This is a bid form document for Halifax Health Medical Center seeking construction services for Project PROJ-25-134, which involves Twin Lakes SPD equipment replacement. The document requires bidders to submit a detailed schedule/timeline demonstrating their understanding of the project scope and specifications, along with a Schedule of Values detailed by division that includes any requested allowances listed separately. Bidders must also provide a detailed work description showing full comprehension of the Scope of Work, and the contractor agrees to hold the bid open for acceptance for 120 days from the bid due date while completing work according to a detailed schedule submitted to Halifax Health Medical Center for review and approval.

The bid form requires a total delivered price to be specified by the bidder, with the contractor being responsible for any facility repairs resulting from damages caused by trucks going outside designated routes. The document establishes that the successful bidder must accomplish project work in accordance with bid solicitation details and complete the work within an approved schedule timeline, though specific pricing terms, funding sources, or contract duration beyond the 120-day bid acceptance period are not detailed in this attachment.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G

HALIFAX HEALTH MEDICAL CENTER

BID FORM of TOTAL PROJECT COST

Invitation to Bid for Construction Services

PROJ-25-134 – TWIN LAKES SPD EQUIPMENT REPLACEMENT

I/We propose to furnish the work described below at the following delivered price:

Contractor shall be responsible for any repair needed to the facility as a result of damages caused by trucks going outside designated routes.

As part of the project bid submittal, a detailed schedule/timeline must be included with each bid response. Sufficient detail will be included in the project schedule/timeline to demonstrate the bidder fully understands the project scope and specifications.

In addition, a Schedule of Values detailed by division must be provided with bid submittal and will include any requested allowances. Requested allowances will be listed separately.

Bidder will include with their bid submittal a detailed work description to show they fully understand the Scope of Work.

The Contractor agrees to:

A. Hold this bid open to acceptance for 120 days from the bid due date.

B. Accomplish project work in accordance with details provided in the bid solicitation.

C. Complete the work within a detailed schedule submitted to HHMC by the successful bidder for review and approval.

BID SUBMITTED BY:

COMPANY: ___________________________________________________________