Amdt 0002 Solicitation W9128F21B0020.pdf
PDF 294 KB Posted
- Attached to
- W9128F21B0020 - Lower Brule Natural Resource Protection Ecosystem Restoration Phase II Federal contract opportunity
- Solicitation number
- 8194
About this file
This amendment to the solicitation modifies specifications and drawings for the construction project "Lower Brule Natural Resource Protection Ecosystem Restoration Phase II". Key details include: adding language specifying the government will furnish 671 tons of riprap and 1510 tons of spalls for incorporation into the work; replacing paragraph 3.2 of section 35 31 20 to provide revised instructions for riprap placement; and noting the bid due date is extended to 13 September 2021. The primary NAICS code is 237990 and the solicitation is restricted to small businesses. The construction project is a continuation of prior ecosystem restoration work and will involve placement of breakwater structures, native plantings, and multiple recreation features.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract W9128F21B0020.pdf | ||
| Section 31 00 00 Earthwork Amdt 0002.pdf | ||
| Amdt 0001 Solicitation W9128F21B0020.pdf | ||
| W9128F21B0020 Am0001 -Dwgs - VOLUME I.pdf | ||
| W9128F21B0020 Am0001 - Dwgs - VOLUME II.PDF | ||
| Specs Shoreline Protection Phase 2 Lower Brule W9128F21B0020.pdf | ||
| Dwgs Vol 2 Shoreline Protection Phase 2 Lower Brule W9128F21B0020.pdf | ||
| W9128F21B0020 Lower Brule Ecosystem Restoration Phase 2.pdf | ||
| Dwgs Vol 1 Shoreline Protection Phase 2 Lover Brule W9128F21B0020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Low er Brule Natural Resource Protection Ecosystem Restoration Phase II
Amendment 0002 is issued to make minor corrections and clarif ications to Section 31 00 “Earthw ork”, provide information on government furnished material, and to replace Paragraph 3.2 of Section 35 31 20 “Rip Rap Placement”.
All other terms and conditions of the Solicitation remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Sep-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F21B0020
X 9B. DATED (SEE ITEM 11)
13-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Sep-2021
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F21B0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SUMMARY OF CHANGES AMD 0002
01 September 2021 Solicitation No. W9128F21B0020
Date of Issue: 13 August 2021 Date of Opening: 13 September 2021
SUBJECT: Amendment No. 0002 to Specifications and Drawings for Construction of Ecosystem Restoration and Shore Protection, Phase 2 (2021), Missouri River at Lower Brule, SD.
TO: Prospective Bidders and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Section 01 30 00.24 Page 10, add the following new paragraph 1.25:
“1.25 GOVERNMENT-FURNISHED PROPERTY
Pursuant to CONTRACT CLAUSES clause: "Government Property " the Government will furnish to the Contractor the following property to be incorporated or installed in the work. Such property is located the project site. The Contractor is responsible for loading and transporting the property to the jobsite. All such property must be installed or incorporated into the work at the expense of the Contractor. Verify the quantity and condition of such Government-furnished property when delivered to him and report the receipt of Government-Furnished Property in accordance with Section 00 72 00 GENERAL
CONDITIONS (CONTRACT CLAUSES) DFARS 252.211-7007 REPORTING OF GOVERNMENT-
FURNISHED PROPERTY. For damage or loss or property follow Section 00 72 00
GENERAL CONDITIONS (CONTRACT CLAUSES) DFARS 252.245-7002 REPORTING LOSS OF
GOVERNMENT PROPERTY.
Quantity Item/Description
671 tons Riprap
1510 tons Spalls “
(2) Section 35 31 20 Page 2, paragraph 3.2
Delete Paragraph 3.2 and Replace with
“3.2 RIPRAP PLACEMENT
a. Riprap shall be placed within the limits shown on the drawings.
Riprap stone shall be placed in such manner as to produce a reasonably well-graded mass of rock with the minimum practicable percentage of voids.
b. The placement area shall be free of objectionable material such as tree snags and root wads prior to placement.
c. Riprap shall be placed to its full course thickness in one operation and in such manner as to avoid damage to the bedding material and to minimize segregation of the riprap. Stones shall be selected and keyed in, meaning that stones are set in contact with each other so that the interstices between adjacent stones shall be as small as the character of the stone will permit. All faces of the set armor stone shall be touching adjacent armor stones. Each armor stone shall not rock in place. The maximum dimension for void space between adjacent stones shall be 12" in any dimension in a horizontal plane and not more than the depth of one armor stone layer vertically, unless otherwise accepted by the Contracting Officer. The face of stone having the largest area shall be placed against the surface of the underlying material. The larger stones shall be well distributed and the entire mass of stones in their final position shall be roughly graded to conform to the gradation specified. The finished riprap shall be free from objectionable pockets of small stones and clusters of larger stones. Placing riprap in layers will not be permitted. The desired distribution of the various sizes of stones throughout the mass shall be obtained by selective loading of the material at the quarry or other source.
d. All stone shall be placed by clam, orange peel or skip box. Maximum drop height shall be zero for stone placed above the water surface, and three feet above the final resting place for stone placed below the water surface. Whatever method is proposed, the contractor shall demonstrate placement to the satisfaction of the Contracting Officer.
e. A tolerance of plus or minus one-half foot will be allowed on the prescribed structure elevations.
f. The side slopes shall be determined by the natural angle of repose of the stone, varying from 1v on 1.25H to 1v on 1.5H, except where specified in the contract drawings. Dumping of stone at the top of slopes and rolling or pushing into place will not be permitted.
g. Manipulating or moving stone at any time prior to placement by means of dozers or other blade equipment will not be permitted. Rearranging of individual stone by mechanical equipment or by hand will be required to the extent necessary to obtain an interlocked and well-graded distribution of stone sizes as specified above.”
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.
Pages or Sections Deleted Pages or Sections Substituted or Added
Section 31 00 00 Earth Work Section 31 00 00 Earth Work
2. This amendment is a part of the bidding papers and its receipt shall be acknowledged. All other conditions and requirements of the specifications remain unchanged.
a. See Section 00 21 00, paragraph: Instructions to Bidders, on how to submit electronic bids.
3. Electric bids will be received until 2:00 p.m., local time at place of bid opening, 13 September 2021.
Attachments: Spec Pages listed in 1.b. above
U.S. Army Engineer District, Omaha Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901
01 Sep 2021
MFS/2184
| (1) Section 01 30 00.24 Page 10, add the following new paragraph 1.25: |
| (2) Section 35 31 20 Page 2, paragraph 3.2 |
| Delete Paragraph 3.2 and Replace with |