9. Bid Schedule_XDAT201040.xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- PKA Restriping 500 Ramp Federal contract opportunity
- Solicitation number
- FA442725R0003
About this file
This document is a Bid Schedule template for two related federal contract opportunities, XDAT201040 and XDAT231001, at Travis Air Force Base. The first opportunity, XDAT201040, is for rubber removal and airfield restriping in FY21 with a proposed contract price of $0. The second opportunity, XDAT231001, is for rubber removal and airfield restriping in FY23 with a proposed contract price of $0.
The Bid Schedule provides a detailed breakdown of the material costs, labor costs, and other direct costs for various line items such as rubber removal, waste hauling and disposal, friction testing, pavement sweeping, and airfield striping. It also includes instructions for completing the construction cost estimate. The related federal contract opportunity, FA442725R0003, is for airfield restriping on the 500 Ramp at Travis AFB. The solicitation includes a Statement of Work and other pertinent information. All questions must be submitted in writing by December 11, 2024, and an organized site visit is scheduled for December 4, 2024. The contracting agency is the Department of the Air Force, Air Mobility Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Phase II 500 100 design rev 20200807.pdf | ||
| XDAT201040_25R0003 RFI Log_121224.xlsx | XLSX spreadsheet | |
| Solicitation Amendment FA442725R00030001 SF 30.pdf | ||
| Solicitation - FA442725R0003.pdf | ||
| Statement of Work Attachment 1.pdf | ||
| SECTION 01 56 00 ENVIRONMENTAL GENERAL REQUIREMENTS.pdf | ||
| Travis AFB Spec 0100 9-16-24.pdf | ||
| SECTION 01 33 00 SUBMITTAL PROCEDURES.pdf | ||
| 7. Schedule of Drawings.xlsx | XLSX spreadsheet | |
| SECTION 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.pdf | ||
| SECTION 01 14 00 Work Restrictions.pdf | ||
| 01 - GENERAL REQUIREMENTS SECTION 01 45 00.00 40 QUALITY CONTROL.pdf | ||
| Statement of Work Attachment 3.pdf | ||
| dafi13-213 - Airfield Driving.pdf | ||
| WD - CA20240007.txt | TXT text file | |
| 2. SOW_XDAT201040_Restriping 500 Ramp Ph 2 111424.docx | DOCX document | |
| Statement of Work Attachment 2.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P1
IGE- XDAT 21-1000
| 60 CES | FOUO | |
| TRAVIS AFB, CA | ||
| FY21 Rubber Removal Base | PROPOSED CONTRACT PRICE | $ - 0 |
| Ph I: Oct 2020 |
| MATERIAL COST | LABOR COSTS | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QUANTITY | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | LINE |
| NO | MEASURE | RATE | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 1 | Rubber removal excluding hauling, 4-6 passes (RSMEANS 02 41 13.30 6850) | MSF | |||||||||
| 2 | Waste (water) hauling (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270) | Mile | |||||||||
| 3 | Waste (water) disposal turnkey (non-contaminated/non-hazardous) | gal | |||||||||
| 4 | Waste (solid) disposal turnkey (non-contaminated/non-hazardous) | Mile | |||||||||
| 5 | Waste (solid) disposal (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270) 20yd | ea | |||||||||
| 6 | Friction Test, 40 and 60 MPH, pre and post tests | each | |||||||||
| 7 | Mobilization | LS | |||||||||
| 8 | Pavement Sweeper rental, 8 days, (8HR DAY/4ot, 8 hr/NITE/4OT) | WK | |||||||||
| 9 | Superintendent | hr | |||||||||
| 10 | PM | hr | |||||||||
| 11 | Laborers | hr | |||||||||
| 12 | Paint Removal (airfield, waterblast) (RSMEANS 32 17 23.13 1400) | SF | |||||||||
| 13 | Airfield Striping with reflective Beads (12 lbs/100 SF) (RSMeans 32 17 23.13 1210) | SF | restripe |
+ no bead
| 14 | Airfield Striping (no beads) (RSMeans 32 17 23.13 1200) | SF | ERROR:#REF! |
| 15 | Storage tank (water waster) Rental, 21K gallon | ls |
| 16 | Runway signs UFC 3-535-01 | ea | |
| 17 | Dumpter (solid waste) rental, 20 CY capacity | ea | |
| 18 | Barricade Rental (30 ea) | week | |
| 19 | Lighted X's (2 each) | week | ERROR:#REF! |
| 20 | Biologist | hr | ERROR:#REF! |
| ERROR:#REF! | |||
| Total (for 1 phase) | |||
| ERROR:#REF! |
Airfield Restrip
XDAT 23-1001
| 60 CES | CUI | |||||||||
| TRAVIS AFB, CA | ||||||||||
| FY23 Rubber Removal Base | PROPOSED CONTRACT PRICE | $ - 0 | ||||||||
| Full Closure: May 2023 | ||||||||||
| MATERIAL COST | LABOR COSTS | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QUANTITY | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | LINE |
| NO | MEASURE | RATE | COSTS | TOTAL | ||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1 | Waste (water) hauling (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270) | Mile | 0.00 | 0.00 | 0.00 | |||||
| 2 | Waste (water) disposal turnkey (non-contaminated/non-hazardous) | Gal | 0.00 | 0.00 | 0.00 | |||||
| 3 | Waste (solid) disposal (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270) | LS | 0.00 | 0.00 | 0.00 | |||||
| 4 | Waste (solid) disposal turnkey (non-contaminated/non-hazardous) 20 yd | EA | 0.00 | 0.00 | 0.00 | |||||
| 5 | Hazardous waste cleanup/pickip/disposal, solid pickup, bulk material | Ton | 0.00 | 0.00 | 0.00 | |||||
| 6 | Hazardous waste cleanup/pickip/disposal, liquid pickup | Gal | 0.00 | 0.00 | 0.00 | |||||
| 7 | Lead paint remediation, plans and methods, lead abatement remediation plan | LS | 0.00 | 0.00 | 0.00 | |||||
| 8 | Mobilization | LS | 0.00 | 0.00 | 0.00 | |||||
| 9 | Pavement Sweeper rental | wk | 0.00 | 0.00 | 0.00 | |||||
| 10 | Superintendent | hr | 0.00 | 0.00 | 0.00 | |||||
| 11 | PM | hr | 0.00 | 0.00 | 0.00 | |||||
| 12 | Laborers | hr | 0.00 | 0.00 | 0.00 | |||||
| 13 | Paint Removal (airfield, waterblast) (RSMEANS 32 17 23.13 1400) | SF | 0.00 | 0.00 | 0.00 | |||||
| 14 | Airfield Striping with reflective Beads (12 lbs/100 SF) (RSMeans 32 17 23.13 1210) | SF | 0.00 | 0.00 | 0.00 | |||||
| 15 | Airfield Striping (no beads) (RSMeans 32 17 23.13 1200) | SF | 0.00 | 0.00 | 0.00 | |||||
| 16 | Storage tank (water waster) Rental, 21K gallon | ls | 0.00 | 0.00 | 0.00 | |||||
| 17 | Dumpster (solid waste) rental, 20 CY capacity | ea | 0.00 | 0.00 | 0.00 | |||||
| 18 | Barricade Rental (30 ea) (If needed) | week | 0.00 | 0.00 | 0.00 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| % | ||||||||||
| TOTAL MATERIAL COSTS | $ - 0 | |||||||||
| TOTAL LABOR COSTS | $ - 0 | |||||||||
| TOTAL OTHER DIRECT COSTS | $ - 0 | |||||||||
| FIELD OFFICE OVERHEAD | $ - 0 | |||||||||
| SUBTOTAL 1 | $ - 0 | |||||||||
| MARK-UP ON SUBS | ||||||||||
| SUBTOTAL 2 | $ - 0 | |||||||||
| PROFIT | $ - 0 | |||||||||
| SUBTOTAL 3 | $ - 0 | |||||||||
| Bond | $ - 0 | |||||||||
| TOTAL PRICE | $ - 0 |
RR Only
XDAT 23-1001
| 60 CES | CUI | ||
| TRAVIS AFB, CA | |||
| FY23 Rubber Removal Base | PROPOSED CONTRACT PRICE | $ - 0 | |
| Partial Closure: May 2023 |
| MATERIAL COST | LABOR COSTS | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QUANTITY | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | LINE |
| NO | MEASURE | RATE | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1 | Rubber removal excluding hauling, 4-6 passes (RSMEANS 02 41 13.30 6850) | MSF | ||||||||
| 2 | Waste (water) hauling (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270) | Mile | ||||||||
| 3 | Waste (water) disposal turnkey (non-contaminated/non-hazardous) | Gal | ||||||||
| 4 | Waste (solid) disposal turnkey (non-contaminated/non-hazardous) 20 yd | EA | ||||||||
| 5 | Waste (solid) disposal (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270) | LS | ||||||||
| 6 | Friction Test, 40 and 60 MPH, pre and post tests | each | ||||||||
| 7 | Mobilization | LS | ||||||||
| 8 | Pavement Sweeper rental, 8 days, 8 hr/day, 4 hr/nite | wk | ||||||||
| 9 | Superintendent | hr | ||||||||
| 10 | PM | hr | ||||||||
| 11 | Laborers | hr | ||||||||
| 12 | Airfield Striping with reflective Beads (12 lbs/100 SF) (RSMeans 32 17 23.13 1210) | SF | ||||||||
| 13 | Airfield Striping (no beads) (RSMeans 32 17 23.13 1200) | SF | ||||||||
| 14 | Storage tank (water waster) Rental, 21K gallon | ls | ||||||||
| 16 | Dumpter (solid waste) rental, 20 CY capacity | ea | ||||||||
| 17 | Barricade Rental (30 ea) (If needed) | week | ||||||||
| 18 | Lighted X's (2 each) (If needed) | week | ||||||||
| 19 | Biologist | hr |
Total (for 1 phase)
Base (B)
| CUI | ||||
| INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit | ||||
| itemizing of all direct costs. | ||||
| Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, | ||||
| linear feet - LF, board feet - BF, each - EA, pound - LB). | ||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the | ||||
| Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, | ||||
| the contractor is responsible for determining quantity estimates. | ||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1. | ||||
| Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | ||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of | ||||
| significant dollar value. | ||||
| Col 10 Line Total. Self-explanatory. | ||||
| NOTE: | In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | |||
| page as follows | ||||
| TOTAL MATERIAL COSTS | $ | 0.00 |
TOTAL LABOR COSTS $ 0.00
TOTAL OTHER DIRECT COSTS $ 0.00
TOTAL DIRECT COSTS $ 0.00
OVERHEAD 14.39 % $ 0.00
SUBTOTAL $ 0.00
PROFIT 8.50 % $ 0.00
SUBTOTAL $ 0.00
Bond 1.07 % $ 0.00
TOTAL PRICE $ 0.00