9-Required Experience.pdf
PDF 86 KB Posted
- Attached to
- FY26 Garage Repairs - Rebid
- Solicitation number
- IFB260094
- Issued by
- Jefferson County, Kentucky
About this file
The document is a Required Experience Form for the Parking Authority of River City's FY26 Garage Repair Package B Rebid, scheduled for October 2025. The form requires a general contractor to demonstrate extensive experience in garage or similar restoration projects by providing documentation of two restoration projects for each of the past three years. Additionally, the contractor must list the proposed superintendent or site foreperson and provide their restoration project experience over the last three years.
The form is structured to ensure that bidding contractors have substantial, verifiable experience in garage restoration work. Potential contractors must comprehensively document their professional track record, including specific project details for each year and the qualifications of key personnel who would be responsible for managing the project. This approach allows the Parking Authority to evaluate the technical capabilities and proven experience of contractors before awarding the garage repair contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6-Bid Form.pdf | ||
| 3-GFE Docs.xlsx | XLSX spreadsheet | |
| 1-Info Signatures-IFB.pdf | ||
| 4-Procurement - LMCO ban the box.pdf | ||
| 2-Acknowledgement Preference (Constr) 1.pdf | ||
| 8-Project Manual.pdf | ||
| 7-PARC Package B Drawings.pdf | ||
| 5-W9 2024.pdf | ||
| 10-Submission Instructions - IFB260094.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Parking Authority of River City
FY26 Garage Repair Package B Rebid
October 2025
Required Experience Form
1) General contractor shall provide a letter listing 3 years of garage, or similar, restoration experience. The contractor shall list 2 garages, or similar, restoration projects for each of the 3 years.
a) Year 1
i) 1st garage or similar restoration project name and details
ii) 2nd garage or similar restoration project name and details
b) Year 2
c) Year 3
2) List the names of the superintendent/site foreperson proposed for this project. Provide the superintendent/site foreperson restoration project experience over the last 3 years.
a) Name of proposed superintendent/site foreperson for the project
b) Superintendent/site foreperson’s restoration project experience for the last 3 years
File details come from the government source that posted it. Updated .