S33 Solicitation (86615625R00005) A0003 HACs QandA.pdf
PDF 161 KB Posted
- Attached to
- Office of Healthcare Programs (OHP) requires contractor support to provide hospital assessment services.
- Solicitation number
- 86615625R00005
About this file
This document is a Questions and Answers (Q&A) record for the Hospital Assessment Consulting Services (HACS) IDIQ solicitation (86615625R00005) issued by the U.S. Department of Housing and Urban Development (HUD). The solicitation was released as unrestricted (later corrected to remove any set-aside language per Amendment 0001), with a questions deadline of February 26, 2026, at 12:00 PM EST, directed to Francis Chen and Marie Niestrath at HUD. The HACS contract is a recompete effort supporting existing incumbents under contract numbers 86615621D00001, 86615621D00002, and 86615621D00003, with no transition-in period required. HUD anticipates awarding up to four IDIQ awardees with a five-year base period (06/24/26–06/23/31) divided into five 12-month increments, with no option periods. The contract type is firm-fixed-price with labor-hour components and includes three Contract Line Item Numbers (CLINs): CLIN 0001 for labor services (offeror-priced), CLIN 0002 for other direct costs, and CLIN 0003 for travel and other direct costs. Task orders will be competed fairly among awardees with no guaranteed work distribution; each awardee receives a minimum guarantee amount to meet exceptions to fair opportunity requirements.
The scope encompasses hospital assessment consulting services for both HUD Section 242 acute care hospitals and Section 232 residential care facilities, with the government issuing an average of four task orders annually under the current contract. Core service areas include performance improvement assessments, business plan reviews, revenue cycle assessments, reimbursement/compliance reviews, non-practitioner workforce planning, and practitioner workforce planning. Deliverables vary by task order but typically include weekly status meetings, final presentations of findings, and final reports. The solicitation requires offerors to submit pricing at the IDIQ level using provided labor categories with hourly rates for the five-year base period, provide a total FTE staffing plan for the IDIQ contract, submit no more than five past performance references, and designate a Contract/Project Manager and alternate with resumes (not counted toward page limits). No minimum qualifications, certifications, security clearances, background investigations, HUD PIV cards, or access to government IT systems are required. Contractor personnel will not collect or access protected health information (PHI) or personally identifiable information (PII). The proposal must include a Proposal Matrix mapping PWS requirements, separate technical and price volumes, a Project Schedule, Management Plan, and Technical Approach, with specific page limits referenced in Section L of the solicitation. All detailed requirements regarding task order scope, deliverable specifications, performance standards, quality assurance, on-site versus remote work percentages, and most personnel requirements will be defined at the task order level.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Name Hospital Assessment Consulting Services (HACS)
Solicitation # 86615625R00005
Questions Due Date 2/26/2026 @ 12:00 PM EST
Email to
Francis Chen, francis.chen@hud.gov
Marie Niestrath, marie.a.niestrath@hud.gov
Solicitation or PWS Reference Question Answer
Synopsis Solicitation
The SAM posting for the HUD OHP consulting solicitation states there is “No Set Aside
Used”, however the solicitation document states that this work is set-aside for small businesses. Just want to clarify that this is a
Small Business Set-Aside?
Amendment 00001 was issued to correct the language. This synopsis/solicitation has no set aside.
Synopsis Solicitation
We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number?
There are incumbents performing these services.
The current contract numbers are:
86615621D00001, 86615621D00002, and
86615621D00003.
Synopsis Solicitation
Is there any incumbent/recompete or this is a brand-new project? If yes, could you please provide us with their award number or even if the customer bought similar services in the past.
There are incumbents performing these services.
The current contract numbers are:
86615621D00001, 86615621D00002, and
86615621D00003.
Amendment 0001 vs.
Attachment 4 - Past
Performance Survey
Attachment 4 - Past Performance Survey describes services related to subscription-based web portals, while the PWS describes hospital assessment consulting services. Will the past performance survey be updated to align with the PWS?
Yes. Please monitor SAM.gov for the updated version of Attachment 4.
Synopsis / Solicitation
Please advise whether proposals should be submitted in separate volumes and, if so, what volumes are required and what page limits apply to each.
Please refer to S13 Synopsis Solicitation
(86615625R00005) A0003, Part VI - Section L - B.
Proposal Submission Instructions.
Synopsis / Solicitation
Could the government provide the evaluation methodology and weighting of evaluation factors?
Please refer to S13 Synopsis Solicitation
(86615625R00005) A0003, Part VII- Section M -
Evaluation factors for award.
Synopsis / Solicitation Where should clients send completed Past
Performance surveys?
Please refer to S13 Synopsis Solicitation
(86615625R00005) A0003, Part VI - Section L - A.
Submission Guidelines.
Synopsis / Solicitation How many past performance references are requested per offeror?
Please refer to S13 Synopsis Solicitation
(86615625R00005) A0003 Part VI - Section L -
Factor C- Past Performance. Following Section L, no more than 5 references.
Synopsis / Solicitation
Will HUD consider extending the proposal due date following the publication of responses to questions?
HUD is not considering extending the proposal due date at this time. However, if the proposal due date is extended, an amendment will be posted on
SAM.gov. Please monitor SAM.gov for amendments.
PWS Section 5.3 - Services
Section 5.3 lists six service areas
(performance improvement assessments, business plan reviews, revenue cycle assessments, reimbursement/compliance, non-practitioner workforce planning, practitioner workforce planning). Will detailed requirements for these services be defined at the IDIQ level or at the Task Order level?
Task Order CLINs will be developed from the parent
IDIQ CLIN structure and tailored to meet specific
HACS requirements. For TOs that align with existing
IDIQ CLINs, the applicable CLINs will be incorporated without modification to maintain contractual alignment. This IDIQ contract has 3
CLINs.
PWS Section 5.3 - Services
For proposal development purposes, could
HUD describe the typical deliverables expected for each of the six service areas listed in Section 5.3?
Deliverables vary by Task Order, however, deliverables typically include weekly status meetings, a final presentation of findings, and a final report.
PWS Section 5.1 - Findings and
Analysis
Please provide guidance on the expected format, frequency, and acceptance criteria for
"findings and analysis" deliverables referenced in Section 5.1.
Section 5.1 of the Performance Work Statement
(PWS) establishes the required format, frequency, and acceptance criteria for “Findings and Analysis” deliverables. These parameters will govern performance at the Task Order level.
PWS Section 5.2 - Program
Requirements
Could HUD clarify whether program requirements will be defined in individual Task
Orders or whether offerors should propose specific program support activities in their proposals?
Program requirements will be defined in individual
Task Orders. That not withstanding, offerors should demonstrate their capabilities in the program requirements listed in PWS Section 5.2 and service listed in PWS Section 5.3. In addition, please refer to
S13 Synopsis Solicitation (86615625R00005)
A0003, Part VI - Section L, Evaluation Factors.
PWS Section 1.11 - Contractor
Travel
To assist with cost estimation, could HUD provide an estimate of anticipated travel requirements (e.g., approximate number of trips per year, typical durations, and general geographic areas)?
There is no travel cost estimation at the IDIQ level or
Task Order level. Please refer to S13 Synopsis
Solicitation (86615625R00005) A0003, Part I, 1.6
Contract Price, Ceiling Column (not to exceed in 5 years).
Attachment 2 - QASP, Appendix
The QASP references Appendix 1 - Surveillance
Matrix. Will this appendix be provided prior to proposal submission?
Appendix 1 is part of S14 Attachment 2 - QASP 242
HACS (86615625R00005). A detailed QASP will be issued at the Task Order level for each project.
Attachment 2 - QASP, Section
6.1
The QASP references Appendices 2, 3, and 4
(Corrective Action Report, Customer
Complaint Record, and Performance
Assessment Report). Will these appendices be made available for review?
Appendices 2, 3, and 4 is part of S14 Attachment 2 -
QASP 242 HACS (86615625R00005).
PWS Section 4.5 - Contractor
Personnel
Could HUD provide the minimum qualifications, education, and experience requirements for the Contract/Project Manager and alternate positions?
No minimum qualifications, education, and experience have been established for the
Contract/Project Manager and alternate positions of the IDIQ level.
PWS Section 4.5 - Contractor
Personnel
Can HUD confirm whether any Key Personnel positions are required beyond the
Contract/Project Manager and alternate?
Contract / project manager and alternates are mandatory at the contract level. Additional Key
Personnel positions may be required at the Task
Order level.
PWS Section 1.8 - Special
Qualifications
Are there any specific certifications, licenses, or specialized qualifications required or preferred for contractor personnel (e.g., healthcare consulting certifications, healthcare finance expertise)?
No specific certifications, licenses, or specialized qualifications required for contractor personnel for the IDIQ level of the contract.
PWS Section 1.12 - Transition
In
Could HUD advise whether there is an incumbent contractor and, if so, provide current contract details and whether a transition period will be provided?
There are incumbents performing these services.
The current contract numbers are:
86615621D00001, 86615621D00002, and
86615621D00003. Transition period will not be required.
PWS Section 1.13 - Transition
Out
Please describe the contractor's anticipated responsibilities for transitioning work to a successor contractor at the end of the contract period.
Transition period will not be required.
Solicitation Section 1.6 -
Contract Price
Could HUD describe the anticipated process for Task Order competitions (e.g., will all awardees be invited to submit quotes for each
Task Order)?
Please refer to HUDAR 2452.216-78 Ordering
Procedures (FEB 2006) as listed in S13 Synopsis
Solicitation (86615625R00005) A0003, SECTION I -
Contract Clauses.
Solicitation Section 1.1 -
Description
For planning purposes, how does HUD anticipate distributing work among the up to four IDIQ awardees?
HUD does not intend to distribute work. Each task order will be competed fairly. Please refer to HUDAR
2452.216-78 Ordering Procedures (FEB 2006) as listed in S13 Synopsis Solicitation
(86615625R00005) A0003, SECTION I - Contract
Clauses.
Solicitation Section 1.4 -
Contract Type
Please clarify whether offerors should provide pricing at the IDIQ level or whether pricing will be established at the Task Order level.
Proposals should be submitted utilitizing
Attachment 3, with pricing at the IDIQ level.
Attachment 3 - Price Schedule Can additional LCATs be added to the Price
Schedule?
Please refer to SAM.gov for the updated version of
Attachment 3.
Attachment 3 - Price Schedule
Should offerors use the estimates of hours per project, as well as 8 projects per year, for pricing purposes, or are these estimates provided as an example only?
Offerors should provide the hourly rate to the Labor
Categories used throughout Base Period 1-5. The "8 projects" estimates are provided as an example of how many task orders could be issued per a 12 month period. Please refer to SAM.gov for the updated version of Attachment 3.
Attachment 3 - Price Schedule, CLIN 0002
Please provide examples of the types of Other
Direct Costs HUD anticipates for this contract
(e.g., report printing, software licenses, data subscriptions).
Examples of Other Direct Costs include but are not limited to: report printing, software licenses, and data subscriptions. Other Direct Costs identified by vendors will be Task Order specific and consistent with the FAR.
PWS Section 1.11 and
Attachment 3 CLIN 0003
To assist with travel cost estimation, could you describe the typical geographic distribution of hospital sites that may require contractor travel?
Travel and Other Direct Costs (ODCs) under this contract are pre-established and subject to a not-to-exceed (NTE) ceiling for the full five-year period of performance. Please refer to S13 Synopsis
Solicitation (86615625R00005) A0003, Part I, 1.6
Contract Price, Ceiling Column (not to exceed in 5 years).
Solicitation Section 1.7 - Place of Performance
What percentage of work does HUD anticipate will be performed on-site at hospital facilities versus remotely?
The percentage of work performed on-site versus remotely will be Task Order specific.
PWS Section 6.1 - Quality
Control Plan
Beyond the Quality Control Plan, are there any other contract-level deliverables, or will all deliverables be defined at the Task Order level?
Deliverables will be defined at the Task Order level.
PWS Section 6.2 - Acceptance
Criteria
If a deliverable is not accepted, what is the expected timeframe for resubmission and re-inspection?
Deliverables will be defined at the Task Order level.
PWS Section 6 - Deliverables
Could you provide guidance on standard deliverables anticipated for each Task Order
(e.g., status reports, assessments, presentations)?
Deliverables vary by Task Order, however, deliverables typically include weekly status meetings, a final presentation of findings, and a final report.
PWS Section 3.3 - Equipment
Will contractors need to access government IT systems, portals, or software? If so, what systems and access requirements should offerors plan for?
No.
PWS Section 3.4 - Materials and Information
What types of materials and information will typically be provided to contractors for each
Task Order (e.g., hospital financial statements, loan documentation)?
Materials and information will vary by Task Order.
PWS
Will contractor personnel require background investigations, security clearances, or Public
Trust determinations?
No.
PWS
Will contractor personnel require HUD PIV cards or other facility/system credentials?
No.
PWS
Could HUD describe the types of data contractors will access and any associated security requirements (e.g., PII, PHI, other CUI, financial data)?
The data shall not include the request or collection of protected health information (PHI) or personally identifiable information (PII).
Synopsis / Solicitation
For past performance evaluation, what criteria will HUD use regarding contract dollar thresholds, recency, and relevance?
Please refer to S13 Synopsis Solicitation
(86615625R00005) A0003 Part VII- Section M -
Factor C - Past Performance. Please refer to
SAM.gov for Attachment 4 and 5.
Attachment 5 - Past
Performance Info
Can past performance of a subcontractor be provided in addition to prime contractor performance?
Please refer to S13 Synopsis Solicitation
(86615625R00005) A0003 Part VII- Section M -
Factor C - Past Performance (refer to bullet 2).
Attachment 5 - Past
Performance Info
What types of experience will be considered relevant for past performance evaluation (e.g., hospital assessment, healthcare consulting, financial consulting, management consulting)?
Please refer to S13 Synopsis Solicitation
(86615625R00005) A0003 Part VII- Section M -
Factor C - Past Performance.
Attachment 4 - Past
Performance Survey, Page 1
Can HUD clarify the description of services in the
Past Performance Survey? The survey (document
S14 Attachment 4, page 1) describes services including "subscription-based web portal," "Rating
Agency Reports," and "Financial and Operational
Benchmarks" which do not appear to align with the hospital assessment consulting services described in the PWS Section 5.1. Is this survey template correct for this solicitation?
Please refer to SAM.gov for the updated version of
Attachment 4.
Synopsis Solicitation, Section
1.5, Page 2
Can HUD clarify the task order performance period flexibility? Section 1.5 states "Orders can be placed up to the last day of the ordering period and can run for a period of 12-months." Does this mean task orders are limited to 12 months maximum, or can they extend beyond the IDIQ ordering period end date of 06/23/31 if issued near the end of the ordering period?
Yes, they can extend beyond the IDIQ ordering period if a task order is issued by end date of
06/23/31.
Synopsis Solicitation, Page 1;
PWS Section 1.1, Page 4
Can HUD clarify the scope applicability to Section
232 residential care facilities? The synopsis focuses exclusively on "Hospital Assessment Consulting
Services" for Section 242 acute care hospitals.
However, PWS Section 1.2 discusses both OHF
(Section 242 hospitals) and ORCF (Section 232 residential care facilities). Will task orders include assessment services for nursing homes, assisted living facilities, and board and care facilities under
Section 232, or is this IDIQ limited solely to acute care hospital assessments?
This IDIQ is for services related to both Section 242 hospitals and Section 232 residential care facilities.
Deliverables will be defined at the Task Order level.
Synopsis Solicitation, Section
1.6, Page 2 vs. Clause 52.217-
8, Page 9
Can HUD clarify whether the base period is 5 years? Section 1.6 states "The IDIQ contracts will not include option periods" and Factor D
Section A states the Period of Performance is
06/24/26 - 06/23/31.
Base period is 5 years, no options. The five-year period will be divided into five 12-month increments identified as Base Period 1, Base Period 2, Base
Period 3, Base Period 4, and Base Period 5.
Synopsis Solicitation, Section
1.6, Page 2
Can HUD clarify the task order competition procedures? The solicitation states awardees will receive "fair opportunity" for task orders exceeding the micro-purchase threshold but does not specify the competition process, evaluation methodology, or exceptions to fair opportunity. What procedures will govern task order awards and what is considered an "exception to fair opportunity"?
Task orders will be competed amongst the contract awardees. Please refer to HUDAR 2452.216-78
Ordering Procedures (FEB 2006) as listed in S13
Synopsis Solicitation (86615625R00005) A0003, SECTION I - Contract Clauses. An exception to fair opportunity is to meet the minimum guarantee award amount for each IDIQ contract awardee-please refer S13 Synopsis Solicitation
(86615625R00005) A0003, Section II 1.4 Contract
Type.
Can HUD provide proposal preparation instructions including volume organization, page limits, font size, margin requirements, and submission format? The solicitation does not include Section L-equivalent instructions for offerors to prepare compliant proposals.
Please refer to S13 Synopsis Solicitation
(86615625R00005) A0003 Part VI - Section L - B.
Proposal Submission Instructions.
Synopsis Solicitation, Section
1.6, Page 2
Section 1 and Solicitation A001 indicates the procurement is unrestricted. Section II, 1.2 indicates this is a small business set-aside.
Can HUD update the Solicitation for consistency?
The solicitation has been updated in Amendment
0001. Please refer to SAM.gov for amendment updates.
Synopsis Solicitation, Factor A, Is the project schedule included in the page count or can it be placed in an Appendix?
It can be placed in an Appendix.
Synopsis Solicitation, Factor A, Factor A requires the Offeror to submit a "Project
Schedule for IDIQ contract: The offeror shall submit a project schedule for the IDIQ that demonstrates a clear understanding of the required contract operations and HUD requirements with realistic timeframes for performing all tasks." Tasks are not detailed to a level within the PWS for Tasks 5.1, 5.2, and 5.3 in order to develop a Project Schedule at the IDIQ level. Can HUD clarify expectations for the
Project Schedule?
Please refer to S13 Synopsis Solicitation
(86615625R00005) A0003 Part VI - Section L -
Factor A.
S14 Attachment 3
Can HUD clarify if the labor category rates to be provided in the Labor Category Breakdown spreadsheet reflect rates at the IDIQ level for the base period of 5 years (as indicated in Part
D of the Solicitation)? If so, should the Offeror build in assumed annual escalations?
The labor category rates reflect rates at the IDIQ level. Please refer to SAM.gov for the updated version of Attachment 3.
S14 Attachment 3 Can HUD confirm that the Senior Consultant II is a full time equivalent?
The Labor Categories listed in Attachment 3 must have hourly rates. Additional labor categories may be added at the contract level at the offeror's discretion. Please refer to SAM.gov for the updated version of Attachment 3.
S14 Attachment 3 Can HUD confirm that the "lo" Unit of Issue is equivalent to labor hour?
Please refer to SAM.gov for the updated version of
Attachment 3.
Synopsis / Solicitation
The solicitation requires submission of a
Proposal Matrix mapping PWS requirements to the proposal. Can the Government clarify under which Volume and Factor this matrix should be included (e.g., Technical Volume under Factor A), and whether it counts toward the applicable page limitation?
"As part of the proposal submission, offerors shall submit a Proposal Matrix using the table below or similar format, which maps what page of the proposal addresses each Performance Work
Statement requirement identified under Technical
Approach…" This would be under Volume I and should be before Factor A. It should not count towards the page limitation. Please refer to SAM.gov.
S13 Synopsis Solicitation (86615625R00005) A0003
Part VI - Section L.
Under Factor B – Management Plan and the Key
Personnel clause, is the Offeror required to propose a total FTE staffing plan for the IDIQ contract, or only at the Task Order level? Additionally, aside from the Contract/Project Manager and Alternate
PM (if applicable), are resumes required for any other proposed personnel at the IDIQ level?
The offeror is required to propose a total FTE staffing plan for the IDIQ contract only.
For planning purposes, can the Government provide historical data regarding the number of
Task Orders issued annually under the predecessor HACS contract, including approximate FTE utilization and typical staffing structures?
The Government has issued an average of 4 Task
Orders annually under the current HACS contract.
The PWS states that the scope of requested work shall be defined at the Task Order level. For purposes of the IDIQ proposal submission, should
Offerors provide a detailed execution methodology for each assessment type listed in PWS Section 5, or is a high-level framework describing the Offeror’s assessment approach sufficient at the IDIQ level?
Please refer to S13 Synopsis Solicitation
(86615625R00005) A0003 Part VI - Section L -
Factor A.
Can the Government provide insight into the anticipated mix of Task Orders between
Section 242 acute care hospitals and Section
232 residential care facilities over the ordering period?
Task Orders are developed on an as needed basis.
There is no way to anticipate the mix of Task Orders between Section 242 acute care hospitals and
Section 232 residential care facilities.
Does the Government anticipate that most assessments will require on-site presence, or will remote/hybrid execution be acceptable depending on Task Order scope?
The percentage of work performed on-site versus remotely will be Task Order specific.
Will contractors be required to access or interface with specific HUD information systems to perform hospital assessments, and if so, will system access requirements be defined at the IDIQ level or at the Task Order level?
There will be no access to specific HUD information systems.
The solicitation requires designation of an
Information System Security Officer (ISSO) or
Security Point of Contact. Can the Government clarify whether there are any minimum qualifications, certifications, clearance levels, or experience requirements expected for this role at the IDIQ level?
No specific minimum qualifications, certifications, clearance levels, or experience requirements are expected for this role at the IDIQ level.
Solicitation: Section L, pg 30
Are the pages of the key personnel resumes required under FACTOR B counted against the
10-page limit for the Management Plan?
No.
Solicitation: Section L, pg 32
At the top of page 33 the solicitation states
"Proposals shall be accompanied by a cover page providing the following information:" FACTOR D -
PRICE on the same page states "The proposal form
(Standard Form 1449), must be executed fully and used as the cover sheet (or first page) of this volume." The SF1449 doesn't have a place for all the listed as required for the cover page for example preparer's information and point of contact for clarifications and discussions. Can the government clarify the confirm page requirements?
Please refer to S13 Synopsis Solicitation
(86615625R00005) A0003 Part VI - Section L, Part II
Price Proposal.
Attachment 3
The attachment doesn't include columns for labor category descriptions and/or descriptions of the work to be performed by each labor category as required by Section L FACTOR D of the solicitation.
Does the government want the offerors to provide descriptions in attachment 3 or will the government provide a revised pricing sheet?
Please refer to SAM.gov for the updated version of
Attachment 3.
PWS, pg 14
The deliverables for Standards/AQLs 5.1b and 5.1c are due at the end of the period of performance. The
Incentive/Remedy indicates 0.1% deduction from the associated monthly LIN for any deviation. Can the government clarify how it intends to monitor and enforce/apply Incentive/Remedy of the
Standards/AQL?
Deliverables will be defined at the Task Order level.
PWS, pg 14
Does the government anticipate other
Standards and AQLs at the task order level for task areas 5.2 - 5.3 and their associated sub-sections?
Deliverables will be defined at the Task Order level.
Solicitation: Section L, Factor
A, pg 30
Factor A requires submission of a “Project
Schedule for the IDIQ” demonstrating understanding of contract operations and task order management. Can the Government clarify its expectations for the Project Schedule? For example, should this schedule reflect a notional
Task Order lifecycle (e.g., proposal development through delivery of final report), a high-level five-year IDIQ management timeline, or is a different approach expected?
Please refer to S13 Synopsis Solicitation
(86615625R00005) A0003 Part VI - Section L -
Factor A.
Solicitation: Section L, Factor
B, pg 30
Factor B (Proposal Submission Instruction) states that we should include a Proposal
Matrix in Part 1 – Technical Proposal. Does this matrix count toward the page limitations for
Factors A and B, or is it excluded from page limits?
As part of the proposal submission, offerors shall submit a Proposal Matrix using the table below or similar format, which maps what page of the proposal addresses each Performance Work
Statement requirement identified under Technical
Approach. This would be under Volume I and should be before Factor A. It should not count towards the page limitation. Please refer to SAM.gov. S13
Synopsis Solicitation (86615625R00005) A0003 Part
VI - Section L.
Attachment 3
There are several notes within Attachment 3, specifically on the "Labor Category Breakdown" tab.
For example, one note reads "I suggest to remove this as we do not have a Task Order. BUT we could give the scenario of a TO and they would need to fill out the "Hours" column." Can you please clarify the government's expectations for the "CLINs-Rates" tab and the hours on the "Labor Category
Breakdown" tab? Specifically, are hours required for evaluation or only a rate card?
Offerors should provide the hourly rate to the Labor
Categories used throughout Base Period 1-5. Please refer SAM.gov for the updated version of Attachment
3.
Could you confirm whether a solicitation is anticipated in the near future and, if so, where industry can monitor for updates or a potential solicitation posting?
S13 Synopsis Solicitation (86615625R00005) A0002 is currently posted on SAM.gov. If you are awarded an IDIQ contract, the anticipated solicitation at the task order level are issued as needed and competed only among the awardees.
RFP Section II, Part I, Section B
How many task orders does the government anticipate awarding annually, and what is the typical size (dollars / LOE / duration) of a task order?
Task Orders are developed on an as needed basis.
There is no way to anticipate the number or size of
Task Orders.
RFP Section II, Part I, Section B
Are task orders expected to be concurrent, and if so, is there a maximum number a contractor can support at one time?
Task Orders are developed on an as needed basis.
There is no maximum a contractor can support at one time.
RFP Section II, Part I, Section B
Does the government intend to award a task order with the BPA?
Not at this time.
RFP Part III - Section I -
Contract Clauses, 2452.209-
70 Potential Organizational
Conflicts Of Interest. (FEB
2000), pg. 8-9
To understand any potential conflicts of interest and to provide a response that appropriately mitigates these risks, can the government provide the portfolio of hospitals and residential care facilities in scope of this solicitation?
No.
RFP Part III - Section I -
Contract Clauses, 2452.219-
70 Small Business
Subcontracting Plan
Compliance. (FEB 2006), 2452.219-73 Incorporation Of
Subcontracting Plan. (DEC
If an offeror has a Small Business
Subcontracting Plan at the GSA Schedule level, is an additional plan required for this RFP or will the GSA Schedule Plan be sufficient?
This requirement is for a standalone HUD IDIQ contract and is not a GSA Schedule or other pre-existing contract vehicle. Offerors shall submit proposals based solely on this solicitation and the terms of the HUD IDIQ. Offerors who anticipate subcontracting any portion of the work must include a Subcontracting Plan.
RFP Part III - Section I -
Contract Clauses, 2452.237-
70 Key Personnel. (FEB 2006),
pg. 13-14
Can the government define the role of the Task
Manager as listed in the Key Personnel Clause from the RFP?
Contract / project manager and alternates are mandatory at the contract level. Additional Key
Personnel positions may be required at the Task
Order level. Please refer to SAM.gov for the updated table under 2452.237-70 Key Personnel. (FEB 2006) in Amendment 3. Also, please refer to PWS Section
4.5 Contract Personnel.
Attachment 3 - Price Schedule, CLINs-Rates tab; RFP - Section
II, Part I, Section B Page 2-3
Can the government clarify how the "CLINs-
Rates" tab in S14 Attachment 3 - Price
Schedule should be completed? Should the
Total Price for CLIN0001, CLIN0002, and
CLIN0003 be completed as indicated in RFP
Section 1.6 Contract Price?
Please refer to SAM.gov for the updated version of
Attachment 3. Yes, CLINs-Rates tab should include the total price for CLIN0001. CLINS 0002 and 0003 are set.
Attachment 3 - Price Schedule, Labor Category Breakdown and
6-Month Extension tabs
Can the government provide instruction on how to complete the Labor Category
Breakdown and 6-Month Extension tabs of
Attachment 3 - Price Schedule? Specifically, which cells can be edited?
Please refer to SAM.gov for the updated version of
Attachment 3.
Attachment 3 - Price Schedule, Labor Category Breakdown;
RFP Part VI - Section L, Factor E
- Price, pg. 33-34
Can the government clarify which labor category tables need to be included in the submission? A sample table is provided in the
RFQ which includes Periods 1-5, whereas the table provided in Attachment 3 does not.
Please refer to SAM.gov for the updated version of
Attachment 3.
PWS Section 3, pg. 8; RFP Part
III - Section I - Contract
Clauses, AS-2315
Cybersecurity and Privacy
Requirements (APRIL 2022),
pg. 21-22
Does the government intend to provide
Government Furnished Equipment, such as laptops, for the execution of this contract? If not, would the government provide written exception to use NIST SP 800-171 compliant information technology?
No.
PWS Section 5.3.3, pg. 11
Can the government confirm it will support the defining of Key Performance Indicators that will be used to "evaluate hospital revenue cycle performance"?
No, the Government will rely on the contractor's expertise.
PWS Section 5.3.4, pg. 11
Can the government confirm it will define the parameters it considers as "optimize" in the context of "optimize the commercial healthcare payor contracts"?
No, the Government will rely on the contractor's expertise.
PWS Section 5.3.4, pg. 11
Will the government provide documentation to support the compliance reviews as requested in Section 5.3.4 or will the hospital be expected to provide the documentation?
This will be clarified as needed at the Task Order level.
PWS Section 5.3.4, pg. 11
Can the government confirm if reviews will be performed jointly with government personnel or independently by the contractor?
This will be clarified as needed at the Task Order level.
PWS Section 5.3.5, pg. 11
Can the government confirm if the underlying data to perform the reviews in Section 5.3.5 provided by HUD or the hospital? Has HUD set acceptable levels/thresholds for each component of the healthcare labor management review?
This will be clarified as needed at the Task Order level.
Solicitation Section B, Description of Services (pg.
2–3); PWS 1.1 Scope of Work
(pg. 4)
The solicitation and PWS describe a broad range of assessment services but do not include any estimated annual level of effort for contractors. Can
HUD provide historical or projected estimates of the expected number of task orders per year and/or anticipated annual hours, labor categories, or complexity tiers?
Task Orders are developed on an as needed basis.
There is no way to anticipate the number or size of
Task Orders. The Government has issued an average of 4 Task Orders annually under the current HACS contract.
PWS 1.2 Background (pg. 4), noting “as needed” support;
Solicitation 1.1 (pg. 2)
Can HUD provide any historical data (e.g., average number of hospital assessments per year) or projected volume of engagements expected under the IDIQ?
Task Orders are developed on an as needed basis.
There is no way to anticipate the number or size of
Task Orders. The Government has issued an average of 4 Task Orders annually under the current HACS contract.
PWS Section 5 (Specific Tasks)
(pgs. 10–12)
Can HUD provide an estimated range of typical task order duration (e.g., number of weeks/months per assessment) and general scope size (e.g., level of complexity, typical deliverables beyond PWS defaults)?
Task Orders are developed on an as needed basis.
There is no way to anticipate the number or size of
Task Orders.
Solicitation Section L, Technical Approach &
Management Plan requirements (pg. 30–31), and
HUDAR 2452.237‑70 Key
Personnel (pg. 13)
We recognize that the pricing sheet has prescribed hours/staffing categories for costing. Is this the expected typical staffing composition for an assessment (e.g., minimum number of consultants, required labor categories, expected hours per role)?
If not, can HUD provide the typcial staffing composition for an engagement/assessment?
Please refer to SAM.gov for the updated version of
Attachment 3.
PWS 1.6 Place of Performance
(pg. 5)—“contractor’s facility and the Borrower’s facility”;
Solicitation 1.7 Place of
Performance (pg. 3)
Can HUD clarify whether site visits to borrower facilities will be required for each assessment, or whether some engagements may be conducted fully virtually? If site visits are required, can HUD provide typical frequency (e.g., number of days per engagement) and number of personnel expected to travel?
The percentage of work performed on-site versus remotely will be Task Order specific.
PWS 1.11 Contractor Travel
(pg. 6), which outlines reimbursement rules but not expected volume; Solicitation
CLIN 0003 Travel (pgs. 2–3)
Given the geographic dispersion of
HUD‑insured hospitals nationwide, can HUD provide estimated annual travel expectations or historical averages for travel under similar consulting engagements (e.g., average number of trips per engagement or per year)?
The percentage of work performed on-site versus remotely will be Task Order specific.
PWS 5.2 Program
Requirements (pg. 10–11), which states that turnarounds
“may be tight” but provides no estimated response windows
Can HUD provide examples of typical task order proposal response times and expected performance timeframes (e.g., 30/60/90‑day assessment cycles), so offerors can appropriately assess resource availability and surge capacity?
Task Orders are developed on an as needed basis.
There is no way to anticipate the number or size of
Task Orders.
Solicitation 1.4 Contract Type
(pg. 2)—multiple award IDIQ up to four vendors; PWS indicates
“as needed” ordering (pg. 4)
Does HUD anticipate issuing multiple task orders concurrently to individual contractors, and if so, can HUD estimate the typical or maximum number of TOs a single awardee may need to support simultaneously?
Task Orders are developed on an as needed basis.
There is no maximum a contractor can support at one time.
PWS 5.1 Findings & Analysis
(pg. 10), which lists a wide variety of functional areas
Does HUD anticipate that assessments will be:
-primarily comprehensive reviews (all functional areas), -topic‑specific assessments (e.g., revenue cycle only), or a mix?
-If a mix, can HUD estimate the percentage of
Task Orders are developed on an as needed basis.
There is no way to anticipate the number or size of
Task Orders.
PWS 5.3 Services (pg. 11), noting “unforeseen emerging needs” may arise
Does HUD foresee any surge requirements—such as rapid‑response assessments, crisis‑driven hospital reviews, or emergency workload spikes—and if so, can
HUD provide expectations for contractor availability and historical occurrences?
Task Orders are developed on an as needed basis.
There is no way to anticipate the number or size of
Task Orders.
PWS 5.1 and 5.3 (pgs. 10–12), which outline tasks but do not specify tools or methodologies
Does HUD expect contractors to utilize
HUD‑standardized assessment methodologies, templates, or analytic models, or are contractors expected to bring their own?
This will be clarified as needed at the Task Order level.
PWS 5.3.7 – Performance
Improvement Assessment of
Residential Care Facilities (pg.
12)
The PWS includes a discrete task area for
Residential Care Facility (RCF) assessments, but the solicitation otherwise appears focused on hospitals. Can HUD clarify the expected proportion of work involving residential care facilities versus acute care hospitals over the ordering period?
Task Orders are developed on an as needed basis.
There is no way to anticipate the mix of Task Orders between Section 242 acute care hospitals and
Section 232 residential care facilities.
PWS 5.3.7 (pg. 12) and PWS
1.1 Scope (pg. 4), which
emphasizes hospital assessments
Can HUD provide estimates or historical data indicating how frequently assessments of residential care facilities are requested, and whether these engagements are typically smaller, similar, or larger in scope and duration compared to hospital assessments?
Task Orders are developed on an as needed basis.
There is no way to anticipate the mix of Task Orders between Section 242 acute care hospitals and
Section 232 residential care facilities.
PWS 5.3.7 (pg. 12) and
Solicitation Section L (pg.
30–31) requiring offerors to propose labor categories
Does HUD expect residential care facility assessments to require distinct labor categories, specialized expertise, or different staffing compositions than hospital assessments? If yes, can HUD provide guidance on the types of skills or experience preferred for RCF engagements?
Please refer to SAM.gov for the updated version of
Attachment 3. At the Task Order level, the labor categories will be clarified as needed.
PWS 1.6 Place of Performance
(pg. 5), requiring work at contractor and borrower sites;
applies broadly but does not distinguish hospitals vs. RCFs
Should contractors assume the same on‑site expectations (e.g., site visits, travel frequency, meeting cadence) for residential care facility assessments as for hospital engagements, or are RCF reviews expected to involve a different level of on‑site presence?
This will be clarified as needed at the Task Order level.
PWS 5.3.7 (pg. 12), which lists
“management, operations, and finances” but is less detailed than the hospital task descriptions
Can HUD clarify whether Residential Care
Facility assessments are expected to mirror the comprehensiveness of hospital assessments (e.g., governance, strategic planning, revenue cycle, workforce), or whether the scope is generally narrower for
RCF engagements?
PWS 1.2 Background (pg. 4), which outlines the Section 232 program but does not tie it to projected workload
Are RCF assessments typically initiated for similar reasons as hospital assessments (e.g., financial distress, performance issues, compliance concerns), or does HUD anticipate different triggers for residential care facility task orders?
Questions