Section 31 00 00 Earthwork Amdt 0002.pdf
PDF 37 KB Posted
- Attached to
- W9128F21B0020 - Lower Brule Natural Resource Protection Ecosystem Restoration Phase II Federal contract opportunity
- Solicitation number
- 8194
About this file
This document package includes an earthwork specification and related federal contract opportunity. The earthwork specification outlines requirements for various construction activities including excavation, backfilling, embankments, and finish grading for a shoreline protection project in Lower Brule, South Dakota. Materials, placement methods, and compaction requirements are specified for different types of fill. Testing protocols are also included.
The associated federal contract opportunity is a solicitation from the Army Corps of Engineers seeking bids for a continuation of ecosystem restoration work under a Tribal Partnership Program. Services required include placement of breakwaters, native plantings, and multiple recreation features. The primary NAICS code is 237990 and the solicitation is set aside 100% for small businesses. The period of performance and response deadline are not specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract W9128F21B0020.pdf | ||
| Amdt 0002 Solicitation W9128F21B0020.pdf | ||
| Amdt 0001 Solicitation W9128F21B0020.pdf | ||
| W9128F21B0020 Am0001 -Dwgs - VOLUME I.pdf | ||
| W9128F21B0020 Am0001 - Dwgs - VOLUME II.PDF | ||
| Dwgs Vol 1 Shoreline Protection Phase 2 Lover Brule W9128F21B0020.pdf | ||
| Specs Shoreline Protection Phase 2 Lower Brule W9128F21B0020.pdf | ||
| Dwgs Vol 2 Shoreline Protection Phase 2 Lower Brule W9128F21B0020.pdf | ||
| W9128F21B0020 Lower Brule Ecosystem Restoration Phase 2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Shoreline Protection Project, Ph 2 (2021), Lower Brule, SD MRR7
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 00 00
EARTHWORK
04/09
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Satisfactory Materials
1.2.2 Unsatisfactory Materials
1.2.3 Cohesionless and Cohesive Materials
1.2.4 Degree of Compaction
1.2.5 Topsoil
1.2.6 Hard/Unyielding Materials
1.2.7 Stone
1.2.8 Unstable Material
1.3 SUBMITTALS
1.4 SUBSURFACE DATA
1.5 CLASSIFICATION OF EXCAVATION
1.5.1 Common Excavation
1.6 DEWATERING WORK PLAN
1.7 BREAKWATER CONSTRUCTION WORK PLAN
PART 2 PRODUCTS
2.1 REQUIREMENTS FOR OFFSITE SOILS
2.2 SELECT GRANULAR MATERIAL
2.2.1 General Requirements
2.3 INITIAL BACKFILL MATERIAL
2.4 DETECTION WIRE FOR NON-METALLIC PIPING
2.5 MATERIAL FOR RIPRAP
2.5.1 Stone
2.5.2 Geotextile
PART 3 EXECUTION
3.1 EARTHWORK NOTIFICATION
3.2 STRIPPING OF TOPSOIL
3.3 EXCAVATION
3.3.1 Dewatering
3.4 GROUND SURFACE PREPARATION
3.4.1 General Requirements
3.4.2 Frozen Material
3.5 EMBANKMENTS
3.5.1 Earth Embankments
3.6 BACKFILLING FOR UTILITIES
3.6.1 Utility Trench Backfill
3.6.1.1 Bedding and Initial Backfill
3.6.1.2 Final Backfill
3.6.2 Backfill for Appurtenances
SECTION 31 00 00 Page 1 Am_0002
3.7 SOIL BORROW AND WASTE
3.7.1 Borrow
3.7.2 Waste
3.8 FINISHING
3.8.1 Embankments
3.9 PLACING TOPSOIL
3.10 RIPRAP CONSTRUCTION
3.10.1 Stone Placement
3.11 BURIED TAPE AND DETECTION WIRE
3.11.1 Buried Detection Wire
3.12 TESTING
3.12.1 Borrow Material Classification
3.12.2 In-Place Densities
3.12.2.1 Embankment
3.13 DISPOSITION OF SURPLUS MATERIAL
-- End of Section Table of Contents --
SECTION 31 00 00 Page 2
SECTION 31 00 00
EARTHWORK
04/09
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO T 180 (2001; R 2004) Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and an 457-mm (18-in) Drop
AASHTO T 224 (2001; R 2004) Correction for Coarse Particles in the Soil Compaction Test
ASTM INTERNATIONAL (ASTM)
ASTM C 136 (2006) Sieve Analysis of Fine and Coarse Aggregates
ASTM D 422 (1963; R 2007) Particle-Size Analysis of Soils
ASTM D 1140 (2000) Amount of Material in Soils Finer than the No. 200 (75-micrometer) Sieve
ASTM D 1556 (2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method
ASTM D 1557 (2007) Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/cu. ft. (2,700 kN-m/cu.m.))
ASTM D 2321 (2008) Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications
ASTM D 2487 (2006e1) Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D 2774 (2008) Underground Installation of Thermoplastic Pressure Piping
ASTM D 4318 (2005) Liquid Limit, Plastic Limit, and Plasticity Index of Soils
SECTION 31 00 00 Page 3
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008) Safety -- Safety and Health Requirements
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA SW-846.3-3a (1999, Third Edition, Update III-A) Test Methods for Evaluating Solid Waste:
Physical/Chemical Methods; Third Edition;
Final Update III-A
EPA 600/4-79/020 (1983) Methods for Chemical Analysis of Water and Wastes
1.2 DEFINITIONS
1.2.1 Satisfactory Materials
Satisfactory materials shall comprise any materials classified by ASTM D 2487 as GC, SC, CL, ML, CL-ML, CH, and MH. Unless otherwise specified, satisfactory materials for earthwork shall not contain stones greater than 3 inches in any dimension. Random material indicated on the bid schedule and other locations is referring to the clay fill material.
1.2.2 Unsatisfactory Materials
Materials which do not comply with the requirements for satisfactory materials are unsatisfactory. Unsatisfactory materials also include man-made fills; trash; refuse; backfills from previous construction; and material classified as satisfactory which contains root and other organic matter or frozen material. The Contracting Officer shall be notified of any contaminated materials. Otherwise satisfactory material which is unsuitable due to excess moisture content will not be classified as unsatisfactory material unless it can not be dried by manipulation, aeration, or blending with other materials satisfactorily as determined by the Contracting Officer's Representative.
1.2.3 Cohesionless and Cohesive Materials
Cohesionless materials include materials classified in ASTM D 2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM and SM will be identified as cohesionless only when the fines are nonplastic. Testing required for classifying materials shall be in accordance with ASTM D 4318, ASTM C 136, ASTM D 422, and ASTM D 1140.
1.2.4 Degree of Compaction
Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D 1557 abbreviated as a percent of laboratory maximum density. Since ASTM D 1557 applies only to soils that have 30 percent or less by weight of their particles retained on the 3/4 inch sieve, the degree of compaction for material having more than 30 percent by weight of their particles retained on the 3/4 inch sieve shall be expressed as a percentage of the maximum density in accordance with AASHTO T 180 Method D and corrected with AASHTO T 224. To maintain the same percentage of coarse material, the "remove and replace" procedure as described in the
SECTION 31 00 00 Page 4
NOTE 8 in Paragraph 7.2 of AASHTO T 180 shall be used.
1.2.5 Topsoil
Topsoil is defined as: Natural, friable soil representative of productive, well-drained soils in the area, free of subsoil, stumps, rocks larger than one inch diameter, brush, weeds, toxic substances, and other material detrimental to plant growth.
1.2.6 Hard/Unyielding Materials
Weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock" with stones greater than 3 inches in any dimension or as defined by the pipe manufacturer, whichever is smaller. These materials usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal.
1.2.7 Stone
Solid homogeneous interlocking crystalline material with firmly cemented, laminated, or foliated masses or conglomerate deposits, neither of which can be removed without systematic drilling and blasting, drilling and the use of expansion jacks or feather wedges, or the use of backhoe-mounted pneumatic hole punchers or rock breakers; also large boulders, buried masonry, or concrete other than pavement exceeding 1/2 cubic yard in volume. Removal of hard material will not be considered rock excavation because of intermittent drilling and blasting that is performed merely to increase production.
1.2.8 Unstable Material
Unstable material shall consist of materials too wet to properly support the utility pipe, conduit, or appurtenant structure.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Shoring and Sheeting Plan; G-AO
Dewatering Work Plan; G-AO
Submit 15 days prior to starting work.
Earthwork Notification
Advance notice on the opening of excavation or borrow areas.
Source of Borrow Material; G-AO
Breakwater Construction Work Plan; G-AO
SECTION 31 00 00 Page 5
SD-06 Test Reports
Borrow Site Testing: G-AO
Within 24 hours of conclusion of physical tests, 2 copies of test results, including calibration curves and results of calibration tests. Results of testing at the borrow site.
Testing
SD-07 Certificates
Testing; G-AO
Qualifications of the commercial testing laboratory or Contractor 's testing facilities.
1.4 SUBSURFACE DATA
A subsurface investigation was not performed. A subsurface investigation of the Grassrope borrow area was performed and is included as an attachement to this specification.
1.5 CLASSIFICATION OF EXCAVATION
No consideration will be given to the nature of the materials, and all excavation will be designated as unclassified excavation.
1.5.1 Common Excavation
Common excavation shall include the satisfactory removal and disposal of all materials not classified as rock excavation.
1.6 DEWATERING WORK PLAN
Submit procedures for accomplishing dewatering work for the beach area prior to the start of Construction Activities.
1.7 BREAKWATER CONSTRUCTION WORK PLAN
Submit procedures as stated in the drawings for accomplishing breakwater construction including placement of all materials shown on the typical breakwater cross section, and the cofferdaming and dewatering of the box culvert areas prior to the start of Construction Activities. Also identify haul routes and construction equipment planned for use on the various construction activities.
PART 2 PRODUCTS
2.1 REQUIREMENTS FOR OFFSITE SOILS
Soils from borrow areas outside Government property for use as embankment or backfill shall be tested for TPH, BTEX and full TCLP including ignitability, corrosivity and reactivity. Backfill shall contain less than 100 parts per million (ppm) of total petroleum hydrocarbons (TPH) and less than 10 ppm of the sum of Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and shall not fail the TCPL test. TPH concentrations shall be
SECTION 31 00 00 Page 6 determined by using EPA 600/4-79/020 Method 418.1. BTEX concentrations shall be determined by using EPA SW-846.3-3a Method 5030/8020. TCLP shall be performed in accordance with EPA SW-846.3-3a Method 1311. Provide Borrow Site Testing for TPH, BTEX and TCLP from a composite sample of material from the borrow site, with at least one test from each borrow site. Material shall not be brought on site until tests have been approved by the Contracting Officer.
2.2 SELECT GRANULAR MATERIAL
2.2.1 General Requirements
Select granular material shall consist of materials classified as GW, GP, SW, SP, by ASTM D 2487 where indicated. The maximum allowable aggregate size shall be 1/2 inch, unless otherwise indicated or recommended by the pipe manufacturer. The liquid limit of such material shall not exceed 35 percent when tested in accordance with ASTM D 4318. The plasticity index shall not be greater than 12 percent when tested in accordance with ASTM D 4318, and not more than 35 percent by weight shall be finer than No. 200 sieve when tested in accordance with ASTM D 1140.
2.3 INITIAL BACKFILL MATERIAL
Initial backfill shall consist of select granular material or satisfactory materials free from rocks 1/2 inch or larger in any dimension unless otherwise indicated or recommended by the pipe manufacturer. Material locally referred to as "Squeegee" or "Pea Gravel" shall not be used.
2.4 DETECTION WIRE FOR NON-METALLIC PIPING
Detection wire shall be 12 AWG single strand, solid copper with a 30-mil (min.) polyethylene jacket suitable for direct bury.
2.5 MATERIAL FOR RIPRAP
2.5.1 Stone
Stone fragments sufficiently durable to ensure permanence in the structure and the environment in which it is to be used. Stone fragments shall be free from cracks, seams, and other defects that would increase the risk of deterioration from natural causes. The size of the fragments shall be such that no individual fragment exceeds a weight of 150 pounds and that no more than 10 percent of the mixture, by weight, consists of fragments weighing 2 pounds or less each. Specific gravity of the rock shall be a minimum of
2.50. The inclusion of more than of a trace (5 percent) quantities of dirt, sand, clay, and rock fines will not be permitted. Other requirements for the Stone (riprap and spalls) can be found in Spec Section 35 31 19.
2.5.2 Geotextile
Geotextile shall conform to the requirements for geotextile in Spec Section 31 05 19.
PART 3 EXECUTION
3.1 EARTHWORK NOTIFICATION
The Contractor shall notify the Contracting Officer sufficiently in advance of beginning excavation and filling to permit elevations and measurements
SECTION 31 00 00 Page 7 to be taken of the undisturbed ground surface at the project site and borrow and waste areas The Contractor is required to notify the Contracting Officer no less than 5 business days in advance of any ground disturbing activity to ensure that a cultural monitor may be on-site. No ground disturbing activity shall be performed until 5 business days after notice is given or as directed by the Contracting Officer. The cultural monitors shall be coordinated by the U.S. Army Corps of Engineers and shall be of no cost to the Contractor.
3.2 STRIPPING OF TOPSOIL
Topsoil shall be stripped to a depth of 4 inches from all areas to be excavated or filled. Stripped topsoil shall be spread on areas already graded and prepared for topsoil, or transported and deposited in stockpiles convenient to areas that are to receive application of the topsoil later, or at locations indicated or specified. Topsoil shall be kept separate from other excavated materials, brush, litter, objectionable weeds, roots, stones larger than 2 inches in diameter, and other materials that would interfere with planting and maintenance operations. .
3.3 EXCAVATION
The Contractor shall perform excavation of every type of material encountered within the limits of the project to the lines, grades, and elevations indicated and as specified. Excavation shall conform to the requirements in EM 385-1-1. Grading shall be in conformity with the drawings and the tolerances specified in paragraph FINISHING. Satisfactory excavated materials shall be transported to and placed in fill or embankment within the limits of the work. Unsatisfactory materials encountered within the limits of the work shall be excavated below grade and replaced with satisfactory materials as directed. Unsatisfactory excavated material shall be disposed of in designated waste or spoil areas.
During construction, excavation and fill shall be performed in a manner and sequence that will provide proper drainage at all times. Excavated material shall not obstruct the flow of any stream, endanger a partly finished structure, impair the efficiency or appearance of any structure, or be detrimental to the completed work in any way
3.3.1 Dewatering
Dewatering of the beach area shall be required before excavation and placement of the beach sand. The specifics the Contractor plans to include for this shall be included in the Breakwater Construction Work Plan.
3.4 GROUND SURFACE PREPARATION
3.4.1 General Requirements
Unsatisfactory material in surfaces to receive fill or in excavated areas shall be removed and replaced with satisfactory materials as directed by the Contracting Officer. The surface (other than underwater areas) shall be scarified to a depth of 6 inches before the fill is placed. Sloped surfaces steeper than 1 vertical to 4 horizontal shall be plowed, stepped, benched, or broken up so that the fill material will bond with the existing material.
3.4.2 Frozen Material
Material shall not be placed on surfaces that are muddy, frozen, or contain
SECTION 31 00 00 Page 8 frost.
3.5 EMBANKMENTS
3.5.1 Earth Embankments
Earth embankments shall be constructed from satisfactory materials free of organic or frozen material and rocks with any dimension greater than 3 inches. The material shall be placed in successive horizontal layers of loose material and compacted. The earth embankments are zoned and consist of gravels and clay loam. The maximum allowable depth of loose material to be compacted shall be determined by the Contractor and approved by the Contracting Officer. The compaction procedures and lift thickness shall be such that the entire depth of the lift is compacted to at least the minimum specified density. Each layer shall be spread uniformly on a soil surface that has been moistened or aerated as necessary, and scarified or otherwise broken up so that the fill will bond with the surface on which it is placed. After spreading, each layer shall be plowed, disked, or otherwise broken up; moistened or aerated as necessary; thoroughly mixed; and compacted to at least 95 percent laboratory maximum density for cohesive materials.Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment.
3.6 BACKFILLING FOR UTILITIES
3.6.1 Utility Trench Backfill
Trenches shall be backfilled to the grade shown. The trench shall be backfilled to 2 feet above the top of pipe prior to performing the required pressure tests. The joints and couplings shall be left uncovered during the pressure test.
3.6.1.1 Bedding and Initial Backfill
Unless otherwise indicated or specified, bedding and initial backfill shall be as specified below:
a. Concrete Pipe. Haunch and bedding material shall consist of select granular material. Haunch and outer bedding shall be compacted to at least 95 percent laboratory maximum density and shall be placed in layers not exceeding 6 inch loose thickness for compaction by hand-operated compactors and 8 inches for other than hand-operated machines. Middle bedding shall be loosely placed and uncompacted. After the pipe has been properly bedded, haunch material, at a moisture content that will facilitate compaction, shall be placed evenly along both sides of the pipe and each layer thoroughly compacted with mechanical tampers or rammers to the springline of the pipe. The haunch material shall be thoroughly compacted under the haunches of the pipe.
b. Pressure Plastic Pipe. Installation of embedment around pipe shall conform to ASTM D 2774. Bedding, haunching and initial backfill shall be either Class IB, II or III material conforming to ASTM D 2321. Compaction of embedment shall be as specified in
ASTM D 2321.
SECTION 31 00 00 Page 9
3.6.1.2 Final Backfill
The remainder of the trench shall be filled with satisfactory material.
Backfill shall be deposited in layers of a maximum of 8 inch loose thickness, and compacted to 90 percent maximum density for cohesive soils and 95 percent maximum density for cohesionless soils. Compaction by water flooding or jetting will not be permitted. Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment.
3.6.2 Backfill for Appurtenances
After the manhole, catchbasin, inlet, or similar structure has been constructed and the concrete has been allowed to cure for 3 days, backfill shall be placed in such a manner that the structure will not be damaged by the shock of falling earth. The backfill material shall be deposited and compacted as specified for final backfill, and shall be brought up evenly on all sides of the structure to prevent eccentric loading and excessive stress.
3.7 SOIL BORROW AND WASTE
3.7.1 Borrow
Borrow material shall be selected to meet the requirements and conditions of the particular fill or embankment for which it is to be used. Material required for fill or embankment in excess of that produced by excavation within the grading limits shall be obtained from the borrow area shown on drawings. Unless specifically provided, no borrow shall be obtained within the limits of the project site without prior written approval. Necessary clearing, grubbing, and satisfactory drainage of borrow pits and the disposal of debris thereon shall be considered related operations to the borrow excavation.
3.7.2 Waste
Soil disposed of in waste areas on Government property shall be graded to provide adequate drainage. Maximum slope in disposal area shall be 1V on 4H.
3.8 FINISHING
The surface of excavations, embankments, and subgrades shall be finished to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. The degree of finish for graded areas shall be within 0.1 foot of the grades and elevations indicated except that the degree of finish for subgrades shall be specified in paragraph SUBGRADE PREPARATION. Ditches shall be finished in a manner that will result in effective drainage. The surface of areas to be turfed shall be finished to a smoothness suitable for the application of turfing materials. Settlement or washing that occurs in graded, topsoiled, or backfilled areas prior to acceptance of the work, shall be repaired and grades re-established to the required elevations and slopes.
3.8.1 Embankments
During construction, embankments and excavations shall be kept shaped and drained. Ditches and drains along subgrade shall be maintained to drain effectively at all times. The finished subgrade shall not be disturbed by
SECTION 31 00 00 Page 10 traffic or other operation and shall be protected and maintained by the Contractor in a satisfactory condition until ballast, subbase, base, or pavement is placed. The storage or stockpiling of materials on the finished subgrade will not be permitted. No subbase, base course, ballast, or pavement shall be laid until the subgrade has been checked and approved, and in no case shall subbase, base, surfacing, pavement, or ballast be placed on a muddy, spongy, or frozen subgrade.
3.9 PLACING TOPSOIL
On areas to receive topsoil, the compacted subgrade soil shall be scarified to a 2 inch depth for bonding of topsoil with subsoil. Topsoil then shall be spread evenly to a thickness of 4 inches and graded to the elevations and slopes shown. Topsoil shall not be spread when frozen or excessively wet or dry. Material required for topsoil in excess of that produced by excavation within the grading limits shall be obtained from the borrow area shown on the drawings.
3.10 RIPRAP CONSTRUCTION
Place riprap on geotextile in the areas indicated.
3.10.1 Stone Placement
Place stone for riprap on prepared geotextile to produce a well graded mass with the minimum practicable percentage of voids in conformance with lines and grades indicated. Place stone for spalls on existing river bed to produce a well graded mass with the minimum practicable percentage of voids in conformance with lines and grades indicated. Distribute larger stone fragments, with dimensions extending the full depth of the riprap throughout the entire mass and eliminate "pockets" of small stone fragments. Rearrange individual pieces by mechanical equipment or by hand as necessary to obtain the distribution of fragment sizes specified above.
3.11 BURIED TAPE AND DETECTION WIRE
3.11.1 Buried Detection Wire
Bury detection wire directly above non-metallic piping at a distance not to exceed 12 inches above the top of pipe. The wire shall extend continuously and unbroken, from manhole to manhole. The ends of the wire shall terminate inside the manholes at each end of the pipe, with a minimum of 3 feet of wire, coiled, remaining accessible in each manhole. The wire shall remain insulated over it's entire length. The wire shall enter manholes between the top of the corbel and the frame, and extend up through the chimney seal between the frame and the chimney seal. For force mains, the wire shall terminate in the valve pit at the pump station end of the pipe.
Tracer wire shall be tested for continuity after placement of the first lift of backfill over wire.
3.12 TESTING
Testing shall be performed by an approved commercial testing laboratory or by the Contractor subject to approval. If the Contractor elects to establish testing facilities, no work requiring testing will be permitted until the Contractor's facilities have been inspected and approved by the Contracting Officer.
SECTION 31 00 00 Page 11
3.12.1 Borrow Material Classification
Satisfactory materials from borrow intended for embankment or backfill shall be classified in accordance with ASTM D 2487. Classification shall be made for each type material or source of material. One classification shall be made for each 1000 cubic yards of material.
3.12.2 In-Place Densities
Field in-place density shall be determined in accordance with ASTM D 1556.
3.12.2.1 Embankment
One test per 4,000 square feet, or fraction thereof, of each lift of fill compacted by other than hand-operated machines. One test per 1,000 square feet, or fraction thereof, of each lift of fill compacted by hand-operated machines.
3.13 DISPOSITION OF SURPLUS MATERIAL
Brush, refuse, stumps, roots, and timber shall be removed from Government property.
-- End of Section --