9-Addendum 3.pdf

PDF 503 KB Posted

Attached to
Concrete: Repair, Replace, and Install New Concrete
Solicitation number
IFB 2000004140
Issued by
Fairfax County, Virginia

About this file

This document is an Addendum (No. 3) for Invitation for Bid (IFB) #2000004140 issued by the County of Fairfax, Virginia, specifically for a Concrete: Repair, Replace, and Install New Concrete contract. The addendum is dated August 22, 2025, with a bid due date of August 28, 2025 at 11:00 a.m. The bid tabulation included is from a previous contract (IFB 2000003150) for Concrete New Installations and Repair, which was originally bid on July 14, 2020. The document provides comprehensive pricing schedules for concrete replacement, new concrete installations, and labor rates across multiple project sizes and types, including concrete walks, curbs, gutters, handicap cuts, drive aprons, and miscellaneous concrete work.

The pricing schedules detail unit prices from five different contractors: ACCUBID Construction Services, Arthur Construction Co., Ashburn Contracting Corporation, Finley Asphalt & Sealing, and M & F Concrete Inc. The bid includes detailed pricing for various project scales, ranging from 1-25 square yards/linear feet to 101+ square yards/linear feet. The contractor is responsible for surveying required for work layout but not for third-party testing required by permits. The pricing covers a wide range of concrete-related services, including installation, replacement, repairs, and associated labor rates for different specialized tasks such as brick pavers installation, footing framework, metal work, and fabrication.

View the file

Other files

File Type Posted
3-Attachment B.pdf PDF
4-Attachment C-Safety Resolution.pdf PDF
1-2000004140 .pdf PDF
2-Appendix A.pdf PDF
5-DPMM Coversheet.pdf PDF
6-Attachment A1-A6 and W9.pdf PDF
7-Addendum 1.pdf PDF
8-Addendum 2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C o u n t y o f F a i r f a x , V i r g i n i a

DATE: August 22, 2025

ADDENDUM NO. 3

TO: ALL PROSPECTIVE BIDDERS

REFERENCE: IFB#2000004140

TITLE: Concrete: Repair, Replace, and Install New Concrete

DUE DATE/TIME: August 28, 2025 @ 11:00 a.m.

The referenced Invitation for Bid has been amended to add a corrected price schedule (see Bonfire).

The following are answers to questions asked.

Q1. Can you please provide the full bid tabulations for the previous contract?

A1. See the attached previous bid tabulation.

Q2. Will the contractor be fiscally responsible for survey and/or materials testing?

A2. Yes, the contractor is responsible for any surveying required for the layout of the work. The contractor is not responsible for any 3rd Party testing as required by permits obtained by the owner.

All other terms and conditions remain unchanged.

Contract Specialist

THIS ADDENDUM IS ACKNOWLEDGED AND IS CONSIDERED A PART OF THE SUBJECT

INVITATION FOR BID:

Name of Firm

(Signature) (Date)

A SIGNED COPY OF ADDENDUM MUST BE INCLUDED IN THE BID PACKAGE OR

RETURNED PRIOR TO THE OPENING DATE/TIME.

NOTE: SIGNATURE ON THIS ADDENDUM DOES NOT SUBSTITUTE FOR YOUR

SIGNATURE ON THE ORIGINAL BID DOCUMENT. THE ORIGINAL BID

DOCUMENT MUST BE SIGNED.

Department of Procurement & Material Management

12000 Government Center Parkway, Suite 427

Fairfax, VA 22035-0013

Website: www.fairfaxcounty.gov/dpmm

Phone (703) 324-3201, TTY: 711, Fax: (703) 324-3228

A D D E N D U M http://www.fairfaxcounty.gov/dpmm

IFB 2000004140

Addendum 3

IFB 2000003150

Concrete - New Installations and Repair

July 14, 2020 @ 10:00 AM

PRICING SCHEDULE, PART 1: CONCRETE, REPLACEMENT

Total Cost

# Items Quantity

UOM

Required

ACCUBID

Arthur Construction

Co., Inc.

$ 664,425.0

Unit Total

Price Cost

Ashburn Contracting

Corporation

$ 467,875.0

Unit Total

Price Cost

Finley Asphalt & Sealing, Inc.

$ 493,561.0

CONSTRUCTION M & F Concrete Inc.

SERVICES, INC.

$ 197,950.0 $ 551,645.0

Unit Total Unit Total

Price Cost Price Cost

1 Remove and Replace Concrete Walk, 4-inch thick (4)

#1-1 Project size: 1-25 square yards 200 SY $ 30 $ 6,000.0 $ 100 $ 20,000.0 $ 65 $ 13,000.0 $ 76.48999999999999 $ 15,297.999999999998 $ 99 $ 19,800.0

#1-2 Project size: 26-50 square yards 300 SY $ 35 $ 10,500.0 $ 81 $ 24,300.0 $ 65 $ 19,500.0 $ 66.48999999999999 $ 19,947.0 $ 66.65000000000001 $ 19,995.0

#1-3 Project size: 51-100 square yards 200 SY $ 45 $ 9,000.0 $ 72 $ 14,400.0 $ 60 $ 12,000.0 $ 66.48999999999999 $ 13,297.999999999998 $ 63 $ 12,600.0

#1-4 Project size: 101+ square yards 200 SY $ 45 $ 9,000.0 $ 63 $ 12,600.0 $ 60 $ 12,000.0 $ 66.48999999999999 $ 13,297.999999999998 $ 63 $ 12,600.0

2 Remove and Replace Concrete Walk, 4-inch thick, exposed aggregate finish (4)

#2-1 Project size: 1-25 square yards 200 SY $ 15 $ 3,000.0 $ 135 $ 27,000.0 $ 75 $ 15,000.0 $ 89.06 $ 17,812.0 $ 128 $ 25,600.0

#2-2 Project size: 26-50 square yards 300 SY $ 15 $ 4,500.0 $ 120 $ 36,000.0 $ 75 $ 22,500.0 $ 79.06 $ 23,718.0 $ 117 $ 35,100.0

#2-3 Project size: 51-100 square yards 200 SY $ 15 $ 3,000.0 $ 100 $ 20,000.0 $ 75 $ 15,000.0 $ 79.06 $ 15,812.0 $ 96 $ 19,200.0

#2-4 Project size: 101+ square yards 200 SY $ 15 $ 3,000.0 $ 90 $ 18,000.0 $ 65 $ 13,000.0 $ 79.06 $ 15,812.0 $ 96 $ 19,200.0

3 Remove and Replace Curb and Gutter, 4-inch (VDOT standard CG-7, latest revision) (4)

#3-1 Project size: 1-25 linear feet 200 LF $ 12 $ 2,400.0 $ 100 $ 20,000.0 $ 40 $ 8,000.0 $ 47.06 $ 9,412.0 $ 38 $ 7,600.0

#3-2 Project size: 26-50 linear feet 300 LF $ 12 $ 3,600.0 $ 80 $ 24,000.0 $ 40 $ 12,000.0 $ 37.06 $ 11,118.0 $ 38 $ 11,400.0

#3-3 Project size: 51-100 linear feet 200 LF $ 12 $ 2,400.0 $ 60 $ 12,000.0 $ 40 $ 8,000.0 $ 37.06 $ 7,412.0 $ 36 $ 7,200.0

#3-4 Project size: 101+ linear feet 200 LF $ 12 $ 2,400.0 $ 40 $ 8,000.0 $ 35 $ 7,000.0 $ 37.06 $ 7,412.0 $ 34 $ 6,800.0

4 Remove and Replace Curb and Gutter, 6-inch (VDOT standard CG-6, latest revision) (4)

#4-1 Project size: 1-25 linear feet 200 LF $ 35 $ 7,000.0 $ 100 $ 20,000.0 $ 40 $ 8,000.0 $ 47.06 $ 9,412.0 $ 38 $ 7,600.0

#4-2 Project size: 26-50 linear feet 300 LF $ 25 $ 7,500.0 $ 80 $ 24,000.0 $ 40 $ 12,000.0 $ 37.06 $ 11,118.0 $ 38 $ 11,400.0

#4-3 Project size: 51-100 linear feet 200 LF $ 35 $ 7,000.0 $ 60 $ 12,000.0 $ 40 $ 8,000.0 $ 37.06 $ 7,412.0 $ 36 $ 7,200.0

#4-4 Project size: 101+ linear feet 200 LF $ 35 $ 7,000.0 $ 40 $ 8,000.0 $ 35 $ 7,000.0 $ 37.06 $ 7,412.0 $ 34 $ 6,800.0

5 Remove and Replace Curb and Gutter, 4-inches (VDOT standard CG-3, latest revision) (4)

#5-1 Project size: 1-25 linear feet 200 LF $ 12 $ 2,400.0 $ 90 $ 18,000.0 $ 40 $ 8,000.0 $ 47.06 $ 9,412.0 $ 30 $ 6,000.0

#5-2 Project size: 26-50 linear feet 300 LF $ 12 $ 3,600.0 $ 70 $ 21,000.0 $ 40 $ 12,000.0 $ 37.06 $ 11,118.0 $ 30 $ 9,000.0

#5-3 Project size: 51-100 linear feet 200 LF $ 12 $ 2,400.0 $ 50 $ 10,000.0 $ 40 $ 8,000.0 $ 37.06 $ 7,412.0 $ 30 $ 6,000.0

#5-4 Project size: 101+ linear feet 200 LF $ 12 $ 2,400.0 $ 35 $ 7,000.0 $ 35 $ 7,000.0 $ 37.06 $ 7,412.0 $ 30 $ 6,000.0

6 Remove and Replace Curb, Standard, 6-inches (VDOT standard CG-2, latest revision) (13)

#6-1 Project size: 1-25 linear feet 200 LF

#6-2 Project size: 26-50 linear feet 200 LF

#6-3 Project size: 51-100 linear feet 200 LF

#6-4 Project size: 101+ linear feet 200 LF

#6-5 Remove and Replace Concrete Steps (Poured in place

200 CY

per CY)

#6-6 Remove and Replace Handicap Curb Cut, 4-inches (CW-

10 EA

1), with Broom Finish

#6-7 Remove and Replace Handicap Curb Cut, 4-inches (CW-

20 EA

1), with Exposed Aggregate Finish

#6-8 Remove and Replace Handicap Curb Cut, 4-inches with

20 EA

Truncated Domes (VDOT standard CG-12, latest

$ 20 $ 4,000.0 $ 90 $ 18,000.0 $ 40 $ 8,000.0 $ 47.06 $ 9,412.0 $ 36 $ 7,200.0

$ 18 $ 3,600.0 $ 70 $ 14,000.0 $ 40 $ 8,000.0 $ 37.06 $ 7,412.0 $ 36 $ 7,200.0

$ 20 $ 4,000.0 $ 50 $ 10,000.0 $ 40 $ 8,000.0 $ 37.06 $ 7,412.0 $ 34 $ 6,800.0

$ 20 $ 4,000.0 $ 35 $ 7,000.0 $ 35 $ 7,000.0 $ 37.06 $ 7,412.0 $ 34 $ 6,800.0

$ 200 $ 40,000.0 $ 100 $ 20,000.0 $ 450 $ 90,000.0 $ 450 $ 90,000.0 $ 350 $ 70,000.0

$ 100 $ 1,000.0 $ 2,750.0 $ 27,500.0 $ 950 $ 9,500.0 $ 1,750.0 $ 17,500.0 $ 850 $ 8,500.0

$ 100 $ 2,000.0 $ 3,250.0 $ 65,000.0 $ 950 $ 19,000.0 $ 1,750.0 $ 35,000.0 $ 450 $ 9,000.0

$ 950 $ 19,000.0 $ 4,250.0 $ 85,000.0 $ 1,650.0 $ 33,000.0 $ 1,750.0 $ 35,000.0 $ 850 $ 17,000.0

July 14, 2020 @ 10:00 AM

PRICING SCHEDULE, PART 1: CONCRETE, REPLACEMENT

#6-9

#6-10

#6-11

#6-12

#6-13

Removal of Ramp

Remove and Replace Concrete Drive Apron (DE-1:

Fairfax County Public Facilities Manual 2001)

Remove and Replace Concrete Slab, 6-inches (Class A-3)

Remove and Replace Concrete Driveway Slab, 6-inches

(Class A-3/High-Early Mix)

Remove and Replace Concrete Driveway Slab, 8-inches (Class A-3/High-Early Mix)

SY

SY

SY

SY

SY

$ 20 $ 1,000.0 $ 27 $ 1,350.0 $ 10 $ 500 $ 27.9 $ 1,395.0 $ 99 $ 4,950.0

$ 50 $ 2,500.0 $ 150 $ 7,500.0 $ 140 $ 7,000.0 $ 119.32 $ 5,966.0 $ 108 $ 5,400.0

$ 60 $ 3,000.0 $ 90 $ 4,500.0 $ 120 $ 6,000.0 $ 102.27 $ 5,113.5 $ 108 $ 5,400.0

$ 60 $ 3,000.0 $ 90 $ 4,500.0 $ 140 $ 7,000.0 $ 102.27 $ 5,113.5 $ 108 $ 5,400.0

$ 70 $ 3,500.0 $ 100 $ 5,000.0 $ 150 $ 7,500.0 $ 136.36 $ 6,818.000000000001 $ 121.5 $ 6,075.0

7 Miscellaneous (7)

#7-1 Saw Cutting (concrete) 300 LF $ 3.5 $ 1,050.0

$ 3 $ 300

$ 2 $ 200

$ 150 $ 1,500.0

$ 20 $ 4,000.0

$ 35 $ 700

$ 20 $ 1,500.0

$ 5 $ 1,500.0

$ 0.5 $ 50.0

$ 150 $ 15,000.0

$ 500 $ 5,000.0

$ 54 $ 10,800.0

$ 40 $ 800

$ 75 $ 5,625.0

$ 3 $ 900

$ 2 $ 200

$ 65 $ 6,500.0

$ 950 $ 9,500.0

$ 45 $ 9,000.0

$ 45 $ 900

$ 45 $ 3,375.0

$ 6 $ 1,800.0

$ 2 $ 200

$ 20 $ 2,000.0

$ 50 $ 500

$ 50 $ 10,000.0

$ 35 $ 700

$ 50 $ 3,750.0

$ 0.5 $ 150.0

$ 0.25 $ 25.0

$ 850 $ 85,000.0

$ 1,000.0 $ 10,000.0

$ 175 $ 35,000.0

$ 45 $ 900

$ 50 $ 3,750.0

#7-2 Wire Mesh Reinforcement (any gauge as per project 100 SF requirement)

#7-3 Angle Iron Reinforcement, 4"x4" 100 LF

#7-4 Asphalt Repair- 5 SY or less up to 6-inches thick 10 EA compacted in lifts per site visit

#7-5 Asphalt Repair- requiring more than 5 SY less up to 6- 200 SY inches in thickness compacted in lifts per site visit

#7-6 Base Stone, 21A, Compacted in Place - for locations 20 TN needing depths greater than 4-inches

#7-7 Excavation per cubic yard- for locations where Owner 75 CY has directed additional depths below 4-inches

PRICING SCHEDULE, PART 2: CONCRETE, NEW INSTALLATIONS

ACCUBID

CONSTRUCTION

Arthur Construction

Co., Inc.

Ashburn Contracting

Corporation

Finley Asphalt & Sealing, Inc.

M & F Concrete Inc.

$ 199,950.0 $ 604,100.0 $ 556,300.0 $ 455,446.5 $ 463,644.5

# Items Quantity

UOM

Required

Unit Total

Price Cost

Unit Total

Price Cost

Unit Total

Price Cost

Unit Total

Price Cost

1 Install Concrete Walk, 4-inches, with Broom Finish (4)

#1-1 Project size: 1-25 square yards 100 SY $ 30 $ 3,000.0 $ 81 $ 8,100.0 $ 65 $ 6,500.0 $ 76.48999999999999 $ 7,648.999999999999 $ 81 $ 8,100.0

#1-2 Project size: 26-50 square yards 100 SY $ 30 $ 3,000.0 $ 72 $ 7,200.0 $ 65 $ 6,500.0 $ 66.48999999999999 $ 6,648.999999999999 $ 72 $ 7,200.0

#1-3 Project size: 51-100 square yards 100 SY $ 40 $ 4,000.0 $ 63 $ 6,300.0 $ 65 $ 6,500.0 $ 66.48999999999999 $ 6,648.999999999999 $ 63 $ 6,300.0

#1-4 Project size: 101+ square yards 150 SY $ 40 $ 6,000.0 $ 54 $ 8,100.0 $ 60 $ 9,000.0 $ 66.48999999999999 $ 9,973.5 $ 63 $ 9,450.0

2 Install Concrete Walk, 4-inches, with Exposed Aggregate Finish (4)

#2-1 Project size: 1-25 square yards 100 SY $ 13 $ 1,300.0 $ 120 $ 12,000.0 $ 65 $ 6,500.0 $ 89.06 $ 8,906.0 $ 120.27 $ 12,027.0

#2-2 Project size: 26-50 square yards 100 SY $ 13 $ 1,300.0 $ 100 $ 10,000.0 $ 65 $ 6,500.0 $ 79.06 $ 7,906.0 $ 87.3 $ 8,730.0

#2-3 Project size: 51-100 square yards 100 SY $ 13 $ 1,300.0 $ 90 $ 9,000.0 $ 65 $ 6,500.0 $ 79.06 $ 7,906.0 $ 84.15000000000001 $ 8,415.0

#2-4 Project size: 101+ square yards 150 SY $ 13 $ 1,950.0 $ 81 $ 12,150.0 $ 60 $ 9,000.0 $ 79.06 $ 11,859.0 $ 84.15000000000001 $ 12,622.5

3 Install Curb and Gutter, 4-inches (VDOT standard CG-6, latest revision) (4)

#3-1 Project size: 1-25 linear feet 100 LF $ 20 $ 2,000.0 $ 80 $ 8,000.0 $ 50 $ 5,000.0 $ 47.06 $ 4,706.0 $ 38 $ 3,800.0

#3-2 Project size: 26-50 linear feet 100 LF $ 20 $ 2,000.0 $ 65 $ 6,500.0 $ 50 $ 5,000.0 $ 37.06 $ 3,706.0 $ 36 $ 3,600.0

#3-3 Project size: 51-100 linear feet 100 LF $ 20 $ 2,000.0 $ 45 $ 4,500.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0

#3-4 Project size: 101+ linear feet 100 LF $ 20 $ 2,000.0 $ 35 $ 3,500.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0

4 Install Curb and Gutter, 6-inches (VDOT standard CG-7, latest revision) (4)

#4-1 Project size: 1-25 linear feet 100 LF $ 20 $ 2,000.0 $ 80 $ 8,000.0 $ 50 $ 5,000.0 $ 47.06 $ 4,706.0 $ 38 $ 3,800.0

#4-2 Project size: 26-50 linear feet 100 LF $ 20 $ 2,000.0 $ 65 $ 6,500.0 $ 50 $ 5,000.0 $ 37.06 $ 3,706.0 $ 36 $ 3,600.0

#4-3 Project size: 51-100 linear feet 100 LF $ 20 $ 2,000.0 $ 45 $ 4,500.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0

#4-4 Project size: 101+ linear feet 100 LF $ 20 $ 2,000.0 $ 35 $ 3,500.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0

5 Install standard 4-inch curb (VDOT standard CG-2, latest revision) (4)

#5-1 Project size: 1-25 linear feet 100 LF $ 25 $ 2,500.0 $ 75 $ 7,500.0 $ 50 $ 5,000.0 $ 47.06 $ 4,706.0 $ 38 $ 3,800.0

#5-2 Project size: 26-50 linear feet 100 LF $ 25 $ 2,500.0 $ 60 $ 6,000.0 $ 50 $ 5,000.0 $ 37.06 $ 3,706.0 $ 36 $ 3,600.0

#5-3 Project size: 51-100 linear feet 100 LF $ 14 $ 1,400.0 $ 40 $ 4,000.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0

#5-4 Project size: 101+ linear feet 100 LF $ 14 $ 1,400.0 $ 30 $ 3,000.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0

6 Install 6-inch standard curb (VDOT standard CG-3, latest revision) (13)

#6-1 Project size: 1-25 linear feet 100 LF $ 12 $ 1,200.0 $ 75 $ 7,500.0 $ 50 $ 5,000.0 $ 47.06 $ 4,706.0 $ 36 $ 3,600.0

#6-2 Project size: 26-50 linear feet 100 LF $ 12 $ 1,200.0 $ 60 $ 6,000.0 $ 50 $ 5,000.0 $ 37.06 $ 3,706.0 $ 36 $ 3,600.0

#6-3 Project size: 51-100 linear feet 100 LF $ 12 $ 1,200.0 $ 40 $ 4,000.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0

#6-4 Project size: 101+ linear feet 100 LF $ 12 $ 1,200.0 $ 30 $ 3,000.0 $ 40 $ 4,000.0 $ 37.06 $ 3,706.0 $ 34 $ 3,400.0

#6-5 Handicap Curb Cut (CW-1), with broom finish and

5 EA

associated curb work

$ 100 $ 500 $ 2,500.0 $ 12,500.0 $ 950 $ 4,750.0 $ 450 $ 2,250.0 $ 450 $ 2,250.0

#6-6 Handicap Curb Cut (CW-1), with exposed aggregate finish 5 EA $ 100 $ 500 $ 3,000.0 $ 15,000.0 $ 1,250.0 $ 6,250.0 $ 1,750.0 $ 8,750.0 $ 450 $ 2,250.0

PRICING SCHEDULE, PART 2: CONCRETE, NEW INSTALLATIONS

#6-7

#6-8

#6-9

#6-10

#6-11

#6-12

#6-13

Handicap Curb Cut, with truncated domes (VDOT standard CG-12, latest revision)

Ramp, 4-inches, with metal railing sleeves

Ramp, 4-inches, with a vertical concrete lip/curb, 2-inches high by 6-inches wide on both running edges (metal railing sleeves to be included)

Concrete drive apron, 6-inches thick (DE-1: Fairfax

COunty Public Facilities Manual 2001)

Concrete slab 6-inches thick (Class A-3)

Concrete driveway slab 6-inches thick (Class A-3/High-

Early Mix)

Concrete driveway slab 8-inches thick (Class A-3/High-

Early Mix)

EA

$ 850

$ 4,250.0

$ 4,000.0

$ 20,000.0

$ 1,650.0

$ 8,250.0

$ 1,750.0

$ 8,750.0

$ 450

$ 2,250.0

$ 25 $ 1,250.0 $ 500 $ 25,000.0 $ 60 $ 3,000.0 $ 100 $ 5,000.0 $ 99 $ 4,950.0

$ 25

$ 1,250.0

$ 500

$ 25,000.0

$ 85

$ 4,250.0

$ 125

$ 6,250.0

$ 108

$ 5,400.0

$ 20

$ 1,000.0

$ 81

$ 4,050.0

$ 90

$ 4,500.0

$ 119.32

$ 5,966.0

$ 108

$ 5,400.0

$ 50 $ 2,500.0 $ 81 $ 4,050.0 $ 90 $ 4,500.0 $ 102.27 $ 5,113.5 $ 81 $ 4,050.0

$ 60 $ 3,000.0 $ 81 $ 4,050.0 $ 90 $ 4,500.0 $ 102.27 $ 5,113.5 $ 90 $ 4,500.0

$ 80

$ 4,000.0

$ 90

$ 4,500.0

$ 95

$ 4,750.0

$ 136.36

$ 6,818.000000000001

$ 99

$ 4,950.0

7 Miscellaneous (15)

#7-1

#7-2

#7-3

#7-4

#7-5

#7-6

#7-7

#7-8

#7-9

#7-10

#7-11

#7-12

#7-13

#7-14

#7-15

Extra charge for aggregate finish

Clean fill material

Reseeding of disturbed lawn areas- to include areas damaged by equipment

Sod of disturbed lawn areas- to include areas damaged by equipment

Under drain STD.UD-3 from the Fairfax County's Public

Facilities Manual (PFM)

Footing trench excavation

Footing A-3 concrete poured in place

Retaining walls, concrete gravity, R-W-2 (VDOT specification)

Retaining walls, concrete gravity, R-W-3 (VDOT

Specification)

New concrete steps poured in place on a properly prepared sub-grade with 4 inches of compacted 21A base stone

Miscellaneous Class A-3 concrete, including formwork, poured in place

Miscellaneous reinforcing steel per VDOT Section 406

Caulking (material & installation)

Truncated domes (furnished & installed)

Handrails (DOJ 2010 ADA Standards for Accessible Design

- Section 505 compliant)

SF

CY

SF

SF

LF

CY

CY

TN

LF

EA

LF

$ 1 $ 200 $ 5 $ 1,000.0 $ 12 $ 2,400.0 $ 15 $ 3,000.0 $ 9 $ 1,800.0

$ 20 $ 400 $ 75 $ 1,500.0 $ 45 $ 900 $ 60 $ 1,200.0 $ 50 $ 1,000.0

$ 1 $ 1,000.0 $ 2.5 $ 2,500.0 $ 2.5 $ 2,500.0 $ 0.33 $ 330.0 $ 0.5 $ 500.0

$ 2

$ 400

$ 10

$ 2,000.0

$ 8

$ 1,600.0

$ 0.5600000000000001

$ 112.00000000000001

$ 3

$ 600

$ 15

$ 1,500.0

$ 35

$ 3,500.0

$ 6

$ 15 $ 1,500.0 $ 100 $ 10,000.0 $ 65 $ 6,500.0 $ 50 $ 5,000.0 $ 50 $ 5,000.0

$ 150 $ 15,000.0 $ 250 $ 25,000.0 $ 450 $ 45,000.0 $ 250 $ 25,000.0 $ 300 $ 30,000.0

$ 150 $ 15,000.0 $ 850 $ 85,000.0 $ 850 $ 85,000.0 $ 500 $ 50,000.0 $ 600 $ 60,000.0

$ 150

$ 15,000.0

$ 950

$ 95,000.0

$ 850

$ 85,000.0

$ 50,000.0

$ 60,000.0

$ 250

$ 150

$ 15,000.0

$ 450

$ 45,000.0

$ 350

$ 35,000.0

$ 300

$ 30,000.0

$ 250

$ 650

$ 65,000.0

$ 60,000.0

$ 100

$ 100

$ 1,200.0

$ 1,200.0

$ 900

$ 900

$ 2.5 $ 250.0 $ 20 $ 2,000.0 $ 4.5 $ 450.0 $ 10 $ 1,000.0 $ 8 $ 800

$ 25 $ 2,500.0 $ 250 $ 25,000.0 $ 35 $ 3,500.0 $ 45 $ 4,500.0 $ 120 $ 12,000.0

$ 110 $ 22,000.0 $ 200 $ 40,000.0 $ 185 $ 37,000.0 $ 125 $ 25,000.0 $ 150 $ 30,000.0

PRICING SCHEDULE, PART 3: LABOR RATES

ACCUBID

CONSTRUCTION

Arthur Construction

Co., Inc.

Ashburn Contracting

Corporation

Finley Asphalt &

Sealing, Inc.

M & F Concrete Inc.

$ 115 $ 450 $ 600 $ 375 $ 527.0 Quantity

# Items Required

UOM

Unit Total

Price Cost

Unit Total

Price Cost

Unit Total

Price Cost

Unit Total

Price Cost

0 No Basket (5)

#0-1 Labor Rate, Regular Hours, Brick Pavers Installer 1 HR $ 20 $ 20 $ 50 $ 50 $ 75 $ 75 $ 75 $ 75 $ 45 $ 45

#0-2 Labor Rate, Regular Hours, Footing Framework 1 HR $ 20 $ 20 $ 50 $ 50 $ 75 $ 75 $ 50 $ 50 $ 45 $ 45

#0-3 Labor Rate, Regular Hours, Fabrication and Installation 1 HR $ 25 $ 25 $ 150 $ 150 $ 150 $ 150 $ 50 $ 50 $ 218.5 $ 218.5

#0-4 Labor Rate, Regular Hours, Metal Work Fabrication 1 HR $ 25 $ 25 $ 100 $ 100 $ 150 $ 150 $ 100 $ 100 $ 126 $ 126

#0-5 Labor Rate, Regular Hours, Metal Work Installation 1 HR $ 25 $ 25 $ 100 $ 100 $ 150 $ 150 $ 100 $ 100 $ 92.5 $ 92.5

Addendum 3
Bid Tab.doc.doc
2025-08-22T11:18:55-0700
Digitally verifiable PDF exported from www.docusign.com