900199 Ph 2 Contract and Bonds.pdf
PDF 507 KB Posted
- Solicitation number
- S-KE0010-00016999
- Issued by
- Lane County, Elmira CDP, Oregon
About this file
This is an Invitation to Bid and Public Improvement Contract document issued by the City of Eugene, Oregon for the Amazon Prairie Mitigation Bank Phase 2 project (BID NO. 10, Job No. 900199). The project encompasses work in and around sensitive wetland habitat, including general excavation totaling 7,922 cubic yards, grading with 3D machine grade control, shallow pool construction, embankment berms and spillways, permanent stabilization, and construction of specialized structures such as flashboard risers, headwalls, and fish screen structures. Additional work includes storm pipe installation (various sizes of PVC and HDPE piping totaling 301 linear feet), coir and wood log installation (5,809 square yards of coir fabric and 160 habitat logs), and protection of sensitive areas including archaeological sites. The work also involves 845 linear feet of compost filter sock, 135 square yards of embankment geotextile, 98 tons of loose riprap, and 1,376 square feet of river rock spillway installation. Electronic bids must be submitted through OregonBuys by Wednesday, June 10, 2026, at 2:00 p.m., with a virtual bid opening occurring at 2:05 p.m. via Microsoft Teams. All work must be completed by September 10, 2026. No bid guaranty is required, and no qualification questionnaire filing is necessary prior to bidding.
The contract amount is to be determined based on unit prices and estimated quantities submitted by the successful bidder, with final payment adjusted according to actual quantities and any approved Change Orders. Bidders must submit a first-tier subcontractor disclosure form within two working hours of the bid closing date. Prior to commencement of work, the contractor must provide performance and payment bonds as specified in the contract documents. The contractor is required to comply with Oregon public works statutes (ORS 279C.800 to 279C.870), maintain specified insurance coverages, and meet affirmative action and non-discrimination requirements in accordance with Eugene Code and federal civil rights laws. The City of Eugene is designated as an Equal Employment Opportunity and Affirmative Action Employer. The contract incorporates the 2024 Oregon Standard Specifications for Construction, as modified by the City's project-specific amendments and supplemental provisions. Contractor payment is subject to filing a sworn statement of compliance with state and local employment and contractor laws prior to any payment being made.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 900199 Ph 2 Instructions to Bidders.pdf | ||
| 900199 Ph 2 Plans 4.pdf | ||
| 900199 Ph 2 Plans 1.pdf | ||
| 900199-20260605 Addendum 1.pdf | ||
| 900199 Ph 2 Plans 2.pdf | ||
| 900199 Ph 3 Specifications.pdf | ||
| 900199 Ph 2 Bid Forms.pdf | ||
| 900199 Ph 2 Plans 3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID NO. 10
INVITATION TO BID
Notice is hereby given that the City of Eugene, Oregon will receive electronic bids until Wednesday, June 10, 2026, until the
Bid Closing time of 2:00 p.m. on OregonBuys at the website https://oregonbuys.gov/bso. The Bid Opening will be virtual at 2:05 p.m., on Wednesday, June 10, 2026, by Microsoft Teams, at which time and place those Bids will be opened and read.
Bidders will be able to attend the bid opening by accessing the web version on Teams at: Click here to join the meeting.
Project: Amazon Prairie Mitigation Bank Phase 2
900199 1 LS Mobilization; 1 LS Erosion Control; 1 EA Construction Entrance - Type 1; 845 LF Compost Filter
Sock; 1 LS CWRR Report; 7,922 CY General Excavation; 1 FA Haul Route Compaction Mitigation; 135 SY
Embankment Geotextile, Non-woven; 98 TN Loose Riprap, Class 50; 76 LF 6 Inch PVC Pipe; 125 LF 12
Inch HDPE Pipe; 101 LF 18 Inch HDPE Pipe; 2 EA Flashboard Riser (with 48" corrugated aluminum pipe);
1 LS Concrete Headwall at Ph 1 Berm, 6 Inches Wide; 2 EA Removable Picket Weir; 1,376 SF River Rock
Spillway - Install Complete; 5,809 SY Coir Fabric -Install Complete; 160 EA Habitat Logs - Install Complete;
Alternate #1 – 1 LS Fish Screen Box
All work must be completed by September 10, 2026 per Special Provision 00180.50(h).
Plans and Specifications may be obtained online from the OregonBuys website. (See 00110.05(e)).
The Agency reserves the right to issue Addenda making changes or corrections to the Plans, Specifications or quantities. The
Agency will provide Addenda only by publishing them on the OregonBuys website. (See 00110.05(e)). No additional notification of addendum issuance will be provided.
Submit bids to Doug Singer, Interim City Engineer as follows:
A bid guaranty is not required for this project. Filing of a qualification questionnaire before bidding will not be required.
Contingent or conditional bids will not be considered for acceptance. No bid will be received or considered unless the bid contains a statement by the bidder that provisions of ORS 279C.800 to 279C.870. This project is a public works improvement project and is subject to ORS279C.800 to 279C.870
Bidders are required to submit a first-tier subcontractor disclosure form, substantially as described in ORS 279C.370, within two working hours of the bid closing date and time.
No bid will be accepted by the City unless it contains a statement by the bidder as a part of the bid that the bidder in carrying out the contract will comply with all applicable laws.
The City of Eugene is an Equal Employment Opportunity and Affirmative Action Employer.
The policy of the City of Eugene is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations.
The City of Eugene in accordance with Title VI of the Civil Rights Act of 1964, 79 Stat. 252, 42 U.S.C. 2000d to 2000-4 and
Tile 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted program of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin in consideration for an award.
The City may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids or to waive any specification or requirement upon a finding of the City that it is in the public interest to do so.
For more information regarding this project, contact Lindsay Smith, 541-729-4301 or lksmith@eugene-or.gov
Dated this 20th day of May, 2026
Doug Singer, PE
Interim City Engineer https://teams.microsoft.com/meet/29040907108696?p=7phRcOq6kaDLg69NFY
Public Improvement Contract for Use with Oregon Standard Specifications – Page 1 (Revised August 2024)
PUBLIC IMPROVEMENT CONTRACT FOR USE WITH
OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION
(SAMPLE)
BETWEEN: The City of Eugene, an Oregon
Municipal Corporation (City)
AND: (Contractor)
CONTRACT NO.:
JOB NO.: 900199
PROJECT: Amazon Prairie Mitigation Bank – Phase 2
RECITALS
Contractor was the successful bidder for the contract for the construction of the public improvement project described in the plans and specifications for the project that were included in the bid documents and the 2024 Oregon Standard Specifications for Construction, issued by the Oregon Department of Transportation, as modified by the City’s Amendments to the Specifications for the Project and any other Supplemental Specifications and Special Provisions included in the Bid Documents (all specifications, plans, Standard Drawings, Supplemental Specifications and Special Provisions included in the Contract are collectively referred to herein as the “Specifications”) which form a part of the Contract.
AGREEMENT
1. The Contract. The Contract between the City and Contractor (the “Contract”) includes this
Document and its exhibits, together with all of the documents and materials included in the definition of the “Contract Documents” in 00110.20 of the Specifications. In addition, the Contract between the City and Contractor shall be deemed to incorporate all reports, records, laws, rules and orders referenced in the Contract documents.
This Document includes and incorporates the following Exhibits:
Exhibit A - Solicitation Documents
2. Definitions. Unless otherwise specifically defined in this Document, all capitalized terms which are not proper nouns shall have the meanings assigned thereto in the Specifications.
3. Project. The project is generally described as:
Amazon Prairie Mitigation Bank – Phase 2
4. Work to be Performed. Contractor agrees to furnish, as the “Work,” all services, labor, materials and equipment which are described as Contractor’s responsibility in the Specifications, as the same may be modified in accordance with the Contract, and to construct the improvement described therein (the “Project”), all according to the provisions of the Contract. All parts of the Work are the sole responsibility of Contractor.
https://oregonbuys.gov/bso/ mailto:support.oregonbuys@oregon.gov https://oregonbuys.gov/bso/
Public Improvement Contract for Use with Oregon Standard Specifications – Page 2
5. Time of Commencement and Completion. Time is of the Essence of the Contract. The time in which Contractor shall commence, prosecute and complete the Work is described in Section 00180 of the Specifications.
6. Contract Amount. The Contract Amount is $__________ and consists of unit prices bid by
Contractor multiplied by estimated quantities, together with lump sum amounts for portions of the Work, as described on Contractor’s Bid attached hereto. The actual sum payable to Contractor for the Work shall be based on lump sum amounts and actual quantities, as modified by Change Orders and adjustments made in accordance with the Specifications.
Payment will be made as provided in the Specifications.
7. Statement of Compliance. Before any payment is made to Contractor, Contractor shall file with City a statement, under oath, that it has complied with all provisions of State law governing contractors on a public contract for a public improvement and for a public works project and that it has complied with the provisions of The Eugene Code, 1971 governing fair employment practices.
7.1. Contractor shall file with City all other documentation relating to such compliance, including a sworn statement by each of its subcontractors to the same effect.
7.2. During the performance of the Contract, Contractor agrees as follows:
7.2.1. Contractor and each subcontractor agrees that it will not discriminate against any employee or applicant for employment because of an individual’s race, religion, color, sex, national origin, marital status, familial status, age, sexual orientation or source of income, a juvenile record that has been expunged pursuant to ORS 419A.260 and 419A.262, or because an individual is a person with a disability which, with reasonable accommodation by the employer does not prevent the performance of the work involved, unless based upon a bona fide occupational qualification reasonably necessary to the normal operation of the employer’s business.
7.2.2. Contractor and all subcontractors employing 15 or more individuals will develop and implement an affirmative action plan to insure that applicants are employed, and that employees are treated during employment, without regard to their race, color, sex, age or national origin. Such plan shall include, but not be limited to the following: employment, upgrading, demotion, transfer, recruitment, recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training, including apprenticeship.
7.2.3. Contractor and each subcontractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the Human Rights Commission setting forth the provisions of this nondiscrimination clause.
7.2.4. Contractor and each subcontractor shall, prior to commencement and during the term of the contract, provide to the City such documentation, and permit any inspection of records as may be required or authorized by rules adopted by the city manager to determine compliance with paragraph 7.2.1.
7.2.5. If upon an investigation conducted pursuant to rules adopted by the city manager in accordance with section 2.019 of The Eugene Code, 1971 there is reasonable cause to believe that Contractor or any subcontractors of Contractor have failed to comply with any of the terms of paragraphs 7.2.1 or 7.2.2, a determination thereof shall be made in accordance with the adopted rules. Such determination may result in the suspension, cancellation or termination of the Contract in whole
Public Improvement Contract for Use with Oregon Standard Specifications – Page 3 or in part and/or the withholding of any funds due or to become due to Contractor, pending compliance by Contractor and/or its subcontractors, with the terms of paragraphs 7.2.1 and 7.2.2.
8. Indemnification. To the fullest extent permitted by law, Contractor shall indemnify, defend
(with counsel approved by City) and hold harmless the parties as described in 00170.72 of the Specifications.
9. Insurance. Contractor shall maintain in force for the duration of the Contract the insurance coverages specified in 00170.70 of the Specifications. Each policy required by these provisions shall be written as a primary policy, not contributing with or in excess of any coverage which City may carry. A copy of each policy or a certificate satisfactory to City shall be delivered to City prior to commencement of the Work. Unless otherwise specified, each policy shall be written on an "occurrence" form with an admitted insurance carrier licensed to do business in the state of Oregon and shall contain an endorsement entitling City to not less than 30 days prior written notice of any material change, nonrenewal or cancellation. In the event the statutory limit of liability of a public body for claims arising out of a single accident or occurrence is increased above the combined single limit coverage requirements specified below, City shall have the right to require Contractor to increase Contractor's coverages by the amount of the statutory limit increase for such claims and to increase the aggregate coverage by an amount that is twice as large as the statutory increase. The adequacy of all insurance required under the Contract shall be subject to approval by City's Risk Manager.
Failure to maintain any insurance coverage required by the Contract shall be cause for immediate termination of the Contract by City.
10. Performance and Payment Bonds. Prior to the commencement of the Work, Contractor shall provide good and sufficient performance and payment bonds as described in 00130.40 of the Specifications for approval by City and in the form of the bonds included in the Solicitation Documents.
11. Termination and Suspension. City may terminate the Contract or suspend the Work at any time as provided in 00180 of the Specifications.
12. Preference for Goods and Services.
12.1. Contractor shall use recycled products to the maximum extent economically feasible in the performance of the Work. Recycled products include all materials, goods and supplies, not less than 50% of the total weight of which consists of secondary and post consumer waste with not less than 10% of its total weight consisting of post consumer waste, as well as any product that could have been disposed of as a solid waste, having completed its life cycle as a consumer item, but otherwise refurbished for reuse without substantial alteration of the product's form.
12.2. In performance of the Work, Contractor shall prefer materials that have been manufactured or produced in the state of Oregon, if price, fitness, availability and quality are otherwise equal.
13. Nonresident Contractors.
13.1. When a public contract is awarded to a nonresident bidder and the contract price exceeds $10,000, the bidder shall promptly report to the Department of Revenue on forms to be provided by the department the total contract price, terms of payment, length of contract and such other information as the department may require before the bidder may receive final payment on the public contract. The contracting agency shall satisfy itself that the requirement of this subsection has been complied with before the contracting agency issues a final payment on a public contract.
Public Improvement Contract for Use with Oregon Standard Specifications – Page 4
13.2. As used in this paragraph, “nonresident contractor” means a contractor that: (A) has not paid unemployment taxes or income taxes in the state of Oregon during the 12 calendar months immediately preceding submission of the bid for the contract, (B) does not have a business address in this state and (C) stated in the bid for the contract that it was not a “resident bidder” under ORS 279A.120.
14. Default; Remedies. Upon Contractor’s default or if in the public interest, City may terminate the Contract and take all other remedial actions available to City, as further specified in the 00180.90 of the Specifications. Without limiting the City’s right to disqualify Contractor pursuant to ORS279C.440, if Contractor willfully violates any of the provisions of sections EC 4.615 to 4.650 of The Eugene Code, 1971 or any of the provisions of State law or City’s administrative rules governing public contracts, or if Contractor knowingly files false affidavits or certificates of compliance required under the Contract, Contractor shall waive for a period of one year any right to bid upon any public improvement project let by City. City's claims for damages and any other equitable relief available to City resulting from Contractor's breach shall survive a termination of the Contract.
15. Liquidated Damages. In the event the Work is not completed within the contract time as specified in the Contract, Contractor shall pay to City liquidated damages, as further specified in 00180.85 of the Specifications.
16. Notices. Any written notices permitted or required by the Contract shall be delivered according to 00150.30 of the Specifications to the attention of the representatives of the parties set for below:
Contractor: ___________ Telephone:
Facsimile:
City: Doug Singer, Interim City Engineer
City of Eugene 180 W 8th Avenue, Suite 200 Eugene, OR 97401
Telephone: 541-682-5291 Facsimile: 541-682-8410 Email: dsinger@eugene-or.gov or such other address and/or numbers as either party may provide to the other by notice given in accordance with this provision.
17. Contract Documents; Interpretation. Where possible, all parts of the Contract shall be interpreted in a manner that avoids conflict between the various documents and their provisions. In the event that any provision of this Document conflicts with any provision of the Specifications, the discrepancy will be resolved in the order of precedence in
00150.10 of the Specifications.
18. Governing Law. The Contract shall be governed by and interpreted in accordance with the laws of the State of Oregon without regard to principles of conflict of laws. If Federal funding is included in the Contract, applicable Federal requirements govern in the event of conflicts among Federal, State and local laws.
19. Dispute Resolution.
Public Improvement Contract for Use with Oregon Standard Specifications – Page 5
19.1. Disagreements; Protests; and Claims. All disagreements, protests and claims relating to the Contract, including claims for additional compensation and time for performance and completion of the Work, shall be resolved in accordance with section 00199 of the Specifications.
19.2. Construction of Contract. The Contract shall not be construed against either party regardless of which party drafted it. Other than as modified by this Document, the applicable rules of contract construction and evidence shall apply.
19.3. Forum. Any dispute between the Agency and the Contractor that arises from or relates to this Contract and is not resolved under the provisions of 00199 of the Specifications, shall be brought in the forum described in 00170.00.
20. Third Party Beneficiaries. The parties to the Contract do not intend to confer on any third party any rights under the Contract, except as otherwise described in 00170.79 of the Specifications. All Subcontractors are third parties.
21. Survival. Any obligation arising under the Contract which is not, or cannot be performed or paid prior to the expiration or termination of the Contract, including, but not limited to, all provisions concerning the quality of the Work, warranties and obligations for payment, indemnification, and reimbursement, shall survive termination or expiration of the Contract.
22. Integration; Amendment. The Contract includes the entire agreement between the parties as of its date of execution and shall not be modified or amended, except as expressly provided in the Contract.
23. Any person who believes that they have been excluded from participation in, denied benefits or services of any program or activity administered by the City, consultants, or contractors on the basis of age, disability, gender, race, color, national origin, age, income status and/or religion may bring forth a complaint of discrimination under Title VI and related statutes to the Office of Human Rights & Neighborhood Involvement, 99 W 10th Avenue, Eugene, Oregon 97401, (541)682-5177, or when federal FHWA funding is included in the project, to the Oregon Department of Transportation, Office of Civil Rights MS 23, 3930 Fairview Industrial Drive SE, Salem, Oregon, 97302, (503) 986-4350.
24. Effective Date. The effective date of the Contract shall be the latest date of signature by the parties, below.
CITY OF EUGENE CONTRACTOR
By: _______________________________ By: _________________________
(signature) (signature)
Jennifer D. Haruyama City Manager
Date: _______________________________ Date: __________________________
PERFORMANCE BOND
SAMPLE
BOND NO. ________________________
KNOW ALL MEN BY THESE PRESENTS, That we________________________________________________, as principal, and ___________________________________________________________, as Surety, are jointly and severally held and bound unto the CITY OF EUGENE in the sum of: $______________ for the payment of which we jointly and severally bind ourselves, our heirs, executors, administrators and assigns or successors and assigns, firmly by these presents.
THE CONDITION OF THIS BOND IS SUCH that, whereas the said principal herein has made and entered into a certain contract, a copy of which is attached hereto, with the CITY OF EUGENE which contract, together with the applicable Plans, Specifications, and Schedule of Items, is by this reference made a part hereof, whereby the said principal agrees to do in accordance with the certain terms, conditions, requirements, Plans and Specifications which set out in said Contract and all authorized modifications of the Contract which increase the amount of the Work and the amount of contract. Notice to the Surety of any of the immediately foregoing are waived.
NOW, THEREFORE, if the principal herein shall faithfully and truly observe and comply with the terms, conditions and provisions of the said contract, in all respects, and shall well and truly and fully do and perform all matters and things by him undertaken to be performed under said contract, upon the terms set forth therein, and within the time prescribed therein, or as extended as provided in the contract, and shall indemnify and save harmless the CITY OF EUGENE, and their respective officers, members, employees, and agents, against any direct or indirect damages of every kind and description that shall be suffered or claimed to be suffered in connection with or arising out of the performance of the said Contract by the said Contractor or its Subcontractors and shall in all respects perform said Contract according to law, then this obligation is to be void, otherwise to remain in full force and effect.
Nonpayment of the bond premium will not invalidate this bond nor shall the CITY OF EUGENE be obligated for the payment thereof.
WITNESS our hands this __________ day of __________________________________, 20 ________
Principal Principal
By ___________________________________ By ________________________________ Authorized Official Signature Authorized Official Signature
Surety ________________________________ By ________________________________ Attorney-in-Fact By ___________________________________ Agent (A Power of Attorney for the Attorney-in-Fact must be attached to this Bond)
Surety's Seal must be Affixed
PAYMENT BOND
SAMPLE
KNOW ALL MEN BY THESE PRESENTS, that we _________________________________________________, as principal, and ________________________________________________________________, as Surety, are jointly and severally held and bound unto the CITY OF EUGENE, in the sum of: $__________________ (_______________________________________________________________________) for the payment of which we jointly and severally bind ourselves, our heirs, executors, administrators and assigns or successors and assigns, firmly by these presents.
THE CONDITION OF THIS BOND IS SUCH that, whereas the said principal herein has made and entered into a certain contract, a copy of which is attached hereto, with the CITY OF EUGENE which contract, together with the applicable Plans, Specifications, and Schedule of Items, is by this reference made a part hereof, whereby the said principal agrees to do in accordance with the certain terms, conditions, requirements, Plans and Specifications which set out in said Contract and all authorized modifications of the Contract which increase the amount of the Work and the amount of contract. Notice to the Surety of any of the immediately foregoing are waived.
NOW, THEREFORE, if the principal herein shall make payment promptly, as due to all Subcontractors and to all persons supplying to the Contractor or its Subcontractors, Equipment, supplies, labor or Materials for the prosecution of the Work, or any part thereof, provided for in said Contract, and shall pay all contribution of amounts due its workers compensation carrier and the State Unemployment Compensation Trust Fund from such Contractor or Subcontractors incurred in the performance of said Contract, and pay all sums of money withheld from Contractor's employees and payable to the Revenue Department; and shall pay all other just debts, dues and demands incurred in the performance of the said Contract and shall pay the CITY OF EUGENE such damages as may accrue to the City under said Contract, then this obligation is to be void, otherwise to remain in full force and effect.
Nonpayment of the bond premium will not invalidate this bond nor shall the CITY OF EUGENE be obligated for the payment thereof.
WITNESS our hands this __________ day of __________________________________, 20 ________
Principal Principal
Surety ________________________________ By ________________________________ Attorney-in-Fact By ___________________________________ Agent
(A Power of Attorney for the Attorney-in-Fact must be attached to this Bond)
Surety's Seal must be Affixed