9-Required Experience.pdf

PDF 86 KB Posted

Attached to
FY26 Garage Repairs - Rebid
Solicitation number
IFB260094
Issued by
Jefferson County, Kentucky

About this file

The document is a Required Experience Form for the Parking Authority of River City's FY26 Garage Repair Package B Rebid, scheduled for October 2025. The form requires a general contractor to demonstrate extensive experience in garage or similar restoration projects by providing documentation of two restoration projects for each of the past three years. Additionally, the contractor must list the proposed superintendent or site foreperson and provide their restoration project experience over the last three years.

The form is structured to ensure that bidding contractors have substantial, verifiable experience in garage restoration work. Potential contractors must comprehensively document their professional track record, including specific project details for each year and the qualifications of key personnel who would be responsible for managing the project. This approach allows the Parking Authority to evaluate the technical capabilities and proven experience of contractors before awarding the garage repair contract.

View the file

Other files

File Type Posted
6-Bid Form.pdf PDF
3-GFE Docs.xlsx XLSX spreadsheet
1-Info Signatures-IFB.pdf PDF
4-Procurement - LMCO ban the box.pdf PDF
2-Acknowledgement Preference (Constr) 1.pdf PDF
8-Project Manual.pdf PDF
7-PARC Package B Drawings.pdf PDF
5-W9 2024.pdf PDF
10-Submission Instructions - IFB260094.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Parking Authority of River City

FY26 Garage Repair Package B Rebid

October 2025

Required Experience Form

1) General contractor shall provide a letter listing 3 years of garage, or similar, restoration experience. The contractor shall list 2 garages, or similar, restoration projects for each of the 3 years.

a) Year 1

i) 1st garage or similar restoration project name and details

ii) 2nd garage or similar restoration project name and details

b) Year 2

c) Year 3

2) List the names of the superintendent/site foreperson proposed for this project. Provide the superintendent/site foreperson restoration project experience over the last 3 years.

a) Name of proposed superintendent/site foreperson for the project

b) Superintendent/site foreperson’s restoration project experience for the last 3 years

File details come from the government source that posted it. Updated .