This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract to provide actuarial review services to the Department of Housing and Urban Development. The contractor will be required to deliver various plans, models, reports, and other materials on a recurring basis according to prescribed schedules, with acceptable quality levels defined for each deliverable. Performance will be monitored through methods such as 100% inspection of deliverables and customer feedback. The contractor's invoice may be reduced by 3% for failures to meet standards. The contract term is for one base year with four optional one-year extensions. The contractor must provide transition plans at the start and end of the contract period.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2.pdf | ||
| Attachment 1 Revised Perfofmance Work Statement.pdf | ||
| Attachment 3 Question and Answers.pdf | ||
| Amendment 1 86615722R00001.pdf | ||
| Sol_86615722R00001Solicitation (Final).pdf | ||
| Attachment A Performance Work Statement (PWS)nb.doc | DOC document | |
| Attachment F Nondisclosure-Agreement-between-HUD-and-Potential-Offeror (1).docx | DOCX document | |
| Attachment C QASP RMCAP Re-compete 7-15-22.pdf | ||
| Attachment D Past Performation Information (1).docx | DOCX document | |
| Attachment E Past Performance Survey.docx | DOCX document | |
| Attachment B Pricing Sheet 7-8-22 (2).xlsx | XLSX spreadsheet | |
| Attachment A1 Task 5.2 (2) (1).pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
Risk Management & Capital Assessment Projections (RMCAP)
08/03/2022 (revised) Version 2.2 Quality Assurance Surveillance Plan (QASP) Risk Management & Capital Assessment Projections (RMCAP)
1 Vision
To achieve operational excellence through the development and execution of risk management models for the Federal Housing Administration (FHA) mission critical Single-Family Mortgage Insurance programs.
1 INTRODUCTION
This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS) entitled Actuarial Review of the Mutual Mortgage Insurance Fund (MMIF). This plan sets forth the procedures and guidelines HUD's Office of Risk Management and Regulatory Affairs QCP will use in ensuring the required performance standards or service levels are achieved by the Contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the Contractor is meeting the performance standards/quality levels identified in the PWS and the Contractor's Quality Control Plan (QCP), and to ensure that the Government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the Integrated Project Team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the Contractor's performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around "what service or quality level is required", as opposed to "how the Contractor should perform the work" (i.e., results, not compliance). This QASP will define the performance management approach taken by HUD's Office of Risk Management and Regulatory Affairs QCP to monitor and manage the Contractor's performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the Contractor.
1.2.2 Performance management represents a significant shift from the more traditional Quality Assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the Contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A "results focus" provides the Contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The Contractor is responsible for the quality of all work performed. The Contractor measures that quality through the Contractor's own Quality Control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by Contractor employees or by subcontractors. The Contractor's QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The Contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. This QASP enables the Government to take advantage of the Contractor's QC program.
1.3.2 The Government representative(s) will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against communicated performance objectives. The Contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
2.1 The Contracting Officer
The Contracting Officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Contracting Officers Representative (COR) and the Contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the Contractor's performance, and must be identified and designated by the CO.
2.2 The Government Technical Representative
The COR is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the Contractor's performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government's behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions, shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the Contractor's work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and in Appendix 1, "Surveillance Matrix". If the Contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract.
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the Government to evaluate Contractor performance when appropriate. The primary methods of surveillance are:
· 100% Inspection - Each month, the COR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.
· Periodic Inspection - The COR typically performs the periodic inspection on a monthly basis.
· CO, PCOR, SCOR, SME Feedback
4.2 Customer Feedback
The Contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the Contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems. The customer always has the option to communicate complaints to the CO and/or COR as opposed to the Contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
4.3 Acceptable Quality Levels
The Acceptable Quality Levels (AQLs) included in Appendix 1, "Surveillance Matrix", for Contractor performance are structured to allow the Contractor to manage how the work is performed. For certain critical activities such as those involving the production of Actuarial Studies and the production of the Replication Package, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Appendix 1.
5.2 Monitoring Forms
The Government's QA surveillance, accomplished by the COR, may be reported using the following monitoring forms: Appendix 2 - "Corrective Action Report (CAR)", Appendix 3 - "Customer Complaint Record", and Appendix 4 "Performance Assessment Report" (PAR). The forms, when completed, will document the Government's assessment of the Contractor's performance under the contract to ensure that the required results are being achieved. The COR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSEMENT
6.1 Determining Performance
The Government will use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the Contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
6.2 Reporting
At the end of each month, the COR will prepare a written report for the SME summarizing the overall results of the quality assurance surveillance of the Contractor's performance. This written report, which includes the Contractor's submitted monthly report and the completed quality assurance monitoring forms, will become part of the QA documentation. It will enable the Government to demonstrate whether the Contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.3 Reviews and Resolution
6.3.1 The COR may require the Contractor's project manager, or a designated alternate, to meet with the CO, PM and/or other Government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the Contractor, including appropriate self-assessments by the Contractor; however, if the need arises, the Contractor will meet with the COR as often as required or per the Contractor's request. The agenda of the reviews may include:
· Monthly performance assessment data and trend analysis,
· Issues and concerns of both parties,
· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis,
· Recommendations for improved efficiency and/or effectiveness,
6.3.2 The CO and COR must coordinate and communicate with the Contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The COR and Contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the discretion of the CO.
6.4 Surveillance Matrix
The Surveillance Matrix (Appendix 1) is the list of performance objectives and standards that must be performed by the Contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the Contractor's performance as it relates to the performance element standards. The PRS should be used to form the foundation of the COR's inspection checklist.
In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance
Rating Criteria
| Excellent / Outstanding |
| Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Appendix 1 - Surveillance Matrix
| Statements |
| Standards/AQLs |
| Inspections |
| Ratings |
5.1 Work, Data, Code and Method Plans
Deliverables:
A001 Management Work Plan A002 Input Data Architecture Plan A003 Output Data Architecture Plan A004 Code Architecture Plan A005 Model Methodology Plan
a) Standard: Submit draft versions of the Management Work Plan (MWP), Input Data Architecture Plan, Output Data Architecture Plan, Code Architecture Plan, and Model Methodology Plan via email to the COR within two weeks of the kick-off meeting and a final version of each plan no later than 90 days after contract award. Submit draft updates to each of the plans, to incorporate changed information, each option year via email to the COR within two weeks of beginning of the option year and the final updated plan(s) are to be delivered to the COR 90 days after the beginning of each option year.
AQL: 2 business days deviation from standard.
What: Work, Data, Code and Method Plans How: 100% review via visual verification and inspection
Frequency: When necessary
Who: COR and PM
Incentive: The Contractor's invoice would be deducted at 3% deduction from the associated monthly CLIN price.
Standard(s): Inspection applies to all standards
| Statements |
| Standards/AQLs |
| Inspections |
| Ratings |
5.2 Modeling, Reporting and Performance Tracking
Deliverables:
A006 Model Validation Assessment A007 Model Validation Performance Testing Plan A008 Model Validation Performance Testing Results A009 Monthly Reports Package A010 Quarterly Reports Package A011 Annual Reports Package A012 Annual Report to Congress A013 Budget Estimates/Re-Estimates A014 Ad Hoc Analysis Reports
a) Standard: Submit Model Validation Assessment within 10 days of each completed module.
AQL: 0 deviation from standard.
b) Standard: Provide the Model Performance Testing Plan Draft to FHA within seven months of contract award and Final within two weeks of draft delivery date.
AQL: 0 deviation from standard.
c) Standard: Provide Model Performance Testing Results Draft to FHA within two weeks of the end of each quarter and Final within two weeks of FHA feedback on Draft.
AQL: 0 deviation from standard.
d) Standard: Submit the Monthly Reports Package via email to the COR one month from the contract award date and monthly thereafter, to be due the 15th of the following month, or within 3 business days of Contractor receiving data for model execution.
AQL: 5 business days from Contractor receiving data for model execution.
e) Standard: Provide the Quarterly Reports Package via email to the COR within 3 business days from the end of each quarter, or from the date the Contractor received the data for model execution.
AQL: 5 business days from the end of each quarter, or data receipt, for all but the NPV and ROA reports for which the 5-day deviation can only occur once per calendar year.
f) Standard: Provide the Annual Reports Package via email to the COR within 5 business days of the Contractor receiving complete data.
AQL: 3 business days deviation from standard.
g) Standard: Provide Annual Report to Congress Draft materials to FHA by October 25th and Final materials by November 1st of each year.
AQL: 0 deviation from standard.
h) Standard: Provide Budget Formulation Credit Subsidy Estimate Package by the third week of November for the Current Year Package, and the first week of December for the Budget Year package or in time to meet OMB's request.
AQL: 0 deviation from standard.
i) Standard: Respond to Ad Hoc Analysis requests within 10 business days of date requested in draft form with a final due within 5 business days of draft delivery.
AQL: 1 business day deviation from standard for draft, 0 deviation for final.
What: Modeling, Reporting and Performance Tracking How: 100% review via visual verification and inspection
Frequency: Continuous
Who: COR and PM
Incentive: The Contractor's invoice would be deducted at 3% deduction from the associated monthly CLIN price.
| Statements |
| Standards/AQLs |
| Inspections |
| Ratings |
5.3 Records Management, Delivery and Review Support
Deliverables:
A015 Model Methods Update Packages
A016 Actuarial Review Report A017 Audit Support and IV&V Replication Packages A018 Audit Support Response Packages A019 Document Retrieval Process A020 RMCAP Framework A021 Program Specifications
a) Standard: Provide Annual Model Update support according to the prescribed schedule: Proposed Update Agenda Items by March 30th; Interim Updates as approved by FHA by May 30th; Final Updates as approved by FHA by July 30th.
AQL: 2 business days deviation from standard.
b) Standard: Provide comparison of actuarial reviews by November 7th or within 5 business days after receipt of the provisional final actuarial reviews.
AQL: 2 business days deviation from standard.
c) Standard: Provide replication packages to the COR within 7 business days of Contractor providing the major model deliverable.
AQL: 3 business days deviation from standard.
d) Standard: Provide IV&V and Audit responses within 3 business days of request.
AQL: 2 business days deviation from standard.
e) Standard: Provide Artifact Retrieval Process and User Guide to the COR 90 days after contract award.
AQL: 10 business days deviation from standard.
f) Standard: Provide a fully functional RMCAP framework within 120 days contract award and ensure that changes to any part of the solution can be implemented within 30 days of notification of required changes.
AQL: 0 deviation from standard.
g) Standard: Program Specifications are delivered within 10 days of program completion.
AQL: 5 business days deviation from standard.
What: Records Management, Delivery and Review Support How: 100% review via visual verification and inspection.
Frequency: When necessary
Who: COR and PM
Incentive: The Contractor's invoice would be deducted at 3% deduction from the associated monthly CLIN price.
| Statements |
| Standards/AQLs |
| Inspections |
| Ratings |
5.4 Transition Services
Deliverables:
A022 Transition-In Plan A023 Transition-Out Plan
a) Standard: Provide a Transition-In plan via email to the COR within 10 days of kick-off meeting and execute said plan during the first 120 days of the contract.
AQL: 1 business day deviation from standard.
b) Standard: Submit a Transition-Out Plan to the COR no later than 150 days before the end of the contract and execute said plan to completion before contract close-out.
AQL: 10 business days deviation from standard.
What: Transition Services How: 100% review via visual verification and inspection.
Frequency: When necessary
Who: COR and PM
Incentive: The Contractor's invoice would be deducted at 3% deduction from the associated monthly CLIN price.
Appendix 2 - Corrective Action Report (CAR)
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY FORMCHECKBOX
MAJOR FORMCHECKBOX
MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
FORMCHECKBOX
ACCEPTED FORMCHECKBOX
REJECTED
12. CLOSE DATE
Appendix 3 - Customer Complaint Record
| CUSTOMER COMPLAINT RECORD |
| DATE/TIME OF COMPLAINT |
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Appendix 4 - Performance Assessment Report (PAR)
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. FORMCHECKBOX
DEFICIENCY (CHECK ALL BOXES THAT APPLY)
FORMCHECKBOX
NEW
FORMCHECKBOX
REPEAT
FORMCHECKBOX
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE FORMCHECKBOX
CONCUR FORMCHECKBOX
NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. FORMCHECKBOX
CONCUR FORMCHECKBOX
NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
File details come from the government source that posted it. Updated .