019. Attachment 2 - Supplies or Services and Price_Costs.pdf

PDF 184 KB Posted

Attached to
230-KV, 40MVAR 3-PHASE BANK, 100 AMP SHUNT REACTOR
Solicitation number
89503426QWA001181
Issued by

About this file

This document is a supplies and pricing section from a federal contract with Western Area Power Administration (WAPA) for the procurement of electrical equipment and related services.

The contract requires the furnishing and delivery of three 230-kV, 13.33 MVAR (40 MVAR 3-phase), 100A shunt reactors with support structures to the Circle Substation located near Circle, Montana (coordinates: 47° 27' 15.666" N 105° 32' 0.951" W). Item 00001 includes the reactors themselves; Item 00002 covers transportation and delivery to the Circle Substation; and Item 00003 is an optional 5-year warranty extension (which can be exercised within 90 days of contract award). The required delivery date is no later than April 29, 2027, with delivery F.O.B. to the destination. The contractor must provide at least 2 weeks' advance notification of shipment and coordinate delivery through Jacob Thielbar (605-350-4593; thielbar@wapa.gov), with deliveries scheduled Monday through Thursday between 8 a.m. and 3 p.m.

The contract includes performance specifications and warranty terms. The offeror must warrant that no-load losses for each single-phase reactor will not exceed a specified threshold, evaluated at $1,999 per kilowatt. If actual losses exceed warranted losses, the contract price will be reduced accordingly. Liquidated damages are set at $1,451.64 per day for failure to meet the delivery deadline, not to exceed 10 percent of the unit purchase price. The contractor must complete technical specifications contained in Attachment 1 and provide test reports to verify performance prior to payment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLIES OR SERVICES AND PRICES /COSTS

Furnish and deliver to Western Area Power Administration (also referred to as Western, WAPA, and the Government), the following described item, complete and in accordance with the technical specifications contained in Attachment 1 of the contract:

Item

No. Description Quantity Unit Unit Price Amount

00001

230-kV, 13.33MVAR (40MVAR 3-phase), 100A shunt reactor, with support structure

3 EA $ $

00002

Transportation/Delivery to the Circle Substation for each Item 00001

LS $ $

00003

5-year warranty for Item 00001 (Optional) 3 EA $ $

Total of Items 1 - 3 $

+ The Government shall have the right to exercise the option of procuring these optional items within 90 days after contract award.

@ The Government requires the potential for ordering a warranty of a minimum of 5 years or more, depending on the standard warranty offered by the Contractor. If the offeror provides a one year standard warranty, then the offeror shall offer the additional cost to bring the warranty up to a total 5-year warranty. The offeror may enter “no charge” on this line item number if the standard warranty offered by the Contractor if the standard warranty is good for five years or more.

For Item 00001, liquidated damages shall be in the amount of one thousand, four hundred, fifty-one dollars and sixty-four cents ($1,451.64) per day, not to exceed ten percent (10%) of the purchase price of the unit upon which such claims are made, and shall begin after the mutually agreed upon “No Later Than” delivery date.

WARRANTED CHARACTERISTICS

The offeror warrants that the performance of the series reactor will be at least as good as stated below, with rated voltage, current, and frequency applied to each reactor.

Losses will be evaluated at $1,999/kW for each single-phase reactor for Item 00001.

(a) Contract Line Item 00001 (Circle Substation)

Total losses for each single-phase reactor in kilowatts ……………………………. insert losses *

* Round off to the nearest tenth of a kilowatt

FAILURE TO MEET WARRANTED CHARACTERISTICS

Prior to payment, the kilowatt losses stated in the "Warranted Characteristics" clause of this contract shall be compared with the actual loss values given in the test report required by the Specification. Monetary value will be established for the actual kilowatt losses of the reactor(s) on the basis of the rates given below. In the event that the actual monetary value exceeds the monetary value calculated for warranted losses, the price of the reactors(s) shall be reduced by the amount that the monetary value of the actual losses exceeding the monetary value of the warranted losses.

No-Load Losses: $1,999/kW

TIME AND PLACE OF DELIVERY, SHIPPING NOTIFICATION

(a) Time of delivery

The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM NO. QUANTITY NO SOONER THAN NO LATER THAN

00001 3 Anytime April 29, 2027

(b) Place of Delivery.

The Government requires delivery to be made according to the following locations. Items shall be delivered F.O.B. (Free On Board) to the destination within the consignee’s premises, to the following locations: (Western shall unload the equipment to the pad or to a specific location at the substation.)

ITEM NO. DESTINATION (CITY/STATE)

00001

CIRCLE SUBSTATION ADDRESS:

No address available

LATITUDE/LONGITUDE:

47° 27’ 15.666” N 105° 32’ 0.951” W (NAD 83)

DIRECTIONS:

From the intersection of MT Hwy 13 & 200 (east side of Circle, MT) 3 miles northeast on MT Hwy 13, east side.

(c) Shipping notification.

Notification of intended shipment shall be given at least 2 weeks prior to shipment from the factory. The truck driver shall notify the below listed contact person when the equipment leaves the factory and again 48 hours prior to arrival at the delivery location. The Contractor shall plan to deliver the equipment Monday through Thursday (8 a.m. to 3 p.m.).

ITEM NUMBERS

NAME/ADDRESS/PHONE NO.

OF CONTACT PERSON

All

Jacob Thielbar 605-350-4593

E-mail: thielbar@wapa.gov mailto:thielbar@wapa.gov

ITEM NUMBERS
All