900301 specifications.pdf
PDF 1 MB Posted
- Solicitation number
- S-KE0010-00017725
- Issued by
- Lane County, Oregon
About this file
This specification and bidding document package is for the City of Eugene, Oregon Public Works Department's Park Forest Drive from 28th Avenue Stormwater Improvements project (Job #900301, ITB 2026-17). The scope of work encompasses stormwater pipe rehabilitation and construction, concrete paving, earthwork, and temporary traffic control along Park Forest Drive. The project incorporates the 2024 Oregon Standard Specifications for Construction with City amendments and supplemental special provisions. Bids are due August 25, 2026, at 2:00 p.m., with online submission required through the OregonBuys eProcurement System. All work must be completed by December 4, 2026, with liquidated damages of $900 per calendar day for non-compliance. The contract requires performance and payment bonds as specified, and the City will award to the lowest responsive responsible bidder whose bid does not exceed available funds.
The estimated project cost range is $200,000 to $300,000. The contractor must comply with Build America Buy America Act requirements for all federal highway-funded materials and manufactured products, with a de minimis threshold allowing up to $1,000,000 or 5% of total applicable costs for non-compliant products. The contract incorporates Class B backfill for all trench work and includes comprehensive temporary water management facility requirements with lump sum payment. Contractors must provide certificates of materials origin and maintain manufacturers' certificates for three years. The project includes specialized provisions for limited operating hours in certain areas (8:00 a.m. to 4:00 p.m. between stations 11+40-12+70), mandatory traffic control plan modifications, landscape repair work requiring licensed Oregon landscape contractors, and coordination with multiple utilities including EWEB, Lumen, Comcast, and others. An emergency removal-fill permit (66241-EM) from the Oregon Department of State Lands authorizing 308 linear feet of waterway impact was issued August 7, 2026, with an expiration date of October 7, 2026, and a $3,700 application fee paid on August 5, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 900301 Instructions to Bidders.pdf | ||
| 900301 Invitation to Bid~1.pdf | ||
| 900301-20260819 Addendum 1.pdf | ||
| 900301 bid forms.pdf | ||
| 900301 Plans.pdf | ||
| 900301 contract and bonds.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C I T Y O F E U G E N E
PARK FOREST DR FROM
28TH AVE STORMWATER
IMPROVEMENTS
BID NUMBER 17, JOB #900301
BID CLOSING: AUGUST 25, 2026
2:00 P.M.
CONTRACT DOCUMENTS
AND
SPECIFICATIONS
CITY OF EUGENE
ENGINEERING DIVISION
PUBLIC WORKS DEPARTMENT
180 W. 8TH AVENUE, SUITE 200
EUGENE, OREGON 97401
(541) 682-5291
Standard Specifications – Updated 7/2026 Page 1
STANDARD SPECIFICATIONS AND STANDARD DRAWINGS
As of March 12, 2026 the 2024 Oregon Standard Specifications for Construction (Oregon Specifications) and the City of Eugene Standard Drawings, both as revised by Amendments #1, #2, #3 and #4, have been adopted as the Standard Specifications and Standard Drawings for the City of Eugene in accordance with City Code section 7.085. Amendments #1, #2, #3 and #4 are hereby made a part of the Standard Specifications and Standard Drawings of the City of Eugene as fully and completely as if it were set forth therein. The Standard Specifications, Standard Drawings and all Amendments may be examined on-line at https://www.eugene-or.gov/444.
SUPPLEMENTAL SPECIFICATIONS
The section, subsection and drawing numbers of the Supplemental Specifications correlate to the section and subsection numbers of the adopted Standard Specifications, which consist of the 2024 Oregon Standard Specifications and the General Conditions for Construction for the City of Eugene, and Standard Drawings.
00110.05(e) Reference to Websites
(ADD)
• American Traffic Safety Services Association (ATSSA) www.atssa.com
• City of Eugene Quality Assurance Program https://www.eugene-or.gov/444/Standard-Specifications-for-Construction
• City of Eugene Field Tested Materials Assurance Guide (FTMAG)
• City of Eugene Purchasing and City of Eugene Public Contracting Rules https://www.eugene-or.gov/108/Purchasing
• City of Eugene Standard Specifications for Construction
• City of Eugene Traffic Sign Manual https://www.eugene-or.gov/183/Traffic-Sign-Manual
• Equipment Watch https://equipmentwatch.com/
• ODOT Construction Section www.oregon.gov/odot/construction/pages/index.aspx
• ODOT Construction Section - Qualified Products List (QPL) www.oregon.gov/ODOT/Construction/Pages/Qualified-Products.aspx
• ODOT Estimating www.oregon.gov/ODOT/Business/Pages/Steel.aspx
• ODOT Traffic Control Plans Unit www.oregon.gov/ODOT/Engineering/Pages/Work-Zone.aspx
Standard Specifications – Updated 7/2026 Page 2
• ODOT Traffic Standards www.oregon.gov/ODOT/Engineering/Pages/Signals.aspx
• OregonBuys https://oregonbuys.gov/bso
• Oregon Legislative Counsel www.oregonlegislature.gov/lc
• Oregon Secretary of State: State Archives https://sos.oregon.gov/archives/Pages/default.aspx
00110.10 Abbreviations
(ADD) PCD – Pedestrian Channelizing Device
00110.20 Definitions
(ADD) Pedestrian Accessible Route - An area for the use of pedestrians to navigate along sidewalks, driveways, curb ramps, crossings, and pedestrian facilities.
(ADD) Pedestrian Channelizing Device - Devices used for channelizing pedestrians along a temporary pedestrian accessible route.
00150.50 (c) Contractor’s Responsibilities
(REVISE) In the tenth bullet change OAR 952-001-0090(6) to OAR 952-001-0090(7)
00160.20 (d) Build America Buy America Act Requirements – REPLACE this subsection, except for the subsection number and title, with the following:
(ADD) If federal highway funds are involved on the Project, the Contractor shall comply with the Build America Buy America Act and implementing regulations (Infrastructure Investment and Jobs Act (“IIJA”), Pub. L. No. 117-58, which includes the Build America, Buy America Act (“the Act”). Pub. L. No. 117-58, Sections 70901-70941).
The Build America Buy America Act requirements apply to construction materials and manufactured products permanently incorporated in the Project. All construction materials and manufactured products permanently incorporated in the Project must be produced in the United States.
Construction materials include an article, Material, or supply that is or consists primarily of only one of the following, with the standard for the material to be considered “produced in the United States’’:
• Non-ferrous metals - All manufacturing processes, from initial smelting or melting through final shaping, coating, and assembly, occurred in the United States.
• Plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables) - All manufacturing processes, from initial combination of constituent plastic or polymer-based inputs, or, where applicable, constituent composite materials, until the item is in its final form, occurred in the United States.
• Glass (including optic glass) - All manufacturing processes, from initial
Standard Specifications – Updated 7/2026 Page 3 batching and melting of raw materials through annealing, cooling, and cutting occurred in the Unites States.
• Fiber optic cable (including drop cable) - All manufacturing processes, from the initial ribboning (if applicable), through buffering, fiber stranding and jacketing, occurred in the United States. All manufacturing processes also include the standards for glass and optical fiber, but not for non-ferrous metals, plastic and polymer-based products, or any others.
• Optical fiber - All manufacturing processes, from the initial preform fabrication stage through the completion of the draw, occurred in the United States.
• Lumber - All manufacturing processes, from initial debarking through treatment and planing, occurred in the United States.
• Drywall - All manufacturing processes, from initial blending of mined or synthetic gypsum plaster and additives through cutting and drying of sandwiched panels, occurred in the United States.
• Engineered wood - All manufacturing processes from the initial combination of constituent materials until the wood product is in its final form, occurred in the United States.
The classification of an article, material, or supply as construction material is based on its status at the time it is brought to the work site for incorporation in the Project. In general, the work site is the location of the Project at which the construction materials will be incorporated.
FHWA issued a final rule on January 14, 2025 amending FHWA's Buy America regulation to terminate FHWA's general waiver for manufactured products and establish Buy America requirements for manufactured products with respect to Federal-aid highway projects.https://www.federalregister.gov/documents/2025/01/14/2024- 31350/buy-americarequirements-for-manufactured-products
Manufactured products assembled outside the Project Site are also subject to the Build America Buy America requirements. Manufactured products means articles, materials, or supplies that have been:
o Processed into a specific form and shape; or o Combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies.
For manufactured products, the final assembly of the product shall occur within the
United States for projects obligated on or after October 1, 2025. For projects obligated after October 1, 2026, the cost of the components of the product that are mined, produced or manufactured in the United States shall be more than 55 percent of the total cost of all components of the product.
The USDOT issued a Public Interest Waiver for De Minimis Costs and Small Grants.
The final waiver can be viewed here:
https://www.federalregister.gov/documents/2023/08/16/2023-17602/waiver-of-buy-americarequirements-for-de-minimis-costs-and-small-grants and this waiver applies to Materials covered by the Build America Buy America Act.
The public interest waiver is for manufactured products and construction materials for which:
o The total value of the non-compliant products (foreign or unknown origin) is no more than the lesser of $1,000,000 or 5% of total applicable costs for the project*; or o The total amount of Federal financial assistance applied to the project, Standard Specifications – Updated 7/2026 Page 4 through awards or subawards, is below $500,000.
*The “total value of the non-compliant products” includes construction materials and manufactured products only. The “total applicable costs” includes construction materials, iron and steel, and manufactured products. The value of materials are the actual cost of the materials, not the anticipated cost of materials. Furthermore, this bullet does not apply to iron and steel subject to the requirements of 23 U.S.C. 313. The de minimis threshold in 23 CFR 635.410(b)(4) continues to apply for steel and iron. (See 00160.20(a).)
Strict compliance with the Build America, Buy America domestic preferences is required, except to the extent the above public interest waiver applies. The Contractor shall not incorporate construction materials and manufactured products in excess of this amount into the Project. All foreign origin construction materials and manufactured products incorporated in the Project in excess of the amount indicated above shall be removed and replaced with domestic construction materials at the Contractor's expense.
The Contractor shall provide the Engineer with a Certificate of Materials Origin, on a form furnished by the Engineer, before incorporating any applicable construction materials and manufactured products into the Project. Unless a Certificate of Materials Origin has been provided to the Engineer, the products and Materials shall be considered of foreign origin.
The Contractor shall retain manufacturers' certificates verifying the origin of all applicable construction materials and manufactured products for 3 years after the date of final payment for the Project, and shall furnish copies to the Engineer upon request.
Iron and steel Materials and manufactured products that are predominately iron or steel are subject to 00160.20(a).
The Contractor shall include this provision in all subcontracts.
00170.61 Industrial Accident Protection:
(REPLACE) (a) Workers’ Compensation with
00170.61(a) Workers’ Compensation and Employer’s Liability - The Contractor shall provide workers' compensation and employer’s liability coverage for on-the-job injuries as required by 00170.70(e).
00195.50 Progress Payment and Retained Amounts
(REPLACE) (c) Forms of Retainage with
(c) Forms of Retainage - If the Agency withholds retainage, forms of acceptable retainage are specified below in Subsections (1) through (3). Unless the Contractor requests and the Agency accepts a form of retainage under Subsections (1)(b), (2) or (3), the Agency will use the "Cash Option " in (1)(a) of this Subsection. If the Agency incurs additional costs as a result of the Contractor's election to use a form of retainage other than Cash, Option (1)(a), the Agency may recover such costs from the Contractor by a reduction of the final payment.
(1) Cash Options - Retainage will be deducted from progress payments and held by the Agency using one of the following options until final payment is made
Standard Specifications – Updated 7/2026 Page 5 according to 00195.90, unless otherwise specified in the Contract.
(a) Except as otherwise provided, the Agency will hold the cash retainage withheld in a bank or other financial institution deemed appropriate by the Agency. Amounts retained will be included in the final payment made according to 00195.90, unless otherwise specified in the Contract.
(b) If the Contractor elects, the Agency will deposit the cash retainage withheld in an interest-bearing account, in a bank or other financial institution for the benefit of the Agency, as required by ORS 279C.560(5). Interest earned on the account shall accrue to the Contractor. Amounts retained and interest earned will be included in the final payment made according to 00195.90, unless otherwise specified in the Contract.
(2) Alternate A (Retainage Surety Bond) - The Contractor may submit a Surety bond in lieu of all or a portion of the retainage required under the Contract. The Agency will accept this Surety bond unless the Agency first finds in writing good cause for rejection based on unique project circumstances in accordance with ORS 279C.560(1)(c).
The Surety bond must be in substantially the form specified in ORS 701.435 (4) (Oregon House Bill 4006, 2024), and executed by a Surety bonding company that is authorized to transact Surety business in the State of Oregon and may not be a Surety obligation of an individual. The Surety bond and any proceeds of the Surety bond must be made subject to all claims and liens and in the same manner and priority specified for retainage under ORS 279C.550 to 279C.570 and ORS 279C.600 to 279C.625. Agency will reduce the cash retainage held by an amount equal to the value of the Surety bond and pay the amount of the reduction to Contractor according to ORS 279C.570. Any retainage withheld on Work performed by a Subcontractor will be released to the Contractor according to 00195.50(d).
When the Agency accepts a Surety bond in lieu of retainage from the Contractor, the Contractor shall accept Surety bonds from Subcontractors or Suppliers from which the Contractor has withheld retainage. At any time before final payment a Subcontractor may submit a Surety bond to the Contractor and request that the Contractor submit a Surety bond as described above for the portion of the Contractor’s retainage that pertains to the Subcontractor. The Surety bond the Subcontractor provides to the Contractor must meet the Agency requirements specified in the paragraph above. When a Contractor at a Subcontractor’s request obtains and submits a Surety bond under this subsection, the Contractor may withhold from payments to the Subcontractor an amount equivalent to the portion of the Contractor’s Surety bond premium for which the Subcontractor is responsible in accordance with ORS 279C.560 (Oregon House Bill 4006, 2024).
Within 30 Days after a Subcontractor’s request the Contractor shall provide a Surety bond as described above, and the Agency will accept the Surety bond unless:
• the Agency finds in writing good cause for rejection based on unique project circumstances in accordance with ORS 279C.560;
• a Surety bond is not commercially available;
Standard Specifications – Updated 7/2026 Page 6
• the Subcontractor refuses to pay to the Contractor the Subcontractor’s portion of the Surety bond premium; or
• the Subcontractor refuses to provide the Contractor with a Surety bond that meets the requirements of ORS 279C.560(1)(b).
Notwithstanding 00195.50(d), within 30 Days of receiving a Surety bond from Contractor at a Subcontractor’s or Supplier’s request, Agency will release to the Contractor the amount held as retainage that is equivalent to the amount the Contractor submitted as a Surety bond. Contractor shall, within 30 Days after receiving a Surety bond from a Subcontractor or Supplier, release to the Subcontractor or Supplier the amount the Contractor holds as retainage that is equivalent to the amount of the Surety bond submitted, in accordance with
ORS 279C.560(8).
(3) Alternate B (Bonds, Securities, and Other Instruments) - Contractor may deposit bonds, securities or other instruments with the Agency or in a bank or other financial institution, to be held by Agency instead of cash retainage for the benefit of the Agency, which the Agency will accept unless the Agency first finds in writing good cause for rejection based on unique project circumstances, in accordance with ORS 279C.560(1)(c).
If the Contractor deposits bonds, securities or other instruments, and Agency does not reject the bonds, securities or other instruments as permitted by ORS 279C.560(1)(c), the Agency will reduce the cash retainage by an amount equal to the value of the bonds, securities and other instruments. Interest or earnings on the bonds, securities and other instruments accrue to the Contractor.
Bonds, securities and other instruments deposited instead of cash retainage shall be of a character approved by the Director of the Oregon Department of Administrative Services, including, but not limited to:
• Bills, certificates, notes or bonds of the United States;
• Other obligations of the United States or agencies of the United States;
• Obligations of a corporation wholly owned by the federal government;
• Indebtedness of the Federal National Mortgage Association;
• General obligation bonds of the State of Oregon or a political subdivision of the
State of Oregon;
• Irrevocable letters of credit issued by an insured institution, as defined in ORS
706.008.
Special Provisions – Job #900301 Page 1
SPECIAL PROVISIONS FOR
PARK FOREST DR FROM 28TH AVE STORMWATER IMPROVEMENTS
PROJECT #900301
PART 00100 – GENERAL CONDITIONS
00120.15 Examination of Work Site and Solicitation Documents; Consideration of
Conditions to be Encountered
(ADD) Inquiries regarding the plans, specifications, and contract documents shall be made to: Sean Kovensky 541-735-5979 or skovensky@eugene-or.gov.
(ADD) 00120.26 Pipe Inspection and Investigation
The Agency has conducted investigations of the existing pipe conditions within the project area and the results are available for Bidder review. The following is a list of resources for the Contractor’s reference:
1. Video inspection reports of the host pipes scheduled for rehabilitation are available upon request to provide information on the host pipe condition and approximate location of the various defects.
2. Inspection videos of the host pipes scheduled for rehabilitation are available upon request to provide a visual in addition to the video inspection report details.
Contact the Project Manager, Sean Kovensky, for access to these files.
Bidders are encouraged to review the location of the stormwater manholes, and to view the Agency’s TV inspection videos prior to bidding.
The availability of pipe inspection information from the Agency is solely for the convenience of the Bidder and does not relieve the Bidder or the Contractor of any duty to conduct examinations and investigations as required by 00120.15.
00120.40(e) Bid Guaranty
(REPLACE) A bid guaranty is not required for this project.
00140.00 Purpose of Contract
(ADD) (a) Scope of Work
The scope of work for this contract includes:
• Stormwater pipe rehabilitation and construction
• Concrete paving
• Earthwork
• Temporary traffic control
Special Provisions – Job #900301 Page 2
00150.50 Cooperation with Utilities
(b) Agency Responsibilities
(ADD) The following Adjustment of Utilities are expected prior to construction:
Utility Description of Work Estimated Completion Date
(ADD) The following Adjustment of Utilities may occur during construction:
Utility Description of Work Estimated Completion Date
EWEB The storm pipe alignment crosses EWEB electric line(s). Coordination is expected
Resolve at preconstruction meeting
Lumen The storm pipe alignment crosses a Lumen line. Coordination is expected. It appears from Lumen’s potholing information that the storm pipe crosses just under Lumen’s conduit.
Resolve at preconstruction meeting
00150.50 Cooperation with Utilities
(ADD) (f) Utility Information:
This Project is located within the Oregon Utility Notification Center area which is a Utilities notification system for notifying owners of Utilities about Work being performed in the vicinity of their facilities. The Utilities notification system telephone number is 811 or 1-800-332-2344.
Utility Contact Person's
Name and Phone Number(s)
1. EWEB Water & Steam Ryan Nossaman 541-685-7685
2. EWEB Electrical (Distribution Engineering Tech) Josh Simmons 541-685-7184
3. Comcast Brian Klopp 541-228-1829 Gabe Norbury 541-731-1498
4. CenturyLink/ Lumen/ Quantum
(Const. Project Administrator) Roman Hernandez 541-636-7074 (Cable Maint. Supervisor) Matt Seeley 503-580-7857
Special Provisions – Job #900301 Page 3
5. Northwest Natural Gas Tom Lepley 971-376-1293 Brian Brown 541-214-6639
6. AT&T Local Facilities Dayla Kerwin 213-688-4219
7. AT&T Long Distance Fiber Dan McGeogh 425-896-9830
8. Zayo Fiber David Miner 503-710-6296 Don Aichlamyr (RBC) 503-586-3493
9. Hunter Communications Jason Robinson 541-799-1132
00150.60 Construction Equipment Restrictions
(ADD) (d) Staging and Storing of Equipment and Materials
Obtain written permission from the City prior to storage of construction equipment, materials, supplies, temporary office or sanitary facilities outside of the construction zone but within City rights-of-way. Obtain written permission from affected private property owners prior to storage of construction equipment, materials, supplies, temporary office or sanitary facilities on private property.
Provide copies of written permission to the Engineer prior to using the Right-of- Way or accessing private property.
Erosion and pollution control measures, in addition to those shown on the plans, may be required in and around storage areas of materials and equipment in the right of way. Per City Code, erosion and pollution control measures are also required, as needed, in and around such storage areas on private property.
Parking regulations outside of the immediate construction zone will remain in effect for the project. Space Rental Permits may be purchased through City of Eugene Parking Services.
00165.75 Storage and Handling of Materials
(ADD) The contractor shall provide a copy of the written authorization from the property owner to store materials on private property to the Engineer prior to storing materials on that private property.
00170.03 Furnishing Right-Of-Way and Permits
(ADD) The Agency has or will obtain the following permits:
• City of Eugene Erosion Control Permit
• Emergency DSL permit
The Agency has secured temporary and permanent easements as identified in the contract Plans.
Special Provisions – Job #900301 Page 4
00180.40 Limitations of Operations
(a) In General
(ADD)
• At the end of each work day, the contractor shall backfill pipe trenches to be flush with adjacent paved surfacing or place steel plates such that the full width of paved surfacing is available for vehicle and pedestrian use after work hours.
If steel plates are used, they shall be accompanied by warning signs W8-24, “STEEL PLATE AHEAD”.
To the bullet that begins “Not begin Work prior to 7:00 a.m. nor continue Work past 7:00 p.m…” add the following sentence:
The previous sentence is excepted by the provision that the contractor shall not perform Work between station 11+40-12+70 prior to 8:00 a.m. nor past 4:00 p.m.
The contractor shall not work between station 11+40-12+70 on non Work Days as defined in 00110.20. Work performed on other station ranges on other non-Work Days may be allowed if approved by the Engineer.
(ADD) 00180.40(c) Specific Limitations - Limitations of operations specified in these
Special Provisions include, but are not limited to, the following:
Limitations Subsection
Cooperation with Utilities ........................................... 00150.50 In General ............................................................. 00180.40(a) Contract Time ....................................................... 00180.50(h) Embankment In Place, Filling Sinkhole ............ 00330.42(c)(9) Opening Sections to Traffic ........................................ 00744.52
00180.41 Project Work Schedules
(ADD) After the paragraph that begins "One of the following Type…" add the following paragraph:
In addition to the "look ahead" Project Work schedule, a Type A schedule as detailed in the Standard Specifications is required on this Contract.
00180.50 Contract Time to Complete Work
(ADD) (h) Contract Time
Complete all Work to be done under the Contract, except for (seeding establishment) (and) plant establishment, not later than December 4, 2026.
00180.85(b) Liquidated Damages
(ADD) The liquidated damages for failure to complete the Work on time required by
00180.50(h) will be $900 per Calendar Day *.
Special Provisions – Job #900301 Page 5
* Calendar Day amounts are applicable when the Contract time is expressed on the Calendar Day, Work Day or fixed date basis.
00195.50 Progress Payment and Retained Amounts
(c)(1) Cash, Alternate A
(REPLACE) The second paragraph that begins with “Except as otherwise provided…” with the following:
Except as otherwise provided, the Agency will hold the cash retainage withheld in a bank or other financial institution deemed appropriate by the Agency. If any interest is accrued on the withheld retainage, it shall accrue to the Agency.
Amounts retained will be included in the final payment made according to 00195.90, unless otherwise specified in the Contract.
PART 00200 – TEMPORARY FEATURES AND APPURTENANCES
00220.02 Public Safety and Mobility
(a) General Requirements
(ADD) The following bulleted item(s) to the end of this subsection:
• Maintain local traffic access at all times.
• Open full road and driveway width on weekends and holidays not scheduled for Work and all other non-work hours. Full road and driveway width shall also be open other days the Contractor is not working.
• In areas where surfacing is altered or removed from crosswalks, marked or unmarked, or sidewalks, resurface the areas with asphalt concrete or concrete in accordance to ADA standards each day if the areas are open to pedestrian or bicycle traffic.
• No ramp or sidewalk location shall be closed for more than 4 Calendar Days without written approval by the Engineer.
• When construction requires the closure of a sidewalk or sidewalk ramp, set up traffic control according to TM844.
• A contiguous, ADA-compliant, pedestrian access route must be available through or alongside the work zone at all times. Construct temporary ramps as needed to bypass closed sidewalk ramps. A sidewalk or sidewalk ramp may be closed per Standard Drawings TM844 and TM844(A) if an appropriate route is available via the other three corners of the intersection.
00220.03 Work Zone Notifications
(c) Public Notice
(ADD) The following bulleted item(s) to the end of this subsection:
• Provide 5 business days prior notification to Lane Transit District (LTD) Operations office, 541-682-6199 for all activities which will affect their
Special Provisions – Job #900301 Page 6 operations. Notify LTD on a daily basis of specific Work activities, location, and schedule.
• Provide 5 business days prior notification to Sanipac Dispatch office, (541)
736-3618 for all activities which will affect their operations. Upon request the contractor shall also notify Sanipac on a daily basis of specific Work activities, location, and schedule.
• Provide 5 business days prior notification to Royal Refuse Dispatch office,
(541) 688-5622 for all activities which will affect their operations. Upon request the contractor shall also notify Royal Refuse on a daily basis of specific Work activities, location, and schedule.
• Provide 5 business days prior notification to Lane Apex Dispatch office, (541)
607-2042 for all activities which will affect their operations. Upon request the contractor shall also notify Lane Apex on a daily basis of specific Work activities, location, and schedule.
• Provide 5 business days prior notification to the U.S. Postal Service (USPS),
(541) 341-3601 for all activities which will affect their operations. Upon request the contractor shall also notify USPS on a daily basis of specific Work activities, location, and schedule.
• Provide 5 business days prior notification to the Eugene 4J School District
Transportation Services, (541) 790-7474, for all activities which will affect their operations. Upon request the contractor shall also notify Eugene 4J School District on a daily basis of specific Work activities, location, and schedule.
• Provide 5 business days prior notification to all residents affected by associated Work. Attempt shall be made to make in-person contact with residence to be affected by associated Work. In addition, provide written notice to residence.
00221.06 Traffic Control Plan
(DELETE) The first sentence.
(ADD) The Traffic Control Plan in the plan set has been approved by the Agency for use by the Contractor. It is the Contractor’s responsibility to modify this TCP as necessary to provide a complete TCP for the Contractor’s Work operation. To propose modifications to this plan, submit a detailed Work schedule showing stage construction, along with the TCP, in writing 5 Work Days before the pre-construction conference for approval. If, as determined by the Engineer, the TCP does not meet these requirements the TCP will be rejected, and no adjustment of Contract Time will be allowed.
00225.40 Temporary Pavement Markers
(REPLACE) The first paragraph that begins “Unless otherwise shown,…” and the four bullets with the following:
Special Provisions – Job #900301 Page 7
Install temporary flexible overlay pavement markers for temporary centerline marking as follows:
• Place and maintain one temporary flexible overlay pavement marker on 40 foot spacing in tangent and curve sections except as below.
• Place and maintain one temporary flexible overlay pavement marker on 20 foot spacing in curved alignment sections identified by a speed rider displaying less than the posted speed and channelization areas.
Establish alignment for placing the temporary flexible overlay pavement markers as follows:
• Control markers at:
• 200 foot intervals on tangents
• 50 foot intervals on curves
• 40 foot intervals on curves with speed rider
• Use string line or other appropriate means to maintain proper alignment of the markers. Adjust placement to avoid straddling a longitudinal joint, while maintaining a suitable alignment of markers.
• Remove and replace misaligned markers at no additional cost to the Agency.
SECTION 00245 - TEMPORARY WATER MANAGEMENT
Section 00245, which is not a Standard Specification, is included in this Project by Special Provision.
Description
00245.00 Scope - This Work consists of furnishing, installing, operating, maintaining, and removing temporary water management facilities in regulated Work areas.
00245.01 Abbreviations:
TWM - Temporary Water Management TWMF - Temporary Water Management Facility TWMP - Temporary Water Management Plan
00245.02 Definitions:
Temporary Water Management Facility - A TWMF that conveys water around or through Work areas, removes water from Work areas, and treats and discharges water at locations outside Work areas.
00245.03 Temporary Water Management Plan - The Agency TWMP is a concept plan.
28 Calendar Days before beginning Work in regulated Work areas, submit stamped Working Drawings of a Contractor-developed TWMP, according to 00150.35, based on either the Agency’s concept plan or an independent plan that meets water quality and environmental guideline requirements and does not negatively affect neighboring properties or water rights.
Include the following minimum information in the TWMP:
Special Provisions – Job #900301 Page 8
The sequence and schedule for dewatering and re-watering. This sequence and schedule must include when to contact the Engineer prior to dewatering and re-watering.
How the Work area is isolated from the active stormwater flow upstream, through, and downstream.
How the stormwater flow is routed and conveyed around or through the isolated Work area.
Description of all construction stages, including appropriate contact points for each stage.
A list of on-site backup Materials and Equipment.
Provide the name of the TWM Subcontractor (if applicable) and Contractor’s superintendent, and their 24-hour contact phone number 10 Days before the pre-Work meeting. If changes in the appointment of the TWM Subcontractor or Contractor’s superintendent occur during the term of the Contract, provide written notice to the Engineer within 5 Calendar Days of the change.
Calculations of water withdraw pump’s capacity.
Any change to the TWMP during construction requires approval prior to implementation.
00245.04 Pre-Work Meeting - Before beginning any TWM Work, attend a pre-work meeting at the Project Site with the Engineer no more than 8 Calendar Days prior to implementation of TWM.
Required meeting attendees include:
Engineer Contractor TWM Subcontractor (if applicable) Agency Environmental Coordinator or their appointed representative
The pre-Work meeting agenda typically includes the method of TWM, the TWMP, energy dissipation, dewatering and re-watering plan and strategy, site clean-up expectations, and the circumstances under which contacting the Engineer is required.
Materials
00245.10 Materials -
Furnish pumps that are:
Self-priming.
Equipped with a variable speed governor.
Equipped with a power source.
Able to pump water that contains soft and hard solid.
Construction
00245.41 Installation - During installation of the temporary water management facility, maintain a downstream water flow rate of at least 50 percent of the upstream water flow rate.
Special Provisions – Job #900301 Page 9
00245.42 Operation - Operate temporary water management as follows:
• Maintain and control water flow downstream of the isolated Work area for the duration of the diversion to prevent downstream de-watering.
• When using a pump for bypassing water during temporary water management, physically monitor the pump in-person and maintain the pump at all times including non-work hours. Provide a back-up pump on-site and ready for use as necessary.
Provide the Engineer with a daily report documenting monitoring activities.
Finishing and Cleaning Up
00245.70 Removal - Prior to removal of the TWMF, obtain approval from the Engineer after completion of all Work. Remove the TWMF and re-water and restore the stormwater flow.
Maintain downstream water flow during removal of the facility.
Measurement
00245.80 Measurement - No measurement of quantities will be made for temporary water management facilities.
The quantities of bypass pump monitoring will not be measured.
Payment
00245.90 Payment - The accepted quantities of temporary water management facilities will be paid for at the Contract lump sum amount for the item "Temporary Water Management Facility".
No separate or additional payment will be made for bypass pump monitoring.
Payment will be payment in full for furnishing and placing all Materials, and for furnishing all Equipment, labor, and Incidentals necessary to complete the Work as specified.
No separate or additional payment will be made for TWMP, maintaining, operating, monitoring, moving, or removing the facility.
00280.42 Stabilization
(b) Temporary Stabilization
(ADD) At the Contractor’s option, temporary stabilization may be accomplished by preparing the lawn areas shown on the plans and applying the seeding mulch according to SP01035.
00280.91 Payment
Pay Item Unit of Measurement
(MODIFY) (h) Concrete Washout Facility ................................................. Lump Sum
(ADD) Item (h) includes maintaining, disposal, transporting and replacement of the
Concrete Washout Facility as needed.
Special Provisions – Job #900301 Page 10
PART 00300 – ROADWORK
00310.41 Removal Work
(c) Drainage Structures
(ADD) Furnish and install temporary plugs for the inlets and outlets to drainage structures before removal. Do not allow sediment or rock to enter the storm drain system.
00330.03 Basis of Performance - Add the following paragraph to the end of this subsection:
Perform all earthwork under this Section on the embankment basis.
00330.42(c) Embankment Construction
(1) In General- Delete the fourth paragraph and replace with the following:
(ADD) Place embankments and all fillings in nearly horizontal layers not more than 8 inches thick, except as provided in 00330.42(c)(2) and 00330.42(c)(9). Compact each layer separately and to the density required in 00330.43 except for embankment Work described in 00330.42(c)(9).
(ADD) (9) Construct Embankment In Place- Filling Sinkhole as referenced in the contract
Plans with suitable borrow materials as in 00330.12 from the project site or contractor-furnished borrow. Remove material from top of sinkhole to expose the length and width extents of the sinkhole. Fill in lifts of 24 inches or less and compact using vibratory plate compactor. Compaction shall be visually accepted by the Engineer. Fill material shall be added until flush with adjacent ground surface. Do not begin the work described in this subsection until all upstream pipe work is completed and stormwater is routed through enclosed piping.
00330.80 Measurement - Add the following paragraph to the end of this subsection:
The bid item Embankment In Place will be measured by the Agency’s DTM model.
The bid item Embankment In Place - Filling Sinkhole will not be measured. The volume cannot be precisely measured, but the Agency estimates the void to be approximately 15 feet wide, 15 feet long and 10 feet deep. The Contractor may visit the site in the public utility easement to examine the volume from the surface and shall exercise caution as it is a sinkhole.
00330.94 Embankment Basis Payment - Add the following bid item to the list:
(d) Embankment In Place – Filling Sinkhole……………………………LS
(ADD) Item (d) includes excavating, selecting, handling, hauling, placing, and compacting of the Materials as specified and all other costs incurred in furnishing required embankment Materials.
Special Provisions – Job #900301 Page 11
PART 00400 – DRAINAGE AND SEWERS
00405.14 Trench Backfill
(ADD) Use Class B Backfill for all trench backfill material.
PART 00700 – WEARING SURFACES
(ADD) 00744.52 Opening Sections to Traffic – Schedule work so that, during the same shift, the surfaces being paved are paved full width and length through the top wearing course before opening to traffic.
PART 00800 – PERMANENT TRAFFIC SAFETY AND GUIDANCE DEVICES
00850.41 Projects With Striping Plans
(ADD) Request pavement marking layout from the Inspector at least five (5) business days prior to planned pavement marking application. The Agency will require a minimum of three (3) business days after completion of top lift paving to layout pavement marking types and locations.
00865.80 Measurement
(ADD) No measurement of Thermoplastic, Extruded, Surface, Non-Profile, pavement markings will be made. Approximately 125 feet of equivalent length of 4 inch wide Thermoplastic, Extruded, Surface, Non-Profile line is required for this project.
00865.90 Payment
(MODIFY) (b) Thermoplastic, Extruded, Surface, Non-Profile ................. Lump Sum
PART 01000 – RIGHT OF WAY DEVELOPMENT AND CONTROL
(DELETE) Section 01030 Seeding and Section 01040 Planting
(ADD) Section 01035 Landscape Repair as follows:
Section 01035 – Landscape Repair
Description
01035.00 Scope - This work consists of small area repair of existing lawn or planted areas as shown on the Plans, typically under 150 square feet per location. This work addresses landscape repairs required due to construction of adjacent concrete sidewalk, accessible ramps, or stormwater/wastewater pipe repairs.
This work excludes planting work and irrigation system modifications or repairs.
Special Provisions – Job #900301 Page 12
01035.01 Contractor’s Qualifications - A valid Oregon Landscape Contractor’s license and a valid Oregon Landscape Business License are required.
All work of this section, with the exception of placing temporary compost and performing temporary seeding, shall be performed by a single firm specializing in landscape work. Supply and application of landscape materials (topsoil, mulch, seed) by automated equipment may be performed by others under the direction of the Landscape Contractor.
01035.02 Definitions:
Certified Seed - A grass or legume seed named variety that has been reviewed and accepted into the Oregon Certified Seed program. Currently certified seed is individually sold in bags with a blue-colored Oregon Certification Tag, thus the name commonly used for such seed is "blue tag stock".
Establishment Period - A period when planting work has been performed and initially accepted, and there is a Contract requirement to care for the planted areas in some way until the period ends.
Noxious Weed - All weed designated by the Oregon State Weed Board as injurious to public health, agriculture, recreation, wildlife, or all public or private property. The Oregon Department of Agriculture (ODA) will be the authority in determination of noxious weed species.
Pure Live Seed (PLS) - The amount of living seed in the total quantity of seed when non-viable seed or non-seed material is excluded.
Weed - A plant that is undesirable where it is growing.
Weed Free - For these Specifications, "Weed Free" is defined as the following maximum amount of living weeds per square yard:
• Zero "Type A" or "Type T" Noxious Weeds
• One "Type B" Noxious Weed
• One of each non-noxious weed listed in the Special Provisions
The ODA Noxious Weed Policy and Classification System lists Type "A", "B", and "T" Noxious Weeds.
01035.03 General - Ensure that work meets the following requirements:
(a) Existing Vegetation - Do not disturb existing desirable vegetation that is to remain or is designated for protection, unless approved by the Agency prior to construction.
(b) Weather Conditions – Work will not be allowed during the following conditions, unless otherwise approved:
• Cold weather - When air or ground temperatures are expected to be below 32 °F.
• Hot weather - When air or ground temperatures are expected to be above 88 °F.
• Wet weather - When the ground reaches saturation.
• Windy weather - When wind velocity exceeds 25 mph.
Special Provisions – Job #900301 Page 13
(c) Seeding Installation Dates – Perform this seeding during the dates shown below. If work done within the seeding dates does not provide coverage according to 01035.60, re-seed according to 01035.44 and as directed.
• Lawn Seeding - March 1 through May 15 and September 1 through October 15. If new seed areas are regularly watered, they can be seeded from March 1 through October 15.
For permanent seeding done outside the seeding dates, ensure that the coverage of live plants required by 01035.60 is achieved no later than 3 weeks into the next permanent seeding period. If this coverage is not achieved, re-seed and re-fertilize areas of insufficient coverage according to the permanent seeding requirements, at no additional cost to the Agency.
01035.04 Coordination - Coordinate with other trades affecting and being affected by work under this Section. Coordinate the following elements with the Agency prior to construction:
(a) Submittals - Contractor shall provide the following submittals for the Engineer’s approval at least 30 days prior to installation:
• Topsoil -o Give the Agency notice of intent to use the specified source o Provide soil test results for each imported topsoil. Test Reports shall be no more than 12 months old.
o Provide access to the source for Agency inspection o Provide one 1 gallon representative soil sample of topsoil.
o Obtain approval of the source before excavation of topsoil begins.
• Seed - Provide a list of sources and certification information for all specified seeds.
Verify that all specified seed has been located and will be available for use on the Project.
• Mulch - Provide supplier source, product, and testing information for all required mulches. Test reports shall be no more than 12 months old.
(b) Notice for Inspections - Notify the Agency a minimum of 24 hours prior to each required inspection.
(c) Site Conditions - Ensure that the area is properly prepared prior to the start of the planting operation.
(d) Utility Use - Provide required water for seed and sod establishment at no additional cost to the Agency.
(e) Verification - Verify actual ground dimensions prior to construction. Notify the Agency of any discrepancies before beginning work.
(f) Required Inspections - At a minimum the following inspections will be required:
(1) Subgrade preparation and scarification - prior to placement of topsoil.
(2) Finish grade - prior to seeding, laying sod, or mulching.
Special Provisions – Job #900301 Page 14
Materials
01035.10 Topsoil - Furnish topsoil containing no substance detrimental to the growth of plants and that is free of plants designated by the Oregon Department of Agriculture as Type "A" or Type "B" weeds. Unsuitable topsoil, or topsoil placed by the Contractor without approval in areas to be planted, may be required to be replaced at no additional cost to the Agency.
Furnish submittals in accordance with 1035.04.
(a) Selected Topsoil - Furnish native topsoil from the required excavations meeting the requirements of 00330.10 or from other Agency-controlled lands. The general limits of topsoil materials will be indicated on the plans. The Agency will make the final determination of the areas where the most suitable materials exist. Furnish topsoil that is the fertile part of a soil profile commonly referred to as the "A" horizon, typically ranging in depth from 3 inches to 12 inches. Do not take material for topsoil from a depth greater than 12 inches below existing ground, unless approved.
Select only sources that are well-drained and, before stripping, have a healthy crop of vegetative growth. Remove and dispose of all heavy grass or other vegetation before taking materials from the source.
(b) Imported Topsoil - No imported topsoil shall be placed until the material and the source have been approved. At the Engineer’s discretion, a reinspection of the source or additional testing may be required when the quality of the imported topsoil changes significantly during placement. Furnish imported topsoil conforming to the following:
(1) Sandy Loam Topsoil – Furnish a consistent and well-blended mix which conforms to the following standards:
Clay 5% - 15% Sand 40% - 60% Silt 35% - 55% Organic Matter 2% - 4% pH Range 5.6 - 6.5
01035.11 Seed - Furnish seed meeting the following requirements:
(a) Label - Deliver all seed in standard, sealed containers. Label each container with the following:
• The kind and variety of each seed of 5 percent or more in a mixture, by weight. Be sure that seed mix labels include the words "mixture" or "mixed seed" when the seed is a mixture
• The country or state where the seed is grown
• The lot number or other lot identification
• The total percentage, by weight, of other crop seed
• The total percentage, by weight, of weed seed
• The total percentage, by weight, of inert matter
• Statement of "No Noxious (weed) Found"
• For each named seed:
• Percentage of germination
• Percentage of hard (non-living) seed, if more than 1 percent
• Percent of PLS for each kind of seed
Special Provisions – Job #900301 Page 15
• Percent and kind of other crop
• Month and year of seed test
• Net weight of contents
• Name and address of seed labeler or seller
• Origin for each seed (state or foreign country)
• If seed inoculant is used, the claimed date that inoculant effectiveness ends
• For treated seeds (if any):
• Statement that the seeds have been treated
• Name of all chemical used in the treatment
• Description process used in the treatment
• Warning statement for all residual chemicals used
• Net weight of each container
• For seeds listed as native, date and location of collection of source (first generation) seed
• For native seeds specified to be collected for direct use on a project, label containers with the date and location of collection sites for each seed species
(b) Quality - Furnish seed meeting the following requirements:
• The seed and labeling complies with Oregon Seed Law and Federal Seed Act.
• The seed has been tested within 18 months of the planting date.
• The seed is not sprouted, moldy, or showing evidence of having been wet or otherwise damaged.
• The seed is labeled as "Oregon Certified Seed" or the equivalent from another state when identified in the Special Provisions. Information about certified seed is available from County Extension Offices, Oregon State University, and the Oregon Department of Agriculture.
(c) Pure Live Seed - Obtain the amount of seed to apply by using the purity and germination percentages from the label on actual bags of seed to be used on the Project.
To calculate the amount of seed to be applied:
• Obtain the PLS factor - Multiply the seed label germination percentage times the seed label purity percentage.
• Divide the specified PLS rate by the PLS factor.
Example: A PLS seeding rate of 10 pounds per acre is specified. The seed label shows a purity of 80 percent and germination is 90 percent. After converting percentages to decimals,
0.80 x 0.90 equals a factor of 0.72. The specified PLS rate, 10 pounds per acre, divided by the factor of 0.72 equals 13.88. In order to meet a PLS seeding rate of 10 pounds per acre, about 14 pounds of seed needs to be applied per acre. For a seed mix, make this calculation for every seed to obtain the total amount to be applied.
(d) Inspection - Each lot of seed is subject to inspection upon delivery to the Project. Seed that is not labeled or that does not conform to the Specifications will be rejected and shall be replaced at no additional cost to the Agency.
(e) Mixes - Furnish seed mixes that meet the labeling, quality and inspection requirements stated above. Submit all other proposed seed or seed mixes for consideration and receive written approval before seeding work begins. Replace rejected seed before planting.
Special Provisions – Job #900301 Page 16
(f) Types of Seed Mixes -
• Lawn Seeding - Seed mix shall be a 3-Way Perennial Rye blend. Submit supplier information for approval by Engineer.
01035.12 Fertilizer - Furnish standard, commercial grade fertilizer meeting the following requirements:
(a) General - Deliver fertilizers to the site in original, unopened containers bearing the manufacturer’s guaranteed analysis, including the percentage of total nitrogen, available phosphoric acid, and water- soluble potash (NPK) in the amounts specified. Label each container with a quality compliance certificate that includes the container mass (weight), the percentage of each ingredient, and the source of each component in the mixture. Ensure that each container is labeled with a Quality Compliance Certificate that meets the applicable requirements of Section 00165. All fertilizer products shall be uniform in composition, dry, free-flowing (if granular), or palletized and shall be approved by the Engineer prior to application.
Furnish fertilizer according to State and Federal regulations.
This is the start of the file's text. The full file is on GovTribe.