This is a construction plan document for the Marion County Board of Commissioners M.S.T.U. Assessment Department involving the paving of Belleview Heights Estates Unit 8 (SE 44th Avenue) in Marion County, Florida. The project encompasses 0.11 miles of new roadway construction totaling 581 linear feet of paving on SE 44th Avenue. The scope of work includes clearing and grubbing (0.63 acres), shoulder stabilization with LBR 25 material (232 square yards), subgrade stabilization with LBR 40 material (1,371 square yards), a 6-inch limerock base (1,371 square yards), bituminous prime coat (1,371 square yards), and 1.25 inches of Type SP 9.5 asphalt concrete pavement (1,371 square yards). Additional work includes sodding (1,639 square yards), 6-inch thick concrete driveways with wire reinforcement (250 square yards), silt fence installation (1,000 linear feet), excavation (149 cubic yards), embankment (265 cubic yards), thermoplastic pavement markings including double yellow stripes (100 linear feet) and stop bars (15 linear feet), and miscellaneous work such as mobilization/demobilization, maintenance of traffic, as-built survey, and plan layout.
The construction plans, prepared by NV5 and signed and sealed by Matthew Dalton Cantrell, P.E. (Florida PE No. 97282), establish specific standards requiring all work to comply with Marion County Land Development Code and F.D.O.T. specifications. The contractor is responsible for utility coordination, erosion and sediment control, maintenance of stormwater drainage patterns, traffic control, survey monument replacement, and restoration of all disturbed areas with equivalent landscaping. The project location is situated in Section 14, Township 17 South, Range 22 East, with construction beginning at station 0+10.00 and ending at station 5+91.01, with elevations ranging from approximately 64.34 to 67.05 feet (NAVD88). No contract award date, bid deadline, or funding source information is provided in these construction documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10-Scope of Work.doc | DOC document | |
| 3-Similar Work Detail Form.pdf | ||
| 5-Special Provisions.doc | DOC document | |
| 6-Disclosure of Subcontractors and Suppliers.pdf | ||
| 4-Vendor Information Form.pdf | ||
| 2-Bidding Specification Manual.docx | DOCX document | |
| 1-ITB General Terms and Conditions.pdf | ||
| 7-Bid Bond Form.pdf | ||
| 8-Conflict of Interest Statement Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NTS
MOUNIR BOUYOUNES, P.E.
ANGEL STOWE
ASSESSMENT MAP SEPARATELY SUBMITTED TO THE
MARION COUNTY M.S.T.U. DEPARTMENT.
PROJECT LOCATION
CHIPLEY
TALLAHASSEE
JACKSONVILLE
ST AUGUSTINE
GAINESVILLE
OCALA
DELAND 4
NEW PORT RICHEY
TAMPA
LAKELAND
MELBOURNE -
COCOA
ORLANDO
BARTOWST PETERSBURG
FT PIERCE
FT MYERS
FT LAUDERDALE
MIAMI
NAPLES
KEY WEST
FORT WALTON
BEACH
PENSACOLA
WEST PALM
BEACH
FLORIDA
TURNPIKE
PANAMA
CITY
LAKE
CITY
DAYTONA
BEACH
SARASOTA -
BRADENTON
BEE LINE
EXPRESSWAY
DISTRICT 1 - CRAIG CURRY
DISTRICT 2 - KATHY BRYANT
DISTRICT 3 - MATT MCCLAIN, VICE CHAIRMAN
DISTRICT 4 - CARL ZALAK, III, CHAIRMAN
DISTRICT 5 - MICHELLE STONE
COVER SHEET
12/14/22 FINAL PLAN SET
SHEET NUMBER DESCRIPTION
01 COVER SHEET
DESCRIPTIONDATE DATE
SUBMITTALS
SHEET
NO.
REVISIONS MARION COUNTY BOARD OF COMMISSIONERS
M.S.T.U. ASSESSMENT DEPARTMENT
BELLEVIEW HEIGHTS ESTATES UNIT 8
PAVING ASSESSMENT MAP
DESCRIPTION
C. WOOD
M. CANTRELL, P.E.
M. CANTRELL, P.E.
11801 Research Drive Alachua, Florida 32615
(352)331-1976 www.nv5.com
CHAD WICKER
02 GENERAL NOTES
03 CONSTRUCTION DETAILS AND SEDIMENTATION CONTROL
04 MASTER VIEW
05 ROADWAY PLAN
NV5
11801 RESEARCH DRIVE
ALACHUA, FL 32615
(352)331-1976
ELECTRIC:
SUMTER ELECTRIC COOPERATIVE (SECO) (352) 770-7326
TELECOM/CABLE:
CHARTER COMMUNICATIONS (352) 527-2189
CENTURY LINK (850) 815-3144
1-800-432-4770
BEFORE YOU DIG !
CALL SUNSHINE STATE ONE CALL OF FLORIDA
AT LEAST TWO FULL BUSINESS DAYS BEFORE
DIGGING OR DISTURBING EARTH
Know what'sbelow.
before you dig.Call
R
LINEAR FEET
ROADWAY
NET LENGTH OF PROJECT
EXCEPTIONS
BRIDGES
GROSS LENGTH OF PROJECT
MILES
581 0.11
581 0.11
581 0.11
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
PROJECT SITE
AutoCAD SHX Text MARION COUNTY, FLORIDA BOARD OF COUNTY COMMISSIONERS M.S.T.U. / ASSESSMENT DEPARTMENT
AutoCAD SHX Text BELLEVIEW HEIGHTS ESTATES UNIT 8 SE 44TH AVENUE PAVING ASSESSMENT PROJECT CONSTRUCTION PLANS
AutoCAD SHX Text
FY 2025/2026 SECTION 14, TOWNSHIP 17 SOUTH, RANGE 22 EAST
AutoCAD SHX Text
%%UCOUNTY COMMISSIONERS
AutoCAD SHX Text
%%UCOUNTY ADMINISTRATOR
AutoCAD SHX Text
%%UDIRECTOR
AutoCAD SHX Text
%%UPROJECTS COORDINATOR
AutoCAD SHX Text
SHEET INDEX
AutoCAD SHX Text Tech: matthewc Plot Date: Jan 20,2026 2:20pm Filename: N:\2025\25-0557\Departments\04_Engineering\02_DWGs\25055700000\Roadway\KEYSRD01.dwg
AutoCAD SHX Text
QUALITY CONTROL:
AutoCAD SHX Text
TECHNICIAN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text FL PE No. 97282
AutoCAD SHX Text
MATTHEW DALTON CANTRELL, P.E.
AutoCAD SHX Text 25-0557
AutoCAD SHX Text
%%UPROJECT CONSULTANT
AutoCAD SHX Text
%%UUTILITY PROVIDERS
AutoCAD SHX Text
LENGTH OF PROJECT
Matthew Cantrell Snapshot
Matthew Cantrell Text Box This item has been digitally signed and sealed by Matthew Dalton Cantrell, P.E. on the date adjacent to the seal.
Signatures must be verified on any electronic copies.
DESCRIPTIONDATE DATE
SUBMITTALS
SHEET
NO.
REVISIONS MARION COUNTY BOARD OF COMMISSIONERS
M.S.T.U. ASSESSMENT DEPARTMENT
BELLEVIEW HEIGHTS ESTATES UNIT 8
PAVING CONSTRUCTION
DESCRIPTION
C. WOOD
M. CANTRELL, P.E.
M. CANTRELL, P.E.
11801 Research Drive Alachua, Florida 32615
(352)331-1976 www.nv5.com
1. ALL CONSTRUCTION COVERED IN THESE PLANS SHALL COMPLY WITH THE MATERIAL REQUIREMENTS AND QUALITY CONTROL STANDARDS CONTAINED IN THE MARION COUNTY LAND DEVELOPMENT CODE. IN CASE OF CONFLICT BETWEEN THE CODES AND / OR THE F.D.O.T. STANDARD SPECIFICATION, THE STRICTEST SHALL APPLY AS DETERMINED BY MARION COUNTY.
2. ADDITIONAL TEST BORINGS AND EXPLORATORY INVESTIGATIONS MAY BE MADE BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
3. NO CHANGES TO THE WORK AS SHOWN ON THESE PLANS SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE PROJECT ENGINEER AND COUNTY. CONTRACTOR SHALL NOT SCALE DRAWINGS. CONTRACTOR SHALL CHECK ACTUAL SITE CONDITIONS PRIOR TO CONSTRUCTION. ANY NEED FOR CLARIFICATION OF THE PROPOSED IMPROVEMENTS OR FOR RESOLUTION OF DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE PROJECT ENGINEER AND COUNTY.
4. UTILITIES SHOWN HEREON HAVE BEEN LOCATED BASED ON ABOVE GROUND EXISTENCE OF STRUCTURES. ACTUAL LOCATION OF UNDERGROUND UTILITIES IS NOT CONFIRMED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL EXISTING UTILITIES SHOWN OR NOT SHOWN THROUGH DIRECT CONTACT WITH THE APPROPRIATE UTILITY COMPANIES. SUCH CONTACT SHALL BE MAINTAINED THROUGHOUT THE LIFE OF THE PROJECT. ANY UTILITIES OBSTRUCTIVE TO THE CONTRACTOR'S OPERATION ARE TO BE RELOCATED BY THE APPROPRIATE UTILITY COMPANY IN ACCORDANCE WITH THE MARION COUNTY LAND DEVELOPMENT CODE PRIOR TO OR IN CONJUNCTION WITH THE PROJECT. MARION COUNTY SHALL NOT BE HELD RESPONSIBLE FOR ANY DAMAGES TO OR DELAYS CAUSED BY THE LOCATION OR DISPOSITION OF ANY UTILITIES.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO UTILITIES, STRUCTURES, AND PROPERTY ON ADJACENT TO THE PROJECT AS A RESULT OF OR CAUSED BY CONSTRUCTION
ACTIVITIES.
6. THE CONTRACTOR IS HEREBY REQUIRED TO IMPLEMENT JOB SAFETY AT ALL TIMES THROUGHOUT THE DURATION OF THE PROJECT. JOB SAFETY PRACTICES SHALL BE IN ACCORDANCE WITH
OSHA AND ANY OTHER LOCAL, STATE, AND FEDERAL REGULATIONS.
7. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BECOME FAMILIAR WITH THE OSHA EXCAVATION STANDARDS AND TO ABIDE BY THEM AS COVERED UNDER THE FLORIDA TRENCH
SAFETY ACT (LAWS OF FLORIDA 90-99) EFFECTIVE OCTOBER 1, 1990.
8. ALL EXISTING STORM WATER DRAINAGE PATTERNS AND CHANNELS OUTSIDE THE CONSTRUCTION AREAS SHOWN ON THESE PLANS ARE TO BE MAINTAINED. THE CONTRACTOR SHALL NOTIFY THE COUNTY IF THE WORK APPEARS TO INTERRUPT AN EXISTING STORMWATER DRAINAGE PATTERN. THE CONTRACTOR SHALL MAINTAIN A CLEAR PATH FOR ALL SURFACE WATER DRAINAGE STRUCTURES AND DITCHES DURING ALL PHASES OF CONSTRUCTION SUCH THAT IMPACT TO THE CONSTRUCTION AND / OR SURROUNDING FACILITIES IS MINIMIZED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY EROSION, SEDIMENT TRANSPORT, DISTURBED FOUNDATIONS, IMPACT TO STRUCTURES, AND ANY OTHER DAMAGE AS A RESULT OF OR
CAUSED BY CONSTRUCTION ACTIVITIES.
9. THE CONTRACTOR SHALL PREVENT THE DISCHARGE OF SEDIMENT INTO EXISTING OR NEW STORMWATER MANAGEMENT FACILITIES DUE TO CONSTRUCTION OPERATIONS. APPROVED EROSION CONTROL DEVICES SHALL BE INSTALLED TO PREVENT DISCHARGE OF SEDIMENT INTO WETLANDS, WATERBODIES, AND ADJACENT PROPERTIES. EROSION CONTROL SHALL CONSIST OF ANCHORED SILT FENCE, OR OTHER EROSION CONTROL METHODS APPROVED BY THE PROJECT ENGINEER AND COUNTY. CONTRACTOR SHALL INSTALL INLET PROTECTION AT ALL INLETS BEFORE ANY CONSTRUCTION ACTIVITIES BEGIN. METHOD SHALL BE SUBMITTED TO THE EOR FOR PRIOR APPROVAL.
10. THE CONTRACTOR AND SUBCONTRACTORS ARE HEREBY REQUIRED TO PROMPTLY NOTIFY THE COUNTY OF ANY DISCREPANCIES OR CONFLICTS FOUND IN THE PLANS OR SPECIFICATIONS, SO THEY CAN BE CLARIFIED BY THE ENGINEER OF OF RECORD AS NEEDED.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFE MAINTENANCE OF PEDESTRIAN AND VEHICULAR TRAFFIC AT ALL TIMES DURING THE DURATION OF THE PROJECT, AND IN
ACCORDANCE WITH FDOT STANDARDS.
12. BURNING WITHIN THE LIMITS OF THE PROPOSED PROJECT SHALL NOT BE ALLOWED UNLESS OTHERWISE SPECIFIED BY MARION COUNTY. IF PERMITTED BY MARION COUNTY, THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE APPROPRIATE AGENCY AND OBTAINING A BURNING PERMIT.
13. THE PROJECT ENGINEER AND COUNTY SHALL HAVE ACCESS TO THE WORK SITE AT ALL TIMES.
14. MARION COUNTY OR THE ENGINEER OF RECORD, AS APPROPRIATE, SHALL BE THE SOLE INTERPRETERS OF THE REQUIREMENTS OF THE DRAWINGS AND SPECIFICATIONS AND SHALL RENDER WRITTEN OR GRAPHIC INTERPRETATIONS AS NECESSARY FOR THE PROPER EXECUTION OR PROGRESS OF THE WORK WITH REASONABLE PROMPTNESS ON REQUEST OF THE CONTRACTOR.
15. ALL DETAILS, SECTIONS, AND NOTES SHOWN ON DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO SIMILAR SITUATIONS ELSEWHERE UNLESS NOTED OR SHOWN OTHERWISE.
16. ALL ASTM DESIGNATIONS SHALL BE AS AMENDED TO DATE UNLESS NOTED OTHERWISE.
17. THE CONTRACTOR SHALL HAUL ALL EXCESS MATERIALS OFF THE JOB SITE. IT WILL BE THE CONTRACTORS RESPONSIBILITY TO DISPOSE OF ALL EXCESS MATERIAL AFTER IT IS DETERMINED
THAT IT IS NO LONGER NEEDED ON THE JOB.
18. ANY SURVEY MARKER, INCLUDING BUT NOT LIMITED TO SECTION MARKERS, BENCH MARKS, LOT CORNERS, ETC. WHICH ARE DISTURBED DURING CONSTRUCTION SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE PRIOR TO FINAL PAYMENT. RESETTING OF MONUMENTS AND MARKERS SHALL BE PERFORMED BY A PROFESSIONAL LAND SURVEYOR, LICENSED TO PRACTICE IN
THE STATE OF FLORIDA AND SHOWN AS RESET ON AS-BUILT PLAN.
19. THE CONTRACTOR SHALL NOTIFY THE COUNTY IN WRITING IMMEDIATELY WHEN CONFLICTS ARE IDENTIFIED DURING THE COURSE OF THE WORK.
20. THE CONTRACTOR IS RESPONSIBLE FOR BRACING, SHORING, OR PROVIDING OTHER MEANS NECESSARY TO PROTECT AND SUPPORT EXISTING UTILITIES EXPOSED DURING CONSTRUCTION
UNTIL THE RESPONSIBLE UTILITY COMPANY ARRIVES ON SITE.
21. THE CONTRACTOR SHALL HAND EXCAVATE WHEN CONSTRUCTION IS WITHIN 18 INCHES OF EXISTING UTILITIES.
22. UNSUITABLE MATERIAL FROM WITHIN THE PROJECT SHALL BE DISPOSED OF OFF-SITE BY THE CONTRACTOR.
23. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE UTILITY PROVIDERS FOR THE RELOCATION, ABANDONMENT, OR CONSTRUCTION OF UTILITIES ASSOCIATED WITH THIS PROJECT.
24. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH THE PROPERTY OWNERS REGARDING RELOCATION , REMOVAL, OR REPLACEMENT OF FENCES, SURVEY MONUMENTS AND SECTION CORNERS, DRIVEWAYS, LANDSCAPE, ETC. NEW CONSTRUCTION SHALL BE EQUIVALENT TO THE EXISTING FEATURES REMOVED RELOCATED, AS DETERMINED BY THE PROJECT
ENGINEER AND COUNTY.
25. ALL AREAS INSIDE AND OUTSIDE THE PROJECT LIMITS, WHICH ARE DISTURBED AS A RESULT OF THE ORIGINAL OR DESIGN GRADE AS APPLICABLE, INCLUDING REPLACEMENT OF EQUIVALENT SHRUBS AND TREES (REPLACEMENT TREES SHALL BE A 6' MINIMUM HEIGHT AND SAME TYPE) AND SODDED AT THE CONTRACTOR'S EXPENSE, UNLESS OTHERWISE APPROVED BY MARION
COUNTY.
26. IF A SINKHOLE SHOULD FORM ON THIS SITE, ALL APPLICABLE PROCEDURES OUTLINED IN THE SJRWMD APPLICANT'S HANDBOOK, OCTOBER 1995, SHOULD BE FOLLOWED. THE PROJECT ENGINEER, COUNTY, AND THE APPROPRIATE PERMITTING AGENCIES SHALL BE NOTIFIED IMMEDIATELY FOR REPAIR PROCEDURES.
27. CONSTRUCTION REFERENCES:
a. MARION COUNTY CITIZEN STANDARDS
b. FDOT STANDARD PLANS, LATEST EDITION
c. FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST EDITION
d. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, LATEST EDITION
e. MARION COUNTY LAND DEVELOPMENT CODE, LATEST REVISIONS
28. DETAILS PERTAINING TO BORINGS, AS SHOWN ON THE PLANS, ARE NOT GUARANTEED TO BE MORE THAN A GENERAL INDICATION OF THE MATERIALS LIKELY TO BE FOUND ADJACENT TO HOLES BORED AT THE SITE, APPROXIMATELY AT THE LOCATIONS INDICATED. THE CONTRACTOR SHALL EXAMINE BORING DATA, WHERE AVAILABLE, AND MAKE THEIR OWN INTERPRETATION OF THE SUBSOIL INVESTIGATIONS AND OTHER PRELIMINARY DATA, AND SHALL BASE THEIR BID ON THEIR OWN OPINION OF THE CONDITIONS LIKELY TO BE
ENCOUNTERED.
29. CONTRACTOR SHALL COORDINATE THE RELOCATION OF EXISTING MAILBOXES WITH THE MAIL CARRIER AND THE PROPERTY OWNER.
30. THE PROJECT AREA SHALL BE SODDED FROM THE EDGE OF PAVEMENT TO THE LIMITS OF DISTURBANCE. PALLET SOD OR ROLLED SOD, WITH NETTING REMOVED, MAY BE USED.
STANDARDS FOR ROAD PAVING:
ROAD PAVING STANDARDS WILL CONSIST OF:
· 8" STABILIZED SHOULDER LBR 25 TO BE COMPACTED TO 95% OF MAX DENSITY.
· 8" STABILIZED SUBGRADE LBR 40 TO BE COMPACTED TO 96% OF MAX DENSITY. NO TEST RESULTS
SHALL BE LESS THAN 35.
· 6" LIMEROCK BASE PRIMED LBR 100 TO BE COMPACTED TO 98% OF MAXIMUM DENSITY. NO TEST
RESULTS SHALL BE LESS THAN 95.
· PAVE WITH A MINIMUM OF 1-1/4" OF TYPE SP-9.5 ASPHALT. THE DESIGN MIX SHALL BE SUBMITTED
AND APPROVED BY MSTU PROJECT MANAGER OR DESIGN ENGINEER PRIOR TO MANUFACTURE OF
THE ASPHALT.
· SOD ANY AREAS DISTURBED DURING CONSTRUCTION.
· CONSTRUCT 4' DRIVEWAY APRONS AND DRIVEWAYS FROM EDGE OF ROADWAY TO RIGHT OF WAY
WITH 6" CONCRETE.
GENERAL NOTES
QTY. UNIT
1 MISCELLANEOUS REQUIREMENTS
1.1 MOBILIZATION/DEMOBILIZATION (INCLUDES INS, P&P, AND BID BOND) 1 LS
1.2 MAINTENANCE OF TRAFFIC (INCLUDES TEMPORARY STRIPING) 1 LS
1.3 AS-BUILT SURVEY 1 LS
1.4 PLAN CONSTRUCTION LAYOUT 1 LS
2 ROADWAY
2.1 CLEARING AND GRUBBING 0.63 AC
2.2 SHOULDER STABILIZATION (LBR 25) 232 SY
2.3 SUBGRADE STABILIZATION (LBR 40) 1,371 SY
2.4 6" LIMEROCK BASE 1,371 SY
2.5 ROADWAY PRIME COAT (BITUMINOUS TREATMENT) 1,371 SY
2.6 1.25" ASPHALT CONCRETE TYPE SP 9.5 1,371 SY
3 DRIVEWAYS AND SOD
3.1 SOD (PALLET SOD OR ROLLED SOD WITH NETTING REMOVED) 1,639 SY
3.2 6" THICK CONCRETE WITH WIRE 250 SY
4 DRAINAGE AND EARTHWORK
4.1 SILT FENCE 1,000 LF
4.2 EXCAVATION 149.0 CY
4.3 EMBANKMENT 265.0 CY
5 PAVEMENT MARKINGS
5.1 6" DOUBLE YELLOW STRIPE (THERMOPLASTIC) 100 LF
5.2 24" WHITE STOP BAR (THERMOPLASTIC) 15 LF
AutoCAD SHX Text Tech: matthewc Plot Date: Jan 05,2026 4:21pm Filename: N:\2025\25-0557\Departments\04_Engineering\02_DWGs\25055700000\Roadway\GNNTRD01.dwg
AutoCAD SHX Text
QUALITY CONTROL:
AutoCAD SHX Text
TECHNICIAN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text FL PE No. 97282
AutoCAD SHX Text
MATTHEW DALTON CANTRELL, P.E.
AutoCAD SHX Text 25-0557
DESCRIPTIONDATE DATE
SUBMITTALS
SHEET
NO.
REVISIONS MARION COUNTY BOARD OF COMMISSIONERS
M.S.T.U. ASSESSMENT DEPARTMENT
BELLEVIEW HEIGHTS ESTATES UNIT 8
PAVING CONSTRUCTION
DESCRIPTION
C. WOOD
M. CANTRELL, P.E.
M. CANTRELL, P.E.
11801 Research Drive Alachua, Florida 32615
(352)331-1976 www.nv5.com
PRINCIPLE POST
POSITION (CANTED
20° TOWARD FLOW)
OPTIONAL
POST POSITIONS
POST (OPTIONS: 2" X 4" OR
2 1/2" MIN. DIA. WOOD; STEEL
1.33 LBS/FT. MIN.)
FILTER FABRIC (IN
CONFORMANCE WITH
SEC. 985 FDOT SPEC.)
T
O
O
R M
O R
E
M
IN
ELEVATION
SILT FLOW
SECTION
V E R
T
IC
A L
20°
FILTER FABRIC
NTS
6' MAX.
EDGE OF PAVEMENT
2'
'-2
NTS
0.02 0.02
10'
TRAVEL
LANE
10'
TRAVEL
LANE
R/W (25') R/W (25')
R/W LINE R/W LINE
℄ CONST. SE 44TH AVENUE
EXISTING GROUND
NTS
PROFILE GRADE LINE
(REFER TO SHEET 04
FOR ELEVATIONS)
2'
SHOULDER
WITH SOD
2'
SHOULDER
WITH SOD
.5
SHOULDER,
SOD
FINISHED TOP
PAVEMENT
2' 2' 4:1
4:1 4:1 4:1
PROPOSED STABILIZED
SHOULDER (LBR 25)
PROPOSED 1.25" STRUCTURAL
COURSE OVERLAY (SP 9.5)
6" LIMEROCK BASE (LBR 100) PRIMED
8" STALBILIZED SUBGRADE (LBR 40)
POSTED SPEED: 25
DESIGN SPEED: 30
EXISTING GROUND
NTS
4'
C E N
T E R
L
IN
E O
F E
X
D R
IV
E
℄ CONST.
PROPOSED EDGE OF
PAVEMENT
PROPOSED EDGE OF
PAVEMENT
APRON TO BE PLACED
SEPARATE FROM LANE
CONSTRUCTION
MATCH EXISTING
WIDTH
RIGHT OF WAY
0.02
EX DRIVEWAY
NTS
NOTE:
1. GRADE DRIVEWAY FOR POSITIVE DRAINAGE TO
ADJACENT SWALE.
6" CONCRETE SHOULDER/DRIVE
SLOPE APRON AND DRIVE TO
MATCH ADJACENT SHOULDER
ROADWAY
PAVEMENT
4' PAVED DRIVE
APRON
2' SHOULDER
DRIVE VARIES
0.06
8" TYPE B STABILIZATION, MIN
LBR-40
VARIES
CONSTRUCTION DETAILS
AND SEDIMENTATION
CONTROL
AutoCAD SHX Text Tech: matthewc Plot Date: Jan 06,2026 8:21am Filename: N:\2025\25-0557\Departments\04_Engineering\02_DWGs\25055700000\Roadway\GNNTRD01.dwg
AutoCAD SHX Text
QUALITY CONTROL:
AutoCAD SHX Text
TECHNICIAN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text FL PE No. 97282
AutoCAD SHX Text
MATTHEW DALTON CANTRELL, P.E.
AutoCAD SHX Text 25-0557
AutoCAD SHX Text
TYPE III SILT FENCE DETAIL
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text
TYPICAL MAILBOX DETAIL
AutoCAD SHX Text
TYPICAL SECTION DETAIL
AutoCAD SHX Text
TYPICAL CONCRETE DRIVEWAY (APRON) DETAIL
TYPICAL PAVED APRON AND DRIVEWAY DETAIL
X X
E
EE
O H W
O H W
OHW
OHW OHW OHW
OHW
OHW OHW OHW OHW OHW OHW
O H W
O H W
O H W
O H W
O H W te te te te te te teTH H
"STO
P"
"STO
P"
"STO
P"
X
TE TE TE TETE TE TE TE
TE TE TE
TE
TE TE TE TE
TE
TE
FO FO
E
PARCEL:
4208-104-001
PARCEL:
4208-104-010
PARCEL:
4208-104-017
PARCEL:
4208-104-013
PARCEL:
4208-105-042
PARCEL:
4208-105-039
PARCEL:
4208-105-036
PARCEL:
4208-105-033
PARCEL:
4208-105-029
PARCEL:
4208-105-026
PARCEL:
4208-105-023
75.00' 75.00' 100.00' 75.00' 75.00' 75.00' 75.00'
.0
.1
.0
N 0°03'36" E
N 0°03'36" E
S 0°02'58" W
N
°5
'4
" E
N
°5
'4
" E
N
°5
'4
" E
S
°5
'4
" W
150.00' 100.00' 150.00' 150.00'
MATCH EX
64.98
65.08
65.27 65.47 65.66 65.86 66.05 66.25 66.44 66.63 66.81 66.87 66.93 67.00 66.88 66.75 66.68 66.62 66.57 66.52 66.46 66.41 66.36 66.30 66.24 66.13 65.87 65.47 65.03 64.60
MATCH EX
64.34
SE 44TH AVE
(50' R/W)
0+00 1+00 2+00 3+00 4+00 5+00 6+00
BEGIN CONSTRUCTION
STA. 0+10.00
N: 1700981.493 E: 632208.476
END PROJECT
STA. 5+91.01
N: 1701562.505 E: 632209.063
75.00' 75.00' 75.00' 75.00'100.00'75.00'75.00'
150.00' 100.00' 150.00' 150.00'
S E
N D L N
(5 R /W
S E
T H S
T (5 R /W
DESCRIPTIONDATE DATE
SUBMITTALS
SHEET
NO.
REVISIONS MARION COUNTY BOARD OF COMMISSIONERS
M.S.T.U. ASSESSMENT DEPARTMENT
BELLEVIEW HEIGHTS ESTATES UNIT 8
PAVING CONSTRUCTION
DESCRIPTION
C. WOOD
M. CANTRELL, P.E.
M. CANTRELL, P.E.
11801 Research Drive Alachua, Florida 32615
(352)331-1976 www.nv5.com
MASTER VIEW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Tech: matthewc Plot Date: Jan 05,2026 4:59pm Filename: N:\2025\25-0557\Departments\04_Engineering\02_DWGs\25055700000\Roadway\PLANRD02.dwg
AutoCAD SHX Text
QUALITY CONTROL:
AutoCAD SHX Text
TECHNICIAN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text FL PE No. 97282
AutoCAD SHX Text
MATTHEW DALTON CANTRELL, P.E.
X X
E
EE
O H W
O H W
OHW
OHW OHW OHW
OHW
OHW OHW OHW OHW OHW OHW
O H W
O H W
O H W
O H W te te te te te te teTH H
"STO
P"
"STO
P"
"STO
P"
X
TE TE TE TETE TE TE TE
TE TE TE
TE
TE TE TE TE
TE
TE
FO FO
E
.0
.1
.0
SE 44TH AVE
(50' R/W)
0+00 1+00 2+00 3+00 4+00 5+00 6+00
REMOVE EXISTING AND
CONSTUCT DRIVEWAY TO
RIGHT-OF-WAY, MATCH
EXISTING MATERIALS AND
WIDTH (TYP.)
DRIVEWAY APRON
(REFER TO DETAIL
ON SHEET 3) (TYP)
S E
T H S
T (5 R /W
S E
N D L N
(5 R /W
150.00' 100.00' 150.00' 150.00'
75.00'
10' 10'
RELOCATE MAILBOXES
(REFER TO DETAIL
ON SHEET 3) (TYP)
R3 0'
R 25'
75.00' 100.00' 75.00' 75.00' 75.00' 75.00'
.0
DITCH (REFER TO
TYPICAL DETAIL
ON SHEET 3) (TYP)
DITCH (REFER TO
TYPICAL DETAIL
ON SHEET 3) (TYP)
2' SOD SHOULDER (REFER TO
TYPICAL SECTION ON SHEET 3)
2' SOD SHOULDER (REFER TO
TYPICAL SECTION ON SHEET 3)
24" STOP BAR
(REFER TO FDOT
INDEX 711-001)
20.7'
50'
6" DOUBLE YELLOW
PAVEMENT MARKINGS
(REFER TO FDOT
INDEX 711-001)
SAW CUT AND MATCH
EXISTING PAVEMENT
ELEVATIONS SITE CONTROL POINT
SET 1/2" STEEL ROD & CAP
STAMPED "TRAVERSE LB 8246"
NORTHING: 1701534.78
EASTING: 632233.57
ELEVATION: 64.64' (NAVD88)
SITE CONTROL POINT
SET 1/2" STEEL ROD & CAP
STAMPED "TRAVERSE LB 8246"
NORTHING: 1701084.46
EASTING: 632200.82
ELEVATION: 65.89' (NAVD88)
RELOCATE MAILBOXES
(REFER TO DETAIL
ON SHEET 3) (TYP)
N 1"=40'
0.31% -0.30%
-0.64% -0.27%
-2.20%
0.97%
PVI STA: +10.00
PVI ELEV: 64.98
PVI STA: +06.09
PVI ELEV: 66.71
PVI STA: +42.14
PVI ELEV: 66.35
PVI STA: +91.01
PVI ELEV: 64.34
PVI STA: +97.01
PVI ELEV: 66.80
E G
.0
0+00
.1
E G
.8
.3
E G
.1
.6
E G
.0
.8
E G
.2
1+00
.1
E G
.7
.3
E G
.9
.5
E G
.4
.8
E G
.4
2+00
.8
E G
.5
.9
E G
.5
.9
E G
.4
.7
E G
.0
3+00
.6
E G
.7
.6
E G
.6
.5
E G
.6
.4
E G
.6
4+00
.4
E G
.8
.3
E G
.7
.2
E G
.6
.1
E G
.4
5+00
.7
E G
.1
.2
E G
.7
.6
E G
.1
E G
.4
6+00
PVI STA: +61.33
PVI ELEV: 67.05
B V
C S
.6
B V
C E
.2
E V
C S
.6
E V
C E
.6
50' VC
PVI STA = 5+08.69
PVI ELEV = 66.15
A.D. = -1.89% K = 26.39
DESCRIPTIONDATE DATE
SUBMITTALS
SHEET
NO.
REVISIONS MARION COUNTY BOARD OF COMMISSIONERS
M.S.T.U. ASSESSMENT DEPARTMENT
BELLEVIEW HEIGHTS ESTATES UNIT 8
PAVING CONSTRUCTION
DESCRIPTION
C. WOOD
M. CANTRELL, P.E.
M. CANTRELL, P.E.
11801 Research Drive Alachua, Florida 32615
(352)331-1976 www.nv5.com
ROADWAY PLAN
AutoCAD SHX Text Tech: matthewc Plot Date: Jan 06,2026 9:44am Filename: N:\2025\25-0557\Departments\04_Engineering\02_DWGs\25055700000\Roadway\PLANRD03.dwg
AutoCAD SHX Text
QUALITY CONTROL:
AutoCAD SHX Text
TECHNICIAN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text FL PE No. 97282
AutoCAD SHX Text
MATTHEW DALTON CANTRELL, P.E.
| 01 Cover Sheet |
| Sheets and Views |
| 01 Cover Sheet |
| 02 General Notes |
| Sheets and Views |
| 02 General Notes |
| 03 Construction Details and Sedimentation Control |
| Sheets and Views |
| 03 Construction Details and Sedimentation Control |
| 04 Master View |
| Sheets and Views |
| 04 Master View |
| 05 Roadway Plan |
| Sheets and Views |
| 05 Roadway Plan |
| 2026-01-20T14:23:23-0500 | |
| Matthew Dalton Cantrell |
File details come from the government source that posted it. Updated .