A 02 CES HEC Equipment Survey_Nov_19_Safety.xlsx
XLSX spreadsheet 224 KB Posted
- Attached to
- Hazardous Energy Control Procedures
- Solicitation number
- W50S9G20Q0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| b 08 QA HEC Procedures 8SEP20.docx | DOCX document | |
| FAR 52.204-24 Offeror Representations.pdf | ||
| B 04 SCA Wage Determination.pdf | ||
| FAR Clause 52_204_25 Prohibition.docx | DOCX document | |
| A 02 Scope of Work - CE HEC_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Home
INSTRUCTIONS FOR SURVEY
General information on LOTO
- If in the Survey you identified that personnel are exposed to any type of hazardous energy you must have a Hazardous Energy Control program and written procedures for that task.
- Here are the exceptions to the Hazardous Energy Control Procedures:
| -Minor tool changes, replacing or changing drill bit on drill press, changing tool on mill or lathe, ect. | ||
| -If there is a plug and cord that can be controlled by the employee and there are not any other sources of energy. | ||
| -Employees do not perform any routine service or maintenance on machine or equipment. The Authorized | Employee, maintenance technician, who is performing maintenance will apply their LOTO procedures while they | perform maintenance. |
This describes the survey process working from left to right on the spreadsheet. First block is the equipment #, second column is the Machine/Equipment column and so on.
1. Survey work place for any machines or equipment that may need Hazardous Energy Control procedures. Annotate in Spreadsheet in appropriate column.
2. After all machines/equipment have been identified describe any servicing, maintenance, or repairs that your personnel would perform. Utilize one block per task and be sure to include tool changes or point of operation tasks that may endanger personnel.
3. Identify all hazards that personnel will be exposed to. One hazard per block.
4. Identify who specifically will be exposed the hazard
5. Using the categories on the right side of the page, input severity and likelihood to get initial risk without any control measure in place.
6. Now describe any control measures that have been put in place. These would be LOTO procedures, JSA, Locally Written instructions, PPE, Guarding, ect.
7. Now fill in the Residual Risk after control measures are in place. The Severity cannot change unless you eliminate the task or equipment only the likelihood can change.
CLIN0001 Base Bid
| WORKCENTER HAZARDOUS ENERGY SURVEY | |||||||
| Group: | MSG | Squadron: | CES | Shop: | |||
| Date: | Supervisor: | STATE EMPLOYEE | |||||
| # | Job/Task | Hazards | |||||
| Machine / Equipment | Hazard & Effect | At Risk | |||||
| BLDG | |||||||
| # | Basic description of tasks performed | Description and effect of existing and potential hazards based on observations and experience. | Personnel or groups exposed. | ||||
| 1 | 104 | OVERHEAD GARAGE DOORS | 1 | ||||
| 2 | 127 | OVERHEAD GARAGE DOORS | 2 | ||||
| 3 | 208 | MITSUBISHI A/C UNIT, FCU-1 | 4 | ||||
| 4 | 208 | TRANE A/C UNIT FCU-3 | |||||
| 5 | 208 | MITSUBISHI A/C UNIT, FCU-2 | |||||
| 6 | 208 | AIRCRAFT HANGER A/C | 1 | ||||
| 7 | 208 | ATLAS COPCO, AIR COMPRESSOR AIR DRYER, R134A | 2 | ||||
| 8 | 208 | MARLEY ENTRANCE HEADER NORTH EAST ENTRANCE | 3 | ||||
| 9 | 208 | MARLEY ENTRANCE HEADER SOUTH EAST ENTRANCE | 4 | ||||
| 10 | 208 | MARLEY ENTRANCE HEADER WEST ENTRANCE | 5 | ||||
| 11 | 208 | DIRECT DRIVE EXHAUST FAN EF-5 | |||||
| 12 | 208 | EXHAUST FAN #28 | |||||
| 13 | 208 | EXHAUST FAN EF-3 | |||||
| 14 | 208 | EXHAUST FAN EF-4 | |||||
| 15 | 208 | EXHAUST FAN EF-1 | |||||
| 16 | 208 | EXHAUST FAN #18 | |||||
| 17 | 208 | EXHAUST FAN #19 | |||||
| 18 | 208 | EXHAUST FAN EF-20 | |||||
| 19 | 208 | EXHAUST FAN EF-11 | |||||
| 20 | 208 | EXHAUST FAN #2 | |||||
| 21 | 208 | EXHAUST FAN #6 | |||||
| 22 | 208 | EXHAUST FAN #7 | |||||
| 23 | 208 | EXHAUST FAN #8 | |||||
| 24 | 208 | EXHAUST FAN #9 | |||||
| 25 | 208 | EXHAUST FAN #10 | |||||
| 26 | 208 | EXHAUST FAN #12 | |||||
| 27 | 208 | EXHAUST FAN #13 | |||||
| 28 | 208 | EXHAUST FAN #14 | |||||
| 29 | 208 | EXHAUST FAN #15 | |||||
| 30 | 208 | EXHAUST FAN #16 | |||||
| 31 | 208 | EXHAUST FAN #17 | |||||
| 32 | 208 | EXHAUST FAN #21 | |||||
| 33 | 208 | EXHAUST FAN #22 | |||||
| 34 | 208 | EXHAUST FAN #23 | |||||
| 35 | 208 | EXHAUST FAN #24 | |||||
| 36 | 208 | EXHAUST FAN #25 | |||||
| 37 | 208 | EXHAUST FAN #26 | |||||
| 38 | 208 | EXHAUST FAN #27 | |||||
| 39 | 208 | EXHAUST FAN EF-1 | |||||
| 40 | 208 | EXHAUST FAN EF-2 | |||||
| 41 | 208 | EXHAUST FAN EF-3 | |||||
| 42 | 208 | EXHAUST FAN EF-4 | |||||
| 43 | 208 | GAS FURNACE | |||||
| 44 | 208 | HEAT EXCHANGER RTU-6 | |||||
| 45 | 208 | HEAT EXCHANGER | |||||
| 46 | 208 | HEAT EXCHANGER, UH-12 | |||||
| 47 | 208 | HEAT EXCHANGER, UH15 | |||||
| 48 | 208 | HANGAR UNIT HEATERS, AIR CONDITIONING CONDENSING UNITS, 1206 | |||||
| 49 | 208 | HANGAR UNIT HEATERS, AIR CONDITIONING CONDENSING UNITS, 1207 | |||||
| 50 | 208 | 2 HEATING AND VENTILATION HANGAR UNIT HEATERS ,1213 | |||||
| 51 | 208 | 3 HEATING AND VENTILATION HANGAR UNIT HEATERS, 1214 | |||||
| 52 | 208 | HANGAR UNIT HEATERS, 1215 | |||||
| 53 | 208 | HANGAR UNIT HEATERS, 1216 | |||||
| 54 | 208 | HANGAR UNIT HEATERS, 1217 | |||||
| 55 | 208 | MAKE UP AIR UNIT #2 | |||||
| 56 | 208 | MAKE UP AIR UNIT #1 | |||||
| 57 | 208 | MAKE UP AIR UNIT MUA-3 | |||||
| 58 | 208 | MAKE UP AIR UNIT #3 | |||||
| 59 | 208 | RCP-1 |
RADIANT CEILING PANEL (ELECTRIC)
60 208 RCP-2
RADIANT CEILING PANEL (ELECTRIC)
61 208 RCP-3
RADIANT CEILING PANEL (ELECTRIC)
| 62 | 208 | IR HEATER # 1 |
| 63 | 208 | IR HEATER # 2 |
| 64 | 208 | IR HEATER # 3 |
| 65 | 208 | IR HEATER # 4 |
| 66 | 208 | IR HEATER # 6 |
| 67 | 208 | IR HEATER # 7 |
| 68 | 208 | IR HEATER # 8 |
| 69 | 208 | IR HEATER # 9 |
| 70 | 208 | IR HEATER # 10 |
| 71 | 208 | IR HEATER # 11 |
| 72 | 208 | IR HEATER # 12 |
| 73 | 208 | IR HEATER # 13 |
| 74 | 208 | IR HEATER # 14 |
| 75 | 208 | ROOFTOP PACKAGE UNIT - RTU-4 |
| 76 | 208 | ROOFTOP PACKAGE UNIT - RTU-3 |
| 77 | 208 | ROOFTOP PACKAGE UNIT - RTU-5 |
| 78 | 208 | ROOFTOP PACKAGE UNIT - RTU-8 |
| 79 | 208 | ROOFTOP PACKAGE UNIT - RTU-16 |
| 80 | 208 | ROOFTOP PACKAGE UNIT - RTU-12 |
| 81 | 208 | ROOFTOP PACKAGE UNIT - RTU-1 |
| 82 | 208 | ROOFTOP PACKAGE UNIT - RTU-13 |
| 83 | 208 | ROOFTOP PACKAGE UNIT - RTU-2 |
| 84 | 208 | ROOFTOP PACKAGE UNIT - RTU-11 |
| 85 | 208 | ROOFTOP PACKAGE UNIT - RTU-7 |
| 86 | 208 | ROOFTOP PACKAGE UNIT - RTU-17 |
| 87 | 208 | ROOFTOP PACKAGE UNIT - RTU-6 |
| 88 | 208 | ROOFTOP PACKAGE UNIT - RTU-10 |
| 89 | 208 | ROOFTOP PACKAGE UNIT - RTU-17, AAON |
| 90 | 208 | ROOFTOP PACKAGE UNIT - RTU-9 |
| 91 | 208 | ROOFTOP PACKAGE UNIT - RTU-11 |
| 92 | 208 | UNIT HEATER UH-1 |
| 93 | 208 | UNIT HEATER UH-2 |
| 94 | 208 | UNIT HEATER UH-3 |
| 95 | 208 | UNIT HEATER UH-4 |
| 96 | 208 | UNIT HEATER UH-5 |
| 97 | 208 | UNIT HEATER UH-6 |
| 98 | 208 | UNIT HEATER UH-7 |
| 99 | 208 | UNIT HEATER UH-8 |
| 100 | 208 | UNIT HEATER UH-9 |
| 101 | 208 | UNIT HEATER UH-10 |
| 102 | 208 | UNIT HEATER UH-11 |
| 103 | 208 | UNIT HEATER UH-13 |
| 104 | 208 | UNIT HEATER UH-14 |
| 105 | 208 | UNIT HEATER UH-16 |
| 106 | 208 | UNIT HEATER UH-17 |
| 107 | 208 | UNIT HEATER UH-18 |
| 108 | 208 | UNIT HEATER UH-19 |
| 109 | 208 | UNIT HEATER UH-20 |
| 110 | 208 | UNIT HEATER UH-21 |
| 111 | 208 | UNIT HEATER UH-22 |
| 112 | 208 | CABINET UNIT HEATER, CUH-1 |
| 113 | 208 | CABINET UNIT HEATER, CUH-2 |
| 114 | 208 | CABINET UNIT HEATER, CUH-3 |
| 115 | 208 | CABINET UNIT HEATER, CUH-4 |
| 116 | 208 | CABINET UNIT HEATER, CUH-5 |
| 117 | 208 | CABINET UNIT HEATER, CUH-6 |
| 118 | 208 | CABINET UNIT HEATER, CUH-7 |
| 119 | 208 | CABINET UNIT HEATER, CUH-8 |
| 120 | 208 | CABINET UNIT HEATER, CUH-9 |
| 121 | 208 | CABINET UNIT HEATER, CUH-10 |
| 122 | 208 | CABINET UNIT HEATER, CUH-19 |
| 123 | 208 | CABINET UNIT HEATER, CUH-12 |
| 124 | 208 | CABINET UNIT HEATER, CUH-13 |
| 125 | 208 | HANGER DOORS, WEST |
| 126 | 208 | HANGER OVERHEAD DOOR, EAST |
| 127 | 208 | HANGER OVERHEAD DOOR , NORTH |
| 128 | 208 | HANGER OVERHEAD DOOR, SOUTH |
| 129 | 208 | ENGINE SHOP OVERHEAD DOOR |
| 130 | 208 | AVIONICS OVERHEAED DOOR |
| 131 | 304 | INGERSOLL RAND AIR DRYER |
| 132 | 304 | PHEUMATECH AIR DRYER |
| 133 | 304 | AIR HANDLER UNIT # 1 |
| 134 | 304 | AIR HANDLER UNIT # 2 |
| 135 | 304 | AIR HANDLER UNIT # 3 |
| 136 | 304 | AHU-2 |
MAKEUP AIR UNIT
MEZZANINE UNIT
137 304 AHU-1
MAKEUP AIR UNIT
WELDING SHOP
| 138 | 304 | AIR HANDLER AHU-3 |
| 139 | 304 | IR-1 |
CO-RAY-VAC INFRA RED
N.E.
| 140 | 304 | EXHAUST FAN EF-1 |
| 141 | 304 | EXHAUST FAN EF-2 |
| 142 | 304 | EXHAUST FAN EF-3 |
| 143 | 304 | EXHAUST FAN EF-4 |
| 144 | 304 | EXHAUST FAN EF-9 |
| 145 | 304 | EXHAUST FAN EF-10 |
| 146 | 304 | EXHAUST FAN EF-5 |
| 147 | 304 | EXHAUST FAN EF-6 |
| 148 | 304 | EXHAUST FAN EF-8 |
| 149 | 304 | EXHAUST FAN EF-7 |
| 150 | 304 | NORTH A/C NOSE DOCK GEN,HVAC INFARED HEATING |
| 151 | 304 | MAU-4 |
SOUTHSIDE DOCK
152 304 FMU-1
STANDING FLOOR UNIT
153 304 FMU-3
STANDING FLOOR UNIT
| 154 | 304 | X-1 UPPER NORTH MAKEUP AIR UNIT |
| 155 | 304 | X-2 UPPER NORTH MAKEUP AIR UNIT |
| 156 | 304 | MUA-1 |
WEST HANGAR
157 304 IR-2
CO-RAY-VAC INFRA RED
S.E.
158 304 IR-3
N.W. UNIT
INFRA-RED HEAT
159 304 IR-4
INFRA-RED HEAT
S.W. UNIT
| 160 | 304 | UNIT HEATER, UH-1 |
| 161 | 304 | UNIT HEATER, UH-2 |
| 162 | 304 | UNIT HEATER, UH-3 |
| 163 | 304 | UNIT HEATER, UH-4 |
| 164 | 304 | UNIT HEATER, UH-5 |
| 165 | 304 | UNIT HEATER, UH-6 |
| 166 | 304 | UNIT HEATER, UH-7 |
| 167 | 304 | UNIT HEATER, UH-8 |
| 168 | 304 | HANGER DOOR, NORTH WEST |
| 169 | 304 | HANGER DOOR, SOUTH WEST |
| 170 | 304 | HANGER OVERHEAD DOOR SOUTH |
| 171 | 304 | HANGER OVERHEAD DOOR, EAST |
| 172 | 304 | HANGER OVERHEAD DOOR, METALS TECHNOLOGY |
| 173 | 304 | OVERHEAD DOOR CORROSION EXTERIOR |
| 174 | 304 | OVERHEAD DOOR CORROSION TO HANGER |
| 175 | 304 | OVERHEAD DOOR BLAST ROOM TO PAINT ROOM |
| 176 | 304 | OVERHEAD DOOR METALS TECHNOLOGY EXERIOR, EAST |
| 177 | 306 | OVERHEAD DOOR STRUCTURAL REPAIR EXERIOR |
| 178 | 306 | OVERHEAD DOOR BETWEEN METALS TECH AND STRUCTRUAL REPAIR |
| 179 | 306 | OVERHEAD DOOR FIRE SUPPRESION SYSTEM |
| 180 | 306 | MAKEUP AIR UNIT #3 |
LOWER ROOF TOP
181 306 AHU-3
OLD WELD SHOP
LOCKER ROOM
182 306 ACCU-4
SPLIT A/C SYSTEM
WELD SHOP OFFICE
| 183 | 306 | EXHAUST FAN 1 |
| 184 | 306 | EXHAUST FAN 2 |
| 185 | 306 | EXHAUST FAN 3 |
| 186 | 306 | EXHAUST FAN 4 |
| 187 | 306 | EXHAUST FAN 1L |
| 188 | 306 | EXHAUST FAN 2L |
| 189 | 306 | CUH-1 |
FAN/COIL UNIT
FLIGHT LINE
190 306 CUH-1
FAN/COIL UNIT
FLIGHT LINE
| 191 | 306 | FLIGHTLINE,HVAC SYSTEMS GENERAL |
| 192 | 306 | ROOF TOP UNIT #2 |
| 193 | 306 | RTU-3 |
LOWER ROOF
ROOF TOP UNIT
194 306 RTU-2
UPPER ROOF
ROOF TOP UNIT
195 306 RTU-1
LOWER ROOF
ROOF TOP UNIT
196 306 RTU-4
S/M OFFICE
EAST UNIT
| 197 | 306 | FLIGHT LINE LOWER ROOF TOP UNIT |
| 198 | 306 | FTR-1 |
VINYL ROOM
HW HEAT
199 306 U.H-8
HANGING UNIT
SHEET METAL SHOP 19
FAN/COIL
200 306 U.H-9
SHEET METAL SHOP
HANGING UNIT
FAN/COIL
201 306 U.H-6
HANGING UNIT
FIRE SUPPRESSION
FAN/COIL
| 202 | 308 | AIR COMPRESSOR DRYER | |
| 203 | 308 | AIR HANDLER UNIT-1 | |
| 204 | 308 | FLOOR HEATER UNIT# 2 | |
| 205 | 308 | FLOOR HEATER UNIT#1 | |
| 206 | 308 | FLOOR HEATER UNIT#1 | |
| 207 | 308 | AHU-1 MEZZAININE UNIT | |
| 208 | 308 | AHU-2 MEZZAININE UNIT | |
| 209 | 308 | BOILER #1 | AERCO |
| 210 | 308 | BOILER #2 | AERCO |
| 211 | 308 | BOILER #3 | AERCO |
| 212 | 308 | BOILER #4 | AERCO |
| 213 | 308 | BOILER #5 | AERCO |
| 214 | 308 | BOILER #6 | AERCO |
| 215 | 308 | P-1, 2-CIRC. PUMPS | WILO |
| 216 | 308 | P-2, 2-CIRC. PUMPS | TACO |
| 217 | 308 | AC-2 CONDENSOR UNIT 2 | |
| 218 | 308 | AC-1 CONDENSOR UNIT | |
| 219 | 308 | AC-1 CONDENSOR UNIT, ACCU-1 | |
| 220 | 308 | EXHAUST FAN EF-1 | |
| 221 | 308 | EXHAUST FAN EF-2 | |
| 222 | 308 | EXHAUST FAN EF-3 | |
| 223 | 308 | EXHAUST FAN EF-4 | |
| 224 | 308 | EXHAUST FAN EF-5 | |
| 225 | 308 | EXHAUST FAN EF-6 | |
| 226 | 308 | EXHAUST FAN EF-1A | |
| 227 | 308 | EXHAUST FAN EF-6 | |
| 228 | 308 | EXHAUST FAN EF-7 | |
| 229 | 308 | EXHAUST FAN EF-8 | |
| 230 | 308 | EXHAUST FAN EF-9 | |
| 231 | 308 | EXHAUST FAN EF-10 | |
| 232 | 308 | EXHAUST FAN EF-11 | |
| 233 | 308 | EXHAUST FAN EF-12 | |
| 234 | 308 | MAU-1 | |
| 235 | 308 | MAU-7 | |
| 236 | 308 | PUMP, BCP-1 | |
| 237 | 308 | PUMP, BCP-2 | |
| 238 | 308 | PUMP, BCP-3 | |
| 239 | 308 | PUMP, BCP-4 | |
| 240 | 308 | PUMP, BCP-5 | |
| 241 | 308 | PUMP, BCP-6 | |
| 242 | 308 | ROOF TOP UNIT, RTU-1 | |
| 243 | 308 | ROOF TOP UNIT, RTU-8 | |
| 244 | 308 | ROOF TOP UNIT #1 | |
| 245 | 308 | IR-1, WEST HANGAR |
INFRA RED HEATER
246 308 IR-2, EAST HANGAR
INFRA RED HEATER
| 247 | 308 | AC-1, CONDENSING UNIT |
| 248 | 308 | UNIT HEATER |
| 249 | 308 | WATER HEATER 100 GAL |
| 250 | 308 | SOUTH A/C DOCK,STRUCT HANGER DOORS |
| 251 | 308 | SOUTH A/C DOCK,OVERHEAD DOORS |
CLIN0002 Opt 1
| WORKCENTER HAZARDOUS ENERGY SURVEY | ||||||||
| Group: | MSG | Squadron: | CES | Shop: | ||||
| Date: | Supervisor: | STATE EMPLOYEE | ||||||
| # | Job/Task | Hazards | ||||||
| Machine / Equipment | Hazard & Effect | At Risk | ||||||
| BLDG | ||||||||
| # | Basic description of tasks performed | Description and effect of existing and potential hazards based on observations and experience. | Personnel or groups exposed. | |||||
| 1 | 401 | AIR_CONDITIONER ACCU-1 | 1 | |||||
| 2 | 401 | AIR_CONDITIONER ACCU-2 | 2 | |||||
| 3 | 401 | AIR_CONDITIONER, UNIT #74 | 4 | |||||
| 4 | 401 | AIR_DRYER, AD-1 | ||||||
| 5 | 401 | AIR_CONDITIONER, UNIT #70 | ||||||
| 6 | 401 | AIR HANDLER UNIT ABOVE MEZZ CENTER | 1 | |||||
| 7 | 401 | AIR_HANDLER, SZ AHU BOSS | 2 | |||||
| 8 | 401 | AIR_HANDLER AHU-1 | ||||||
| SOUTH | 3 | |||||||
| 9 | 401 | AIR_HANDLER AHU-2 | ||||||
| NORTH | 4 | |||||||
| 10 | 401 | AIR_HANDLER AHU-1 | ||||||
| SIMULATOR | 5 | |||||||
| 11 | 401 | BOILER-1 | ||||||
| 12 | 401 | BOILER-2 | ||||||
| 13 | 401 | BOILER-3 | ||||||
| 14 | 401 | BOILER B-1 | ||||||
| 15 | 401 | BOILER B-1 Simulator | ||||||
| 16 | 401 | BOILER B-3 | ||||||
| 17 | 401 | CHILLER, CH-1 | ||||||
| 18 | 401 | COMPRESSOR SIM | ||||||
| 19 | 401 | ENTRANCE HEATER, EH-1 | ||||||
| 20 | 401 | ENTRANCE HEATER, EH-2 | ||||||
| 21 | 401 | SIMULATOR EVAPORATOR | ||||||
| 22 | 401 | EXHAUST FAN, EF-153 | ||||||
| 23 | 401 | EXHAUST FAN, EF-154 | ||||||
| 24 | 401 | EXHAUST FAN, EF-165 | ||||||
| 25 | 401 | EXHAUST FAN, EF-166 | ||||||
| 26 | 401 | FAN/ COIL, FCU-2 SIM | ||||||
| 27 | 401 | FAN/ COIL, FCU-1 SIM | ||||||
| 28 | 401 | SIMULATOR HUMIDIFIER | ||||||
| 29 | 401 | BOSS HUMIDIFIER | ||||||
| 30 | 401 | CIRCULAR PUMP-1 | ||||||
| 31 | 401 | CIRCULAR PUMP-2 | ||||||
| 32 | 401 | CIRCULATION PUMP - MEZZANINE | ||||||
| 33 | 401 | PUMP-1 | ||||||
| 34 | 401 | PUMP-2 | ||||||
| 35 | 401 | PUMP MOTOR, P-1 | ||||||
| 36 | 401 | PUMP MOTOR, P-2 | ||||||
| 37 | 401 | PUMP MOTOR, P-3 | ||||||
| 38 | 401 | PUMP MOTOR, P-4 | ||||||
| 39 | 401 | PUMP MOTOR, P-5 | ||||||
| 40 | 401 | PUMP MOTOR, P-6 | ||||||
| 41 | 401 | ROOF TOP UNIT | ||||||
| 42 | 401 | DOMESTIC HOT WATER RECIRCULATION PUMP, P-1 | ||||||
| 43 | 401 | ROOF TOP UNIT-48 | ||||||
| 44 | 401 | ROOF TOP UNIT-47 | ||||||
| 45 | 401 | ROOF TOP UNIT-37 | ||||||
| 46 | 401 | ROOF TOP UNIT-74 | ||||||
| 47 | 401 | ROOF TOP UNIT, YORK | ||||||
| 48 | 401 | ENERGY RECOVERY VENTILATION, ERV-1 | ||||||
| 49 | 401 | RELIEF FAN NORTH RF-1 | ||||||
| 50 | 401 | RELIEF FAN NORTH RF-2 | ||||||
| 51 | 401 | UNIT HEATER NORTH GATE | ||||||
| 52 | 401 | UNIT HEATER, UH-3 | ||||||
| 53 | 401 | UNIT HEATER, UH-4 | ||||||
| 54 | 401 | UNIT HEATER, UH-5 | ||||||
| 55 | 401 | UNIT HEATER, UH-6 | ||||||
| 56 | 401 | UNIT HEATER, UH-7 | ||||||
| 57 | 401 | UNIT HEATER, UH-8 | ||||||
| 58 | 401 | UNIT HEATER, UH-9 | ||||||
| 59 | 401 | UNIT HEATER, UH-11 | ||||||
| 60 | 401 | UNIT HEATER, UH-12 | ||||||
| 61 | 401 | UNIT HEATER, UH-13 | ||||||
| 62 | 401 | UNIT HEATER, UH-14 | ||||||
| 63 | 401 | UNIT HEATER, UH-15 | ||||||
| 64 | 401 | UNIT HEATER, UH-16 | ||||||
| 65 | 401 | UNIT HEATER, UH-17 | ||||||
| 66 | 401 | UNIT HEATER, UH-19 | ||||||
| 67 | 401 | UNIT HEATER, UH-150 | ||||||
| 68 | 401 | UNIT HEATER, UH-166 | ||||||
| 69 | 401 | UNIT HEATER, UH-165 | ||||||
| 70 | 401 | UNIT HEATER, UH-1 | ||||||
| 71 | 401 | UNIT HEATER, UH-2 | ||||||
| 72 | 401 | 50 GALLON WATER HEATER | ||||||
| 73 | 500 | HEATING UNIT-PHARMACY | ||||||
| 74 | 500 | CONDENSING UNIT #29 | ||||||
| 75 | 500 | CONDENSING UNIT #30 | ||||||
| 76 | 500 | AC-30 A/C SPLIT SYSTEM DSS | ||||||
| 77 | 500 | A/C SPLIT SYSTEM-4 | ||||||
| 78 | 500 | AC-5 A/C SPLIT SYSTEM | ||||||
| 79 | 500 | AC-6 A/C SPLIT SYSTEM | ||||||
| 80 | 500 | AC-29 A/C SPLIT SYSTEM |
HSS
| 81 | 500 | A/C SPLIT SYSTEM AC-1 |
| 82 | 500 | A/C SPLIT SYSTEM |
EAST OFFICES
| 83 | 500 | SUPPLY BLDG,HVAC AIR DISTIBUTION |
| 84 | 500 | BOILER, B-1 |
| 85 | 500 | BOILER, B-2 |
| 86 | 500 | CUH-1 |
NE ENTRANCE WALL HEATER
| 87 | 500 | EXHAUST FAN 4 |
| 88 | 500 | EXHAUST FAN EF-1 |
| 89 | 500 | EXHAUST FAN EF-2 |
| 90 | 500 | EXHAUST FAN EF-3 |
| 91 | 500 | FAN/ COIL FCU-1 |
| 92 | 500 | FAN/ COIL FCU-2 |
| 93 | 500 | MAKEUP AIR UNIT, MAU-1 |
| 94 | 500 | PACKAGE UNIT #27 |
| 95 | 500 | PACKAGE UNIT #28 |
| 96 | 500 | PUMP P-15 |
| 97 | 500 | PUMP P-16 |
| 98 | 500 | PUMP P-17 |
| 99 | 500 | PUMP P-18 |
| 100 | 500 | RTU-1 |
ROOF TOP UNIT-27 NORTH ROOF
101 500 RTU-2
ROOF TOP UNIT-28 NORTH ROOF
102 500 RTU-3
HAZ-MAT BUILDING
103 500 RTU-4
2ND FLOOR
104 500 PRV-1
POWER ROOF VENT
105 500 PRV-2
POWER ROOF VENT
106 500 PRV-3
POWER ROOF VENT
107 500 DSS-1
FAN/COIL/SALT
BREAKROOM COOLING
108 500 DSS-2
COOLING (SALT)
| 109 | 500 | FTR-1 HEAT |
| 110 | 500 | HEATER, TRANE |
| 111 | 500 | OH HEATER-13, UH-1 |
| 112 | 500 | OH HEATER-13, UH-2 |
| 113 | 500 | OH HEATER-13, UH-3 |
| 114 | 500 | OH HEATER-13, UH-4 |
| 115 | 500 | OH HEATER-13, UH-5 |
| 116 | 500 | OH HEATER-13, UH-6 |
| 117 | 500 | OH HEATER-13, UH-7 |
| 118 | 500 | OH HEATER-13, UH-8 |
| 119 | 500 | CUH-1 |
WALL HEATER
NE ENTRANCE
| 120 | 512 | EMERGENCY GENERATOR |
| 121 | 512 | AIR DRYER-43 |
| 122 | 512 | AIR COMPRESSOR-4 |
| 123 | 512 | AIR_CONDITIONER, AAON UNIT |
| 124 | 512 | AC-82 |
AC SPLIT SYSTEM-82
| 125 | 512 | AIR_CONDITIONER, AAON UNIT -1 |
| 126 | 512 | A.C.50 |
A/C SPLIT SYSTEM-50
127 512 A.C.50
A/C SPLIT SYSTEM-51
128 512 A.C.50
A/C SPLIT SYSTEM-52
129 512 A.C.50
A/C SPLIT SYSTEM-53
130 512 A.C.50
A/C SPLIT SYSTEM-54
131 512 A.C.50
A/C SPLIT SYSTEM-55
| 132 | 512 | A.C.50 A/C SPLIT SYSTEM-56 |
| 133 | 512 | A.C.50 A/C SPLIT SYSTEM-65 |
| 134 | 512 | A.C.50 A/C SPLIT SYSTEM-61 |
| 135 | 512 | A.C.50 A/C SPLIT SYSTEM-62 |
| 136 | 512 | A.C.50 A/C SPLIT SYSTEM-63 |
| 137 | 512 | A.C.50 A/C SPLIT SYSTEM-64 |
| 138 | 512 | A.C.50 A/C SPLIT SYSTEM-65 |
| 139 | 512 | A.C.50 A/C SPLIT SYSTEM-66 |
| 140 | 512 | A.C.50 A/C SPLIT SYSTEM-38 |
| 141 | 512 | A.C.50 A/C SPLIT SYSTEM-68 |
| 142 | 512 | A.C.50 A/C SPLIT SYSTEM-69 |
| 143 | 512 | A.C.50 A/C SPLIT SYSTEM-40 |
| 144 | 512 | A.C.50 A/C SPLIT SYSTEM-81 |
| 145 | 512 | AHU-1 |
AIR HANDLER UNIT-13
| 146 | 512 | FCU-2 AIR HANDLER UNIT-45 FILTER BOX CREDIT UNION |
| 147 | 512 | FCU-1 |
AIR HANDLER UNIT-44
148 512 CUH-6
FAN COIL-11 EAST ENTRY
149 512 CUH-1
FAN/COIL-7
150 512 CUH-4
FAN/COIL-12
151 512 CUH-3
FAN/COIL-15
152 512 CUH-5
FAN/COIL-14
| 153 | 512 | COIL, CUH-2 |
| 154 | 512 | COIL |
CENTER HALL CEILING
| 155 | 512 | CONDENSING UNIT-38 |
| 156 | 512 | CONDENSING UNIT-40 |
| 157 | 512 | CONDENSING UNIT-36 |
| 158 | 512 | ENTRANCE HEATER |
| 159 | 512 | ENTRANCE HEATER |
| 160 | 512 | ENTRANCE HEATER |
| 161 | 512 | ENTRANCE HEATER |
| 162 | 512 | ENTRANCE HEATER |
| 163 | 512 | ENTRANCE HEATER |
| 164 | 512 | EXHAUST FAN, EF-1 |
| 165 | 512 | EXHAUST FAN, EF-2 |
| 166 | 512 | EXHAUST FAN, EF-3 |
| 167 | 512 | EXHAUST FAN, EF-4 |
| 168 | 512 | HUMIDIFIER |
LAN ROOM
169 512 P-20
PUMP-2 CIRCULATION
170 512 P-19
PUMP-48A CIRCULATION
171 512 RTU-6
ROOF TOP UNIT-35 CSC
AHU ONLY
172 512 RTU-5
ROOF TOP UNIT-70
173 512 RTU-4
ROOF TOP UNIT-37 SERVER/LAN ROOM, ROOF
BACK-UP UNIT
174 512 RTU-3
ROOF TOP UNIT-79 EAST ROOF H+C
175 512 RTU-2
ROOF TUP UNIT-71
176 512 RTU-1
ROOF TOP UNIT-60 CLUB
| 177 | 512 | RTU #1 |
| 178 | 512 | ROOF TOP UNIT #3 |
| 179 | 512 | ROOF TOP UNIT #4 |
| 180 | 512 | ROOF TOP UNIT #5 |
| 181 | 512 | ROOF TOP UNIT #6 |
| 182 | 512 | ROOF TOP UNIT #2 |
| 183 | 512 | WH-1 |
WATER HEATER-2
CLIN0003 Opt 2
| WORKCENTER HAZARDOUS ENERGY SURVEY | ||||||||
| Group: | MSG | Squadron: | CES | Shop: | ||||
| Date: | Supervisor: | STATE EMPLOYEE | ||||||
| # | Job/Task | Hazards | ||||||
| Machine / Equipment | Hazard & Effect | At Risk | ||||||
| BLDG | ||||||||
| # | Basic description of tasks performed | Description and effect of existing and potential hazards based on observations and experience. | Personnel or groups exposed. | |||||
| 1 | POL | EXHAUST FAN #1 | 1 | |||||
| 2 | POL | FILTER SEPERATOR #1 | 2 | |||||
| 3 | POL | FILTER SEPERATOR #2 | 4 | |||||
| 4 | POL | FILTER SEPERATOR #3 | ||||||
| 5 | POL | FILTER SEPERATOR #4 | ||||||
| 6 | POL | FILTER SEPERATOR #5 | 1 | |||||
| 7 | POL | AC-1 | ||||||
| SPLIT A/C SYSTEM | 2 | |||||||
| 8 | POL | AC-2 | ||||||
| SPLIT A/C SYSTEM | 3 | |||||||
| 9 | POL | EXHAUST FAN #1 | 4 | |||||
| 10 | POL | EXHAUST FAN #2 | 5 | |||||
| 11 | POL | EXHAUST FAN #3 | ||||||
| 12 | POL | KOHLER 200KW GENERATOR | ||||||
| 13 | POL | FILTER SEPERATOR #6 | ||||||
| 14 | POL | FILTER SEPERATOR #7 | ||||||
| 15 | POL | EXHAUST FAN, EF-1 | ||||||
| 16 | POL | MAKEUP AIR UNIT MUA-1 | ||||||
| 17 | 611 | A/C CONDENSING UNIT, AC-3 | ||||||
| 18 | 611 | ACCU# 2 MEDICS | ||||||
| 19 | 611 | ACCU#1 | ||||||
| 20 | 611 | A/C UNIT-16 MEDICS, SMALL | ||||||
| 21 | 611 | AHU-4 |
AIR HANDLER UNIT KITCHEN
| 22 | 611 | AIR HANDLER UNIT DINING HALL |
| 23 | 611 | AIR HANDLER UNIT#1 MEDICS-LARGE |
| 24 | 611 | AHU-3 |
DINING HALL (19)
| 25 | 611 | BOILER, B-1 |
| 26 | 611 | BOILER, B-2 |
| 27 | 611 | ENTRANCE HEATER |
| 28 | 611 | CUH #1 ENTRANCE HEATER |
| 29 | 611 | CUH #2 ENTRANCE HEATER |
| 30 | 611 | CUH #3 ENTRANCE HEATER |
| 31 | 611 | CUH #5 ENTRANCE HEATER |
| 32 | 611 | EXHAUST FAN EF-1 |
| 33 | 611 | EXHAUST FAN EF-13 |
| 34 | 611 | EXHAUST FAN EF-3 |
| 35 | 611 | EXHAUST FAN EF-4 |
| 36 | 611 | EXHAUST FAN EF-5 |
| 37 | 611 | EXHAUST FAN EF-6 |
| 38 | 611 | EXHAUST FAN EF-7 |
| 39 | 611 | EXHAUST FAN EF-8 |
| 40 | 611 | EXHAUST FAN EF-9 |
| 41 | 611 | EXHAUST FAN EF-10 |
| 42 | 611 | FTR-6 |
HEATER
| 43 | 611 | CIRCULATION PUMP |
| 44 | 611 | PUMP #1 |
| 45 | 611 | PUMP #2 |
| 46 | 611 | PUMP #3 |
| 47 | 611 | PUMP #4 |
| 48 | 611 | PUMP #5 |
| 49 | 611 | HOT WATER RECIRCULATION PUMP (KITCHEN) |
| 50 | 611 | HOT WATER RECIRCULATION PUMP DOMESTIC WATER |
| 51 | 611 | CUH-2 |
SOUTH MAIN ENTRY HEATER
52 611 CUH-1
NORTH MAIN ENTRY HEATER
53 611 CUH-4
CEILING HEATER
54 611 FTR-5
HEATER
55 611 FTR-8
HEATER
56 611 FTR-10
HEATER
57 611 FTR-1
FINTUBE
DINNING HALL WINDOW
58 611 FTR-2
DISHWASHER HEATER
59 611 FTR-3
JANITORS CLOSET
60 611 FTR-4
STORE ROOM EAST
FINTUB
61 611 FTR-5
MENS RESTROOM
HALLWAY HEATER
62 611 FTR-6
WOMENS RESTROOM HEAT
HALLWAY (RADIATION)
63 611 FTR-7
WEST ENTRANCE
64 611 FTR-8
WOMENS RESTROOM
FINTUBE
65 611 FTR-9
KITCHEN
WOMENS SHOWER
FINTUBE
66 611 FTR-10
MENS KITCHEN RESTROOM DINNING HALL
67 611 FTR-11
MENS KITCHEN
SHOWER RESTROOM HEATER
FINTUBE
| 68 | 611 | UNIT HEATER, UH-1 |
| 69 | 611 | UNIT HEATER, UH-2 |
| 70 | 701 | AIR COMPRESSOR (SHOP AIR) |
| 71 | 701 | AIR COMPRESSOR |
| 72 | 701 | ACCU-1 |
AIR CONDITIONING ROOF UNIT -UNIT#34
J/C CONDENSING UNIT
| 73 | 701 | COMM ROOM DUCTLESS SPLIT SYSTEM |
| 74 | 701 | VEHICLE BAY AIR HANDLER |
| 75 | 701 | AIR HANDLER - CARPENTER SHOP |
| 76 | 701 | AHU-1 |
AIR HANDLER UNIT-1
| 77 | 701 | AIR HANDLER UNIT-2 |
| 78 | 701 | BOILER, B-1 |
| 79 | 701 | BOILER, B-2 |
| 80 | 701 | P-4 |
CIRCULATING PUMP - HEATING WATER
| 81 | 701 | DUST COLLECTOR -UNIT #29 |
| 82 | 701 | EUH-1 |
ELECTRIC HEATER
| 83 | 701 | ENTRANCE HEATER - UNIT#16 OFFICE |
| 84 | 701 | H-1 |
ENTRANCE HEATER -WEST ENTRANCE -UNIT#17
85 701 EXHAUST FAN, EF-1
WEST ROOF
| 86 | 701 | EXHAUST FAN, EF-3 |
| 87 | 701 | EXHAUST FAN, EF-4 |
| 88 | 701 | EXHAUST FAN, EF-5 |
| 89 | 701 | EXHAUST FAN, EF-6 |
| 90 | 701 | EXHAUST FAN, EF-2 |
| 91 | 701 | EXHAUST FAN, EF-7 |
| 92 | 701 | UH-3 |
OVERHEAD HEATER - UNIT #
93 701 UH-4
OVERHEAD HEATER - UNIT #4
94 701 UH-7
OVERHEAD HEATER UNIT #7
95 701 UH-8
OVERHEAT HEATER UNIT #8
96 701 UH-9
OVERHEAD HEATER UNIT #9
97 701 UH-10
OVERHEAD HEATER UNIT #10
98 701 UH-11
OVERHEAD HEATER UNIT #11
99 701 UH-12
OVERHEAD HEATER UNIT #12
| 100 | 701 | OVERHEAD HEATER, SUPPLY RM, UH-1 |
| 101 | 701 | OVERHEAD HEATER, PAINT ROOM, UNIT#22 |
| 102 | 701 | OVERHEAD HEATER #12 |
| 103 | 701 | PUMP, NOW 2009 |
| 104 | 701 | PUMP |
| 105 | 701 | PUMP, P-3 |
| 106 | 701 | P-1 |
BOILER PUMP
107 701 P-2
BOILER PUMP
| 108 | 701 | ROOF TOP UNIT |
| 109 | 701 | ROOF VENTILATOR -UNIT #7 |
| 110 | 701 | ROOF VENTILATOR -UNIT #6 |
| 111 | 701 | ROOF VENTILATOR -UNIT #26 |
| 112 | 701 | IR HEAT, IR-1 |
| 113 | 701 | IR HEAT, IR-2 |
| 114 | 701 | IR HEAT, IR-3 |
| 115 | 701 | SF-1 |
OFFICE SUPPLY FAN
| 116 | 701 | UNIT HEATER, UH-1 |
| 117 | 701 | UNIT HEATER, UH-2 |
| 118 | 701 | UNIT HEATER, UH-13 |
| 119 | 701 | WATER HEATER - UNIT#15 |
| 120 | 701 | CE BLDG.,OVERHEAD DOORS |
| 121 | 706 | AIR CONDITIONER, AC-1 |
| 122 | 706 | AIR HANDLER UNIT, AHU-1 |
| 123 | 706 | AIR HANDLER UNIT, AHU-2 |
| 124 | 706 | AIR HANDLER UNIT, AHU-3 |
| 125 | 706 | B-1 |
BOILER # PF514
MECH
| 126 | 706 | BOILER ROOM EXHAUST FAN #1 |
| 127 | 706 | BOILER ROOM EXHAUST FAN #2 |
| 128 | 706 | BOILER ROOM EXHAUST FAN #3 |
| 129 | 706 | EXHAUST FAN #4 |
| 130 | 706 | EXHAUST FAN #1 |
| 131 | 706 | EXHAUST FAN #6 |
| 132 | 706 | EXHAUST FAN #7 |
| 133 | 706 | EXHAUST FAN, EF-1 |
| 134 | 706 | EXHAUST FAN, EF-2 |
| 135 | 706 | EXHAUST FAN, EF-3 |
| 136 | 706 | EXHAUST FAN, EF-4 |
| 137 | 706 | EXHAUST FAN, EF-5 |
| 138 | 706 | EXHAUST FAN, EF-6 |
| 139 | 706 | EXHAUST FAN, EF-7 |
| 140 | 706 | EXHAUST FAN, EF-8 |
| 141 | 706 | EXHAUST FAN, EF-9 |
| 142 | 706 | EXHAUST FAN, EF-10 |
| 143 | 706 | EXHAUST FAN, EF-11 |
| 144 | 706 | EXHAUST FAN, EF-12 |
| 145 | 706 | PUMP P-1 |
| 146 | 706 | PUMP P-2 |
| 147 | 706 | COIL PUMP, CP-2 |
| 148 | 706 | COIL PUMP, CP-3 |
| 149 | 706 | UNIT HEATER, UH-1 |
| 150 | 706 | UNIT HEATER, UH-2 |
| 151 | 706 | UNIT HEATER, UH-3 |
| 152 | 706 | UNIT HEATER, UH-4 |
| 153 | 706 | UNIT HEATER, UH-5 |
| 154 | 706 | VEHICLE MAIT,OVERHEAD DOORS |
| 155 | 723 | HEAT PUMP, HP-1 |
| 156 | 723 | HEAT PUMP, HP-2 |
| 157 | 723 | HEAT PUMP, HP-3 |
| 158 | 723 | ENERGY RECOVERY VENTILATOR, ERV-1 |
| 159 | 723 | ENERGY RECOVERY VENTILATOR, ERV-2 |
Risk Matrix
| Risk Matrix | Likelihood / Probability | Residual Risk Level | ||||||||
| Improbable / Rarely (L1) | Very Unlikely (L2) | Unlikely (L3) | Likely (L4) | Very Likely (L5) | ||||||
| Little or no chance of occurrence | Expected to occur at some point | Could occur and is Likely to occur several times | Could occur and is Very Likely to occur frequently | Frequent, continuously occurs | Level of Risk Acceptance | Risk Level | ||||
| Severity | Catastrophic (S4) | |||||||||
| (Death, Loss of Asset, Perminant Disability) | Moderate Risk | Substantial Risk | High Risk | Very High Risk | Very High Risk | Wing Commander | Very High Risk | |||
| 4 | 8 | 12 | 16 | 20 | 16 - 20 | |||||
| Critical (S3) | ||||||||||
| (Severe injury, Partial Disability or Damaged Equipment) | Low Risk | Moderate Risk | Substantial Risk | High Risk | Very High Risk | Group Commander | High Risk | |||
| 3 | 6 | 9 | 12 | 15 | 12 | |||||
| Moderate (S2) | ||||||||||
| (Minor Injury, Medical Attention, minor damage to equipment) | Low Risk | Moderate Risk | Moderate Risk | Substantial Risk | High Risk | Squadron Commander | Substantial Risk | |||
| 2 | 4 | 6 | 8 | 10 | 9 | |||||
| Negligable (S1) | ||||||||||
| (First Aid or less, insignifianct damage to equipment) | Very Low Risk | Low Risk | Low Risk | Moderate Risk | Moderate Risk | Flight Chief | Moderate Risk | |||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||
| Shop Chief | Low Risk | |||||||||
| 3 | ||||||||||
| Shop Chief | Very Low Risk | |||||||||
| 1 |
Sample
| Job Risk Analysis | ||||||||||
| Dept: | Job: | Assessors: | Date: | |||||||
| # | Job Steps | Hazards | Initial Risk | Controls | Residual Risk | |||||
| Hazard & Effect | At Risk | Severity | Likelihood | Risk Rating | Severity | Likelihood | Risk Rating | |||
| Basic description of tasks recorded in sequence. | Description and effect of existing and potential hazards based on observations and experience. | Population or groups exposed. | S Code | L Code | Priority Risk Code | Describe necessary controls for each hazard using the Hierarchy of Controls method. | S Code | L Code | Priority Risk Code | |
| 1 | Worker reaches into bin next to machine, grasps with one hand a 15-pound casting and carries to grinding wheel 10’ away every 2 minutes. | 1) MSD to back, and hands from bending into bin and lifting; | Metal workers in Metal shop | 3 | 3 | 9 | 1) Open-side, tilted and self-adjusting bins to reduce reach | 2 | 1 | 2 |
| 2) lacerations to hand from sharp burrs/edges of casting; | 2 | 3 | 6 | 2) Cut-resistant gloves and sleeves | 1 | 2 | 2 | |||
| 3) tripping or slipping on items while carrying parts | 3 | 2 | 6 | 3) 5S system, hose reels, pre-inspection, and housekeeping | 2 | 1 | 2 | |||
| 2 | Worker holds piece with both hands at grinder to deburr edges for ~ 1 minute | 4) MSD to hands from static muscle loading | Same | 3 | 3 | 9 | 4) Use fixture to hold piece while grinding | 2 | 2 | 4 |
| 5) abrasions from grinder | 2 | 3 | 6 | 5) Use fixture to hold piece while grinding | 2 | 2 | 4 | |||
| 6) eye and face injury from flying particles from grinding | 3 | 4 | 12 | 6) Use ANSI Z87 eye protection and face shield | 2 | 2 | 4 | |||
| 3 | Place piece in finished bin adjacent to grinder | 7) MSD to back twisting & tossing pieces | Same | 3 | 3 | 9 | 7) Place bin in position where twisting is not required | 2 | 2 | 4 |
image1.JPG image2.JPG