This is a Scope of Work document for Forsyth County Schools in Georgia establishing a contract for a pool of asphalt and concrete contractors to provide paving, patching, milling, overlay, striping, and seal coating services at school facilities on an as-needed basis. The scope encompasses asphalt removal and replacement, paving overlay, patching, full depth reclamation, seal coating, traffic lane and parking space striping, handicapped parking layouts, fire hydrant marking, concrete repair and construction, sidewalk installation, curb and gutter work, and dumpster pad construction. All work must be completed according to specified technical requirements, including precise temperature and moisture conditions for asphalt placement, concrete strength minimums of 3,000 to 4,000 PSI depending on application, proper drainage and grading to eliminate water ponding, and industry-standard construction practices. Work must be scheduled through a maintenance coordinator during normal business hours of Monday through Friday, 7:00 a.m. to 3:30 p.m. ET, with any outside-hours work requiring prior written authorization.

Contractors selected for this contract pool must provide written quotes, work plans, timelines, and costs for each individual project as requested via email, with site visits conducted for every project to establish accurate measurements and specifications. A local company representative must be available at the job site within forty-eight hours of notification, and awarded firms must attend onsite meetings with project managers and site administrators before beginning work. All materials and workmanship are warranted for one year from substantial completion, with new surfacing specifically warranted against raveling, delamination, potholing, and surface cracking. Contractors are responsible for correcting any defects or deficiencies at their own expense within five days of notification. The document requires vendors to acknowledge their understanding and compliance capability by signing the Scope of Work form before proceeding with work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P26-05 SCOPE OF WORK

1.0 Overview- The contractor or contractors shall provide asphalt and or both concrete and asphalt services for our facilities as per the specifications herein. This RFP intends to establish a contract for a pool of asphalt and concrete contractors. Necessary work including paving, patching, milling, paving overlay, striping, handicapped parking dimensions layout and painting, fire lane painting and hydrant marking and striping, traffic Lanes, and seal coating at FCS Schools. This RFP will also cover the repair and construction of existing flat concrete work and repair. Requirements will be different at each location on an as‐needed basis. Services shall include all necessary labor, materials, tools, and equipment to complete the project.

2.1 Paving Specifications Asphalt Removal and Replacement

2.1.1 Prior to removing the asphalt, the full depth of the area(s) should be marked and saw cut, creating a straight, uniform, and smooth patch.

2.1.2 Asphalt spoils and debris must be removed entirely from the sub‐base (a minimum of 6”) and disposed of at an approved off‐site dumping facility.

2.1.3 Edges of the work must be clean, straight, and vertical. Any chipping, cracking, crushing, or damage to the adjacent pavement (surface) must be sawed, cut, removed, and replaced.

2.1.4 Drainage plans are required prior to starting subgrade preparation. Soil should be excavated and fine‐graded. All stormwaters should be pitched to stormwater management systems. There should be no standing ponds of water. The surface should be flat without crowning. The contractor is responsible for all efforts to ensure the proper surface slope and eliminate “water ponding.”

2.1.5 A stabilized subgrade is required. Repair and recompact subgrade as needed. Lime application or pavement reinforcing geo grids are acceptable.

2.1.6 The subbase should be minimum 4 inches. Acceptable subbases are asphalt binder, crushed limestone, or recycled concrete. Compact with roller and apply herbicide to prevent vegetation growth.

2.1.7 A two (2) inch top layer of hot mix asphalt concrete (HMAC) should be compacted at a temperature no less than 175 degrees F. This should also be referenced in section 2.4.

2.1.8 Mill/grind areas along edges, curbs, manholes, inlet grates, and other concrete areas so that new asphalt has proper elevation transitions and stormwater runoff. A tack coat emulsion must also be applied to the edges of the existing asphalt surrounding the repair/replacement areas.

2.1.9 Hot mix asphalt concrete (HMAC) shall be placed at no less than 250 degrees F and no higher than 300 degrees F.

2.1.10 Before placing HMAC material, the minimum outside temperature must be 40 degrees F and rising. A clean and dry substrate should accompany.

2.1.11 In all instances, work must comply with current industry standard.

2.2 Paving Overlay Asphalt and Concrete Services

2.2.1 Before starting subgrade preparation, drainage plans are required. Soil should be excavated and fine‐graded. All stormwaters should be pitched to stormwater management systems. There should be no standing ponds of water. The surface should be flat without crowning. All efforts to ensure the proper surface slope and eliminate “water ponding” are the contractor's responsibility.

2.2.2 Tack coat and apply 1 inch of perma‐flex and 1 inch of hot mix asphalt concrete (HMAC).

2.2.3 Mill/grind areas along edges, curbs, manholes, inlet grates, and other concrete areas so that new asphalt has proper elevation transitions and stormwater runoff. A tack coat emulsion must also be applied to the edges of the existing asphalt surrounding the repair/replacement areas.

2.2.4 Hot‐mix asphalt concrete (HMAC) shall be placed at a temperature of at least 250 degrees F and at a temperature of at least 300 degrees F.

2.2.5 A minimum outside temperature of 40 degrees F and rising must exist before the new hot mix material and a clean and dry substrate are placed.

2.3 Patching Pavement

2.3.1 Prior to removing the asphalt, the full extent of the area(s) should be marked and saw cut, creating a straight, uniform, and smooth patch.

2.3.2 Asphalt spoils and debris must be removed entirely from the sub‐base (a minimum of 6”) and disposed of at an approved off‐site dumping facility.

2.3.3 Drainage plans are required prior to starting subgrade preparation. Soil should be excavated and fine‐graded. All stormwaters should be pitched to stormwater management systems. There should be no standing ponds of water. The surface should be flat without crowning. The contractor is responsible for all efforts to ensure the proper surface slope and eliminate “water ponding.”

2.3.4 Saw cut, remove damaged asphalt, and replace with two (2) inches of asphalt binder and one (1) inch of hot mix asphalt concrete (HMAC).

2.3.5 Mill/grind areas along edges, curbs, manholes, inlet grates, and other concrete areas so that new asphalt has proper elevation transitions and stormwater runoff.

2.3.6 Completed patches must meet the existing grade of adjacent asphalt, concrete, etc.

2.3.7 Hot‐mix asphalt concrete (HMAC) shall be placed at a temperature of at least 250 degrees F and at a temperature of at least 300 degrees F.

2.3.8 A two (2) inch top layer of hot mix asphalt concrete (HMAC) should be compacted at a temperature no less than 175 degrees F.

2.3.9 A minimum outside temperature of 40 degrees F and rising must exist before the placement of new hot mix asphalt concrete (HMAC) material and a clean and dry substrate.

2.4 Full Depth Reclamation Asphalt and Concrete Services

2.4.1 Mechanical broom & force air clean the surface to receive the new pavement of all loose stones, dirt, and debris.

2.4.2 Mill the existing surface down 3” and haul off all debris to an approved dump facility. If there is not a 90-degree vertical edge where the milling begins and ends, then the area needs to be saw cut to create a proper 90-degree vertical edge to tie into.

2.4.3 Mill/grind areas along edges, curbs, manholes, inlet grates, and other concrete areas so that new asphalt has proper elevation transitions and stormwater runoff.

2.4.4 Any asphalt that is left over after milling along with a portion of the subgrade will be pulverized to a depth of 10” and stabilized using 60 lbs/SY of Portland cement. After Portland cement is mixed into the subgrade the area will then be graded and compacted. Water will be applied with ample water equipment to then activate cement. Prior to water application and during the grading process, if contractor finds that the fluff rate of the pulverization process has created excess subgrade, contractor is responsible to appropriately clip the subgrade to bring it to correct grade and haul off and dispose of excess materials. Such additional costs incurred should be considered in base price as a change order will not be permitted/accepted for such excess materials/time/equipment/hauling/etc.

2.4.5 Apply tack coat to promote adhesion between existing stabilized subgrade surface and the new pavement surface. Area will then be paved with 2 inches (compacted thickness) of Type-2 9.5mm Surface Asphalt and properly compacted.

2.5 Sealcoating

2.5.1 Mechanically remove existing thermoplastic traffic markings as needed. Remove oil and grease spots by scrubbing and flushing with water until clean. Clean asphalt surfaces of all loose dust, dirt, leaves, and other foreign materials by contractor‐preferred method.

2.5.2 Route out all suitable Straight‐line cracking in asphalt ¼” wide or greater to form a reservoir for hot‐applied crack sealant. Thoroughly clean the routed reservoir with compressed air or other satisfactory methods to remove dust or debris. Seal Cracks with approved Sealant per manufacturer’s application specifications. Fill cracking as close to flush as possible; a thin squeegeed band‐aid is acceptable.

2.5.3 Seal‐coat material to be high quality, polymer‐modified coal‐tar emulsion meeting federal specification R-P-355e. Apply two (2) layers of seal coating. Don't allow vehicular traffic on the pavement until the sealer has cured enough not to become marked.

2.6 Striping

2.6.1 Each parking space shall have a rectangular area no less than 9 ½ feet wide x 19 feet long. Stripes should be 4 ½ inches wide with white traffic paint.

2.6.2 Wheel stops should be pinned and securely placed in the center and 3 feet from the edge/fence line or walkway path.

2.7 Handicapped Parking Dimensions Asphalt and Concrete Services

2.7.1 All spaces shall be located near or convenient to a level or ramped entrance, not exceeding a five (5) percent slope to the facility served by the parking space.

2.7.2 Each parking space must have a rectangular area no less than 14 feet wide x 20 feet long. A handicapped sign and post (80 inches in height) will be installed at the edge of the space in the center, behind the wheel stop. There should be at least one handicapped space per 40 parking spaces.

2.7.3 Stripes should be at least 4 ½ inches wide and painted blue traffic paint. A 48‐inch x 48‐inch blue field wheelchair symbol should be placed in the center of the space toward the space entrance. The wheelchair symbol within the field should be painted white at 36 inches x 3 inches.

2.7.4 If available (based on the ratio and dimensions above), double handicapped parking spaces are acceptable. The spaces should be a combined width of 23 feet with a center walkway path of 5 feet wide (with diagonal blue striping).

The length should be 19 feet. A curbed ramp (not to exceed a five percent grade) may be required if spaces terminate at the walkway.

2.8 Fire Hydrant

2.8.1 The fire hydrant shall be marked with red traffic paint.

2.8.2 The curb should have 20 linear feet of red marking minimum with the hydrant in the center or match existing.

2.9 Traffic Lanes

2.9.1 Traffic lanes should be yellow traffic paint.

2.9.2 Traffic flow diagrams will be discussed onsite for each project.

2.10 Concrete

2.10.1 Areas shall be marked and saw cut to full depth before removing the Exis\ting concrete, creating a straight, uniform, and smooth patch.

2.10.2 Concrete spoils and debris should be completely removed from the subbase (a minimum of 6”) and disposed of at an approved off‐site dumping facility.

2.10.3 Edges of the rehabilitation work must be clean, straight, and vertical. Any chipping, cracking, crushing, or damage to the adjacent pavement (surface) edge occurring due to the construction activities shall be seen, cut, removed, and replaced.

2.10.4 Drainage plans are required prior to starting subgrade preparation. Soil should be excavated and fine‐graded. All stormwaters should be pitched to stormwater management systems. There should be no standing ponds of water. The surface should be flat without crowning. The contractor is responsible for all efforts to ensure the proper slope of the surface and eliminate “water ponding.”

2.10.5 The vendor is responsible for designing the proper forms. Timber can be used to achieve the desired outcome for each project. All concrete should have a minimum of 3000 PSI with fiberglass. The slab should have control joints to prevent premature cracking. Concrete should not be poured/installed if the temperature is below 50 degrees F.

2.10.6 Concrete curb and gutter to match existing curbing in style, reveal, and width.

Thickness to be per plans and details. Place 1/2‐inch fiber expansion joints where new curbing abuts existing. Dowel new curbing to existing with three

(3) #4 rebar. Place three (3) continuous runs of #4 rebar in the new curb and gutter. Expansion joints shall not exceed every 30 LF of curbing run, minimum 1‐inch‐deep tool joints not to exceed every 10 LF of curbing run. Concrete to be a minimum of 3,500 psi. Back‐fill topsoil behind the new curb and tamp.

2.10.7 Concrete sidewalk to be at least 4 inches thick and reinforced with light welded wire mesh. Place 1/2‐inch fiber expansion joints where new concrete abuts existing. Expansion joints shall be placed at sidewalk intersections, at the backside of curbing, and not exceed every 50 LF of sidewalk run. Minimum 1‐ inch‐deep tool joints are to be placed in the center and not to exceed the width of the sidewalk. Sidewalks wider than 8'‐0" should have a longitudinal tool joint at the mid‐point in width. Concrete to be a minimum of 3,500 psi.

Back‐fill topsoil behind the new sidewalk and tamp.

2.10.8 Concrete pavement should be at least 6 inches thick and reinforced with heavy welded wire mesh. Place 1/2‐inch fiber expansion joints where new concrete abuts existing. Dowel new concrete pavement to existing with #4 rebar not less than every 18 inches on center or per plans. Expansion joints shall not exceed every sixty feet (60') square. Apply cure and seal. As soon as feasible, saw‐cut minimum 2‐inch‐deep control joints not to exceed fifteen feet (15') square. Concrete to be a minimum of 4,000 psi. Do not permit vehicular traffic on concrete pavement until it has sufficiently cured.

2.11 Dumpster Pad

2.11.1 The dumpster pad dimension should be 12 x 24 feet to accommodate two 8‐ yard containers.

2.11.2 The pad should be at least 6 inches thick with a concrete apron.

2.11.3 The pad should also have 6 x 6 x 10 welded wire mesh or half‐inch number 4 rebar to strengthen the pad. Use 4000 PSI concrete with fiberglass.

2.11.4 The slab should have control joints to prevent premature cracking.

2.11.5 Pad should have a 1 ½ percent grade toward the center of the slab with a sanitary sewer drain with a minimum of a 4‐inch diameter.

2.12 Warranty

2.12.1 The contractor shall warranty all project materials and workmanship for at least one year from substantial completion. New surfacing shall be warranted from raveling, delamination, potholing, or surface cracking for one year. The contractor is responsible for maintaining proper drainage and ensuring no ponding water.

Specific concerns regarding warrant ability due to existing condition(s) must be brought to the attention of Forsyth County Schools in advance.

2.13 Guarantee

2.13.1 The contractor shall guarantee all workmanship and materials to be free from defects.

2.13.2 Upon notification, the vendor must correct any defects and/or deficiencies at their own expense within five (5) days after notification.

2.13.3 Final acceptance does not relieve the contractor from responsibility for latent defects or deficiencies.

2.14 Quotes/ Pricing Sheet for Material, Labor, and Equipment Form

2.14.1 For future work associated with this contract, a request for a quote will be submitted via email to the vendor.

2.14.2 The contractor must provide a written quote for each project as needed.

2.14.3 Quote forms will be submitted to those qualified via email.

2.14.4 Site visits will be conducted for each project.

2.14.5 Firms must submit a written work plan, timeline, and cost when submitting quotes.

2.14.6 FCSS Facilities may accept the work plan, timeline, and cost submitted or decide not to proceed with the project.

2.14.7 FCSS Facilities may issue a revised work plan and timeline. During the site visit, FCSS will provide a quote form and timeline for each occurrence.

2.14.8 A local company representative must be available for the designated FCSS representative at the job site within forty‐eight (48) hours.

2.14.9 Before starting each project, the awarded firm must attend an on‐site meeting with the project manager and/or the principal/site administrator to review the requirements, expectations, and scope.

2.15. Measurements

2.15.1 The contractor will be responsible for taking accurate measurements of all areas.

2.16 Schedules

2.16.1 All work must be scheduled with a maintenance coordinator

2.16.2 Normal operating hours are Monday through Friday from 7:00 a.m. ET to 3:30 p.m. ET.

2.16.3 Any work performed outside of normal business hours must have prior written authorization from a maintenance coordinator or director of facilities.

By signing this document, the vendor acknowledges that they have read the Scope of Work and understand the requirements outlined within it.

Vendor Can Comply:

Vendor Cannot Comply:

Name: _____________________________

Signature: ______________________________

Date: __________________________________

Vendor Name:
Date:
Group1: Off

File details come from the government source that posted it. Updated .