Summary
This Request for Statement of Qualifications (RFSQ) is issued by the State of Utah Division of Facilities Construction and Management (DFCM) to prequalify new contractors for capital improvement projects and public school construction work. The solicitation seeks prequalified contractors in nine specialized trades: Electrical, Fire Protection Systems, General, Hazmat, HVAC/Mechanical, Paving, Plumbing, Roofing, and Site/Civil. The prequalification applies to DFCM-managed projects with construction budgets under $3,500,000 and public school construction projects exceeding $500,000, located throughout Utah. This Stage I prequalification does not replace the Stage II competitive procurement requirement but establishes a registry of qualified contractors eligible to bid on future projects. A mandatory meeting is scheduled for December 3, 2026, at 1:00 PM (in-person or virtual attendance required), with questions due by December 9, 2026, at 3:00 PM. The Statement of Qualifications proposal deadline is December 17, 2026, at 12:00 PM via the U3P portal, and prequalification announcements will be issued by January 15, 2027, at 5:00 PM. Prequalified contractors will receive an effective date of February 1, 2027, valid for 18 months, after which recertification is required.
Contractors must meet specific pass-or-fail criteria and achieve an overall minimum score of 80 points (with a minimum of 20 points for past performance references) to qualify. Evaluation is based on two primary criteria: Statement of Qualifications and Experience (80 points) and Past Performance Ratings (20 points). Performance ratings must average 4.0 or higher on a 5-point scale. Contractors must submit required documentation including a DFCM Contractor Information Form, Statement of Qualifications and Experience Form (one per trade), letter of bondability from a surety, active State of Utah DOPL contractor license, DFCM Termination or Debarment Certification Form, and DFCM Performance References Form. For contractors without three DFCM performance ratings from completed projects in the past five years, a minimum of five non-DFCM references must be provided. No pricing information or contract amounts are included in this solicitation, as this is a prequalification process only. The solicitation is open-ended, allowing contractors to apply during this initial window to enter the prequalified contractor registry for future competitive procurements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Division of Facilities Construction and Management Taylorsville State Office Building 4315 South 2700 West, 3rd Floor
Taylorsville, Utah 84129 dfcm.utah.gov | 801.957.7270
Request for Statement of Qualifications Open-Ended Stage I Prequalification of Contractors for DFCM-Managed and Public School Construction Projects
November 12, 2026
U3P Reference #CS27031
DFCM Request for Statement of Qualifications for New Prequalified Contractors, 11.9.2026 2
Solicitation Overview This Open-Ended Stage 1 Request for Statement of Qualifications for Prequalification (RFSQ) is issued for new contractors interested in bidding on Stage II DFCM-managed projects, as well as performing work for any public school construction projects in Utah.
During the 2026 General Session, the State of Utah Division of Facilities Construction and Management (DFCM) was designated as the sole state authority for the oversight of public school construction projects, replacing the State Board of Education, effective July 1, 2026 for all construction beginning January 1, 2027. Utah Code 63A-5b Part 12: Public School Construction Oversight (63A-5b Part 12) is the governing statute. This Request for Statement of Qualifications solicitation is issued in compliance with this statute.
The Division of Facility Construction and Management (DFCM) public school construction oversight authority includes a requirement for DFCM to establish and maintain a registry of qualified contractors, which are referred to as prequalified contractors moving forward, to participate in competitive procurements for public school construction projects with budgets exceeding $500,000. All public school projects exceeding $500,000 must be awarded to a DFCM Prequalified Contractor unless waived by the DFCM Director.
The Stage I prequalification of Contractors does not replace or eliminate the Stage II competitive procurement requirement under the Utah Procurement Code - Title 63G, Chapter 6a. Rather, it creates a pool of contractors which have been by approved by DFCM to participate in public school construction procurements.
This prequalification will result in a DFCM maintained list of prequalified electrical, fire protection system, general, Hazmat, HVAC/mechanical, plumbing, paving, and roofing Contractors approved for participation in DFCM-managed project procurements and public school construction procurements. This prequalification of Contractors is based on the minimum qualification standards provided in the Selection Criteria section of this solicitation.
Prequalified Contractors are limited to participating in Stage II procurements specific to the trade under which they are prequalified. For example, a prequalified roofing Contractor is not eligible to participate in a Stage II procurement for prequalified general Contractor services. They are only eligible to participate in competitive procurements for roofing Construction services. All Contractors are able to participate in procurements that are not advertised as ‘Stage II Prequalified’.
Prequalification is not for subcontractors of original Contractors. Original Contractors hold contracts directly with DFCM or a school district. Only original Contractors are required to be prequalified by DFCM. Subcontractors working for original Contractors who are not contracted directly with a school district are not required to be prequalified by DFCM.
Contact Information:
- All questions specific to this solicitation must be submitted via the U3P portal under this solicitation’s U3P reference number.
- General questions regarding prequalification can be sent to dfcm_vbs@utah.gov.
- Technical questions related to U3P must be directed to u3padmin@utah.gov.
Please make note of the Solicitation Schedule deadlines below. These dates must be met by Contractors seeking prequalification.
Solicitation Schedule Event Date Time Location
Solicitation Posting Thursday, November 12, 2026 3:00 PM U3P Mandatory Meeting Thursday, December 3, 2026 1:00 PM In Person Attendance: Taylorsville State Office Building
3rd Floor – Bonneville Conference Rm.
4315 South 2700 West - Taylorsville, Utah 84129 Virtual Attendance: https://meet.google.com/meet/rwz-ozvi-bvy
Questions Deadline Wednesday, December 9, 2026 3:00 PM U3P Addendum Issued Friday, December 11, 2026 3:00 PM U3P SOQ Proposal Deadline Thursday, December 17, 2026 12:00 NOON U3P Prequalification Announcement Friday, January 15, 2027 5:00 PM U3P https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:dfcm_vbs@utah.gov https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:u3padmin@utah.gov https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities
DFCM Request for Statement of Qualifications for New Prequalified Contractors, 11.9.2026 3
Prequalification Process
1. Solicitation Documents and Forms The solicitation documents consist of all documents referenced within this solicitation and all documents included in the ‘Supporting Documentation’ section of the Utah Public Procurement Place (U3P) website procurement posting for this solicitation.
2. Solicitation Schedule The Solicitation Schedule includes important deadlines that must be met by the Contractor in order to become prequalified, in addition to the date on which the addendum and prequalification announcement will be issued.
3. Mandatory Meeting A mandatory meeting will be held on the date and time, and at the location specified on the Solicitation Schedule.
All Contractors wishing prequalify must attend this meeting in its entirety and sign in to show proof of attendance.
Contractors arriving late or who are not in attendance at this meeting are ineligible for prequalification under this solicitation. The conference room doors will be closed to indicate the commencement of the meeting and no additional attendees will be admitted.
During the meeting, a presentation will be made to review the prequalification process, requirements, and other information in the solicitation. Contractors are encouraged to come prepared with questions and requests for clarification about the prequalification process and requirements.
4. Requests for Information, Questions and Addendum Following the mandatory meeting, all questions regarding the prequalification process and requirements must be submitted via U3P no later than the date and time listed on the Solicitation Schedule.
An addendum in response to all questions will be posted on the U3P website no later than the date and time specified on the Solicitation Schedule.
All addenda issued shall become part of the solicitation, and any changes or additional requirements shall be incorporated into the Contractor’s proposal documents. Contractors are responsible for obtaining all information contained in the addenda prior to submitting their proposal documents.
5. Statement of Qualifications (SOQ) Proposals Deadline Contractors are solely responsible for ensuring that submission of their SOQ proposal in U3P is complete no later than the date and time specified on the Solicitation Schedule.
Please allow AMPLE time to submit your SOQ proposal. U3P WILL NOT allow Contractors to submit documents after the date and time specified on the Solicitation Schedule. Contractors who miss this deadline or who have not submitted all requirements will not be prequalified under this solicitation. No exceptions can be made.
6. Contractors Seeking Prequalification for Multiple Specialized Trades Contractors seeking prequalification must indicate all construction trades for which they are seeking prequalification on the Contractor Information Form which is required as part of their SOQ proposal. The prequalified trades are as follows:
- Electrical Contractor
- General Contractor
- Fire Protection Systems Contractor
- Hazmat Contractor
- HVAC/Mechanical Contractor
- Paving Contractor
- Plumbing Contractor
- Roofing Contractor
- Site/Civil Contractor
7. What Documents Make Up the Statement of Qualifications (SOQ) “Proposal”?
Each Contractor seeking prequalification is required to submit a Statement of Qualifications (SOQ) “proposal”. The SOQ proposal documents required for prequalification under this solicitation are provided on the Contractor Prequalification https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities
DFCM Request for Statement of Qualifications for New Prequalified Contractors, 11.9.2026 4
SOQ Proposal Documents Checklist page of this solicitation. SOQ proposals missing one or more of required proposal documents may be disqualified from prequalification at this time.
8. The Selection Committee In addition to the objective criteria by which Contractors will be evaluated, the prequalification process utilizes a Selection Committee made up of three or more qualified individuals to perform a subjective evaluation of each contractor’s proposal documents, qualifications, and experience.
The Selection Committee will be composed of qualified individuals from DFCM, other State entities, or third-party individuals experienced in construction. The Selection Committee is responsible for evaluating and scoring proposal documents.
To maintain the fair and equitable treatment of all Contractors, no Contractor shall unduly contact or offer gifts or gratuities to DFCM employees, employees of other State entities, Selection Committee members, Local Education Agency (LEA) employees, or any others involved with this solicitation to influence the selection process or in a manner that gives the appearance of influencing the selection process. This prohibition applies before the solicitation is issued and extends through the prequalification process. Failure to comply with this requirement may result in a disqualification. Contractors should be aware that Selection Committee members will be required to certify that they have not been contacted by any Contractors in an effort to influence the selection process.
9. Prequalified Status Each Contractor prequalified under this Request for Statement of Qualifications will have a prequalified status effective date of February 1, 2027 valid for a period of 18 months. All contractors must recertify prior to their expiration date or their prequalification status will be revoked.
10. Prequalification Renewal Requirements Contractor Prequalification Renewal Documents can be found on the DFCM website – Prequalified Contractors page.
Renewal documents will be accepted no sooner than 60 days prior to the Contractor’s expiration date. If renewal documents are not received prior to the Contractor’s expiration date, the Contractor will be removed from the prequalified list and required to reapply for prequalification under a future Request for Statement of Qualification opportunity to regain their prequalified status.
Contractors are required to independently monitor their prequalified status and submit their renewal documents to DFCM via dfcm_vbs@utah.gov prior to their expiration date. DFCM is not responsible for notifying Contractors of their pending expiration or change in prequalified status.
11. Prequalification and Competitive Procurement Participation Only Contractors who have successfully prequalified through the Stage I Request for Statement of Qualifications process and who are listed on the respective prequalified contractor list determined by the services identified in the solicitation on or before the date the project is solicited will be eligible to participate in the procurement. Contractors not listed on the DFCM prequalified contractor list on or before the solicitation date for the project are not eligible to participate.
12. Licensure Contractors shall comply with all laws, including employment insurance, and licensing laws and requirements of the State of Utah and the Federal Government, as applicable, whether or not they are specifically listed in the solicitation documents.
13. DFCM Reservation of Rights The Division of Facilities Construction and Management reserves the right to cancel this solicitation, reject any or all SOQ proposal, or to waive any formality or technicality in the best interest of the State.
https://dfcm.utah.gov/construction-management/prequalified-contractor/ mailto:dfcm_vbs@utah.gov
DFCM Request for Statement of Qualifications for New Prequalified Contractors, 11.9.2026 5
Selection Criteria The following Selection Criteria will be used in evaluating each Contractor’s SOQ proposal. Each criterion is assigned a point value and weighed accordingly. The selection committee will perform a comprehensive evaluation of each SOQ proposal.
DFCM will prequalify all responsive and responsible Contractors receiving an overall minimum score of 80 points, who have received a minimum of 20 Past Performance References points, and who have met all requirements listed within this solicitation. Contractors failing to meet these requirements will not be prequalified at this time.
Selection Criteria Points Summary Statement of Qualifications and Experience 80
Past Performance References 20 Total Possible Points 100
A. Pass or Fail Criteria The following are prequalification requirements. If the Contractor fails to meet one or more requirements, the Contractor may be automatically disqualified from prequalification at this time.
The Contractor must attend and sign the roster at the Mandatory Meeting.
The Contractor must submit all required SOQ proposal documents to U3P by the due date established in the Solicitation Schedule. Please reference the Contractor Prequalification SOQ Proposal Documents Checklist page of this solicitation for a detailed list of the required documents.
Performance ratings collected for the Contractor must average a 4 or higher out of a possible 5 or the Contractor will not meet the minimum performance rating requirement for prequalification. Performance References must be submitted on the DFCM Performance References Form. Additional information about how reference are collected are included under Section C, below.
The Contractor is required to sign and submit the DFCM Termination or Debarment Certification Form provided. Contractors must certify that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from soliciting work by any governmental department or agency, including Federal agencies. The Contractor must also certify that neither it nor its principals have been terminated during the performance of a contract or withdrew from a contract to avoid termination. If the Contractor cannot certify these statements, they are required to fill out the section of the form that requests a detailed written explanation of the circumstances. The circumstances will be reviewed by DFCM to determine if the Contractor will be consideration for prequalification.
B. Statement of Qualifications and Experience | 80 Points The evaluation committee will review and score the information provided in each Contractor’s Statement of Qualifications and Experience Form. This form provides DFCM with information regarding the experience and work history of the Contractor, qualifications of their management staff and key individuals, and other information that tells DFCM why the Contractor should be prequalified. Contractors must receive a minimum of 60 points out of a possible 75 points for the Statement of Qualifications and Experience portion of the evaluation to achieve prequalification.
Contractors requesting prequalification under more than one trade are required to submit a Statement of Qualifications and Experience Form for each trade. The information provided on each form should be specific to the Contractor’s qualifications and experience in that trade. Each Statement of Qualifications and Experience Form will be independently evaluated by the Selection Committee. Contractors should not presume achieving prequalification for one trade will prequalify them for other trades. Each Statement of Qualifications and Experience form submitted will be evaluated independently of each other.
DFCM Request for Statement of Qualifications for New Prequalified Contractors, 11.9.2026 6
C. Past Performance Rating | 20 Points Contractors requesting prequalification under more than one trade are required to submit a minimum of three references for each trade. Multiple forms may be used to meet this requirement.
DFCM Performance Ratings: DFCM rates the performance of each Contractor on a scale of 1 (low) to 5 (high). All ratings for completed DFCM projects over the past five years will be used in the selection scoring matrix. It is the Contractor’s responsibility to confirm and review for accuracy their DFCM performance ratings prior to the proposal deadline. Changes made to DFCM ratings resulting from discrepancies found after the proposal deadline will not be considered for this prequalification.
DFCM performance ratings are available for review upon request by contacting the DFCM VBS Coordinator via email at dfcm_vbs@utah.gov.
Non-DFCM Performance Ratings: If a Contractor does not have a minimum of three DFCM performance ratings for completed projects over the past five years, they are required to submit the DFCM Performance References Form for completed non-DFCM projects completed within the past five years for work in the trade they are seeking prequalification. These references will be used one of two ways: to supplement the existing DFCM performance ratings the Contractor has for completed DFCM projects, or to fulfill the minimum three ratings requirement. If the Contractor does not have any DFCM performance ratings, all references will be obtained by the references the Contractor provides.
Complete and accurate information for non-DFCM references must be provided on the DFCM Performance References Form. The form requires a minimum of five references. References provided for non-DFCM projects will be contacted at random and asked a series of predetermined questions. The reference will be asked to rate the Contractor on a scale of 1 (low) to 5 (high) for each question. Contractors must average a minimum average rating of 4 out of a possible 5 or the Contractor will not meet the minimum performance rating requirement for prequalification. The three highest performance ratings will be averaged and used in the selection scoring matrix.
Contractors that fail to receive a minimum of three performance ratings may be disqualified from the selection process. DFCM will only contact references until a collective total of three performance ratings for non-DFCM and DFCM projects are obtained.
Incomplete reference information or the inability for DFCM to acquire a rating from a Contractor provided reference may result in the Contractor being disqualified from the selection process.
mailto:dfcm_vbs@utah.gov
DFCM Request for Statement of Qualifications for New Prequalified Contractors, 11.9.2026 7
Contractor Prequalification SOQ Proposal Documents Checklist
The documents listed below are required proposal documents every Contractor must submit. If any single document is not submitted as part of the Contractor’s SOQ proposal, the Contractor may be deemed non-responsive and ineligible for prequalification at this time.
- ☐ DFCM Contractor Information Form*
- ☐ DFCM Contractor Statement of Qualifications and Experience Form* This form is required for EACH trade prequalification is being applied for. There is a checkbox at the top of the form allowing you to indicate which trade that SOQ form is for.
- ☐ Letter of Bondability from the Contractor’s Surety with a Power of Attorney A letter of bondability or prequalification letter is a document from a surety company showing that a contractor has the ability to bond for a project. It lists their approved single-project and aggregate bonding limits, but it does not guarantee a bond for a specific job. If you have questions about this letter, please reach out to your surety.
- ☐ Active State of Utah DOPL Contractor License The Contractor’s license must be compliant with the licensing requirements per R156-55a. Utah Construction Trades Licensing Act Rule. The Contractor must hold the required active State of Utah DOPL license for the trade(s) in which they are seeking prequalification. Expired licenses will be considered non-responsive.
- ☐ DFCM Termination or Debarment Certification Form*
- ☐ DFCM Performance References Form* Documents above listed with an asterisk ‘*’ must be submitted on the provided DFCM forms, which can be accessed in the U3P procurement posting for this solicitation under ‘Supporting Documentation’.
https://adminrules.utah.gov/public/rule/R156-55a/Current%20Rules?searchText=undefined https://adminrules.utah.gov/public/rule/R156-55a/Current%20Rules?searchText=undefined
6. Contractors Seeking Prequalification for Multiple Specialized Trades
File details come from the government source that posted it. Updated .