88310327Q00012 Amendment 0003 Response to Questions.docx
DOCX document 21 KB Posted
- Attached to
- Artifact Conservation Project Coordinator
- Solicitation number
- 88310327Q00012
About this file
This is an amendment to a Request for Quote (RFQ) that provides government responses to vendor questions and extends the submission deadline for NARA Solicitation 88310327Q00012.
The solicitation seeks a Project Coordinator to support a 3-year artifact conservation initiative at NARA's Presidential Libraries and Museums. The submission deadline has been extended to November 19, 2026, at 2:00 PM Eastern Time. This is a Total Small Business Set-Aside acquisition requiring vendors to maintain active SAM.gov registration at time of quotation submission. The contract will be awarded as a Firm-Fixed-Unit-Price (FFUP) agreement with compensation based on fixed rates rather than actual hours worked, though an hourly rate will establish the fixed price. The anticipated workload averages 40 hours per month, with flexibility to accommodate fluctuations based on project activity and deliverables. The contract structure includes one base year and two one-year option periods (with two additional option years available solely for administrative flexibility). Other Directed Costs (ODCs) are capped at $5,000 annually and cover authorized travel expenses for in-person meetings and annual conservation forums, reimbursed per Federal Travel Regulations. Quotations must include proposed labor rates and completed CLIN pricing schedules. The proposed Project Coordinator must have a minimum of 10 years of professional experience, which may include consulting or contract assignments with cultural sector and heritage organizations. Experience may be evaluated at the individual level, including work performed for previous employers. Teaming and subcontracting are permitted, with specific subcontractors required to be identified at the initial quotation stage. Remote work from any U.S. location is permitted, though the coordinator must be available for standard Eastern Time Zone business hours. Personnel require a basic National Agency Check with Inquiries (NACI) or equivalent background investigation for IT system access prior to work commencement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NARA Project Coordinator RFQ - amendment 0003.docx | DOCX document | |
| NARA Project Coordinator RFQ Dn Final Extension.docx | DOCX document | |
| NARA Project Coordinator RFQ Dn Final.docx | DOCX document | |
| NARA Project Coordinator RFQ DN (Rev 1).docx | DOCX document | |
| Project Coordinator for NARA Artifacts RFQ (DN).docx | DOCX document | |
| 88310327Q000008 RFQ PL Artifact Conservation DN.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Archives and Records Administration (NARA) Solicitation Number: 88310327Q00012 - Amendment 00003 Artifact Conservation Project Coordinator Response to Questions and Extension
The Purpose of this amendment is to address Vendor Question and extend the responses due date for the subject Request for Quote.
The due date for this requirement is extended from November 12, 2026 to 2:00pm ET, November 19, 2026.
The Following questions are consolidated and categorized to ease clarity of the response:
CATEGORY 1: ADMINISTRATIVE AND SUBMISSION INSTRUCTIONS
Question 1: Section (viii) Item 3 gives the subject line for the submission email as "RFQ 8831032QF00012" while Section (xv) gives "RFQ 88310327Q00012". Please confirm which should be used.
Government Response: The Government acknowledges the typographical error in the submission instructions. Quoters should use the correct solicitation number (88310327Q00012) in their email subject lines.
Question 2: The RFQ states that quotations are due November 11, 2026, at 2:00 p.m. Eastern, while the public opportunity listing (SAM.gov) indicates November 12, 2026. Please confirm the controlling deadline.
Government Response: The deadline listed on SAM.gov governs. The RFQ is hereby amended to reflect the quotation deadline of November 19, 2026, at 2:00 PM Eastern Time.
Question 3: I am in the process of completing my SAM registration. Can you confirm whether the SAM registration must be active at the time of quotation submission or at the time of the award?
Government Response: In accordance with standard acquisition regulations and RFO Part 4, vendors must have an active Federal Government contracts registration in the System for Award Management (SAM.gov) at the time of quotation submission.
Question 4: The RFQ jumps from (vi) to (viii). Is there a section (vii) that should be included?
Government Response: This was a numbering error in the RFQ document. There is no missing Section (vii). The RFQ will be amended to correct the section numbering.
Question 5: A second SAM.gov attachment, "88310327Q000008 RFQ PL Artifact Conservation," now returns a message that the resource has been deleted. Please confirm whether it applies to this RFQ and, if so, repost it.
Government Response: That attachment was uploaded in error and has been deleted. It does not apply to this RFQ.
CATEGORY 2: COMPETITION AND SET-ASIDE STATUS
Question 6: The RFQ identifies this procurement as full and open competition, while the public listing identifies a total small-business set-aside. Please confirm the applicable competition status and small-business size standard. If the acquisition is a small business set-aside, please confirm whether FAR 52.219-6 and 52.219-14 will be added.
Government Response: This acquisition is a Total Small Business Set-Aside. The RFQ is hereby amended to remove references to Full and Open competition and to incorporate clauses 52.219-6 (Notice of Total Small Business Set-Aside) and 52.219-14 (Limitations on Subcontracting).]
CATEGORY 3: PRICING AND CLIN STRUCTURE
Question 7: Section (viii) states that no pricing is requested at this stage. However, Section (v) requests a proposed labor rate, and Section (ix) includes labor rate evaluation. Should our initial quotation include a proposed labor rate and completed CLIN pricing schedule, or only the three qualification components identified in Section (viii)?
Government Response: Reference to “No pricing or labor rates are required” were removed. Pricing and completed CLIN schedules should be submitted with the contractors quote.
Question 8: The CLIN schedule describes a labor-hour contract, while Section 10.0 references a fixed-price fee-for-services compensation structure. Please confirm the intended contract type and whether compensation will be based on actual hours worked at an agreed hourly rate.
Government Response: The Government intends to award a Firm-Fixed-Unit-Price (FFUP) contract. Compensation will be based on fixed price rather than actual hours worked, though the hourly rate will be used to establish the fixed rate Question 9: Each ODC CLIN has a $5,000 ceiling. Could the Government identify the anticipated types of reimbursable ODCs and clarify whether travel, lodging, mileage, meals, materials, and other project-related expenses should be included under these CLINs?
Government Response: Authorized travel expenses for the occasional in-person meetings and the annual conservation forums are the primary anticipated ODCs. These will be reimbursed in accordance with Federal Travel Regulations (FTR) and fall within the $5,000 annual ODC CLIN limit.
CATEGORY 4: PERIOD OF PERFORMANCE AND ESTIMATED WORKLOAD
Question 10: Could the Government clarify the intended period of performance? The background describes a three-year initiative (36 months) running through September 2029. However, the CLIN structure identifies a one-year base period and four one-year options, a potential five-year contract.
Government Response: The core initiative is planned for 36 months (one base year and two option years). The CLIN structure includes Option Periods III and IV (the 4th and 5th years) solely to provide administrative flexibility in the event of unforeseen project delays.
Question 11: Is the estimated 40 hours per month an anticipated average, a monthly ceiling, or a minimum commitment? May hours vary between months to accommodate reporting cycles and conservation forums?
Government Response: The 40 hours per month is an anticipated average. The Government understands that workload may fluctuate based on project activity, deliverables, and the conservation forums. The contractor is expected to manage their schedule flexibly to meet deliverable deadlines.
CATEGORY 5: EVALUATION, EXPERIENCE, AND TEAMING
Question 12: May a company satisfy the recent-experience requirement through the experience of its proposed employee or subcontracted coordinator, including qualifying projects performed while that individual worked for another organization?
Government Response: Yes. The Government is primarily evaluating the qualifications and experience of the proposed Project Coordinator. Experience gained by the proposed individual while employed by other organizations is acceptable and will be evaluated.
Question 13: Does NARA permit a general contracting company to serve as the prime contractor while subcontracting specialists? Are proposed subcontractors required to be identified and committed at the initial BPA quotation stage?
Government Response: Yes, teaming arrangements and subcontracting are permitted. If an offeror is proposing a specific individual as the Project Coordinator who is a subcontractor, that individual must be identified in the initial quotation. An award-contingent letter of commitment from that individual is highly encouraged to demonstrate availability.
Question 14: Does the requirement for at least 10 years of professional experience include consulting or contract assignments supporting museums, libraries, archives, and comparable heritage organizations, or must the experience have been gained as a direct employee? Is this a firm requirement?
Government Response: Consulting and contract assignments supporting cultural sector/heritage organizations absolutely count toward the 10-year experience requirement. Yes, the 10-year threshold is a firm minimum requirement for the proposed Coordinator.
Question 15: Component 2 requests information concerning artifact assessment, treatment, and transport. Will three to five examples of coordinating conservation projects satisfy this requirement where the proposed coordinator managed schedules, documentation, budgets, and communications but did not personally perform conservation treatment?
Government Response: Yes. Comparable museum and archival project coordination (preservation planning, collection relocations, vendor management) is acceptable. The Government is seeking project coordination and management expertise, not necessarily a bench conservator.
CATEGORY 6: PLACE OF PERFORMANCE, TRAVEL, AND SECURITY
Question 16: Can the Government clarify whether the coordinator may work remotely from any U.S. location, or whether proximity to NARA facilities is preferred or required?
Government Response: The work may be performed remotely from any U.S. location. Proximity to NARA facilities is not a requirement, though the Coordinator must be available for standard Eastern Time Zone business hours for meetings.
Question 17: Will background screening be required for personnel working remotely on NARA systems? If so, what level, and must it be completed before work begins?
Government Response: Yes. A basic National Agency Check with Inquiries (NACI) or equivalent background investigation is required for IT system access.
File details come from the government source that posted it. Updated .