomino Valley Fire Station in Reno, Nevada. The Bureau of Land Management requires the replacement of the existing motor assembly and fan motor to ensure proper heating and protection of fire engines during winter months.

The project scope includes disconnecting and removing the current induced draft motor assembly and fan motors, properly disposing of the failed equipment, and installing new components. The work will be performed at 5605 Grass Valley Road, with a performance period from January 9, 2025 to February 27, 2026. The contractor must provide necessary ladders and lifting equipment, complete start-up and testing of the replacement units, and perform troubleshooting as needed. All work must comply with OSHA safety standards and applicable mechanical codes.

View the file

Other files

File Type Posted
Sol_140L3926Q0002_Amd_0001.pdf PDF
B_09_Answers_Doc_0001.pdf PDF
B_03_Davis-Bacon_Act_WD___NV20250044.pdf PDF
Sol_140L3926Q0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

[Palomino Valley Fire Station Engine Bay Heater] Page 1

PALOMINO VALLEY FIRE UNIT HEATER MOTOR AND FAN MOTOR

REPAIR

STATEMENT OF WORK (SOW)

I. GENERAL

The goal of this project is to repair a heater in the engine bay at the Palomino Valley Fire Station, located at 5605 Grass Valley Road, Reno, NV 89510. The current motor assembly and fan motor need replacement. A heater is needed during the winter to provide heat and protection for the fire engines and prevent the water pumps from freezing.

II. PERFORMANCE REQUIREMENTS

A. Description of Work:

The unit is ceiling mounted and is approximately 16 feet above the floor o The Contractor will provide ladders / lifting equipment as needed

Demo of existing motor assembly and fan motor on a REZNOR, UDAP60 o Disconnect and remove bad induced draft motor assembly.

o Disconnect and remove bad fan motors.

o Properly dispose of broken equipment.

Installation of replacement motor assembly and fan motor for heater o Furnish and install a new induced draft motor assembly.

o Furnish and install a new fan motor.

o Complete start-up and testing of replacement.

o Trouble shooting of any issue or error codes of replacement equipment.

B. Place of Performance:

Bureau of Land Management Palomino Valley Fire Station 5605 Grass Valley Road Reno, NV 89510

C. Period of Performance:

January 9, 2025– February 27, 2026 (As soon as Possible)

III. DELIVERABLES

Mechanical work on Palomino Valley Fire Station engine bay heater to include removal and disposal of failed components, purchase and installation of new equipment.

All work to be completed in accordance with safety in accordance with OSHA and applicable mechanical codes.

[Palomino Valley Fire Station Engine Bay Heater] Page 2

[Palomino Valley Fire Station Engine Bay Heater] Page 3

[Palomino Valley Fire Station Engine Bay Heater] Page 4

File details come from the government source that posted it. Updated .