B05 Attachment 1 - SOW.pdf

PDF 83 KB Posted

Attached to
Liquid Oxygen ID/IQ Contract
Solicitation number
89503625QSW000182
Issued by

About this file

This document is a Statement of Work (SOW) for the purchase of Liquid Oxygen (LOX) for the Southwestern Power Administration (SWPA) at the Table Rock Dam Powerhouse. The SOW specifies that LOX must be delivered in bulk with a minimum of 99.5% oxygen, less than 0.5% inert gas, and a dew point of minus 80 degrees Fahrenheit or lower. Delivery will be to an 80-ton LOX storage and injection facility owned by the U.S. Army Corps of Engineers, located on Highway 165 South of Branson, Missouri.

The contract allows for flexible delivery quantities ranging from zero to forty tons per delivery request, with SWPA providing at least 24 hours' advance notice. Deliveries will typically occur Monday through Friday between 7:30 a.m. and 4:00 p.m., though evening and weekend deliveries may be required. The supplier will be solely responsible for transportation and transfer of LOX from their trailer to the Corps facility, with delivery requests made only by specifically authorized SWPA representatives.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1

UNITED STATES DEPARTMENT OF ENERGY

SOUTHWESTERN POWER ADMINISTRATION

6655 S LEWIS

TULSA, OKLAHOMA 74136

STATEMENT OF WORK

DESCRIPTION:

The purchase of Liquid Oxygen (LOX) for use and delivery at Table Rock Dam Powerhouse.

REQUIREMENT:

LOX delivered in bulk. LOX to consist of a minimum of 99.5% oxygen, less than 0.5% inert gas and have a dew point of minus 80 degrees Fahrenheit or lower.

Delivery of the LOX will be to the Table Rock Dam Powerhouse, 80-ton LOX storage and injection facility, owned and operated by the Little Rock District, U.S. Army Corps of Engineers (Corps). Corps Powerhouse personnel will provide access to the LOX storage facility for delivery.

They will sign for the delivery and accept the delivery bill of lading. Table Rock Powerhouse is located on Highway 165 South of Branson, Missouri at 760 Hatchery Road.

Actual quantities of LOX required shall be determined solely by Southwestern Power Administration (SWPA). The quantities of LOX scheduled will vary between zero (0) and forty

(40) tons per delivery request/per day.

SWPA will provide the supplier with at least twenty-four (24) hours’ advance notice of the required delivery quantities and scheduled delivery time for the following day. Deliveries will typically occur Monday through Friday between the hours of 7:30 a.m. and 4:00 p.m., although some evening and weekend deliveries may be required.

SWPA will have no personnel involved in the unloading or transfer of LOX from the supplier’s trailer to the Corps LOX storage facility at Table Rock Dam Powerhouse. The supplier shall assume sole responsibility for the transportation of LOX to the Table Rock Dam Powerhouse, and the transfer of LOX from the trailer to the Corps facility at the Powerhouse.

LOX delivery requests shall be made only by SWPA individuals specifically identified in the contract as authorized representatives.

File details come from the government source that posted it. Updated .