B_09_Answers_Doc_0001.pdf

PDF 286 KB Posted

Attached to
Gas Heater Repair Palomino Valley Fire Station
Solicitation number
140L3926Q0002
Issued by

About this file

This document is an Amendment (0001) to Solicitation 140L3926Q0002 for a Gas Heater Repair at Palomino Valley Fire Station. The solicitation involves repairing a REZNOR UDAP60 gas heater located 16 feet high in a fire engine garage. Key details include a site visit scheduled for January 6, 2026 at 5605 Grass Valley Rd, Reno, NV, with Grant Moss as the Point of Contact. The closing date is extended to 11:59 pm PST on January 13, 2026, with a performance period from January 20 to February 27, 2026. The amendment includes answers to contractor questions about electrical disconnects, wiring condition, access restrictions, building occupancy, and power supply voltage (believed to be 110V). Contractors are advised to field verify technical details and coordinate with the Contracting Officer's Representative (COR) for any potential power outages during the repair work.

View the file

Other files

File Type Posted
Sol_140L3926Q0002_Amd_0001.pdf PDF
B_03_Davis-Bacon_Act_WD___NV20250044.pdf PDF
Sol_140L3926Q0002.pdf PDF
A_04_PV_Heater_Repair_SOW_REVISED.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140L3926Q0002 Gas Heater Repair Palomino Valley Fire Station

Amendment 0001

The Site Visit is at 9:00 am PST on January 6, 2026 at 5605 Grass Valley Rd, Reno, NV 89510.

The Point of Contact for the Site Visit is Grant Moss, GMoss@blm.gov, 775-430-1818.

Any questions must be submitted by email to MBernard@blm.gov no later than 11:59 pm PST January 6, 2026.

The Closing date for this solicitation is changed to 11:59 pm PST Jan 13, 2026.

The Period of Performance is from Jan 20, 2026 until Feb 27, 2026.

Answers to questions:

1. Is the electrical disconnect switch easily accessible near the unit?

a. It is accessible, located on ceiling. See attached picture.

b.

2. What is the condition of the existing electrical connections and wiring?

a. Wires appear to be in good condition, no known issues, contractor to field verify.

3. Are there any access restrictions to reach the unit at its 16-foot height?

a. The floor area below will be clear of obstructions while work is being performed.

4. What is the type of building where this work will be performed?

a. This is the garage for Fire Engines and Trucks.

5. Will the building need to remain operational during the repair work?

a. Employees may occupy the building, however, if needed the building can be de-energized.

Coordinate any power outages with COR.

6. What is the power supply voltage for the REZNOR UDAP60 unit?

a. It is believed to be a 110V system. Contractor to field verify.

mailto:GMoss@blm.gov mailto:MBernard@blm.gov