5-Concrete Services Price Sheet.pdf

PDF 51 KB Posted

Attached to
P26-05 Concrete & Asphalt Services
Solicitation number
P26-05
Issued by
Fayette County, Georgia

About this file

This is a Concrete Services Price Sheet for Project P26-05 submitted by Forsyth County Schools in Georgia as part of a competitive Request for Proposal for Concrete and Asphalt Services. The price sheet establishes the pricing structure and rate framework that qualified contractors must use when submitting bids for concrete work throughout the county schools system. The document provides a comprehensive pricing template organized into six main categories of services and materials that vendors must populate with their specific rates and costs.

The pricing structure includes labor rates for forming and concrete crew positions (Carpenter/Form Setter, Laborer, Finisher, and Foreman on an hourly basis, plus an overtime multiplier percentage), equipment and machine rates for site preparation (Skid Steer, Mini Excavator, Full Size Excavator, and Compactor/Plate Tamper on hourly rates, with optional separate mobilization charges), concrete material costs for various PSI strengths and additives, flatwork pricing for slabs and sidewalks per square foot, curb and gutter work per linear foot, and add-alternates including rebar, wire mesh, vapor barriers, base preparation, and removal and disposal services. The document explicitly notes that prices exclude permits, testing, and engineering work, with minimum load charges billed at cost and weather protection billed on a time-and-materials basis unless otherwise specified. Vendors are required to complete all applicable rate fields corresponding to the services they propose to provide.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P26-05 CONCRETE SERVICES PRICE SHEET

Vendor Name:

As per the terms and conditions of the RFP, the pricing below

1. LABOR RATES – FORMING & CONCRETE CREW

Description Unit Rate ($)

Carpenter / Form Setter Per Hour Laborer Per Hour Finisher Per Hour Foreman Per Hour Overtime Multiplier %

2. EQUIPMENT / MACHINE RATES – GRADING & SITE PREP

Equipment Unit Rate ($)

Skid Steer Per Hour Mini Excavator Per Hour Excavator (Full Size) Per Hour Compactor / Plate Tamper Per Hour Mobilization (if separate) Lump Sum

3. CONCRETE MATERIAL COST

Description Unit Cost ($)

Concrete (3000 PSI) Per Cubic Yard Concrete (4000 PSI) Per Cubic Yard Fiber Add Per Cubic Yard Air Entrainment Per Cubic Yard Winter / Hot Weather Additives Per Cubic Yard

Additional Material Markup %

4. FLATWORK PRICING (INCLUDES CONCRETE, LABOR, FINISHING)

Description Unit Price ($)

4” Slab on Grade Per SF 5” Slab on Grade Per SF 6” Reinforced Slab Per SF Sidewalk (4”) Per SF Driveway (6”) Per SF Sawcut Control Joints Per LF Thickened Edge Per LF

5. CURB & GUTTER (INCLUDES CONCRETE, LABOR, FINISHING)

Description Unit Price ($)

Standard Curb & Gutter Per LF Mountable Curb Per LF Integral Curb Per LF Valley Gutter Per LF

6. ADD ALTERNATES / ADD-ONS

Description Unit Price ($)

Rebar (Installed) Per LB Wire Mesh Per SF Vapor Barrier Per SF Base Prep / Aggregate Per Ton Removal & Disposal Per CY

Optional Clarifications Section

Prices exclude permits, testing, engineering.

Minimum load charges billed at cost.

Weather protection billed at T&M unless noted otherwise.

Vendor Name:
Rate Per Hour:
Rate Per Hour_2:
Rate Per Hour_3:
Rate Per Hour_4:
Rate:
Rate Per Hour_5:
Rate Per Hour_6:
Rate Per Hour_7:
Rate Per Hour_8:
Rate Lump Sum:
Cost Per Cubic Yard:
Cost Per Cubic Yard_2:
Cost Per Cubic Yard_3:
Cost Per Cubic Yard_4:
Cost Per Cubic Yard_5:
Additional Material Markup:
Price Per SF:
Price Per SF_2:
Price Per SF_3:
Price Per SF_4:
Price Per SF_5:
Price Per LF:
Price Per LF_2:
Price Per LF_3:
Price Per LF_4:
Price Per LF_5:
Price Per LF_6:
Price Per LB:
Price Per SF_6:
Price Per SF_7:
Price Per Ton:
Price Per CY:
Vapor Barrier:
Wire Mesh:
Rebar Installed:

File details come from the government source that posted it. Updated .