SECTION B

SUPPLIES OR SERVICES AND PRICES

BIDDING SCHEDULE

LIBERTY SUBSTATION, STAGE 07 (RUDD Bay)

CLIN Work or Material Estimated Quantity Unit Unit Price Amount

0001 Mobilization and preparatory work 1 LS $ $ _

0002 Miscellaneous sitework 1 LS $ $ _

0003 Demolition 1 LS $ $ _

0004 Concrete foundations 61 CY $ $ _

0005 Type "C" cable trench 1 LS $ $ _

0006 Steel structures, welded (galvanized) 8057 LB $ $ _

0007 Power circuit breaker, 230-kV, 3000 amps (Government-furnished)

1 EA $ $ _

0008 Disconnecting switch, 230-kV, 3,000 amps, and associated support structures (Government-furnished)

4 EA $ $ _

0009 Disconnecting switch, 230-kV, 3,000 amps, with grounding blades and associated support structures (Government-furnished)

1 EA $ $ _

0010 Coupling capacitor voltage transformer, 230-kV, single phase and associated support structures (Government-furnished)

2 EA $ $ _

0011 Outdoor bus systems 1 LS $ $ _

0012 Associated electrical equipment and material 1 LS $ $ _

0013 Existing outdoor electrical equipment and material

1 LS $ $ _

0014 Furnishing 5/c No. 10 AWG control cable 4900 LF $ $ _

0015 Furnishing 12/c No. 10 AWG control cable 3650 LF $ $ _

0016 Installing 5/c No. 10 AWG control cable 4900 LF $ $ _

0017 Installing 12/c No. 10 AWG control cable 3650 LF $ $ _

0018 Electrical Testing 1 LS $ $ _

TOTAL $ _

ABBREVIATIONS

CLIN = Contract Line Item Number

CY = cubic yards EA = each LF = linear feet LS = for the lump sum of LB = pounds

*** Prices must be entered for each item. All extensions of unit-priced items will be subject to verification by the Government. In case of a difference between the unit price and the extension, the unit price will govern. In case of variation between the total shown on the bid and the total verified by the Government, the total (sum of the items) determined by the Government will be considered to be the bid.