This document is an amendment to a solicitation for construction services. The solicitation is for the Lower Brule Natural Resource Protection Ecosystem Restoration Phase II project. The project scope involves placement of a breakwater structure, native plantings, and multiple recreation features. Drawings are revised and a revised bid schedule is issued with unit pricing for items including placement of geotextiles, aggregates, stone, and construction of recreational amenities. A site visit is scheduled for August 26, 2021. Bids are due by September 13, 2021. The solicitation is set aside for small businesses. The primary NAICS code is 237990. The agency is the Department of the Army Corps of Engineers Engineering District Omaha. Options include additional stone, aggregates, guardrails, shelters, and amenities. Pricing is to be provided for basic requirements and each optional scope.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract W9128F21B0020.pdf | ||
| Amdt 0002 Solicitation W9128F21B0020.pdf | ||
| Section 31 00 00 Earthwork Amdt 0002.pdf | ||
| W9128F21B0020 Am0001 -Dwgs - VOLUME I.pdf | ||
| W9128F21B0020 Am0001 - Dwgs - VOLUME II.PDF | ||
| Dwgs Vol 1 Shoreline Protection Phase 2 Lover Brule W9128F21B0020.pdf | ||
| Specs Shoreline Protection Phase 2 Lower Brule W9128F21B0020.pdf | ||
| Dwgs Vol 2 Shoreline Protection Phase 2 Lower Brule W9128F21B0020.pdf | ||
| W9128F21B0020 Lower Brule Ecosystem Restoration Phase 2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Low er Brule Natural Resource Protection Ecosystem Restoration Phase II
This Amendment is to issue an Amendment 0001 to Draw ings Volume I and Volume II, a Revised Bid Schedule, dated 19 Aug 2021 and to change Site Visit Date, 26 Aug 2021 see 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995). All other terms and conditions of the Solicitation remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F21B0020
X 9B. DATED (SEE ITEM 11)
13-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Aug-2021
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F21B0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Date of Issue: 13 August 2021 Date of Opening: 13 September 2021
SUBJECT: Amendment No. 0001 to Specifications and Drawings for Construction of Ecosystem Restoration and Shore Protection, Phase 2 (2021), Missouri River at Lower Brule, SD.
TO: Prospective Bidders and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Drawings (Reissued). The following drawings are revised with latest revision date of 19 August 2021, and reissued with this amendment.
(1) Sheets E1.04, E2.04, E3.01, E4.01, E5.01, F1.04, F2.04, F3.01, F4.01, G1.04, G2.04, G3.01, G4.01, G-005, CS100, CS103, CS401, CS402, CG102, CG103, CG104, CU103, and ES103.
2. This amendment is a part of the bidding papers and its receipt shall be acknowledged. All other conditions and requirements of the specifications remain unchanged.
a. See Section 00 21 00, paragraph: Instructions to Bidders, on how to submit electronic bids.
3. Electric bids will be received until 2:00 p.m., local time at place of bid opening, 13 September 2021.
Attachments: Dwgs. listed in 1.a. above
U.S. Army Engineer District, Omaha Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901
SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
BID SCHEDULE
Revised 19 Aug 2021
Item Estimated Unit No. Description Quantity Unit Price Amount
BASIC
0001 Entire work, complete, for placement of the Breakwater
Structures (placement of geotextile, and random fill) as shown on the drawings and in the specifications 1,900 LF $_________ $___________
0002 Entire work, complete, for quarried stone for placement of the Breakwater Structures (not including Class ‘A’ Riprap) as shown on the drawings and in the specifications 11,400 Tons $_________ $___________
0003 Entire work, complete, for spalls as shown on the drawings and in the specifications 6,365 Tons $_________ $___________
0004 Entire work, complete, for aggregate surface course as shown on the drawings and in the specifications 2,780 Tons $_________ $___________
0005 Entire work, complete, for removal and salvaging / replacing existing stone as shown on the drawings and in the specifications 2,000 Tons $_________ $___________
0006 Entire work, complete, for the mobilization / demobilization of all equipment as shown on the drawings & in the specifications L.S. Job - $___________
0007 All remaining work Except for Option
Items listed below L.S. Job - $___________
TOTAL BASIC AMOUNT $_______________
OPTION 1
0008 Entire work, complete, for quarried stone as shown on the drawings and in the specifications 215 Tons $_________ $___________
0009 All remaining work
Items listed below L.S. Job - $___________
TOTAL OPTION 1AMOUNT $ _______________
OPTION 2
0010 Entire work, complete, for aggregate surfacing (parking area, pedestrian trail, and entry road) as shown in the drawings and specifications 3930 Tons $_________ $___________
0011 Entire work, complete, for boat ramp, launch section, boat ramp grading, rip-rap slope protection, one trash receptacle, electrical outlet, and lighting as shown in the drawings and specifications L.S. Job $___________
0012 Entire work, complete, for w-beam guardrail (boat ramp parking area) as shown in the drawings and specifications 1178 L.F. $_________ $___________
0013 Entire work, complete, for entry road improvements (asphalt pavement, concrete culvert pipe, misc. grading) as shown in the drawings and specifications L.S. Job $___________
0014 Entire work, complete, for fish cleaning station (shelter, concrete slab and footings, tables, trash receptacle, electrical outlet, lighting, yard hydrant) as shown in the drawings and specifications L.S. Job $___________
0015 Entire work, complete, for one vault toilet (building, concrete slab and footings), trash receptacle, electrical outlet, lighting, and yard hydrant as shown in the drawings and
0016 Entire work, complete, for one small picnic shelter (canopy, concrete slab and footings) one trash receptacle, one grill, and one picnic table as shown
0017 Entire work, complete, for water service as shown in the drawings and specifications L.S. Job $___________
0018 All remaining work
Items listed below L.S. Job $___________
TOTAL OPTION 2 AMOUNT $ _______________
OPTION 3
0019 Entire work, complete, for sand beach surface course as specifications 1615 Tons $_________ $___________
0020 Entire work, complete, for rip-rap slope protection in beach area as shown in the drawings and specifications 127 Tons $_________ $___________
0021 Entire work, complete, for aggregate base course (for sand beach) as shown in the drawings and specifications 780 Tons $_________ $___________
0022 Entire work, complete, for w-beam guardrail (picnic area parking & basketball court area) specifications 575 L.F. $_________ $___________
0023 All remaining work
TOTAL OPTION 3 AMOUNT $ _______________
OPTION 4
0024 Entire work, complete, for two small picnic shelters (canopy, concrete slab and footings), two trash receptacles, two grills, two picnic tables, and two park benches as shown in the drawings and specifications L.S. Job $___________
0025 Entire work, complete, for one large picnic shelter (canopy, concrete slab and footings), one trash receptacle, two grills, and four picnic tables as shown in the drawings and specifications L.S. Job $___________
0026 Entire work, complete, for one vault toilet (building, concrete slab and footings), trash receptacle, electrical outlet, lighting, and yard hydrant as
0027 Entire work, complete, for aggregate surfacing (picnic shelter, beach parking, basketball court, and horseshoe pit areas) as shown in the drawings and specifications 1126 Tons $_________ $___________
0028 All remaining work
TOTAL OPTION 4 AMOUNT $ _______________
OPTION 5
0029 Entire work, complete, for basketball court and two park benches as shown
0030 Entire work, complete, for horseshoe pit and one park bench
0031 All remaining work L.S. Job $___________
TOTAL OPTION 5 AMOUNT $ _______________
TOTAL AMOUNT (Basic plus Options) $_______________
Notes:
1. See SECTION 00 21 00, INSTRUCTIONS, CONDITIONS, & NOTICES TO BIDDERS for evaluation of options. The Government reserves the right to exercise the options within 180 days after issuance of Notice to Proceed.
2. The quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to Contract Clauses "Variation in Estimated Quantity."
3. Bid prices must be entered for all items of the schedule. Total amount bids submitted without bid prices being entered on individual items will be rejected. Extensions will be subject to verification by the Government. In case of variation between the unit prices and the extensions, the unit prices will be considered the bid. In case of variation between the individual bid item prices and the total amount, the individual bid prices will be considered the bid.
4. A modification to a bid which provides for a single adjustment to the total amount bid should state the application of the adjustment to each respective unit price and lump sum price affected.
If the modification is not so apportioned, the single adjustment will be applied to Item No.7.
5. See SECTION 00 72 00, GENERAL CONDITIONS, FAR 52.217-7 Option for Increased Quantity—Separately Priced Line Items for additional information on how the Government will award option items. Additional duration will be added to the contract performance period for each option exercised as follows:
Option 1: 0 days Option 2: 75 days Option 3: 45 days Option 4: 45 days Option 5: 30 days
Option Items 0008 thru 0009, 0010 thru 0018, 0019 thru 0023, 0024 thru 0028, and 0029 thru 0031 will be awarded all together or not at all.
6. See Section 01 22 00 MEASUREMENT AND PAYMENT for additional information.
The following have been modified:
SECTION 00 21 00 INSTRUCTIONS TO BIDDERS
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visit will be conducted on 26 August 2021 at 12:30 PM CDT. To register to attend the Site Visit contact Greg Johnson during normal duty hours.:
Name: Greg Johnson Email Address: Greg.Johnson@usace.army.mil Telephone: (402) 995-2701
(End of provision)
(End of Summary of Changes) mailto:Greg.Johnson@usace.army.mil
| BASIC |
| OPTION 1 |
| OPTION 2 |
| OPTION 3 |
| OPTION 4 |
| OPTION 5 |