9-Addendum 3.pdf
PDF 503 KB Posted
- Solicitation number
- IFB 2000004140
- Issued by
- Fairfax County, Virginia
About this file
This document is an Addendum (No. 3) for Invitation for Bid (IFB) #2000004140 issued by the County of Fairfax, Virginia, specifically for a Concrete: Repair, Replace, and Install New Concrete contract. The addendum is dated August 22, 2025, with a bid due date of August 28, 2025 at 11:00 a.m. The bid tabulation included is from a previous contract (IFB 2000003150) for Concrete New Installations and Repair, which was originally bid on July 14, 2020. The document provides comprehensive pricing schedules for concrete replacement, new concrete installations, and labor rates across multiple project sizes and types, including concrete walks, curbs, gutters, handicap cuts, drive aprons, and miscellaneous concrete work.
The pricing schedules detail unit prices from five different contractors: ACCUBID Construction Services, Arthur Construction Co., Ashburn Contracting Corporation, Finley Asphalt & Sealing, and M & F Concrete Inc. The bid includes detailed pricing for various project scales, ranging from 1-25 square yards/linear feet to 101+ square yards/linear feet. The contractor is responsible for surveying required for work layout but not for third-party testing required by permits. The pricing covers a wide range of concrete-related services, including installation, replacement, repairs, and associated labor rates for different specialized tasks such as brick pavers installation, footing framework, metal work, and fabrication.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-Attachment B.pdf | ||
| 4-Attachment C-Safety Resolution.pdf | ||
| 1-2000004140 .pdf | ||
| 2-Appendix A.pdf | ||
| 5-DPMM Coversheet.pdf | ||
| 6-Attachment A1-A6 and W9.pdf | ||
| 7-Addendum 1.pdf | ||
| 8-Addendum 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C o u n t y o f F a i r f a x , V i r g i n i a
DATE: August 22, 2025
ADDENDUM NO. 3
TO: ALL PROSPECTIVE BIDDERS
REFERENCE: IFB#2000004140
TITLE: Concrete: Repair, Replace, and Install New Concrete
DUE DATE/TIME: August 28, 2025 @ 11:00 a.m.
The referenced Invitation for Bid has been amended to add a corrected price schedule (see Bonfire).
The following are answers to questions asked.
Q1. Can you please provide the full bid tabulations for the previous contract?
A1. See the attached previous bid tabulation.
Q2. Will the contractor be fiscally responsible for survey and/or materials testing?
A2. Yes, the contractor is responsible for any surveying required for the layout of the work. The contractor is not responsible for any 3rd Party testing as required by permits obtained by the owner.
All other terms and conditions remain unchanged.
Contract Specialist
THIS ADDENDUM IS ACKNOWLEDGED AND IS CONSIDERED A PART OF THE SUBJECT
INVITATION FOR BID:
Name of Firm
(Signature) (Date)
A SIGNED COPY OF ADDENDUM MUST BE INCLUDED IN THE BID PACKAGE OR
RETURNED PRIOR TO THE OPENING DATE/TIME.
NOTE: SIGNATURE ON THIS ADDENDUM DOES NOT SUBSTITUTE FOR YOUR
SIGNATURE ON THE ORIGINAL BID DOCUMENT. THE ORIGINAL BID
DOCUMENT MUST BE SIGNED.
Department of Procurement & Material Management
12000 Government Center Parkway, Suite 427
Fairfax, VA 22035-0013
Website: www.fairfaxcounty.gov/dpmm
Phone (703) 324-3201, TTY: 711, Fax: (703) 324-3228
A D D E N D U M http://www.fairfaxcounty.gov/dpmm
IFB 2000004140
Addendum 3
IFB 2000003150
Concrete - New Installations and Repair
July 14, 2020 @ 10:00 AM
PRICING SCHEDULE, PART 1: CONCRETE, REPLACEMENT
Total Cost
# Items Quantity
UOM
Required
ACCUBID
Arthur Construction
Co., Inc.
$ 664,425.0
Unit Total
Price Cost
Ashburn Contracting
Corporation
$ 467,875.0
Unit Total
Price Cost
Finley Asphalt & Sealing, Inc.
$ 493,561.0
CONSTRUCTION M & F Concrete Inc.
SERVICES, INC.
$ 197,950.0 $ 551,645.0
Unit Total Unit Total
Price Cost Price Cost
1 Remove and Replace Concrete Walk, 4-inch thick (4)
#1-1 Project size: 1-25 square yards 200 SY $ 30 $ 6,000.0 $ 100 $ 20,000.0 $ 65 $ 13,000.0 $ 76.48999999999999 $ 15,297.999999999998 $ 99 $ 19,800.0
#1-2 Project size: 26-50 square yards 300 SY $ 35 $ 10,500.0 $ 81 $ 24,300.0 $ 65 $ 19,500.0 $ 66.48999999999999 $ 19,947.0 $ 66.65000000000001 $ 19,995.0
#1-3 Project size: 51-100 square yards 200 SY $ 45 $ 9,000.0 $ 72 $ 14,400.0 $ 60 $ 12,000.0 $ 66.48999999999999 $ 13,297.999999999998 $ 63 $ 12,600.0
#1-4 Project size: 101+ square yards 200 SY $ 45 $ 9,000.0 $ 63 $ 12,600.0 $ 60 $ 12,000.0 $ 66.48999999999999 $ 13,297.999999999998 $ 63 $ 12,600.0
2 Remove and Replace Concrete Walk, 4-inch thick, exposed aggregate finish (4)
#2-1 Project size: 1-25 square yards 200 SY $ 15 $ 3,000.0 $ 135 $ 27,000.0 $ 75 $ 15,000.0 $ 89.06 $ 17,812.0 $ 128 $ 25,600.0
#2-2 Project size: 26-50 square yards 300 SY $ 15 $ 4,500.0 $ 120 $ 36,000.0 $ 75 $ 22,500.0 $ 79.06 $ 23,718.0 $ 117 $ 35,100.0
#2-3 Project size: 51-100 square yards 200 SY $ 15 $ 3,000.0 $ 100 $ 20,000.0 $ 75 $ 15,000.0 $ 79.06 $ 15,812.0 $ 96 $ 19,200.0
#2-4 Project size: 101+ square yards 200 SY $ 15 $ 3,000.0 $ 90 $ 18,000.0 $ 65 $ 13,000.0 $ 79.06 $ 15,812.0 $ 96 $ 19,200.0
3 Remove and Replace Curb and Gutter, 4-inch (VDOT standard CG-7, latest revision) (4)
#3-1 Project size: 1-25 linear feet 200 LF $ 12 $ 2,400.0 $ 100 $ 20,000.0 $ 40 $ 8,000.0 $ 47.06 $ 9,412.0 $ 38 $ 7,600.0
#3-2 Project size: 26-50 linear feet 300 LF $ 12 $ 3,600.0 $ 80 $ 24,000.0 $ 40 $ 12,000.0 $ 37.06 $ 11,118.0 $ 38 $ 11,400.0
#3-3 Project size: 51-100 linear feet 200 LF $ 12 $ 2,400.0 $ 60 $ 12,000.0 $ 40 $ 8,000.0 $ 37.06 $ 7,412.0 $ 36 $ 7,200.0
#3-4 Project size: 101+ linear feet 200 LF $ 12 $ 2,400.0 $ 40 $ 8,000.0 $ 35 $ 7,000.0 $ 37.06 $ 7,412.0 $ 34 $ 6,800.0
4 Remove and Replace Curb and Gutter, 6-inch (VDOT standard CG-6, latest revision) (4)
#4-1 Project size: 1-25 linear feet 200 LF $ 35 $ 7,000.0 $ 100 $ 20,000.0 $ 40 $ 8,000.0 $ 47.06 $ 9,412.0 $ 38 $ 7,600.0
#4-2 Project size: 26-50 linear feet 300 LF $ 25 $ 7,500.0 $ 80 $ 24,000.0 $ 40 $ 12,000.0 $ 37.06 $ 11,118.0 $ 38 $ 11,400.0
#4-3 Project size: 51-100 linear feet 200 LF $ 35 $ 7,000.0 $ 60 $ 12,000.0 $ 40 $ 8,000.0 $ 37.06 $ 7,412.0 $ 36 $ 7,200.0
#4-4 Project size: 101+ linear feet 200 LF $ 35 $ 7,000.0 $ 40 $ 8,000.0 $ 35 $ 7,000.0 $ 37.06 $ 7,412.0 $ 34 $ 6,800.0
5 Remove and Replace Curb and Gutter, 4-inches (VDOT standard CG-3, latest revision) (4)
#5-1 Project size: 1-25 linear feet 200 LF $ 12 $ 2,400.0 $ 90 $ 18,000.0 $ 40 $ 8,000.0 $ 47.06 $ 9,412.0 $ 30 $ 6,000.0
#5-2 Project size: 26-50 linear feet 300 LF $ 12 $ 3,600.0 $ 70 $ 21,000.0 $ 40 $ 12,000.0 $ 37.06 $ 11,118.0 $ 30 $ 9,000.0
#5-3 Project size: 51-100 linear feet 200 LF $ 12 $ 2,400.0 $ 50 $ 10,000.0 $ 40 $ 8,000.0 $ 37.06 $ 7,412.0 $ 30 $ 6,000.0
#5-4 Project size: 101+ linear feet 200 LF $ 12 $ 2,400.0 $ 35 $ 7,000.0 $ 35 $ 7,000.0 $ 37.06 $ 7,412.0 $ 30 $ 6,000.0
6 Remove and Replace Curb, Standard, 6-inches (VDOT standard CG-2, latest revision) (13)
#6-1 Project size: 1-25 linear feet 200 LF
#6-2 Project size: 26-50 linear feet 200 LF
#6-3 Project size: 51-100 linear feet 200 LF
#6-4 Project size: 101+ linear feet 200 LF
#6-5 Remove and Replace Concrete Steps (Poured in place
200 CY
per CY)
#6-6 Remove and Replace Handicap Curb Cut, 4-inches (CW-
10 EA
1), with Broom Finish
#6-7 Remove and Replace Handicap Curb Cut, 4-inches (CW-
20 EA
1), with Exposed Aggregate Finish
#6-8 Remove and Replace Handicap Curb Cut, 4-inches with
20 EA
Truncated Domes (VDOT standard CG-12, latest
$ 20 $ 4,000.0 $ 90 $ 18,000.0 $ 40 $ 8,000.0 $ 47.06 $ 9,412.0 $ 36 $ 7,200.0
$ 18 $ 3,600.0 $ 70 $ 14,000.0 $ 40 $ 8,000.0 $ 37.06 $ 7,412.0 $ 36 $ 7,200.0
$ 20 $ 4,000.0 $ 50 $ 10,000.0 $ 40 $ 8,000.0 $ 37.06 $ 7,412.0 $ 34 $ 6,800.0
$ 20 $ 4,000.0 $ 35 $ 7,000.0 $ 35 $ 7,000.0 $ 37.06 $ 7,412.0 $ 34 $ 6,800.0
$ 200 $ 40,000.0 $ 100 $ 20,000.0 $ 450 $ 90,000.0 $ 450 $ 90,000.0 $ 350 $ 70,000.0
$ 100 $ 1,000.0 $ 2,750.0 $ 27,500.0 $ 950 $ 9,500.0 $ 1,750.0 $ 17,500.0 $ 850 $ 8,500.0
$ 100 $ 2,000.0 $ 3,250.0 $ 65,000.0 $ 950 $ 19,000.0 $ 1,750.0 $ 35,000.0 $ 450 $ 9,000.0
$ 950 $ 19,000.0 $ 4,250.0 $ 85,000.0 $ 1,650.0 $ 33,000.0 $ 1,750.0 $ 35,000.0 $ 850 $ 17,000.0
July 14, 2020 @ 10:00 AM
PRICING SCHEDULE, PART 1: CONCRETE, REPLACEMENT
#6-9
#6-10
#6-11
#6-12
#6-13
Removal of Ramp
Remove and Replace Concrete Drive Apron (DE-1:
Fairfax County Public Facilities Manual 2001)
Remove and Replace Concrete Slab, 6-inches (Class A-3)
Remove and Replace Concrete Driveway Slab, 6-inches
(Class A-3/High-Early Mix)
Remove and Replace Concrete Driveway Slab, 8-inches (Class A-3/High-Early Mix)
SY
SY
SY
SY
SY
$ 20 $ 1,000.0 $ 27 $ 1,350.0 $ 10 $ 500 $ 27.9 $ 1,395.0 $ 99 $ 4,950.0
$ 50 $ 2,500.0 $ 150 $ 7,500.0 $ 140 $ 7,000.0 $ 119.32 $ 5,966.0 $ 108 $ 5,400.0
$ 60 $ 3,000.0 $ 90 $ 4,500.0 $ 120 $ 6,000.0 $ 102.27 $ 5,113.5 $ 108 $ 5,400.0
$ 60 $ 3,000.0 $ 90 $ 4,500.0 $ 140 $ 7,000.0 $ 102.27 $ 5,113.5 $ 108 $ 5,400.0
$ 70 $ 3,500.0 $ 100 $ 5,000.0 $ 150 $ 7,500.0 $ 136.36 $ 6,818.000000000001 $ 121.5 $ 6,075.0
7 Miscellaneous (7)
#7-1 Saw Cutting (concrete) 300 LF $ 3.5 $ 1,050.0
$ 3 $ 300
$ 2 $ 200
$ 150 $ 1,500.0
$ 20 $ 4,000.0
$ 35 $ 700
$ 20 $ 1,500.0
$ 5 $ 1,500.0
$ 0.5 $ 50.0
$ 150 $ 15,000.0
$ 500 $ 5,000.0
$ 54 $ 10,800.0
$ 40 $ 800
$ 75 $ 5,625.0
$ 3 $ 900
$ 2 $ 200
$ 65 $ 6,500.0
$ 950 $ 9,500.0
$ 45 $ 9,000.0
$ 45 $ 900
$ 45 $ 3,375.0
$ 6 $ 1,800.0
$ 2 $ 200
$ 20 $ 2,000.0
$ 50 $ 500
$ 50 $ 10,000.0
$ 35 $ 700
$ 50 $ 3,750.0
$ 0.5 $ 150.0
$ 0.25 $ 25.0
$ 850 $ 85,000.0
$ 1,000.0 $ 10,000.0
$ 175 $ 35,000.0
$ 45 $ 900
$ 50 $ 3,750.0
#7-2 Wire Mesh Reinforcement (any gauge as per project 100 SF requirement)
#7-3 Angle Iron Reinforcement, 4"x4" 100 LF
#7-4 Asphalt Repair- 5 SY or less up to 6-inches thick 10 EA compacted in lifts per site visit
#7-5 Asphalt Repair- requiring more than 5 SY less up to 6- 200 SY inches in thickness compacted in lifts per site visit
#7-6 Base Stone, 21A, Compacted in Place - for locations 20 TN needing depths greater than 4-inches
#7-7 Excavation per cubic yard- for locations where Owner 75 CY has directed additional depths below 4-inches
PRICING SCHEDULE, PART 2: CONCRETE, NEW INSTALLATIONS
ACCUBID
CONSTRUCTION
Arthur Construction
Co., Inc.
Ashburn Contracting
Corporation
Finley Asphalt & Sealing, Inc.
M & F Concrete Inc.
$ 199,950.0 $ 604,100.0 $ 556,300.0 $ 455,446.5 $ 463,644.5
# Items Quantity
UOM
Required
Unit Total
Price Cost
Unit Total
Price Cost
Unit Total
Price Cost
Unit Total
Price Cost
1 Install Concrete Walk, 4-inches, with Broom Finish (4)
#1-1 Project size: 1-25 square yards 100 SY $ 30 $ 3,000.0 $ 81 $ 8,100.0 $ 65 $ 6,500.0 $ 76.48999999999999 $ 7,648.999999999999 $ 81 $ 8,100.0
#1-2 Project size: 26-50 square yards 100 SY $ 30 $ 3,000.0 $ 72 $ 7,200.0 $ 65 $ 6,500.0 $ 66.48999999999999 $ 6,648.999999999999 $ 72 $ 7,200.0
#1-3 Project size: 51-100 square yards 100 SY $ 40 $ 4,000.0 $ 63 $ 6,300.0 $ 65 $ 6,500.0 $ 66.48999999999999 $ 6,648.999999999999 $ 63 $ 6,300.0
#1-4 Project size: 101+ square yards 150 SY $ 40 $ 6,000.0 $ 54 $ 8,100.0 $ 60 $ 9,000.0 $ 66.48999999999999 $ 9,973.5 $ 63 $ 9,450.0
2 Install Concrete Walk, 4-inches, with Exposed Aggregate Finish (4)
#2-1 Project size: 1-25 square yards 100 SY $ 13 $ 1,300.0 $ 120 $ 12,000.0 $ 65 $ 6,500.0 $ 89.06 $ 8,906.0 $ 120.27 $ 12,027.0
#2-2 Project size: 26-50 square yards 100 SY $ 13 $ 1,300.0 $ 100 $ 10,000.0 $ 65 $ 6,500.0 $ 79.06 $ 7,906.0 $ 87.3 $ 8,730.0
#2-3 Project size: 51-100 square yards 100 SY $ 13 $ 1,300.0 $ 90 $ 9,000.0 $ 65 $ 6,500.0 $ 79.06 $ 7,906.0 $ 84.15000000000001 $ 8,415.0
#2-4 Project size: 101+ square yards 150 SY $ 13 $ 1,950.0 $ 81 $ 12,150.0 $ 60 $ 9,000.0 $ 79.06 $ 11,859.0 $ 84.15000000000001 $ 12,622.5
3 Install Curb and Gutter, 4-inches (VDOT standard CG-6, latest revision) (4)
#3-1 Project size: 1-25 linear feet 100 LF $ 20 $ 2,000.0 $ 80 $ 8,000.0 $ 50 $ 5,000.0 $ 47.06 $ 4,706.0 $ 38 $ 3,800.0
#3-2 Project size: 26-50 linear feet 100 LF $ 20 $ 2,000.0 $ 65 $ 6,500.0 $ 50 $ 5,000.0 $ 37.06 $ 3,706.0 $ 36 $ 3,600.0
#3-3 Project size: 51-100 linear feet 100 LF $ 20 $ 2,000.0 $ 45 $ 4,500.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0
#3-4 Project size: 101+ linear feet 100 LF $ 20 $ 2,000.0 $ 35 $ 3,500.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0
4 Install Curb and Gutter, 6-inches (VDOT standard CG-7, latest revision) (4)
#4-1 Project size: 1-25 linear feet 100 LF $ 20 $ 2,000.0 $ 80 $ 8,000.0 $ 50 $ 5,000.0 $ 47.06 $ 4,706.0 $ 38 $ 3,800.0
#4-2 Project size: 26-50 linear feet 100 LF $ 20 $ 2,000.0 $ 65 $ 6,500.0 $ 50 $ 5,000.0 $ 37.06 $ 3,706.0 $ 36 $ 3,600.0
#4-3 Project size: 51-100 linear feet 100 LF $ 20 $ 2,000.0 $ 45 $ 4,500.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0
#4-4 Project size: 101+ linear feet 100 LF $ 20 $ 2,000.0 $ 35 $ 3,500.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0
5 Install standard 4-inch curb (VDOT standard CG-2, latest revision) (4)
#5-1 Project size: 1-25 linear feet 100 LF $ 25 $ 2,500.0 $ 75 $ 7,500.0 $ 50 $ 5,000.0 $ 47.06 $ 4,706.0 $ 38 $ 3,800.0
#5-2 Project size: 26-50 linear feet 100 LF $ 25 $ 2,500.0 $ 60 $ 6,000.0 $ 50 $ 5,000.0 $ 37.06 $ 3,706.0 $ 36 $ 3,600.0
#5-3 Project size: 51-100 linear feet 100 LF $ 14 $ 1,400.0 $ 40 $ 4,000.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0
#5-4 Project size: 101+ linear feet 100 LF $ 14 $ 1,400.0 $ 30 $ 3,000.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0
6 Install 6-inch standard curb (VDOT standard CG-3, latest revision) (13)
#6-1 Project size: 1-25 linear feet 100 LF $ 12 $ 1,200.0 $ 75 $ 7,500.0 $ 50 $ 5,000.0 $ 47.06 $ 4,706.0 $ 36 $ 3,600.0
#6-2 Project size: 26-50 linear feet 100 LF $ 12 $ 1,200.0 $ 60 $ 6,000.0 $ 50 $ 5,000.0 $ 37.06 $ 3,706.0 $ 36 $ 3,600.0
#6-3 Project size: 51-100 linear feet 100 LF $ 12 $ 1,200.0 $ 40 $ 4,000.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0
#6-4 Project size: 101+ linear feet 100 LF $ 12 $ 1,200.0 $ 30 $ 3,000.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0
#6-5 Handicap Curb Cut (CW-1), with broom finish and
5 EA
associated curb work
$ 100 $ 500 $ 2,500.0 $ 12,500.0 $ 950 $ 4,750.0 $ 450 $ 2,250.0 $ 450 $ 2,250.0
#6-6 Handicap Curb Cut (CW-1), with exposed aggregate finish 5 EA $ 100 $ 500 $ 3,000.0 $ 15,000.0 $ 1,250.0 $ 6,250.0 $ 1,750.0 $ 8,750.0 $ 450 $ 2,250.0
PRICING SCHEDULE, PART 2: CONCRETE, NEW INSTALLATIONS
#6-7
#6-8
#6-9
#6-10
#6-11
#6-12
#6-13
Handicap Curb Cut, with truncated domes (VDOT standard CG-12, latest revision)
Ramp, 4-inches, with metal railing sleeves
Ramp, 4-inches, with a vertical concrete lip/curb, 2-inches high by 6-inches wide on both running edges (metal railing sleeves to be included)
Concrete drive apron, 6-inches thick (DE-1: Fairfax
COunty Public Facilities Manual 2001)
Concrete slab 6-inches thick (Class A-3)
Concrete driveway slab 6-inches thick (Class A-3/High-
Early Mix)
Concrete driveway slab 8-inches thick (Class A-3/High-
Early Mix)
EA
$ 850
$ 4,250.0
$ 4,000.0
$ 20,000.0
$ 1,650.0
$ 8,250.0
$ 1,750.0
$ 8,750.0
$ 450
$ 2,250.0
$ 25 $ 1,250.0 $ 500 $ 25,000.0 $ 60 $ 3,000.0 $ 100 $ 5,000.0 $ 99 $ 4,950.0
$ 25
$ 1,250.0
$ 500
$ 25,000.0
$ 85
$ 4,250.0
$ 125
$ 6,250.0
$ 108
$ 5,400.0
$ 20
$ 1,000.0
$ 81
$ 4,050.0
$ 90
$ 4,500.0
$ 119.32
$ 5,966.0
$ 108
$ 5,400.0
$ 50 $ 2,500.0 $ 81 $ 4,050.0 $ 90 $ 4,500.0 $ 102.27 $ 5,113.5 $ 81 $ 4,050.0
$ 60 $ 3,000.0 $ 81 $ 4,050.0 $ 90 $ 4,500.0 $ 102.27 $ 5,113.5 $ 90 $ 4,500.0
$ 80
$ 4,000.0
$ 90
$ 4,500.0
$ 95
$ 4,750.0
$ 136.36
$ 6,818.000000000001
$ 99
$ 4,950.0
7 Miscellaneous (15)
#7-1
#7-2
#7-3
#7-4
#7-5
#7-6
#7-7
#7-8
#7-9
#7-10
#7-11
#7-12
#7-13
#7-14
#7-15
Extra charge for aggregate finish
Clean fill material
Reseeding of disturbed lawn areas- to include areas damaged by equipment
Sod of disturbed lawn areas- to include areas damaged by equipment
Under drain STD.UD-3 from the Fairfax County's Public
Facilities Manual (PFM)
Footing trench excavation
Footing A-3 concrete poured in place
Retaining walls, concrete gravity, R-W-2 (VDOT specification)
Retaining walls, concrete gravity, R-W-3 (VDOT
Specification)
New concrete steps poured in place on a properly prepared sub-grade with 4 inches of compacted 21A base stone
Miscellaneous Class A-3 concrete, including formwork, poured in place
Miscellaneous reinforcing steel per VDOT Section 406
Caulking (material & installation)
Truncated domes (furnished & installed)
Handrails (DOJ 2010 ADA Standards for Accessible Design
- Section 505 compliant)
SF
CY
SF
SF
LF
CY
CY
TN
LF
EA
LF
$ 1 $ 200 $ 5 $ 1,000.0 $ 12 $ 2,400.0 $ 15 $ 3,000.0 $ 9 $ 1,800.0
$ 20 $ 400 $ 75 $ 1,500.0 $ 45 $ 900 $ 60 $ 1,200.0 $ 50 $ 1,000.0
$ 1 $ 1,000.0 $ 2.5 $ 2,500.0 $ 2.5 $ 2,500.0 $ 0.33 $ 330.0 $ 0.5 $ 500.0
$ 2
$ 400
$ 10
$ 2,000.0
$ 8
$ 1,600.0
$ 0.5600000000000001
$ 112.00000000000001
$ 3
$ 600
$ 15
$ 1,500.0
$ 35
$ 3,500.0
$ 6
$ 15 $ 1,500.0 $ 100 $ 10,000.0 $ 65 $ 6,500.0 $ 50 $ 5,000.0 $ 50 $ 5,000.0
$ 150 $ 15,000.0 $ 250 $ 25,000.0 $ 450 $ 45,000.0 $ 250 $ 25,000.0 $ 300 $ 30,000.0
$ 150 $ 15,000.0 $ 850 $ 85,000.0 $ 850 $ 85,000.0 $ 500 $ 50,000.0 $ 600 $ 60,000.0
$ 150
$ 15,000.0
$ 950
$ 95,000.0
$ 850
$ 85,000.0
$ 50,000.0
$ 60,000.0
$ 250
$ 150
$ 15,000.0
$ 450
$ 45,000.0
$ 350
$ 35,000.0
$ 300
$ 30,000.0
$ 250
$ 650
$ 65,000.0
$ 60,000.0
$ 100
$ 100
$ 1,200.0
$ 1,200.0
$ 900
$ 900
$ 2.5 $ 250.0 $ 20 $ 2,000.0 $ 4.5 $ 450.0 $ 10 $ 1,000.0 $ 8 $ 800
$ 25 $ 2,500.0 $ 250 $ 25,000.0 $ 35 $ 3,500.0 $ 45 $ 4,500.0 $ 120 $ 12,000.0
$ 110 $ 22,000.0 $ 200 $ 40,000.0 $ 185 $ 37,000.0 $ 125 $ 25,000.0 $ 150 $ 30,000.0
PRICING SCHEDULE, PART 3: LABOR RATES
ACCUBID
CONSTRUCTION
Arthur Construction
Co., Inc.
Ashburn Contracting
Corporation
Finley Asphalt &
Sealing, Inc.
M & F Concrete Inc.
$ 115 $ 450 $ 600 $ 375 $ 527.0 Quantity
# Items Required
UOM
Unit Total
Price Cost
Unit Total
Price Cost
Unit Total
Price Cost
Unit Total
Price Cost
0 No Basket (5)
#0-1 Labor Rate, Regular Hours, Brick Pavers Installer 1 HR $ 20 $ 20 $ 50 $ 50 $ 75 $ 75 $ 75 $ 75 $ 45 $ 45
#0-2 Labor Rate, Regular Hours, Footing Framework 1 HR $ 20 $ 20 $ 50 $ 50 $ 75 $ 75 $ 50 $ 50 $ 45 $ 45
#0-3 Labor Rate, Regular Hours, Fabrication and Installation 1 HR $ 25 $ 25 $ 150 $ 150 $ 150 $ 150 $ 50 $ 50 $ 218.5 $ 218.5
#0-4 Labor Rate, Regular Hours, Metal Work Fabrication 1 HR $ 25 $ 25 $ 100 $ 100 $ 150 $ 150 $ 100 $ 100 $ 126 $ 126
#0-5 Labor Rate, Regular Hours, Metal Work Installation 1 HR $ 25 $ 25 $ 100 $ 100 $ 150 $ 150 $ 100 $ 100 $ 92.5 $ 92.5
| Addendum 3 |
| Bid Tab.doc.doc |
| 2025-08-22T11:18:55-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .