About this file

This is a Manufacturing Qualification Requirements (MQR) document issued by the 848th Supply Chain Management Group (848 SCMG) on 31 July 2026, establishing qualification requirements for vendors seeking to manufacture Critical Application Items (CAI) and Critical Safety Items (CSI) for the Air Force.

The document governs vendor qualification requirements for items managed by three supply chain management squadrons (422d, 423d, and 424th SCMS) and applies Air Force Material Command Instruction (AFMCI) 23-113 and Federal Acquisition Regulation (FAR) Subpart 9.2 standards. Potential suppliers must submit a Source Approval Request (SAR) to obtain Engineering Support Activity (ESA) source approval to manufacture commodities. The MQR covers four SAR categories: Category I (Actual Item—vendor has previously manufactured the exact subject item); Category II (Similar Item—vendor has manufactured similar but not identical items); Category III (New Manufacturer—vendor does not meet Categories I or II); and Category IV (Alternate Item—vendor proposes an equivalent part with like fit, form, and function). Qualified items are listed on the MQR-MIL, accessible via SAM.gov. The document emphasizes NADCAP and OEM certification requirements for manufacturing processes, particularly heat treatment, surface hardening, plasma spray, and milling operations. Site survey visits typically span three working days maximum and should be completed before contract award. Approved sources must notify the ESA in writing of changes to ownership, address, process sequences, process parameters, sub-tier suppliers, or quality deficiencies. Contact information is provided for AFSC Small Business Office (Air Force-managed parts), Defense Logistics Agency (DLA-managed parts), and the Strategic Alternate Sourcing Program Office (SASPO).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 July 2026 848 SCMG-MQR

MANUFACTURING QUALIFICATION REQUIREMENTS (MQR)

COMMODITY CRITICAL APPLICATION ITEMS (CAI) AND CRITICAL SAFETY ITEMS (CSI)

1. OVERVIEW

This document establishes Manufacturing Qualification Requirements (MQR) applicable to items managed by three squadrons in the 848th Supply Chain Management Group (848 SCMG); the 422d Supply Chain Management Squadron (SCMS), the 423 SCMS, and the 424 SCMS. The intent of this MQR is to:

1.1 Meet the requirements of Operational Safety, Suitability, and Effectiveness (OSS&E) while complying with Air Force Material Command Instruction (AFMCI) 23-113, Pre-Award Qualification of New or Additional Parts Sources and the Use of the Source Approval Request (SAR).

1.2 Provide a summary and information to help potential offerors navigate the SAR process.

Note: Although this MQR summarizes, highlights, and emphasizes areas of AFMCI 23-113 for clarity, potential offerors are encouraged to review the full AFMCI. Should a conflict exist between this MQR and cited source documents, the requirements in the source documents shall take precedence. AFMCI 23-113 is available from the Air Force Publishing website: https://www.e-publishing.af.mil/

Subject 848 SCMG-managed items covered by this MQR are Critical Application Items (CAI) and Critical Safety Items (CSI) listed on the MQR-MIL, available publicly via the SAM.gov website https://sam.gov/ (search “MQR”).

2 Vendor qualification requirements are governed by AFMCI 23-113 and Federal Acquisition

Regulation (FAR), Subpart 9.2, Qualification Requirements. The proposed offeror (i.e., potential supplier) must satisfy these requirements by submitting a source approval request (SAR) in order to obtain Engineering Support Activity (ESA) source approval to manufacture commodity items for the specific application. The actual Level-of-Effort (LOE) to manufacture a specific commodity item will be specified by the applicable technical data and contract documents.

3 The terms “make” or “manufacture” are utilized throughout this document to represent a generic LOE. While AFMCI 23-113 also addresses repair requirements, this MQR is relevant to only manufacturing requirements and has no bearing on repair requirements. Approval to repair an item is not equivalent to approval to manufacture that item, and separate SARs must be submitted for repair and/or manufacturing.

4 In addition to the areas identified below that align with AFMCI 23-113, the following guidance is applicable to MQRs:

https://www.e-publishing.af.mil/ https://sam.gov/

31 July 2026 848 SCMG-MQR

4.1 Approved sources shall submit written notification on company letterhead to the appropriate ESA notifying them of changes to ownership; address; process sequence;

process parameters; Sub-Tier Suppliers (STS); and/or quality deficiencies affecting form, fit, or function.

4.2 Potential sources are not to utilize intellectual property (IP) of any third party without appropriate authorization of the IP owner. Potential sources are cautioned that no part of the government MQR is intended to endorse or encourage the improper use of IP developed by the Original Equipment Manufacturer (OEM) or any other third party.

4.3 Potential sources are advised to retain a copy of any/all SAR packages submitted to the government for their own records.

5 SAR SUBMITTAL AND GENERAL REQUIREMENTS

AFMCI 23-113, Section 2 covers Government responsibilities broken down by organization and/or functional responsibility; the following Paragraphs may be of note to the potential offeror:

5.1 Para 2.2.1: The Gov Program Manager may also serve as the Engineering Support Activity

[ESA]

5.2 Para 2.3.1: The ESA evaluates the item Technical Data Package for completeness, Data Rights availability etc.

5.3 Para 2.3.1.3 & 2.3.1.4: The ESA tailors the SAR contents checklist (i.e., the checklist used by the potential offeror creating a submission) & tailors SAR evaluation checklist (used to evaluate potential offeror submissions)

5.4 Para 2.3.2: The ESA estimates the costs for testing and evaluation which a potential offeror might incur to become qualified

5.5 Para 2.3.5: The ESA performs a tech-eval of the SAR and determines approval/disapproval of the relevant potential offeror

5.6 Para 2.3.6: If the ESA is planning to consider qualification by similarity (CAT II), the prospective source may need to provide analysis data to show differences and similarities

5.7 Para 2.3.11: The ESA sets up and runs any needed site survey visits

5.8 Para 2.5.2: The Small Business Office, Source Development Specialist (SDS) [not the ESA], acts as the primary liaison with industry (i.e., prospective sources) on all SAR submissions

5.9 Para 2.5.5: The SDS performs a non-tech review of SAR submissions looking for compliance, format, required docs, etc.

5.10 Para 2.5.7: The SDS notifies the potential offeror of the results of the submission (i.e., 31 July 2026 848 SCMG-MQR approved or disapproved)

5.11 Para 2.5.8: Sources previously qualified and now not qualified, will be provided with the reason(s) etc., enabling them to take action to become re-qualified (see also FAR 9.207)

6 AFMCI 23-113, Section 3 covers SAR Core Processes; the following Figures and Paragraphs may be of note to the potential offeror:

6.1 Fig 1: SAR Pre-Award Requirements Generation Process flow chart (who, does what, in sequential order)

6.2 Para 3.5.4: For Federal Aviation Administration (FAA) Parts Manufacturer Approval (PMA) SARs, the ESA may require additional SAR elements (Example FAA PMA items are those applicable to military, commercial derivative aircraft [e.g., E-3, KC-46]) Note: There are numerous paragraphs addressing FAA PMA items (recommend: search for

“PMA”)

6.3 Fig 2: SAR Package Approval Process flow chart

6.4 Para 3.6, SAR Categories (relevant to manufacturing):

6.4.1 Category I, Actual Item - Proposed offerors have manufactured the exact (Subject) item for the prime contractor, OEM, another service, civil agencies, or foreign governments.

6.4.2 Category II, Similar Item - Proposed offerors have not manufactured the subject item but have manufactured items similar in complexity, design, criticality, processes, materials, and application for prime contractor, OEM, another service, civil agencies, or foreign government.

6.4.3 Category III, New Manufacturer - SARs from proposed offerors, who do not meet Category I or II criteria

6.4.4 Category IV, Alternate Item - Offeror is proposing an alternate part (part with like fit, form, function) as potentially equivalent to the OEM part. These can be reverse engineered, but not reengineered components. Some alternate parts are provided for the civil sector under FAA PMA via tests and computations or identicality without a license agreement.

6.5 Para 3.6.6: The ESA may tailor SAR, pre-award qual for any category

6.6 Para 3.7: Site Survey visit details

6.6.1 Visit typically spans about 3 working days max

31 July 2026 848 SCMG-MQR

6.6.2 Should be completed before SAR approval/contract award

6.6.3 Para 3.7.2: Typical team visit composition (who comes, for what reason)

6.6.3.1 Para 3.7.2.2: Team conducts pre- and post-visit briefings; concerns/findings are briefed at exit

6.6.3.2 Para 3.7.2.3: Formal report prepared within ten days of completion; prospective supplier has 30 days to address concerns/corrective action plans

6.6.4 Para 3.7.3: Link to example visit checklist (Note that the ESA may tailor the checklist as necessary)

6.6.5 Para 3.7.4: Examples where site surveys (visits) should be performed

7 AFMCI 23-113, ATTACHMENTS SECTION; of note to the potential offeror:

7.1 Attachment 1: Glossary of References and Supporting Information (A list of source references, published Forms, a list of Abbreviations and Acronyms, and Terms with definitions [and embedded links]

7.2 Attachment 5: SAR Evaluation Checklist (A checklist used by the ESA and SDS to evaluate SAR submittals; tailorable by the ESA as necessary): Of note to the potential offeror:

Section D, Quality Assurance Documentation, Item 6, covers NADCAP* and OEM certification requirements. The potential offeror should understand that while many manufacturing processes may be considered typical or common-place, they are still significant and if done incorrectly could result in altered/defective material structures and mechanical properties, reduced reliably, etc. After-the-fact evaluation could require destructive testing, and as such, potential offerors should be able to show compete certification that their manufacturing processes (in-house or third party) comply with NADCAP and/or industry standard requirements. Example processes include, but aren’t limited to: Heat Treatment and Surface Hardening (NADCAP 7102), Plasma Spray (NADCAP 7109), Milling (NADCAP 7126), etc.

*NADCAP: A standardized, industry-managed cooperative accreditation program for the aerospace, defense, and space industries, formerly known as the National Aerospace and Defense Contractors Accreditation Program).

7.3 Attachment 6: SAR Contents Checklist (Information and checklists pertaining to potential offeror preparation of a SAR); of note to the potential offeror:

7.3.1 Para A6.1.1: The ESA may add any information or adjust according to the Qualification Requirement as necessary.

7.3.2 Para A6.3: Guidance on what items will be solicited, to whom, etc.

7.3.3 Para A6.3.1.3: Submission documentation deficiencies & timelines associated with

31 July 2026 848 SCMG-MQR submitting corrections, etc.

7.3.4 Table A6.1: A checklist for SAR required elements, submissions under the Qualification

Waiver Criteria (QWC) provided by the ESA in the QR

7.3.5 Para A6.3.5: Details associated with how many NSNs/Part Number combinations can be included in each SAR package; Note: “A maximum of five (5) part numbers or NSNs…on a single SAR”.

7.3.6 Para A6.3.6: Specific situations pertaining to a QR (see also Para 2.2.2); waivers granted to the ESA exempting a QR, and guidance to a potential offeror regarding locating a specific QR (or existence of a QR waiver)

7.3.7 Para A6.3.7 – A6.3.13: Specifics related to planning, creating, and submitting a SAR

7.3.7.1 A6.3.7: …prior to submitting (the SAR) to the Small Business Office (SBO) for ESA review

7.3.7.2 A6.3.10: Format for submissions (e.g., CD/DVD-ROM, pdf, cover sheet data rights marking, etc.)

7.3.7.3 A6.3.11: Clarification on the definition of a Dealer/Distributor versus an actual manufacturer

7.3.8 Table A6.2: Required Elements by SAR Category (i.e., the checklist of elements required to be submitted by a potential offeror [e.g., Cover Letter, Quality History, Test Results, etc. broken down into requirements for each SAR Category]); note para A6.3.13 (above the Table), “The reviewing activity may add any information deemed necessary”

7.3.8.1 Table A6.2 Notes 1 and 2: Additional requirements applicable to the checklist

7.3.8.2 Para A6.3.14.1: Allowance for current FAA PMA Holders already qualified to produce…the exact/identical item to submit a CAT 1 PMA SAR

7.3.8.3 Figure A6.1 SAR Elements Description: A breakdown/description of each Element called out in the checklist (i.e., Table A6.2) to include an example of a technical data rights certification letter

7.3.9 Figure A7.1: Common Use Item Coordination Sheet: Used by the Gov to route common use items (in accordance with the Joint Aeronautical Commanders’ Group (JACG) Aviation Critical Safety Item Management Handbook); references to the JACG throughout AFMCI 23-113

8 GOVERNMENT FURNISHED TECHNICAL/ENGINEERING DATA REQUESTS

31 July 2026 848 SCMG-MQR

8.1 Technical Data requests associated with an active solicitation shall be submitted to the appropriate Procurement Contracting Officer (PCO) listed in the solicitation. The request shall be made on company letterhead and shall include, details on the specific technical data being requested, a reference to the specific solicitation announcement, and a valid DD Form 2345, Militarily Critical Technical Data Agreement.

8.2 Requests where no active solicitation exists (e.g., in response to a sources sought synopsis), shall be submitted to the AFLCMC/LZP TINKER PUBLIC SALES office as indicated below. The request shall be made on company letterhead and shall include, a reference to the specific announcement, the specific technical data being requested, and valid DD Form 2345, Militarily Critical Technical Data Agreement.

8.3 For other requests, contact the Strategic Alternate Sourcing Program Office (SASPO) as indicated below.

9 CONTACT INFORMATION

AFSC Small Business Office (Submittals for Air Force-managed parts)

Website: http://www.afsc.af.mil/Units/SBO.aspx

Email: AFSC.SB.Workflow@us.af.mil

Phone: (405) 739-2601

Mailing Address: AFSC/SB Attn: Source Development Specialist 3001 Staff Drive, Suite 1AG85A Tinker AFB, OK 73145-3009

Defense Logistics Agency (DLA) (Submittals for DLA-managed parts)

Website DLA Weapons Support (Richmond) Home

Phone 804-279-3861

Website, “Contact Weapons Support…” https://www.dla.mil/Aviation/Contact/ http://www.afsc.af.mil/Units/SBO.aspx mailto:AFSC.SB.Workflow@us.af.mil https://www.dla.mil/Aviation/ https://www.dla.mil/Aviation/Contact/

31 July 2026 848 SCMG-MQR

Tinker AFB, Public Sales Office (AFLCMC/LZP TINKER PUBLIC SALES)

Email AFLCMC.LZP.TINKERPUBLICSALES@us.af.mil

Strategic Alternate Sourcing Program Office (SASPO)

Website: https://www.tinker.af.mil/Units/429SCMS-SASPO/

Email: 429SCMS.SASPO.Workflow@us.af.mil mailto:AFLCMC.LZP.TINKERPUBLICSALES@us.af.mil https://www.tinker.af.mil/Units/429SCMS-SASPO/ mailto:429SCMS.SASPO.Workflow@us.af.mil

1. OVERVIEW
This document establishes Manufacturing Qualification Requirements (MQR) applicable to items managed by three squadrons in the 848th Supply Chain Management Group (848 SCMG); the 422d Supply Chain Management Squadron (SCMS), the 423 SCMS, and the 424 ...
2 Vendor qualification requirements are governed by AFMCI 23-113 and Federal Acquisition Regulation (FAR), Subpart 9.2, Qualification Requirements. The proposed offeror (i.e., potential supplier) must satisfy these requirements by submitting a source ...
3 The terms “make” or “manufacture” are utilized throughout this document to represent a generic LOE. While AFMCI 23-113 also addresses repair requirements, this MQR is relevant to only manufacturing requirements and has no bearing on repair requirem...
4 In addition to the areas identified below that align with AFMCI 23-113, the following guidance is applicable to MQRs:
4.1 Approved sources shall submit written notification on company letterhead to the appropriate ESA notifying them of changes to ownership; address; process sequence; process parameters; Sub-Tier Suppliers (STS); and/or quality deficiencies affecting ...
4.2 Potential sources are not to utilize intellectual property (IP) of any third party without appropriate authorization of the IP owner. Potential sources are cautioned that no part of the government MQR is intended to endorse or encourage the improp...
4.3 Potential sources are advised to retain a copy of any/all SAR packages submitted to the government for their own records.
5 SAR SUBMITTAL AND GENERAL REQUIREMENTS
AFMCI 23-113, Section 2 covers Government responsibilities broken down by organization and/or functional responsibility; the following Paragraphs may be of note to the potential offeror:
5.1 Para 2.2.1: The Gov Program Manager may also serve as the Engineering Support Activity [ESA]
6 AFMCI 23-113, Section 3 covers SAR Core Processes; the following Figures and Paragraphs may be of note to the potential offeror:
6.6.1 Visit typically spans about 3 working days max
6.6.2 Should be completed before SAR approval/contract award
6.6.3 Para 3.7.2: Typical team visit composition (who comes, for what reason)
6.6.3.1 Para 3.7.2.2: Team conducts pre- and post-visit briefings; concerns/findings are briefed at exit
6.6.3.2 Para 3.7.2.3: Formal report prepared within ten days of completion; prospective supplier has 30 days to address concerns/corrective action plans
6.6.4 Para 3.7.3: Link to example visit checklist (Note that the ESA may tailor the checklist as necessary)
6.6.5 Para 3.7.4: Examples where site surveys (visits) should be performed
7 AFMCI 23-113, ATTACHMENTS SECTION; of note to the potential offeror:
7.2 Attachment 5: SAR Evaluation Checklist (A checklist used by the ESA and SDS to evaluate SAR submittals; tailorable by the ESA as necessary): Of note to the potential offeror: Section D, Quality Assurance Documentation, Item 6, covers NADCAP* and...
7.3.8.1 Table A6.2 Notes 1 and 2: Additional requirements applicable to the checklist
7.3.8.2 Para A6.3.14.1: Allowance for current FAA PMA Holders already qualified to produce…the exact/identical item to submit a CAT 1 PMA SAR
7.3.8.3 Figure A6.1 SAR Elements Description: A breakdown/description of each Element called out in the checklist (i.e., Table A6.2) to include an example of a technical data rights certification letter

File details come from the government source that posted it. Updated .