931 60 30 Cone Penetrometer Testing Conversion Kit November 2021.docx
DOCX document 39 KB Posted
- Attached to
- Rebid D9 Cone Penetrometer
- Solicitation number
- 22-494DOT-FINAD-B-28279
- Issued by
- Jackson County, Illinois
About this file
This document is a specification and questionnaire for a Drill Rig to Cone Penetration Testing Conversion Kit issued by the Illinois Department of Transportation. The kit must include a drilling to CPT adapter, a three-piece retraction system, a cone system with components to perform and transmit data, and a data acquisition and interface system with a field laptop. The Department is seeking bids from established manufacturers or authorized dealers, with serviceability and prompt parts and service to the State of Illinois being key factors in the award. Bidders must provide detailed literature and specifications on the proposed equipment, which must have been manufactured for at least 5 years. The Department reserves the right to waive minor informalities if it is in the best interest of the State.
The successful bidder must provide a full 12-month warranty on the equipment, as well as on-site training for Department personnel. Delivery time is critical, and delays in delivery may impact consideration of the supplier in future bids. Bidders must submit the completed specification questionnaire, descriptive literature, and other required documentation with their bid response.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Terms and Conditions 2~2.docx | DOCX document | |
| Forms B Section~39.docx | DOCX document | |
| Forms A V.18.1~37.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specification No. 931-60-30 Specification No. 931-60-30 Specifications and Questionnaire for a Drill Rig to CPT Conversion Kit
State of Illinois Department of Transportation Bureau of Business Services Specifications and Questionnaire for a Drill Rig to Cone Penetration Testing Conversion Kit November 2021 This specification and questionnaire covers a Drill Rig to Cone Penetration Testing Conversion Kit for use by the Department of Transportation. To improve parts and service availability and increase tool life, the Department of Transportation is specifying units and accessories as outlined below.
Each bidder shall submit with their bid descriptive literature and specifications describing all the equipment proposed. This information shall be clearly marked to indicate the make, model, and accessories proposed to be furnished.
· The manufacturer of the equipment proposed has been actively involved in the manufacture of the equipment called for in the questionnaire for a period of not less than 5 years.
· Parts and service for the equipment proposed are readily available to the State of Illinois.
It is the responsibility of each bidder to complete and return this questionnaire with the bid.
Unless otherwise specified, the proposed equipment shall be complete in all parts and ready for immediate use upon delivery.
Bidders are advised to carefully read these specifications as changes have been made since the last solicitation issue.
Proposed with this Bid:
| Make: |
| Model: |
| Manufactured By: |
| Bidder: |
| Telephone: |
| Contact Name: |
| Email: |
The Illinois Department of Transportation reserves the right to waive minor informalities, deficiencies or technical variances which by their nature are restrictive to a given manufacturer, if in its’ judgement, it would be in the best interest of the State to do so and it would not prejudice the rights of other bidders.
Serviceability will be a factor in award. Successful bidder shall either be able to provide service after purchase or shall indicate other qualified service facilities able to service equipment, within a reasonable period of time at agency locations. Bidder shall provide documentation and enumerating service locations. A Review of the bidder's ability to provide prompt parts and service to the State of Illinois and in particular to the delivery location, will be considered in determining award.
Bids will only be accepted from established manufacturers or their authorized dealers. Any dealer submitting a bid hereby guarantees that it is an authorized dealer of the manufacturer and that the manufacturer has agreed to supply the dealer with all quantities of products required by the dealer in fulfillment of its obligations under any resultant contract with the State. Bidder must submit authorized dealer letter upon request.
Warranty:
Unless otherwise specified, Manufacturers’ standard warranty shall be provided. Bidder shall attach copies of warranty with their bid. Warranty shall commence at the Illinois Department of Transportation in-service date. If any equipment fails to conform to the warranties during the applicable warranty period, the Vendor or Manufacturer will adjust, repair or replace the equipment at no charge to the Department as soon as possible upon notice from the Department. Equipment shall be repaired on-site and will be performed at no additional cost to the Department.
The Vendor may provide or perform warranty service at a dealer location within the Districts geographic region if on-site repair is not possible. Vendor shall facilitate pickup and delivery of equipment at Vendor's cost if warranty repair(s) are made off-site during the warranty period. The contract Vendor is responsible for any failure of their allied or sub-contractors’ fulfillment of said warranties. Failure to provide this service shall result in a “Complaint to Vendor” that could affect future bid awards.
Delivery:
It will be the responsibility of the successful vendor to guarantee delivery within the quoted time and to require allied manufacturers or suppliers to complete the installation of auxiliary equipment in accordance with the quoted delivery time.
Failure to comply with the quoted delivery time because of delays resulting from the inability of suppliers of allied equipment such as bodies, snowplows, spreaders, etc., may be reason to refuse to consider similar items from those suppliers on future bids.
All equipment provided by the Vendor and the sub-contractor(s) shall be fully operational when delivery is made. Any noted defects at the time of delivery shall be addressed by Vendor in the first 30 days of in-service.
Bidder/Vendor acknowledges the requirements above. Yes |_| No |_|
| Bidder/Vendor Initials: |
| Date: |
Note: If the equipment proposed exceeds the minimums called for in the specification please do not mark NO. Mark Yes and explain with a short comment on how it exceeds.
Drill Rig to Cone Penetration Testing Kit:
The drill rig adapter kit shall allow Cone Penetrometer Testing with a drill rig not provided with this bid. An adapter screwed on to the drill head shall allow the separate push and pull hydraulic system to advance and retract the CPT VTK series equipment to and from the subsurface. The following components at a minimum shall be supplied with the kit.
Component List:
· Drilling to CPT adapter for pin head and AWJ threads
· Three-piece system with latch for retraction Any component not called for in the minimum list above required to complete the system shall be included.
| Complies: |_| Yes | |_| No |_| Exception |
| If NO or exception to any portion, please explain: |
Cone System:
The cone system shall be complete with all components necessary to perform and transmit data to a data acquisition system. The cone system shall be pre-calibrated with the data acquisition system described later in the specification. The following components at a minimum shall be supplied with CPT rig. Note: The system shall be manufactured, calibrated and serviced domestically.
Component List:
· Two (2) – 10.0 cm² VTK Data Pack or equivalent SCPTU cones with 10-ton push capacity.
Capable of recording:
· Tip Resistance
· Local Friction (skin friction)
· Pore Water Pressure
· Shear Wave collection for seismic application
· Inclination
· 150 Feet of Push rod with the required diameter that matches the cone
· One (1) - Cone adapter (if required) Cone to Rod
· One (1) - Friction Reduction Ring for Push rod
· One (1) - Spool of CPT cable, 150’+ min. with storage
· One (1) - Depth measuring device to determine real time depth of cone
· Two (2) - Seismic strike plates with two triggers and strike hammer
· One (1) - Rod wiper donut and holder
· One (1) – Rod rack system with 150’ min. storage Any component not called for in the minimum list above required to complete the system shall be included.
| Complies: |_| Yes | |_| No |_| Exception |
| If NO or exception to any portion, please explain: |
The following items shall be provided at a minimum for replacement or repair needs:
· Eight (8) – Spare cone tips
· Four (4) – Friction sleeves
· One (1) – Spool of CPT cable 150’+
· 100 count of u2 pore water pressure filter elements, pre-saturated
· 10 count of C-clip if required for CPT probe
· 50 count of each size O-ring, X-ring, gaskets or seals for probe
· One (1) – Field service kit with carrying case, complete with any tools for field service repairs to the system or supporting equipment.
Complies: |_| Yes |_| No CPT Data Acquisition and Interface System:
The following components shall be compatible with the cone system provided, pre-calibrated and ready for use upon delivery:
· One (1) – Data Acquisition Unit and carrying case
· All cables to interface with CPT probe and Data Acquisition unit
· Capability of interfacing with GPS to record test location
· Switching unit and cables for seismic strike plate and trigger Complies: |_| Yes |_| No Component provided:
| Make: |
| Model: |
| If NO or exception to any portion, please explain: |
· One (1) – Rugged Field Laptop computer with carrying case
· Minimum 4 gig of ram
· Latest version of software and license to interface with Data Acquisition unit
· All cables required for connection between laptop and acquisition unit
· GPS interface to record test location
· If system requires Bluetooth/wifi connectivity or external flash drive it shall be included Complies: |_| Yes |_| No |_| Exception Component provided:
| Make: |
| Model: |
| If NO or exception to any portion, please explain: |
Finish:
All exterior surfaces normally powder coated or painted shall be manufacturer's standard color.
Complies: |_| Yes |_| No
Manuals:
Three copies of all operators’ manuals, parts lists, and warranty information shall be provided at time of delivery to each district receiving one or more units.
Complies: Yes |_| No |_| Note: The manuals, parts lists, and service or shop manuals listed above may be furnished on flash drive in lieu of paper.
Requirements Covering Items Detailed Above:
All equipment cataloged as standard or safety related shall be furnished and in place and shall be included in the purchase price of the unit. Any parts, tools, and/or accessories not specifically called for but required for proper operation shall be provided.
Complies: Yes |_| No |_| The component parts of the unit shall be of proper size and design to safely withstand maximum stresses imposed by a capacity load, and the manufacturers rated loads for components shall not be exceeded when the unit is loaded with such loads.
Complies: Yes |_| No |_| Standard tool kits shall be supplied if needed.
| Complies: Yes |_| | No |_| |_| Not required |
| If NO to any portion, please explain: |
Warranty:
Full coverage warranty for a minimum 12 months shall be provided. Bidder shall attach copy of warranty with bid.
| Complies: Yes |_| | No |_| |
| Describe warranty: |
Since the continuous operation of this equipment is of the utmost importance and sometimes of an emergency nature, it is necessary that the successful bidder be in a position to render prompt parts and service to the State of Illinois.
List sources for parts and Service:
The bidder or manufacturer of the unit which is considered for award shall, at the request of the State of Illinois, demonstrate this equipment within the receiving District in the State of Illinois and in the presence of authorized IDOT personnel to prove out any features which may be in question.
Complies: Yes |_| No |_|
Training:
Instruction shall be performed by qualified factory or dealer personnel covering the operation and routine service and maintenance of the equipment shall be performed upon delivery or agreed date within 15 days of delivery. The training shall be for all personnel in the assigned headquarters location of the machine. More than a single day may be required to satisfy this requirement.
Complies: Yes |_| No |_|
| Describe Training: |
Note: This is not a sales call. Training not meeting IDOT expectations will be cause to generate a “Complaint-to-Vendor” that would affect award recommendations for future quotations.
Delivery:
This equipment is to be delivered in first-class operating condition with acceptance subject to Department of Transportation inspection and approval.
Bid Response:
Bidders will need to send copies of each of the following with their bid response.
a) Specification Questionnaire
b) Descriptive Literature