This is a Scope of Work document from a County for a road reclamation and resurfacing project in the Lake Tropicana Subdivision. The project involves reclaiming and resurfacing approximately 2.24 miles of minor local road sections, including roadway preparation, shoulder removal, minor clearing and grubbing, importing limerock to re-establish 2% roadway slope if needed, reclaiming and resurfacing, temporary striping, permanent thermoplastic striping, and stabilizing all disturbed areas during construction. The contract term is 90 days from the Notice to Proceed, with all work except thermoplastic striping required to be completed within 60 days and the final 30 days reserved for thermoplastic striping placement. Contractors are highly recommended to visit the project work location before submitting their bid.
The document indicates that liquidated damages will be imposed if contract items remain incomplete after the 90-day deadline, except for thermoplastic striping work. The Notice to Proceed will only be issued after all required documentation is received by the County. No specific pricing terms, funding sources, set-aside requirements, or incumbent contractor information is provided in this scope of work document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
DESCRIPTION OF PROJECT
This project involves reclaiming and resurfacing of approximately 2.24 miles of minor local road sections in the Lake Tropicana Subdivision. Reclaim and resurface work involves roadway prep, shoulder removal, minor clearing and grubbing, importing limerock to re-establish 2% roadway slope if needed, reclaiming and resurfacing, temporary striping, permanent thermoplastic striping, and stabilizing all areas disturbed during construction.
CONTRACT TERM
This contract will be in effect for 90 days from the date of the NOTICE TO PROCEED. The NOTICE TO PROCEED will not be issued until all required documentation is received by the COUNTY. The last 30 days of the contract is to accommodate the placement of thermoplastic striping only. All other contract related work must be completed within 60 days. Liquidated damages will begin to be imposed if there are any outstanding contract items remaining incomplete except for thermoplastic striping after 90 days.
PRIOR TO SUBMITTING BID
It is in the CONTRACTOR’s best interest and highly recommended for CONTRACTOR to visit the project work location before submitting a bid.