This is a pricing template for the IES Data Repository and Restricted Use Data (DR-RUD) Program, a firm-fixed price federal contract with the U.S. Department of Education's Institute of Education Sciences (IES). The template is structured to capture labor costs, other direct costs, and general and administrative (G&A) expenses across a base period and four option periods, with an additional optional task for phase-out support.

The contract structure spans from July 1, 2026 through June 30, 2031, consisting of a one-year base period (07/01/2026-06/30/2027) followed by four one-year option periods. The pricing template includes seven primary tasks: Meetings, Data Stewardship/Project Management/Reporting, Subject Matter Expertise, Export and Export Review, Export Reviewer Seats, CIPSEA Training, and IT System Security Requirements, plus an optional Task 8 for phase-out support. The labor categories include various IT and technical positions ranging from IT Project Director to Administrative Assistant, with provisions for Software Developers, Data Scientists, Security Analysts, Subject Matter Experts, and Support Staff. The template also accounts for other direct costs including computing, copying, supplies, subcontracts/consultants, travel, printing, honoraria, telephone, network server, server data storage, and postage/shipping. A G&A rate line is included for application across all periods. The pricing template is submitted by Synergy Enterprises, Inc., and all cells currently show zero values, indicating this is a blank template awaiting contractor pricing inputs for submission with their proposal response.

View the file

Other files

File Type Posted
Attachment 1 - DR-RUD PWS 5.21.26.pdf PDF
IES DR-RUD Clarification Questions Responses.xlsx XLSX spreadsheet
91990026R0010 - IES DR-RUD.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

IES Data Repository and Restricted Use Data (DR-RUD) Program
TaskBase PeriodOption Period 1Option Period 2Option Period 3Option Period 4Total
1
2
3
4
5
6
7
8
Total

Base Period

1234444
IES Data Repository and Restricted Use Data ProgramTask 1Task 2Task 3Task 4Task 5Task 6Task 7Total
Base Period of Performance: 07/01/2026-06/30/2027MeetingsData Stewardship, Project Management and ReportingSubject Matter ExpertiseExport and Export ReviewExport Reviewer SeatsCIPSEA TrainingIT System Security Requirements
Labor CategoryRateHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPrice
IT Project Director$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Project Manager IV$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Project Manager I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Devloper$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Developer II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Data Scientist$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Senior Data Scientist$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Subject Matter Expert$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Engineer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Senior Software Engineer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Data Analytics Specialist II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Information Security Officer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert III$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert IV$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Support Staff$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Administrative Assistant$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0

Total Labor Costs 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0

Other Direct Costs: Subject to G&A

Computing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Copying$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Supplies$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Subcontracts/consultants$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Travel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Printing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Honoraria$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Telephone$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Network Server$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Server Data Storage Cost$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Postage/Shipping$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0

Total Other Direct Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

G&A (Fill in Rate in Cell C51) 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

Total Price $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

Synergy Enterprises, Inc.

&"Arial,Bold"&12Direct Cost Summary &"Arial,Regular" &A August 1, 2017

&"Arial,Italic"&9Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

Option Period 1

1234444
IES Data Repository and Restricted Use Data ProgramTask 1Task 2Task 3Task 4Task 5Task 6Task 7Total
OP1 Period of Performance: 07/01/2027-06/30/2028MeetingsData Stewardship, Project Management and ReportingSubject Matter ExpertiseExport and Export ReviewExport Reviewer SeatsCIPSEA TrainingIT System Security Requirements
Labor CategoryRateHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPrice
IT Project Director$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Project Manager IV$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Project Manager I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Devloper$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Developer II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Data Scientist$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Senior Data Scientist$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Subject Matter Expert$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Engineer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Senior Software Engineer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Data Analytics Specialist II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Information Security Officer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert III$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert IV$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Support Staff$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Administrative Assistant$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0

Total Labor Costs 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0

Other Direct Costs: Subject to G&A

Computing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Copying$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Supplies$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Subcontracts/consultants$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Travel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Printing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Honoraria$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Telephone$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Network Server$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Server Data Storage Cost$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Postage/Shipping$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0

Total Other Direct Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

G&A (Fill in Rate in Cell C51) 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

Total Price $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

&"Arial,Regular" &A

&"Arial,Italic"&9Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

Option Period 2

1234444
IES Data Repository and Restricted Use Data ProgramTask 1Task 2Task 3Task 4Task 5Task 6Task 7Total
OP2 Period of Performance: 07/01/2028-06/30/2029MeetingsData Stewardship, Project Management and ReportingSubject Matter ExpertiseExport and Export ReviewExport Reviewer SeatsCIPSEA TrainingIT System Security Requirements
Labor CategoryRateHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPrice
IT Project Director$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Project Manager IV$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Project Manager I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Devloper$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Developer II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Data Scientist$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Senior Data Scientist$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Subject Matter Expert$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Engineer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Senior Software Engineer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Data Analytics Specialist II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Information Security Officer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert III$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert IV$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Support Staff$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Administrative Assistant$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0

Total Labor Costs 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0

Other Direct Costs: Subject to G&A

Computing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Copying$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Supplies$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Subcontracts/consultants$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Travel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Printing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Honoraria$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Telephone$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Network Server$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Server Data Storage Cost$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Postage/Shipping$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0

Total Other Direct Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

G&A (Fill in Rate in Cell C51) 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

Total Price $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

&"Arial,Regular" &A

&"Arial,Italic"&9Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

Option Period 3

1234444
IES Data Repository and Restricted Use Data ProgramTask 1Task 2Task 3Task 4Task 5Task 6Task 7Total
OP3 Period of Performance: 07/01/2029-06/30/2030MeetingsData Stewardship, Project Management and ReportingSubject Matter ExpertiseExport and Export ReviewExport Reviewer SeatsCIPSEA TrainingIT System Security Requirements
Labor CategoryRateHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPrice
IT Project Director$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Project Manager IV$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Project Manager I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Devloper$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Developer II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Data Scientist$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Senior Data Scientist$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Subject Matter Expert$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Engineer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Senior Software Engineer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Data Analytics Specialist II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Information Security Officer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert III$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert IV$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Support Staff$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Administrative Assistant$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0

Total Labor Costs 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0

Other Direct Costs: Subject to G&A

Computing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Copying$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Supplies$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Subcontracts/consultants$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Travel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Printing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Honoraria$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Telephone$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Network Server$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Server Data Storage Cost$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Postage/Shipping$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0

Total Other Direct Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

G&A (Fill in Rate in Cell C51) 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

Total Price $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

&"Arial,Regular" &A

&"Arial,Italic"&9Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

Option Period 4

1234444
IES Data Repository and Restricted Use Data ProgramTask 1Task 2Task 3Task 4Task 5Task 6Task 7Total
OP4 Period of Performance: 07/01/2030-06/30/2031MeetingsData Stewardship, Project Management and ReportingSubject Matter ExpertiseExport and Export ReviewExport Reviewer SeatsCIPSEA TrainingIT System Security Requirements
Labor CategoryRateHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPriceHoursPrice
IT Project Director$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Project Manager IV$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Project Manager I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Devloper$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Developer II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Data Scientist$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Senior Data Scientist$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Subject Matter Expert$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Software Engineer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Senior Software Engineer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Data Analytics Specialist II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Information Security Officer$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Security Analyst II$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert III$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
IT Recognized Expert IV$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Support Staff$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0
Administrative Assistant$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0.000$0

Total Labor Costs 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0

Other Direct Costs: Subject to G&A

Computing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Copying$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Supplies$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Subcontracts/consultants$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Travel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Printing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Honoraria$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Telephone$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Network Server$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Server Data Storage Cost$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0
Postage/Shipping$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0

Total Other Direct Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

G&A (Fill in Rate in Cell C51) 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

Total Price $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0

&"Arial,Regular" &A

&"Arial,Italic"&9Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

Optional Task 8

1
IES Data Repository and Restricted Use Data ProgramTask 8Total
Phase-Out Support
Labor CategoryRateHoursPriceHoursPrice
IT Project Director$0.000$0.000$0
IT Project Manager IV$0.000$0.000$0
IT Project Manager I$0.000$0.000$0
Software Devloper$0.000$0.000$0
Software Developer II$0.000$0.000$0
Data Scientist$0.000$0.000$0
Senior Data Scientist$0.000$0.000$0
Subject Matter Expert$0.000$0.000$0
Software Engineer$0.000$0.000$0
Senior Software Engineer$0.000$0.000$0
IT Data Analytics Specialist II$0.000$0.000$0
Information Security Officer$0.000$0.000$0
IT Security Analyst I$0.000$0.000$0
IT Security Analyst II$0.000$0.000$0
IT Security Analyst II$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0
IT Recognized Expert I$0.000$0.000$0
IT Recognized Expert III$0.000$0.000$0
IT Recognized Expert IV$0.000$0.000$0
Support Staff$0.000$0.000$0
Administrative Assistant$0.000$0.000$0

Total Labor Costs 0 $0.00 0 $0

Other Direct Costs: Subject to G&A

Computing$0.00$0
Copying$0.00$0
Supplies$0.00$0
Subcontracts/consultants$0.00$0
Travel$0.00$0
Printing$0.00$0
Honoraria$0.00$0
Telephone$0.00$0
Network Server$0.00$0
Server Data Storage Cost$0.00$0
Postage/Shipping$0.00$0

Total Other Direct Costs $0.00 $0

G&A (Fill in Rate in Cell C51) 0.00% $0.00 $0

Total Price $0.00 $0

&"Arial,Regular" &A

&"Arial,Italic"&9Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

Payment Schedule

IES Data Repository and Restricted Use Data (DR-RUD) Program
Payment Schedule (Base Period)
Task/Subtask NumberDescription of DeliverableDue DateAmount

Total

File details come from the government source that posted it. Updated .