PHS_Microwave_Building_Battery_Replacement_Scope.pdf

PDF 77 KB Posted

Attached to
Microwave Tower Battery and Charger Replacement Federal contract opportunity
Solicitation number
89503119QWA000063
Issued by
Department of Energy Western Area Power Administration

About this file

Scope of Work

View the file

Other files for this federal contract opportunity

Other files attached to Microwave Tower Battery and Charger Replacement, newest first.
File Type Posted
Amendment_0001.pdf PDF
PWS_-_PHS_MW_Building_Battery_Replacement_7_23_19.pdf PDF
Revised_Cover_Page_RFQ-FBO.pdf PDF
phs_T4029a.pdf PDF
WD_2015-5469_Rev_9.pdf PDF
Cover_Page_RFQ-FBO.pdf PDF
Sol-89503119QWA000063.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHS M/W Building Battery Replacement SOW

• Provide temporary power to support site loads during the transition from the old system to the new system. The telecom loads will remain online throughout the duration of this transition.

• Remove existing chargers, racks and wiring. WAPA will retain possession of existing chargers and racks.

• Remove existing battery plant and palletize. Send batteries to an EPA approved recycling center for disposal. A certificate of disposal will be supplied to WAPA when the batteries are disposed of.

• Supply and install two (2) flooded strings of “12 OPzS-1500” BAE batteries (48 total batteries), racks, two (2) 200 amp rack mount disconnects, spill containment with pillows and terminal covers. This will provide two (2) 48VDC battery banks (A&B).

• Supply, mount and install two (2) new telecom racks. Mount and wire WAPA provided Eltek chargers, DC distribution and disconnects in these racks.

• Replace two (2) 15 amp AC breakers with 20 amp 2 pole breakers in AC distribution panel DHA.

• Install and label six (6) AC feeds to chargers.

• Install and label DC feeds to each disconnect.

• Install new 4” x 4” wireway overhead of new charger racks to match up to existing 4” x 4” wireway

• Install and label new A&B DC load feeds to THA and THB telecom racks. Cap the ends of each wire. WAPA will be responsible for termination at each rack.

• Provide installed battery test values (Voltage, Specific Gravity, Impedance)