Water/Sewer Connection and Bathroom Remodel Project for Livermore Substation
Solicitation number
89503118BWA000004
Issued by

About this file

SF30 - Amendment 0002

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

89503118BWA000004

x x

0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PHOENIX AZ 85005-6457

DSW

PO BOX 6457

DESERT SOUTHWEST REGIONAL OFFICE

US DOE/WESTERN AREA POWER

WAPA (DSW)

PHOENIX AZ 85005-6457

DSW

PO BOX 6457

DESERT SOUTHWEST REGIONAL OFFICE

US DOE/WESTERN AREA POWER

WAPA (DSW)

05/23/20180002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/25/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Eric W. Jordan

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation no.89503118BWA000004 Amendment 0002

The purpose of this amendment is to answer Contractor questions, revise the specifications and add asbestos report.

A. Add the below paragraph to Division 2.B.2.f (the below change is annotated with horizontal line in the right margin of the attached specification page change)

f. The existing control panels in the building must be protected from dust and construction debris. Air flow around the control panels must be maintained so the panels do not over-heat. . Draping plastic sheets over the control panels will restrict the air flow.

The contractor must cordon off the work area from the control panels. The contractor shall instruct all of his employees to stay clear of the control panels to avoid inadvertently touching a switch.

B. See below questions and answers:

Question 1 Drawing A1, Detail B, existing 22” x 14” opening. With an active working vent fan in this space, we would recommend blanking off this opening rather than installing a louvered grill. Please confirm if this is desired (see attached photo IMG_0201.jpg)

Answer 1 Install per WAPA specifications.

Question 2 Section C, Project Specifications, Division 2.A.3.b.iii – Please provide a copy of the hazardous materials report for review prior to bid.

Answer 2 A lead and asbestos survey was conducted on April 25, 2018 (survey report attached).

Specifically this survey targeted the wall joints, base board mastic, floor tile mastic, and paint in the area planned for renovation.

Lead Results According to the California Department of Health Services and Federal Environmental Protection Agency, lead concentrations must exceed 5,000 parts per million (ppm) to meet the definition of lead based paint. The tested materials contain lead concentrations ranging between 91-460 ppm, well below the 5,000 ppm threshold.

Asbestos Results Results from sampled suspect building materials indicate no asbestos was detected.

Western Environmental Department reviewed the results with WAPA-SNR Safety Manager and Adam Laboratories Inc. Together they concluded, lead and asbestos are not present at levels of concern from a worker safety or hazardous materials standpoint. However, PPE and lead awareness training are recommend by Cal/OSHA when working with surfacing materials containing <600 ppm of Lead.

Furthermore, Bay Area Air Quality Management District asbestos notification will not be required for this project as the project does not involve the removal of 100

sq. ft. or more, 100 linear ft. or more, or 35 cubic feet or more of asbestos.

Solicitation no.89503118BWA000004 Amendment 0002

Question 3 We recommend utilizing dust barriers to isolate the work are from the electrical equipment in the building. Please confirm this is desired.

Answer 3 Barriers are required. The existing control panels in the building must be protected from dust and construction debris. Air flow around the control panels must be maintained so the panels do not overheat. . Draping plastic sheets over the control panels will restrict the air flow. The contractor must cordon off the work area from the control panels. The contractor shall instruct all employees to stay clear of the control panels to avoid inadvertently touching a switch.

Question 4 On Traffic Control Plan T2, states no traffic control allowed between 6:00AM to 9:00 PM and between 3:30 PM to 6:30 PM is this a typo or can we only work from 9:00PM to 6:00AM in roadway

Answer 4 The time is 6:00 AM to 9:00 AM, this is a requirement from the City of Livermore.

Question 5 Plan calls for Manhole tie in but detail called out S-5A is a connection to sewer main. Which is correct? If it is tied into manhole please provide detail

Answer 5 The manhole connection is the preference of the City of Livermore and you need to contact the city for direction when you make the tie-in. There are no details of the manhole tie-in.

Question 6 There is a porta-potty outside of gate will contractor have access to this? (locked with pad lock)

Answer 6 No, the contractor must provide their own sanitation facilities.

Question 7 Specs state only 20 feet of trench open at one time. This is not possible at this depth.

Answer 7 The trench cannot be left open overnight on the roadway, 20 foot maximum was listed so that each section of the trench can be closed each night. If the trench must be longer it is the contractor’s option to provide steel plates so traffic can flow during the hours listed.

Question 8 Is this project Tax Exempt, Tax on Materials and Third Party Rental Equipment only, or fully Tax Burdened?

Answer 8 This is a federal project which is federally tax exempt. Please review California state statutes for state tax exemption determination.

Question 9 Is it the desire of WAPA for the Contractor to have a single, full time, non-working site Supervisor to manage the project and site safety requirements?

Answer 9 Please refer to Standard 1, which describes the role and responsibilities of a Superintendent. The Superintendent must me in a non-working status only when critical work elements are being performed.

C. The date and time set for receipt of bids remains unchanged, June 14, 2018 at 2:00 PM local time.