9. Bid Schedule_XDAT201040.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
PKA Restriping 500 Ramp Federal contract opportunity
Solicitation number
FA442725R0003
Issued by
Department of the Air Force Air Mobility Command

About this file

This document is a Bid Schedule template for two related federal contract opportunities, XDAT201040 and XDAT231001, at Travis Air Force Base. The first opportunity, XDAT201040, is for rubber removal and airfield restriping in FY21 with a proposed contract price of $0. The second opportunity, XDAT231001, is for rubber removal and airfield restriping in FY23 with a proposed contract price of $0.

The Bid Schedule provides a detailed breakdown of the material costs, labor costs, and other direct costs for various line items such as rubber removal, waste hauling and disposal, friction testing, pavement sweeping, and airfield striping. It also includes instructions for completing the construction cost estimate. The related federal contract opportunity, FA442725R0003, is for airfield restriping on the 500 Ramp at Travis AFB. The solicitation includes a Statement of Work and other pertinent information. All questions must be submitted in writing by December 11, 2024, and an organized site visit is scheduled for December 4, 2024. The contracting agency is the Department of the Air Force, Air Mobility Command.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P1

IGE- XDAT 21-1000

60 CESFOUO
TRAVIS AFB, CA
FY21 Rubber Removal BasePROPOSED CONTRACT PRICE$ - 0
Ph I: Oct 2020
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURSAVERAGETOTALDIRECTLINE
NOMEASURERATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1Rubber removal excluding hauling, 4-6 passes (RSMEANS 02 41 13.30 6850)MSF
2Waste (water) hauling (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270)Mile
3Waste (water) disposal turnkey (non-contaminated/non-hazardous)gal
4Waste (solid) disposal turnkey (non-contaminated/non-hazardous)Mile
5Waste (solid) disposal (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270) 20ydea
6Friction Test, 40 and 60 MPH, pre and post testseach
7MobilizationLS
8Pavement Sweeper rental, 8 days, (8HR DAY/4ot, 8 hr/NITE/4OT)WK
9Superintendenthr
10PMhr
11Laborershr
12Paint Removal (airfield, waterblast) (RSMEANS 32 17 23.13 1400)SF
13Airfield Striping with reflective Beads (12 lbs/100 SF) (RSMeans 32 17 23.13 1210)SFrestripe

+ no bead

14Airfield Striping (no beads) (RSMeans 32 17 23.13 1200)SFERROR:#REF!
15Storage tank (water waster) Rental, 21K gallonls
16Runway signs UFC 3-535-01ea
17Dumpter (solid waste) rental, 20 CY capacityea
18Barricade Rental (30 ea)week
19Lighted X's (2 each)weekERROR:#REF!
20BiologisthrERROR:#REF!
ERROR:#REF!
Total (for 1 phase)
ERROR:#REF!

Airfield Restrip

XDAT 23-1001

60 CESCUI
TRAVIS AFB, CA
FY23 Rubber Removal BasePROPOSED CONTRACT PRICE$ - 0
Full Closure: May 2023
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURSAVERAGETOTALDIRECTLINE
NOMEASURERATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1Waste (water) hauling (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270)Mile0.000.000.00
2Waste (water) disposal turnkey (non-contaminated/non-hazardous)Gal0.000.000.00
3Waste (solid) disposal (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270)LS0.000.000.00
4Waste (solid) disposal turnkey (non-contaminated/non-hazardous) 20 ydEA0.000.000.00
5Hazardous waste cleanup/pickip/disposal, solid pickup, bulk materialTon0.000.000.00
6Hazardous waste cleanup/pickip/disposal, liquid pickupGal0.000.000.00
7Lead paint remediation, plans and methods, lead abatement remediation planLS0.000.000.00
8MobilizationLS0.000.000.00
9Pavement Sweeper rentalwk0.000.000.00
10Superintendenthr0.000.000.00
11PMhr0.000.000.00
12Laborershr0.000.000.00
13Paint Removal (airfield, waterblast) (RSMEANS 32 17 23.13 1400)SF0.000.000.00
14Airfield Striping with reflective Beads (12 lbs/100 SF) (RSMeans 32 17 23.13 1210)SF0.000.000.00
15Airfield Striping (no beads) (RSMeans 32 17 23.13 1200)SF0.000.000.00
16Storage tank (water waster) Rental, 21K gallonls0.000.000.00
17Dumpster (solid waste) rental, 20 CY capacityea0.000.000.00
18Barricade Rental (30 ea) (If needed)week0.000.000.00
$ - 0$ - 0$ - 0$ - 0
%
TOTAL MATERIAL COSTS$ - 0
TOTAL LABOR COSTS$ - 0
TOTAL OTHER DIRECT COSTS$ - 0
FIELD OFFICE OVERHEAD$ - 0
SUBTOTAL 1$ - 0
MARK-UP ON SUBS
SUBTOTAL 2$ - 0
PROFIT$ - 0
SUBTOTAL 3$ - 0
Bond$ - 0
TOTAL PRICE$ - 0

RR Only

XDAT 23-1001

60 CESCUI
TRAVIS AFB, CA
FY23 Rubber Removal BasePROPOSED CONTRACT PRICE$ - 0
Partial Closure: May 2023
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURSAVERAGETOTALDIRECTLINE
NOMEASURERATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1Rubber removal excluding hauling, 4-6 passes (RSMEANS 02 41 13.30 6850)MSF
2Waste (water) hauling (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270)Mile
3Waste (water) disposal turnkey (non-contaminated/non-hazardous)Gal
4Waste (solid) disposal turnkey (non-contaminated/non-hazardous) 20 ydEA
5Waste (solid) disposal (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270)LS
6Friction Test, 40 and 60 MPH, pre and post testseach
7MobilizationLS
8Pavement Sweeper rental, 8 days, 8 hr/day, 4 hr/nitewk
9Superintendenthr
10PMhr
11Laborershr
12Airfield Striping with reflective Beads (12 lbs/100 SF) (RSMeans 32 17 23.13 1210)SF
13Airfield Striping (no beads) (RSMeans 32 17 23.13 1200)SF
14Storage tank (water waster) Rental, 21K gallonls
16Dumpter (solid waste) rental, 20 CY capacityea
17Barricade Rental (30 ea) (If needed)week
18Lighted X's (2 each) (If needed)week
19Biologisthr

Total (for 1 phase)

Base (B)

CUI
INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit
itemizing of all direct costs.
Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF,
linear feet - LF, board feet - BF, each - EA, pound - LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the
Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise,
the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of
significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE:In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows
TOTAL MATERIAL COSTS$0.00

TOTAL LABOR COSTS $ 0.00

TOTAL OTHER DIRECT COSTS $ 0.00

TOTAL DIRECT COSTS $ 0.00

OVERHEAD 14.39 % $ 0.00

SUBTOTAL $ 0.00

PROFIT 8.50 % $ 0.00

SUBTOTAL $ 0.00

Bond 1.07 % $ 0.00

TOTAL PRICE $ 0.00

File details come from the government source that posted it. Updated .