About this file
This document is Appendix D - Project Cost for the Delaware Health and Social Services Division of Public Health's Spay Neuter Program System Enhancement Project. The project seeks a comprehensive software solution to modernize the state's Spay & Neuter Program (SNP), with the goal of streamlining operations for a small team and improving accessibility for veterinary providers and income-eligible pet owners. The contract includes a project lifecycle spanning four phases: Planning, Configuration and Customization, Testing and Deployment, and Operations and Support. The initial contract term covers two base years, with options for two additional two-year extensions, totaling potentially six years of service.
The cost proposal is structured with a firm fixed cost approach, divided into project lifecycle costs and annual operations and support costs. The pricing model allows for payment upon successful completion and approval of deliverables in each project phase. The contractor will be required to provide detailed cost breakdowns for each project phase, including activities and deliverables, with separate pricing for the initial project implementation and subsequent operational years. The system must include features such as digital vouchers, mobile device compatibility, and integration of identification numbers and portals, all designed to enhance the efficiency of Delaware's animal welfare program.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Delaware Health and Social Services
Division of Public Health d
Delaware Health and Social Services
Division of Public Health d
APPENDIX D
PROJECT COST PPROPOSAL
D1. Firm Fixed Cost Forms The contractor shall complete sections D1.1 (Project Lifecycle Cost) and D1.2 (Annual Operations and Support Cost), the sum of which represents the firm fixed cost for the contract presented in section D1.3 (Total Project Cost).
D1.1 Project Lifecycle Cost The following represents the deliverables and activities per the project lifecycle and phases presented in Appendix B, Section 1.2 (Project Lifecycle). In effect, the contractor’s Project Plan defines a payment schedule; and upon the successful completion and approval of the deliverables and activities for each phase, the contractor will be paid the set amount. This section covers the cost through deployment, and section D1.2 covers the cost post-deployment.
| Phase |
| Project Phase Deliverables & Activities |
| Project Cost |
| 1 |
| Planning Phase |
Activity: Schedule and conduct meetings
Activity: Finalize contractor and stakeholder staffing
Activity: Finalize subcontractor and/or vendor contracts, if applicable
Deliverable: Project Schedule
Deliverable: Change Management Plan
Deliverable: Continuity of Operations Plan
Deliverable: Interface Control Document(s)
Deliverable: Architecture Network Diagram
| Project Phase Cost |
| $ |
| Phase |
| Project Phase Deliverables & Activities |
| Project Cost |
| 2 |
| Configuration and Customization Phase |
Activity: Schedule and conduct meetings
Activity: Spin-up the cloud instance for the SaaS product
Activity: Configure the product
Activity: Customize the product, if applicable
Deliverable: Training Plan
Deliverable: Test Plan
Deliverable: Product Deployment Plan
| Project Phase Cost |
| $ |
| Phase |
| Project Phase Deliverables & Activities |
| Project Cost |
| 3 |
| Testing and Deployment Phase |
Activity: Schedule and conduct meetings
Activity: Implement the Test Plan
Activity: Implement the Training Plan
Activity: Implement the Product Deployment Plan
Deliverable: User Guide
Deliverable: Data Element Dictionary
| Project Phase Cost |
| $ |
D1.2 Annual Operations and Support Cost The contractor shall set the annual operations and support cost, which can be specified as a single all-inclusive cost category or itemized into separate cost categories (e.g., product hosting cost, mailing cost, supply cost, contractor staff position, etc.). The contract effective date begins Base Year 1 of the contract, and the firm fixed cost for the contract includes Base Year 1 through Base Year 2. The Division of Public Health has the option to extend the contract with two (2) extensions for a period of two (2) years for each extension.
The annual operations and support cost begins with phase 4 of the project lifecycle, Operations and Support Phase, per Appendix B, Section 1.2 (Project Lifecycle). As such, the contractor shall prorate at a minimum Base Year 1 to exclude the Project Lifecycle Cost stated in section D.1.1, based on the projected start date of the Operations and Support Phase stated in the contractor’s Project Plan submitted per RFP Appendix B. This section covers the post-deployment cost, and section D1.1 covers the cost for the project lifecycle phases through deployment.
| Operations and Support Cost Category |
| Years 1-2 Cost |
| Years 3-4 Cost |
| Years 5-6 Cost |
Cost Category 1
Cost Category 2
Cost Category n
| Total Annual Cost |
| $ |
| $ |
| $ |
D1.3 Total Project Cost The contractor shall state the total project cost as the sum of sections D.1.1 and D.1.2.
| Project Cost Category |
| Project Cost |
Phase 1 – Planning Phase
Phase 2 – Configuration and Customization Phase
Phase 3 – Testing and Deployment Phase
Phase 4 – Operations and Support Phase – Years 1-2
Phase 4 – Operations and Support Phase – Years 3-4
Phase 4 – Operations and Support Phase – Years 5-6
| Total Project Cost |
| $ |
image1.png image2.png
File details come from the government source that posted it. Updated .