9-2-CS27031--Stage I Prequalification, Documents Checklist.pdf
PDF 302 KB Posted
- Solicitation number
- CS27031
- Issued by
- Utah
About this file
This is a Stage I Prequalification Documents Checklist issued by the State of Utah Division of Facilities Construction and Management (DFCM) for an open-ended prequalification process for contractors in multiple trades including Electrical, Fire Protection Systems, General, Hazmat, HVAC/Mechanical, Paving, Plumbing, Roofing, and Site/Civil. The checklist outlines mandatory documentation requirements that non-Hazmat contractors must submit as part of their Statement of Qualifications (SOQ) proposal to be deemed responsive and eligible for prequalification. Required documents for non-Hazmat contractors include the DFCM Contractor Information Form, DFCM Contractor Statement of Qualifications and Experience Form (submitted for each trade applied for), a Letter of Bondability from the contractor's surety with Power of Attorney, an active State of Utah DOPL Contractor License compliant with R156-55a, a DFCM Termination or Debarment Certification Form, and a DFCM Performance References Form. All documents marked with an asterisk must be submitted on provided DFCM forms accessible through the U3P procurement posting.
Hazmat contractors are subject to additional documentation requirements beyond those required of non-Hazmat contractors, including specialized forms, Pollution Liability Insurance, Utah Lead-Based Paint Renovation Firm Certification Card, Utah Asbestos Company Certification Card issued by the Division of Air Quality, Utah Asbestos Program Individual Certifications for Supervisors or Workers, Utah Asbestos Program Individual Certification for Project Designers, and Lead Certified Worker Certificates in the form of RRP, Supervisor, or Worker Training per 40 CFR Part 745.225. This prequalification process covers DFCM capital improvement projects with construction budgets under $3,500,000 and public school construction projects with budgets exceeding $500,000 throughout the State of Utah, which may be state-funded or non-state-funded. The checklist is provided for contractor reference and is not itself required to be submitted with the SOQ proposal.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DFCM Contractor Stage I Prequalification Documents Checklist, 8.20.2026
Contractor Prequalification Documents Checklist This checklist is for contractor use only and is not required to be submitted with the contractor’s SOQ proposal.
The documents listed below are required proposal documents every non-Hazmat Contractor must submit. If any single document is not submitted as part of the Contractor’s SOQ proposal, the Contractor will be deemed non-responsive and ineligible for prequalification at this time.
- ☐ DFCM Contractor Information Form*
- ☐ DFCM Contractor Statement of Qualifications and Experience Form* This form is required for EACH trade prequalification is being applied for. There is a checkbox at the top of the form allowing you to indicate which trade that SOQ form is for.
- ☐ Letter of Bondability from the Contractor’s Surety with a Power of Attorney A letter of bondability or prequalification letter is a document from a surety company showing that a contractor has the ability to bond for a project. It lists their approved single-project and aggregate bonding limits, but it does not guarantee a bond for a specific job. If you have questions about this letter, please reach out to your surety.
- ☐ Active State of Utah DOPL Contractor License The Contractor’s license must be compliant with the licensing requirements per R156-55a. Utah Construction Trades Licensing Act Rule. The Contractor must hold the required active State of Utah DOPL license for the trade(s) in which they are seeking prequalification. Expired licenses will be considered non-responsive.
- ☐ DFCM Termination or Debarment Certification Form*
- ☐ DFCM Performance References Form* Documents above listed with an asterisk ‘*’ must be submitted on the provided DFCM forms, which can be accessed in the U3P procurement posting for this solicitation under ‘Supporting Documentation’.
Required Documents Checklist for Hazmat Contractors Only:
The documents listed below are required proposal documents every Hazmat Contractor must submit. If any single document is not submitted as part of the Contractor’s SOQ proposal, the Contractor will be deemed non-responsive and ineligible for prequalification at this time.
- ☐ DFCM Hazmat Contractor Information Form*
- ☐ DFCM Hazmat Contractor Statement of Qualifications and Experience Form*
- ☐ DFCM Termination or Debarment Certification Form*
- ☐ DFCM Performance References Form*
- ☐ Pollution Liability Insurance
- ☐ Utah Lead-Based Paint Renovation Firm Certification Card
- ☐ Utah Asbestos Company Certification Card (Issued by the Division of Air Quality)
- ☐ Utah Asbestos Program Individual Certifications Supervisor or Worker Cards (Per the Utah Division of Air Quality)
- ☐ Utah Asbestos Program Individual Certification for Project Designer (Per the Utah Division of Air Quality)
- ☐ Lead Certified Worker Certificates which can be in the form of RRP, Supervisor or Worker Training (Per 40 CFR Part 745.225) Documents above listed with an asterisk ‘*’ must be submitted on the provided DFCM forms, which can be accessed in the U3P procurement posting for this solicitation under ‘Supporting Documentation’.
https://adminrules.utah.gov/public/rule/R156-55a/Current%20Rules?searchText=undefined https://adminrules.utah.gov/public/rule/R156-55a/Current%20Rules?searchText=undefined
| DFCM Contractor Information Form: Off |
| DFCM Contractor Statement of Qualifications and Experience Form: Off |
| Letter of Bondability from the Contractors Surety with a Power of Attorney: Off |
| Active State of Utah DOPL Contractor License: Off |
| DFCM Termination or Debarment Certification Form: Off |
| DFCM Performance References Form: Off |
| DFCM Hazmat Contractor Information Form: Off |
| DFCM Hazmat Contractor Statement of Qualifications and Experience Form: Off |
| DFCM Termination or Debarment Certification Form_2: Off |
| DFCM Performance References Form_2: Off |
| Pollution Liability Insurance: Off |
| Utah LeadBased Paint Renovation Firm Certification Card: Off |
| Utah Asbestos Company Certification Card Issued by the Division of Air Quality: Off |
| Utah Asbestos Program Individual Certifications Supervisor or Worker Cards Per the Utah Division of Air: Off |
| Utah Asbestos Program Individual Certification for Project Designer Per the Utah Division of Air Quality: Off |
| Lead Certified Worker Certificates which can be in the form of RRP Supervisor or Worker Training Per 40: Off |
File details come from the government source that posted it. Updated .