Text version

z. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Western that may be uncovered during demolition remain the property of Western. Carefully salvage in a manner to prevent damage and promptly return to the

COR.

2. Bidding Schedule item “Miscellaneous Items" includes the following:

a. Remove demolition waste materials from project site and dispose of them in an EPA approved construction and demolition waste landfill acceptable to authorities having jurisdiction, and recycle or dispose of them according to local jurisdiction.

i. Do not allow demolished materials to accumulate on-site.

ii. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

iii. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

b. Do not burn demolished materials.

c. Removed and Salvaged Items:

i. Clean salvaged items.

ii. Pack or crate items after cleaning. Identify contents of containers.

iii. Store items in a secure area until delivery to Western’s warehouse.

iv. Transport items to Western’s warehouse, as designated by the COR.

v. Protect items from damage during transport and storage.

d. Removed and Re-installed Items:

i. Clean and repair items to functional condition adequate for intended re-use.

ii. Pack or crate items after cleaning and repairing. Identify contents of containers.

iii. Protect items from damage during transport and storage.

iv. Re-install items in locations, as indicated by the COR. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use, as indicated.

e. Existing Items to Remain: Protect existing items, as indicated, against damage and soiling during demolition. When permitted by the COR, items may be removed to a suitable, protected storage location during selective demolition; cleaned and re-installed in their original locations after operations are complete.

f. The existing control panels in the building must be protected from dust and construction debris. Air flow around the control panels must be maintained so the panels do not overheat.

. Draping plastic sheets over the control panels will restrict the air flow. The contractor must cordon off the work area from the control panels. The contractor shall instruct all of his employees to stay clear of the control panels to avoid inadvertently touching a switch.

3. Bidding Schedule item “Water Connection and Sewer Connection” includes the following:

a. Connect to existing City of Livermore Water Company 20" Diameter Steel Waterline this shall include the require coordination with the City of Livermore.

b. Install 1" Service Tap and 5/8" Meter. This shall be inclusive of the City of Livermore Meter Fees and all Impact Fees as well as permits, inspection and bonding required by the City of Livermore.

c. Install 1" Polyethylene SDR9 Service Line

d. Locate Existing City of Livermore Sewer Manhole

e. Construct 4” SDR 35 Sewer Service Lateral from Manhole to Property.

f. Construct Cleanout and Precast Utility Box and Cover.

2. Bidding Schedule item “Miscellaneous Items" includes the following:
3. Bidding Schedule item “Water Connection and Sewer Connection” includes the following:

File details come from the government source that posted it.