815-NRM23-04_Replace Electric Service Cypress Hills_Drawings.pdf
PDF 12 MB Posted
- Solicitation number
- 36C78623B0027
About this file
This federal contract opportunity is for the construction of electrical service improvements at Cypress Hills National Cemetery in Brooklyn, New York. The solicitation number is 36C78623B0027 and is seeking a contractor to furnish all labor, materials, equipment, and supervision required to perform work described in the statement of work, specifications and drawings. The project involves replacing the existing electrical service and is identified as project number 815-NRM23-04. The opportunity is a 100% set-aside for small business and is being issued by the Department of Veterans Affairs National Cemetery Administration. The contractor will be responsible for construction activities necessary to improve the electrical service at Cypress Hills National Cemetery located at 625 Jamaica Avenue in Brooklyn.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cypress Hills National Cemetery Brooklyn, New York
Electrical Service Improvement Project Number: 815-NRM22-06
COVER SHEET
GI-100
DWG NUMBER TITLE
1 GI-100 COVER SHEET
2 B-100 TOPOGRAPHIC SURVEY
3 EG-100 SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
4 ED-100 FLOOR PLAN - EXISTING AND DEMOLITION
5 ED-200 POWER RISER DIAGRAM- EXISTING AND DEMOLITION
6 ES-100 SITE UTILITY PLAN
7 ES-200 CONSTRUCTION DETAILS
8 E-100 POWER RISER DIAGRAM- EXISTING AND NEW WORK
9 E-200 GROUNDING DETAILS
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2022, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
ELECTRICAL SERVICE
IMPROVEMENTS
CYPRESS HILLS NATIONAL CEMETERY
815-NRM22-06
HU UB
March 10, 2023
FINAL CONSTRUCTION DOCUMENTS - ISSUED FOR CONSTRUCTION
JACKIE ROBINSON PKWY
JAMAICA AVE
CYPRESS HILLS ST
FULTON ST
ARLINGTON AVE
C R
ESC
EN
T ST
ATLANTA AVE
HIGHLAND
PARK
INDEX OF SHEETSGENERAL NOTESVICINITY MAP
1. FURNISH ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO COMPLETE THE WORK SHOWN IN
THESE DOCUMENTS.
2. PRESERVE ALL PROPERTY IRONS. REESTABLISH ALL DAMAGED OR DESTROYED BY CONTRACTOR'S FORCES. SUCH IRONS SHALL BE REESTABLISHED BY A LICENSED LAND SURVEYOR IN ACCORDANCE
WITH STATE LAWS.
3. EXISTING UTILITY SERVICE LINES, POLES, VALVE BOXES, METERS, ETC. ARE TO REMAIN IN PLACE AND IN OPERATION, UNLESS THE PLANS SPECIFICALLY CALL FOR THEIR ADJUSTMENT. EXISTING UTILITIES AND LOCATIONS, AS SHOWN ON THE PLANS, REPRESENT THE BEST INFORMATION OBTAINABLE FOR DESIGN.
THE PLAN LOCATIONS SHOWN ARE NOT GUARANTEED; VERIFY IN THE FIELD.
4. DO NOT PROCEED WHEN OBSTRUCTIONS, CONFLICTS, AND/OR GRADE DIFFERENCES EXIST.
IMMEDIATELY NOTIFY CONTRACTING OFFICER REPRESENTATIVE (COR). THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL DAMAGES, REVISIONS, AND REMEDIAL WORK, AS DETERMINED BY
THE COR, DUE TO FAILURE TO GIVE SUCH NOTIFICATION.
5. PROVIDE MINIMUM ADVANCED NOTICE OF FORTY-EIGHT (48) HOURS TO UTILITY COMPANIES PRIOR TO
STARTING ANY EXCAVATION AS FOLLOWS:
CONTACT NEW YORK CITY ONE-CALL SYSTEM: 1.800.272.4480
6. SAVE AND PROTECT ALL TREES AND SHRUBS NOT SPECIFICALLY IDENTIFIED FOR REMOVAL.
EXCAVATION, PARKING, STORAGE, DUMPING, AND ALL OTHER ACTIVITIES THAT MAY RESULT IN SOIL
COMPACTION/CONTAMINATION ARE PROHIBITED ON THE PROTECTED SIDE OF TREE PROTECTION
FENCE.
7. COORDINATE ALL ACCESS, ROUTES OF ACCESS, AND STORAGE/PARKING AREAS WITH CEMETERY STAFF. PROVIDE FLAGGERS WHEN CROSSING, ENTERING, AND WORKING IN AND ADJACENT TO CITY STREETS. CLEAN ROADS DAILY THAT ARE USED BY CONTRACTOR'S FORCES AND AS DIRECTED BY COR.
8. NO MATERIAL DELIVERY IS PERMITTED OVER EXISTING OR PROPOSED CEMETERY PAVED ROADS, EXCEPT AS SPECIFICALLY APPROVED BY COR AND CEMETERY STAFF.
9. COORDINATE CONSTRUCTION WORK WITH THE COR AND CEMETERY STAFF. MAINTAIN AT LEAST ONE
OPEN LANE AT ALL TIMES.
10. CHECK AND REPLACE/REPAIR ALL EROSION CONTROL DEVICES AT THE END OF EACH DAY'S
CONSTRUCTION AND AFTER EACH RAIN EVENT GREATER THAN 1/2".
11. ALL DIMENSIONS SHOWN PARALLEL AND PERPENDICULAR UNLESS OTHERWISE NOTED. DO NOT SCALE
DIMENSIONS OFF THE DRAWINGS.
12. REMOVE DEBRIS, RUBBLE, AND OTHER WASTE MATERIALS FROM THE SITE AND DISPOSE OF LEGALLY
OFF GOVERNMENT'S PROPERTY AT CONTRACTOR'S EXPENSE.
13. RESTORE ALL AREAS AND ITEMS DAMAGED DURING CONSTRUCTION.
14. THE ADDRESS FOR NEW SERVICES IS 625 JAMAICA AVENUE, BROOKLYN BLOCK 3892, LOT #1
CONSULTANTS
PRIME CONSULTANT:
WALKER FEDERAL SERVICES, LLC.
7820B WORMANS MILL ROAD
SUITE 162
FREDERICK, MARYLAND 21701
CEMETERY
03/10/2023
JAMAICA AVENUE
BLOCK 3892
PART OF LOT 1
(NOT TO SCALE)
HATCH #1
(NOT TO SCALE)
HATCH #2
NOTES:
1. PROPERTY KNOWN AS PART OF LOT 1, BLOCK 3892, AS SHOWN ON THE NEW
YORK CITY DIGITAL TAX MAP OF THE BOROUGH OF BROOKLYN, KINGS COUNTY,
CITY AND STATE OF NEW YORK.
2. PER CONTRACTUAL AGREEMENT WITH CLIENT, CONTROL POINT ASSOCIATES,
INC. PC HAS NOT PERFORMED A BOUNDARY SURVEY OF THE SITE. BOUNDARY
LINES SHOWN HEREON ARE APPROXIMATE AND FOR ORIENTATION PURPOSES
ONLY AND DO NOT REPRESENT A PROPERTY/BOUNDARY OPINION.
3. THE LOCATION OF UNDERGROUND UTILITIES SHOWN ARE BASED UPON
MARKOUT PROVIDED BY CONTROL POINT ASSOCIATES, INC. LOCATIONS AND
SIZES ARE BASED ON UTILITY MARK-OUTS, ABOVE GROUND STRUCTURES THAT
WERE VISIBLE & ACCESSIBLE IN THE FIELD, AND THE MAPS AS LISTED IN THE
REFERENCES AVAILABLE AT THE TIME OF THE SURVEY. BEFORE ANY
EXCAVATION IS TO BEGIN, ALL UNDERGROUND UTILITIES SHOULD BE VERIFIED
AS TO THEIR LOCATION, SIZE AND TYPE BY THE PROPER UTILITY COMPANIES.
CONTROL POINT ASSOCIATES, INC. DOES NOT GUARANTEE THE UTILITIES
SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA EITHER IN SERVICE OR
ABANDONED.
4. THIS PLAN IS BASED ON INFORMATION PROVIDED BY A SURVEY PREPARED IN
THE FIELD BY CONTROL POINT ASSOCIATES, INC. AND OTHER REFERENCE
MATERIAL AS LISTED HEREON.
5. THIS SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT AND
IS SUBJECT TO THE RESTRICTIONS, COVENANTS AND/OR EASEMENTS THAT
MAY BE CONTAINED THEREIN.
6. BY GRAPHIC PLOTTING ONLY PROPERTY IS LOCATED IN FLOOD HAZARD ZONE
X (AREA OF MINIMAL FLOOD HAZARD) PER REF. # 2 (PANEL NOT PRINTED)
7. THE EXISTENCE OF UNDERGROUND STORAGE TANKS, IF ANY, WAS NOT KNOWN
AT THE TIME OF THE FIELD SURVEY.
8. ELEVATIONS REFER TO THE NORTH AMERICAN VERTICAL DATUM OF 1988
(NAVD88) WHICH IS 1.46 FEET BELOW THE BOROUGH OF BROOKLYN HIGHWAY
DATUM.
TO CONVERT TO BROOKLYN HIGHWAY DATUM SUBTRACT 1.46' FROM THE
ELEVATIONS SHOWN. TO CONVERT TO NGVD 1929 ADD 1.10' TO ELEVATIONS
SHOWN.
9. THE OFFSETS SHOWN ARE NOT TO BE USED FOR THE CONSTRUCTION OF ANY
STRUCTURE, FENCE, PERMANENT ADDITION, ETC.
10. BUILDING DIMENSIONS SHOWN HEREON ARE MEASURED AT GROUND LEVEL OF
BUILDING EXTERIOR.
REFERENCES:
1. THE NEW YORK CITY TAX MAP OF THE BOROUGH OF BROOKLYN, KINGS COUNTY,
CITY AND STATE OF NEW YORK, BROOKLYN BLOCK 3892, EFFECTIVE DATE:
12-06-2008.
2. MAP ENTITLED "NATIONAL FLOOD INSURANCE PROGRAM, FIRM, FLOOD
INSURANCE RATE MAP, CITY OF NEW YORK, NEW YORK, BRONX, RICHMOND,
NEW YORK, QUEENS AND KINGS COUNTIES," PANEL NOT PRINTED, MAP NUMBER
3604970217 F, MAP REVISED: SEPTEMBER 5, 2007. INFORMATION SHOWN PER
NATIONAL FLOOD HAZARD LAYER FIRMETTE, MAP EXPORTED ON 10/03/2018.
3. MAP ENTITLED "SUBSURFACE UTILITY LOCATING, CYPRESS HILL", PREPARED BY
CONTROL POINT ASSOCIATES, INC, DATED OCTOBER 09, 2018.
4. NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION, BUREAU OF WATER AND
SEWER OPERATIONS, WATER MAPPING, MAP PRINTED 10/18/2018.
5. NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION, BUREAU OF WATER AND
SEWER OPERATIONS, SEWER MAPPING MAPPING, MAP PRINTED 10/18/2018.
6. MAP ENTITLED "CITY OF NEW YORK BOROUGH OF BROOKLYN, OFFICE OF THE
PRESIDENT, BUREAU OF HIGHWAYS AND SEWERS, MAP ELIMINATING THE LINES
OF NASSAU STREET FROM JAMAICA AVENUE TO THE BOROUGH LINE AND LAUREL
STREET AND SUNNYSIDE AVENUE, FROM HIGHLAND PARK TO NASSAU STREET
AND ADJUSTING THE GRADES THEREFOR", DATED MAY 7, 1957, FILE NO. N-1039.
UNAUTHORIZED ALTERATION OR ADDITION TO A SURVEY MAP BEARING A LICENSED LAND
SURVEYOR'S SEAL IS A VIOLATION OF SECTION 7209, SUB-DIVISION 2, OF THE NEW YORK
STATE EDUCATION LAW.
ONLY COPIES FROM THE ORIGINAL OF THIS SURVEY MARKED WITH AN ORIGINAL OF THE
LAND SURVEYOR'S EMBOSSED SEAL SHALL BE CONSIDERED TO BE VALID TRUE COPIES.
800-241-3624
718-270-5735
800-762-0592
855-661-6323VERIZON COMMUNICATIONS
CONSOLIDATED EDISON CO. OF N.Y.
NATIONAL GRID
AT&T CORPORATION
PHONE NUMBERUTILITY COMPANY
UTILITIES:
SERIAL NUMBER(S): 182760795
BASED UPON THE UTILITY COMPANIES RESPONSE TO THIS REQUEST.
THE FOLLOWING COMPANIES WERE NOTIFIED BY THE NEW YORK CITY ONE-CALL SYSTEM
(1-800-272-4480) AND REQUESTED TO MARK OUT UNDERGROUND FACILITIES AFFECTING
AND SERVICING THIS SITE. THE UNDERGROUND UTILITY INFORMATION SHOWN HEREON IS
CLEAR / NO CONFLICT
MARKED
MARKED
CLEAR / NO CONFLICT
STATUS
O
R
K
CIT
Y
O
N
E
C
A
L
L
C
E
N
T E
R y
S a f e l g
D i
THEN-
L
L
A
C
P
O
T
S
N E
W
Y
L
I
SURFACE ANYWHERE IN THE STATE.
THE STATE OF NEW YORK REQUIRES NOTIFICATION BY EXCAVATORS,
DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S
GAS VALVE
WATER VALVE
MAIL BOX
UTILITY POLE
APPROX. LOC. UNDERGROUND SAN. LINE
DECIDUOUS TREE & TRUNK SIZE
POST
ELECTRIC MANHOLE
SANITARY/SEWER MANHOLE
STREET LIGHT
HYDRANT
GAS MANHOLE
EXIST. FINISHED FLOOR ELEVATION
EXIST. DOOR SILL ELEVATION
CLEAN OUT
PARKING SPACE COUNT
APPROX. LOC. UNDERGROUND ELEC. LINE
APPROX. LOC. UNDERGROUND GAS LINE
OVERHEAD WIRES
SIGN
APPROX. LOC. UNDERGROUND WATER LINE
CATCH BASIN OR INLET
EXIST. TOP OF WALL ELEVATION
EXIST. BOTTOM OF WALL ELEVATION
VENT
DRAIN / GRATE
LEGEND:
PROPERTY LINE
EXISTING CONTOUR
EXISTING SPOT ELEVATION
EXIST. GUTTER ELEVATION
EXIST. TOP OF CURB ELEVATION
OVERHANG
CONCRETE
TYPICAL
SOLID WHITE LINE
EXIST. GROUND FLOOR ELEVATION
APPROX. LOC. UNDERGROUND UNKNOWN LINE
ROOF DRAIN
IRON FENCE
METAL COVER
COLUMN
RIM ELEVATION
TOP OF PIPE ELEVATION
ELEVATION
FULL OF DEBRIS
FLOOD LIGHT
0 10 20 40 60
N
C
A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg.
Of
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2018, TIER4 DESIGN, LLC.
WALKER FEDERAL SERVICES, LLC.
7820B WORMANS MILL ROAD
SUITE 162
FREDERICK, MARYLAND 21701
DESIGN SERVICES TO REPLACE
WATER SERVICE LINE
CYPRESS HILLS NATIONAL CEMETERY
815-NRM22-06
T.C. D.E.C.
2929 EXPRESSWAY DRIVE
HAUPPAUGE, NY 11749
631.580.2645 - 908.668.9595 FAX
GREGORY DESSI
I N
OIN
EI ATO CS S
ONTROL P
SA
C T
C . PC
Consultant firm street address Consultant firm city, state, zip code Consultant firm phone number Consultant POC
WWW.CPASURVEY.COM
PROJECT
AREA
(NOT TO SCALE)
LOCATION MAP
TOPOGRAPHIC SURVEY
B-101
12-17-2018
100% CONSTRUCTION DOCUMENTS - ISSUED FOR CONSTRUCTION
ELECTRICAL SERVICE
IMPROVEMENTS
March 10, 2023
02 09
ELECTRICAL SYMBOLS ELECTRICAL ABBREVIATIONS
GROUND
CONDUIT DOWN OR AWAY
CONDUIT UP OR TOWARD VIEWER
CONDUIT, STUBBED AND CAPPED AS SHOWN
GROUND GRID CABLE
UNDERGROUND ELECTRIC
CIRCUIT BREAKER, THERMAL MAGNETIC TRIP SHOWN,
3 POLE UON.
FUSE - RATING INDICATED
DRAWOUT CIRCUIT BREAKER
DRAWOUT CIRCUIT BREAKER
DELTA CONNECTION, THREE PHASE
DELTA CONNECTION, SINGLE PHASE
WYE CONNECTION - UNGROUNDED, GROUNDED,
THREE PHASE
WYE CONNECTION - UNGROUNDED, GROUNDED,
SINGLE PHASE
PRESSURE INDICATING TRANSMITTER
NEON GLOW TUBE, ONE PER PHASE
ELECTRICAL INTERLOCK
KEY INTERLOCK
FUSED SWITCH, MEDIUM VOLTAGE
SURGE ARRESTER/LIGHTNING ARRESTER
GROUND ROD
DRY CONTACTS - NO, NC
GROUND
POTENTIAL TRANSFORMER
TRANSFORMER
CURRENT TRANSFORMER,
NUMBER INDICATED
CORE BALANCE CURRENT TRANSFORMER
EXISTING, NEW ELECTRIC MANHOLE
OR HANDHOLE AND NUMBER
INTERLOCKED RECEPTACLE WITH
DISCONNECT SWITCH
FIELD PHOTOGRAPH
TERMINATION
GROUNDING RESISTOR
VOLTMETER
AMMETER
WATT METER
WATTHOUR METER
A
AC
AF
AFF
AFG
AHU
AIC
AL
AM
AT
ATS
AUTO
AUX
AWG
BAT
BKR
BLDG
BOCA
C
CB
CC
CH
CIR,CKT
CLR
COMB
CONT'D
CPT
CR
CT
CU
DC
DIA
DIST
DIV
DN
DP
DSW
DWG
E
EA
EC
ECB
EF
EL
EMH
EO
ER
ETM
ETR
EX
F
FA
FAAP
FACP
FDR
FLR
FSS
FUT
G
GALV
GC
GFI
GFP
GFR
GND
HH
HP
HVAC
HZ
IC
ICCB
I & C
ID
IG
INST
ITC
JB
K
KCMIL
KVA
KW
LA
LB
LO
LCP
LOS
LVL
AMPERE
ALTERNATING CURRENT
AMPERE FRAME
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AIR HANDLING UNIT
AMPERES INTERRUPTING
CAPACITY (SYM, RMS, AMPS)
ALUMINIUM
AMMETER
AMPERE TRIP
AUTOMATIC TRANSFER SWITCH
AUTOMATIC
AUXILIARY
AMERICAN WIRE GAUGE
BATTERY
BREAKER
BUILDING
BUILDING OFFICIALS AND
CODE ADMINISTRATORS
CONDUIT
CIRCUIT BREAKER
CONTROL CABLE
CABINET HEATER
CIRCUIT
CLEAR
COMBINATION
CONTINUED
CONTROL POWER
TRANSFORMER
CONTROL RELAY
CURRENT TRANSFORMER
COPPER, COMPRESSOR UNIT
DIRECT CURRENT
DIAMETER
DISTRIBUTION
DIVISION
DOWN
DISTRIBUTION PANEL
DISCONNECTING SWITCH
DRAWING
EMPTY, ELECTRICAL INTERLOCK,
EXISTING
EACH
EMPTY CONDUIT
ENCLOSED CIRCUIT BREAKER
EXHAUST FAN
ELEVATION
ELECTRIC MANHOLE
ELECTRIC OPERATOR
EXISTING RELOCATED
ELAPSED TIME METER
EXISTING TO REMAIN
EXISTING
FUSE, FRAME, FRONT
FRAME AMPS
FIRE ALARM ANNUNCIATOR
PANEL
FIRE ALARM CONTROL PANEL
FEEDER
FLOOR
FUSED SAFETY SWITCH
FUTURE
GREEN, GROUND, GROUND GRID
GALVANIZED
GENERATOR CONTACTOR,
GENERATOR CONTROL PANEL
GROUND FAULT INTERRUPTER
GROUND FAULT PROTECTION
GROUND FAULT RELAY
GROUND
HANDHOLE
HORSE POWER
HEATING VENTILATION AND AIR
CONDITION
HERTZ
INTERRUPTING CAPACITY
INSULATED CASE CIRCUIT
BREAKER
INSTRUMENTATION & CONTROL
IDENTIFICATION
ISOLATED GROUND
INSTANTANEOUS
INTERFACE TERMINAL CABINET
JUNCTION BOX
KEY INTERLOCK
KILO CIRCULAR MILS
KILOVOLT-AMPERE
KILOWATT
LIGHTNING ARRESTER
CONDUIT BOX, RIGHT ANGLE
LOCKOUT
LOCAL CONTROL PANEL
LOCKOUT STOP PUSH BUTTON
LEVEL
MAIN CIRCUIT BREAKER
MACHINE
MULTIFUNCTION RELAY
MANHOLE, MOUNTING HEIGHT
MINIMUM
MAIN LUG ONLY
MOUNT
MOUNTED
NEUTRAL
NON-AUTOMATIC
NORMALLY CLOSED
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NATIONAL FIRE PROTECTION
ASSOCIATION
NON-FUSED SAFETY SWITCH
NORMALLY OPEN
NUMBER
NAMEPLATE
NOT TO SCALE
OVERLOAD
POLE OR POLES
PULL BOX, PUSH BUTTON
POWER FACTOR
PHASE
PILOT LIGHT
MICROPROCESSOR BASED METERING
PHASE MONITOR RELAY
POWER MONITORING DEVICE
PANEL
POWER QUALITY MONITOR
PAIR
PRIMARY
POTENTIAL TRANSFORMER
REMOVE, RED, REAR, RUN
CONTRACTORS
RIGID GALVANIZED STEEL / GALVANIZED
RIGID CONDUIT
RECEPTACLE
REQUIRED
ROOT MEAN SQUARE
ROOM
ROOF TOP UNIT
SURGE ARRESTOR
SURGE PROTECTION DEVICE
SWITCH
SYMMETRICAL
TRIP AMPS
TERMINAL BOARD, TERMINAL BLOCK
TIME DELAY RELAY
TERMINAL JUNCTION BOX
TWISTED SHIELDED PAIR
HIGH-TEMP RELAY
TEST SWITCH
TRANSIENT VOLTAGE SURGE
SUPPRESSOR
TYPICAL
UNDERGROUND
UNDERWRITERS LABORATORY
UNLESS OTHERWISE NOTED
VOLTS OR VOLTAGE
VOLTAMPS
MB,MCB
M/C
MFR
MH
MIN
MLO
MT
MTD
N
NA
NC
NEC
NEMA
NFPA
NFSS
NO
NO.
NP
NTS
OL
P
PB
PF
PH
PL
PM
PMR
PMT
PNL
PQM
PR
PRI
PT
R
RGS,GRC
RECPT
REQ'D
RMS
RM
RTU
SA
SPD
SW
SYM
TA
TB
TDR
TJB
TSP
TSH
TS
TVSS
TYP
UG
UL
UON
V
VA
W W/
WH
WP
WR
XFMR
Z
O
WATTS, WIRE
WITH
WATTHOUR
WEATHERPROOF
WELDING RECEPTACLE
TRANSFORMER
IMPEDANCE
PHASE, DIAMETER
NUMBER
LEGEND
NEW WORK
DEMOLITION
EXISTING
ELECTRICAL GENERAL NOTES
1. IT IS THE INTENT OF THESE DRAWINGS AND OTHER RELATED
DOCUMENTS TO PRODUCE A COMPLETE AND FUNCTIONING ELECTRICAL
SYSTEM. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL LABOR,
MATERIAL, TESTS, AND OTHER SERVICES AS MAY BE NECESSARY TO
ACHIEVE THIS PRODUCT. THE CONTRACTOR SHALL ACKNOWLEDGE
ACCEPTANCE OF THE PLANS AS AN ADEQUATE DEFINITION OF THE
SCOPE OF WORK AND EXTRA COST CLAIMS BASED ON DISCREPANCIES
ON THE PLANS WILL NOT BE CONSIDERED.
2. ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE NATIONAL
ELECTRICAL CODE (NEC) AND ALL LOCAL CODES HAVING JURISDICTION.
ALL EQUIPMENT, DEVICES, AND MATERIAL SHALL BE LISTED WITH
UNDERWRITERS LABORATORIES FOR ITS APPLICATION AS INSTALLED
AND SHALL BEAR THE UL LABEL.
3. THE REQUIRED BUILDING AND TRADES PERMIT WILL BE OBTAINED BY
CONTRACTOR. CONTRACTOR SHALL COORDINATE WITH THE OWNER.
4. THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE CONDITIONS OF
THE PREMISES AND THE CHARACTER AND EXTENT OF WORK REQUIRED
PRIOR TO CONSTRUCTION. BRING TO THE ATTENTION OF
OWNER/ENGINEER FOR FURTHER DIRECTIONS, IF THERE ARE
DIFFICULTIES IN COMPLYING WITH DRAWINGS/SPECIFICATIONS.
5. ELECTRICAL PLANS ARE DIAGRAMMATIC. DO NOT SCALE DRAWINGS.
6. CONSULT PLANS, IF ANY, OF ALL OTHER AFFECTED AREAS FOR
COORDINATION AND RELATED WORK.
7. CONSULT EXISTING AS BUILT ARCHITECTURAL AND STRUCTURAL PLANS
AND DETAILS FOR CONSTRUCTION TYPE, HEADROOM, ROOM FINISHES,
CEILINGS, ETC. COORDINATE WITH OWNER, AS REQUIRED.
8. CIRCUIT NUMBERS ARE FOR IDENTIFICATION PURPOSES ONLY.
CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTLY SPACING THE
CIRCUITS IN THE PANEL AND BALANCE THE LOAD ON THE PHASES
UNDER NORMAL OPERATING CONDITIONS.
9. SHOP DRAWINGS FOR ALL ELECTRICAL EQUIPMENT, FIXTURES, DEVICES
AND MATERIALS SHALL BE SUBMITTED TO THE OWNER/ENGINEER FOR
APPROVAL BEFORE DELIVERY TO THE JOB SITE. CONTRACTOR SHALL
REPLACE ALL NON-CONFIRMING EQUIPMENTS AND DEVICES, AT NOT
EXTRA CHARGE TO OWNER, IF SUCH EQUIPMENTS / DEVICES ARE
PROCURED / DELIVERED / INSTALLED PRIOR TO APPROVAL OF SHOP
DRAWINGS.
10. CONTRACTOR SHALL VERIFY WIRE SIZES, CB AND FUSE RATINGS FOR
ALL EQUIPMENT, AND BRING TO THE ATTENTION OF THE
OWNER/ENGINEER ANY DISCREPANCIES AFFECTING THE WORK PRIOR
TO PROCEEDING.
11. ALL WORK SHALL BE DONE AT SUCH TIMES AND IN SUCH A MANNER AS
WILL LEAST INTERFERE WITH THE MAINTENANCE AND OPERATION OF
ALL RELATED OR AFFECTED SYSTEM. ALL POWER OUTAGES, FIRE
ALARM SHUT DOWNS, ETC. SHALL BE COORDINATED WITH OWNER.
12. WHERE APPLICABLE, CONTRACTOR SHALL BE RESPONSIBLE FOR
PROPER SIZING OF ALL MOTOR OVERLOAD DEVICES (HEATERS) IN
STARTERS BASED ON ACTUAL NAMEPLATE RATINGS ON THE MOTORS
BEING INSTALLED.
13. HORSEPOWER / WATTAGE INDICATED ON DRAWINGS MAY DIFFER FROM
ACTUAL EQUIPMENT FURNISHED. IF FURNISHED EQUIPMENT DIFFERS
FROM RATINGS ON DRAWINGS, CONTRACTOR SHALL MARK THE
DRAWINGS FOR AS BUILT CONDITION.
14. THE EXACT NUMBER OF WIRES MAY NOT BE INDICATED FOR ALL
CIRCUITS, ONLY THOSE WHERE CLARIFICATION IS NECESSARY. THE
ELECTRICAL CONTRACTOR SHALL PROVIDE ALL WIRES NECESSARY FOR
THE PROPER FUNCTIONING OF THE SYSTEM WHETHER INDICATED ON
DRAWINGS OR NOT.
15. PROVIDE PULL WIRE AND FISH CORD FOR ALL NEW EMPTY CONDUIT
RUNS IN EXCESS OF 10 FEET.
16. ALL CONDUCTORS, RACEWAYS AND CABLES SHALL BE CONCEALED IN
CEILING OR WALL UNLESS OTHERWISE INDICATED.
17. OPENINGS IN EXISTING BUILDING STRUCTURE FOR PASSAGE OF
CONDUITS/CABLES SHALL NOT BE CUT UNTIL THE CONTRACTOR HAS
ASKED FOR AND RECEIVED WRITTEN APPROVAL FROM THE OWNER.
18. NEW LIGHTING FIXTURES, WHERE APPLICABLE, SHALL BE FURNISHED
AND INSTALLED COMPLETE WITH ALL ACCESSORIES (INCLUDING LAMPS).
19. SYMBOLS SHOWN ON THIS SHEET ARE STANDARD SYMBOLS. ALL OF
THEM MAY NOT BE APPLICABLE TO THIS PROJECT.
20. THE CONTRACTOR SHALL GUARANTEE ALL HIS WORK AND MATERIALS
FOR A PERIOD OF ONE YEAR AFTER ACCEPTANCE BY OWNER.
21. ALL NEW PENETRATIONS THRU FLOOR AND WALLS SHALL BE FIRE
STOPPED IN ACCORDANCE WITH BOCA, NEC, AND NFPA.
22. CONDUCTORS SHALL BE INSTALLED CONTINUOUS BETWEEN DEVICES,
WITH SPLICES LOCATED ONLY IN JUNCTION BOXES OR IN CABINETS, AS
SHOWN. CONDUCTORS SHALL BE OF SUFFICIENT LENGTH TO REACH
THE FARTHEST POINT. A MINIMUM OF 6" LOOPS SHALL REMAIN WHERE
CONNECTIONS OR TAPS ARE TO BE MADE.
23. PROVIDE AN UPDATED TYPEWRITTEN PANEL DIRECTORY IN THE PANEL
AFTER COMPLETION OF WORK.
24. ELECTRICAL CONTRACTOR SHALL PROVIDE AS BUILT DRAWINGS, ALL
MANUFACTURERS DATA AND WARRANTY LITERATURE AT THE
COMPLETION OF THE CONTRACT.
1. IT SHALL BE THE RESPONSIBILITY OF
THE ELECTRICAL CONTRACTOR TO
COORDINATE EXACT REQUIREMENTS
FOR INCOMING SERVICE OF LOCAL
UTILITY FOR POWER, PAY ALL FEES,
AND INSTALL A COMPLETE AND
FUNCTIONAL SYSTEM.
COORDINATION WITH POWER COMPANY
1. WHERE REQUIRED, THE ELECTRICAL
CONTRACTOR SHALL COORDINATE ALL
MOUNTING HEIGHTS FOR SWITCHES,
RECEPTACLES, WALL MOUNTED LIGHT
FIXTURES, AND TELEPHONE OUTLETS
BY THE USE OF THE ARCHITECTURAL
AND ENGINEERING DRAWINGS. SHOULD
ANY CONFLICTS BECOME APPARENT
THE CONTRACTOR SHALL REQUEST
CLARIFICATION PRIOR TO
INSTALLATION. IF THE WORK IS NOT
COORDINATED ANY REMEDIAL WORK
SHALL BE REDONE AT NO ADDITIONAL
COST TO THE OWNER.
WIRING DEVICES
1. BALLAST FOR LIGHTING FIXTURES SHALL
OPERATE THE SPECIFIED LAMPS.
ELECTRONIC BALLAST SHALL HAVE A
POWER FACTOR GREATER THAN .95,
LESS THAN 10% HARMONIC DISTORTION.
2. THE ELECTRICAL CONTRACTOR SHALL
PROVIDE SPARE LAMPS EQUAL TO 15%
OF THE TOTAL OF ALL LIGHTING
FIXTURES INSTALLED ON THE PROJECT.
LIGHT FIXTURES (IF APPLICABLE) 1. DEMOLITION AND REMOVAL OPERATIONS SHALL COMMENCE ONLY AFTER ALL EROSION AND
SEDIMENTATION CONTROL MEASURES ARE IN PLACE AND FUNCTIONAL.
2. THE CONTRACTOR AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR COMPLYING WITH APPLICABLE FEDERAL, STATE, AND LOCAL REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS AT ALL TIMES
FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR AND SUBCONTRACTORS TO INITIATE, MAINTAIN, AND SUPERVISE
ALL SAFETY REQUIREMENTS, PRECAUTIONS, AND PROGRAMS IN CONNECTION WITH THE WORK.
3. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL CODES, OBTAIN ALL PERMITS, AND PAY ALL FEES
REQUIRED FOR THE EXECUTION OF THE WORK.
4. NOTIFY NEW YORK CITY ONE-CALL SYSTEM: 1.800.272.4480 OF INTENDED DEMOLITION OPERATIONS.
5. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES, INCLUDING IRRIGATION LINES, TAKE CARE TO PROTECT UTILITIES THAT ARE TO REMAIN, AND REPAIR CONTRACTOR CAUSED
DAMAGE ACCORDING TO CURRENT LOCAL STANDARDS AND AT THE CONTRACTOR'S EXPENSE.
COORDINATE ALL CONSTRUCTION WITH THE APPROPRIATE UTILITY COMPANIES. RELOCATE EXISTING
IRRIGATION LINES AS NECESSARY FOR CONSTRUCTION..
6. CONTRACTOR SHALL DEVELOP AND IMPLEMENT A WASTE MANAGEMENT PLAN PRIOR TO THE
COMMENCEMENT OF WORK. AT A MINIMUM THE PLAN SHALL INCLUDE:
6.1. THE PROPER PROCEDURES FOR DISPOSAL OR RECLAIMING FOR REUSE / RECYCLING.
6.2. DESIGNATED AREAS FOR WASTE MANAGEMENT CONTAINERS. CONTAINERS SHALL BE PROPERLY
MARKED FOR ALLOWABLE AND PROHIBITED ITEMS AND MATERIALS.
6.3. DESIGNATED CHEMICAL STORAGE AREAS, APPROPRIATE CHEMICAL STORAGE CONTAINERS, AND
PROCEDURES FOR SPILL CONTROL. CHEMICALS SHALL NOT BE PERMITTED TO INFILTRATE TO
GROUNDWATER OR BE PUMPED UNTREATED FROM PIT DEWATERING FACILITIES.
6.4. CONCRETE WASHOUT AREAS, LOCATED AWAY FROM DESIGNATED CONSTRUCTION EXIT.
7. PROVIDE NEAT AND STRAIGHT SAWCUTS OF EXISTING CURBS, CONCRETE AND ASPHALT PAVEMENT ALONG
ALL LIMITS OF DEMOLITION.
8. ALL DEMOLISHED MATERIALS BECOME THE PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE DESIGNATED. DISPOSE OF OFF GOVERNMENT PROPERTY IN A LEGAL MANNER. PROLONGED STORAGE OR
THE SALE OF DEMOLISHED ITEMS OR MATERIALS ON-SITE IS NOT PERMITTED WITHOUT PRIOR
NOTIFICATION AND CONSENT OF OWNER.
9. ALL PAVEMENT, BASE COURSE, SIDEWALKS, CURBS, BUILDINGS, FOUNDATIONS, ETC., IN THE AREA TO BE REMOVED SHALL BE REMOVED TO FULL DEPTH. EXISTING BASE COURSE MATERIALS MAY BE WORKED INTO THE NEW PAVEMENT OR BUILDING SUBGRADE PROVIDED THAT THE GRADATION, CONSISTENCY, COMPACTION, SUBGRADE CONDITION, ETC., ARE IN ACCORDANCE WITH THE SPECIFICATIONS. BASE COURSE MATERIALS SHALL NOT BE WORKED INTO THE SUBGRADE OF AREAS TO RECEIVE PLANTING.
10. THE CONTRACTOR SHALL USE WATER SPRINKLING AND OTHER SUITABLE METHODS AS NECESSARY TO
CONTROL DUST AND DIRT CAUSED BY THE DEMOLITION WORK.
11. ALL EXISTING FEATURES REMAINING AND NOT SPECIFICALLY MENTIONED THAT INTERFERE WITH THE NEW CONSTRUCTION SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
NOTIFY THE OWNER OR CONSTRUCTION MANAGER OF DISCREPANCIES BETWEEN EXISTING CONDITIONS
AND DRAWINGS BEFORE PROCEEDING WITH DEMOLITION WORK.
12. IT IS NOT ANTICIPATED THAT HAZARDOUS MATERIALS WILL BE ENCOUNTERED. IF MATERIALS SUSPECTED
OF CONTAINING HAZARDOUS MATERIALS ARE ENCOUNTERED, IMMEDIATELY NOTIFY THE OWNER.
13. CONTRACTOR SHALL PROVIDE PROTECTION TO ALL STREETS, FENCES, TREES, UTILITIES AND STRUCTURES THAT ARE TO REMAIN. CONTRACTOR-CAUSED DAMAGE SHALL BE REPAIRED TO MATCH
EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
14. CAVITIES LEFT BY STRUCTURE REMOVAL SHALL BE BACKFILLED WITH SATISFACTORY MATERIAL AND
COMPACTED TO 98% OF MAXIMUM DENSITY PER ASTM D698 - STANDARD PROCTOR.
15. EXISTING INFORMATION/TOPOGRAPHIC SURVEY WAS PREPARED BY CONTROL POINT ASSOCIATES, INC. PC, DATED DECEMBER 5, 2018.
16. PAVEMENT MARKINGS TO BE REMOVED SHALL BE PAINTED OVER TO MATCH PAVEMENT OR REMOVED WITH
WIRE BRUSHING.
17. EXCEPT AS SHOWN, NO TREES SHALL BE REMOVED AND/OR VEGETATION DISTURBED WITHOUT APPROVAL
OF THE ARCHITECT/ENGINEER.
18. TREE PROTECTION SHALL CONSIST OF THE FOLLOWING STEPS:
A. CONTRACTOR SHALL HIRE A LICENSED LANDSCAPE CONTRACTOR TO OVERSEE TREE PROTECTION.
B. PRIOR TO ANY GRADING OPERATIONS, LOCATE TREES TO BE PROTECTED AND NEATLY CUT ROOTS TO A
DEPTH OF 30" AT THE DIMENSIONED LIMITS SHOWN USING A UTILITY TRENCHING MACHINE.
C. TREAT EXPOSED ROOTS WITH A HORTICULTURAL TREE PRUNING PROTECTION PRODUCT.
D. PRUNE TREE LIMBS BY THE SAME PROPORTIONAL PERCENTAGE AS TREE ROOTS REMOVED (I.E., 25% OF
ROOTS REMOVED SHALL RESULT IN 25% OF TREE LIMBS REMOVED).
E. INSTALL A MIN. 4' HIGH PROTECTION FENCE TO THE LIMITS SHOWN.
F. BEGIN CLEARING AND GRADING OPERATIONS.
19. CONTRACTOR SHALL PROVIDE HEAVY CONSTRUCTION MATTING TO PROTECT ALL DRIVES AND CURB TO
REMAIN DURING DEMOLITION, BORING AND TRENCHING OPERATIONS.
DEMOLITION GENERAL NOTES
SYMBOLS, ABBREVIATIONS
AND GENERAL NOTES
EG-100
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2022, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
ELECTRICAL SERVICE
IMPROVEMENTS
CYPRESS HILLS NATIONAL CEMETERY
815-NRM22-06
HU UB
March 10, 2023
FINAL CONSTRUCTION DOCUMENTS - ISSUED FOR CONSTRUCTION
ENCLOSURE
PULLBOX
ECB FOR #625
LODGE BUILDING
METER BOX
FOR #625
LODGE
BUILDING
METER BOX
FOR #641 GARAGE
GARAGE
PITT
POWER
PANEL
M
M
M
METER
BOX
FOR #641
GARAGE
GARAGE
PITT
POWER
PANEL
METER BOX
FOR #625
LODGE
BUILDING
ECB
FOR
#625
LODGE
BUILDING
DSW
PULLBOX
WIRE WAY PULLBOX
DSW
FOR
2ND
FLOOR
JAMAICA
METER BOX
FOR
2ND FLOOR
JAMAICA
LIGHT FIXTURE
RECEPTACLE
WIRE WAY
PULLBOX
METER BOX FOR
2ND FLOOR
JAMAICA
DSW
FOR 2ND FLOOR
JAMAICA
LIGHT FIXTURE
ENCLOSURE
SERVICE
DISCONNECT
INCOMING SERVICE FROM
UTILITY COMPANY
GENERAL NOTES:
1. FOR ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES,
SEE DRAWINGS EG-100.
2. FOR POWER RISER DIAGRAM - EXISTING AND DEMOLITION, SEE
DRAWING ED-200.
3. FOR SITE UTILITY PLAN, SEE DRAWING ES-100.
4. FOR POWER RISER DIAGRAM - EXISTING AND NEW WORK, SEE
DRAWING E-100.
DRAWING NOTES:
FLOOR PLAN -
EXISTING AND DEMOLITION
ED-100
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2022, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
ELECTRICAL SERVICE
IMPROVEMENTS
CYPRESS HILLS NATIONAL CEMETERY
815-NRM22-06
HU UB
March 10, 2023
FINAL CONSTRUCTION DOCUMENTS - ISSUED FOR CONSTRUCTION
DISCONNECT AND REMOVE ALL EXISTING ELECTRICAL
EQUIPMENT INCLUDING ENCLOSURE, PULL BOXES, SUPPORT ETC.
DISCONNECT AND REMOVE FEEDER WIRING BACK TO LODGE
BUILDING. DEMOLISH ALL EXPOSED CONDUITS AND PULL BOXES.
CUT AND FLUSH THE EMBEDDED CONDUIT AND ABANDON IN
PLACE. PATCH THE OPENING AND MATCH WITH SURROUNDINGS.
REMOVE EXISTING INCOMING UTILITY FEEDER CABLE UPTO THE
EXTENT AS REQUIRED. COORDINATE WITH UTILITY COMPANY FOR
REMOVAL OF FEEDER. CUT AND FLUSH THE EMBEDDED CONDUIT
AND ABANDON IN PLACE.
DEMOLISH LIGHT FIXTURE, LIGHT SWITCH, RECEPTACLE
INCLUDING WIRING AND CONDUIT.
ALL ELECTRICAL EQUIPMENT, CONNECTION, WIRING, CONDUIT,
PULL BOXES ETC. SHALL BE DEMOLISHED ENTIRELY FROM THE
THE VAULT. VAULT SHALL NOT HAVE ANY REMAINED ELECTRICAL
EQUIPMENT AND CONNECTION.
NONE
FLOOR PLAN - EXISTING AND DEMOLITION
ED-100
SOUTH WALL ELEVATION
SCALE: NONE
A
ED-100
EAST WALL ELEVATION
SCALE: NONE
B
ED-100
A
ED-100
B
ED-100
SPLICE BOX
PANEL
208/120V, 3Ø, 4W
FIRST
FLOOR +
BASEMENT
BASEMENT
ECB -
REAR
NEW
OFFICE
60A, 2P
208/120V, 1P, 3W, 60A PANEL
FIRST
FLOOR
ECB -
SECOND
FLOOR
40A, 2P
208/120V, 1P, 3W, PANEL
SECOND
FLOOR
LODGE BUILDINGGARAGE
FIRST FLOOR
SECOND FLOOR
PULLBOX
208/120V, 1P, 3W, 100A PANEL
GARAGE
MMM
WIREWAY
4 - #3/0 AWG
208/120V, 3Ø,4W
D/SW
200A
FUSE
UNDER GROUND
UTILITY SERVICE
FROM CON EDISONPULLBOX
4 - #3/0 AWG
UNDERGROUND VAULT
GROUND
ECB
125A
FOR #625
LODGE
BUILDING
METER BOX
FOR #625
LODGE
BUILDING
METER BOX
FOR #641
GARAGE
GARAGE
PITT
POWER
PANEL
208/120V, 1Ø, 3W, 125A BUS
100AMAIN
METER BOX
FOR 2ND FLOOR
JAMAICA
208/120V, 1P, 3W
D/SW
100A
FUSE
TOTAL 3 FEEDER WIRING IN
UNDERGROUND DUCT
3 - #3 AWG
3 - #3 AWG
3 - #3 AWG
EXISTING
BACK FLOW
PREVENTER
120V, 20A
CIRCUIT
WIRING
GENERAL NOTES:
1. FOR ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES,
SEE DRAWINGS EG-100.
2. FOR FLOOR PLAN - EXISTING AND DEMOLITION, SEE DRAWING
ED-100.
3. FOR SITE UTILITY PLAN, SEE DRAWING ES-100.
4. FOR POWER RISER DIAGRAM - EXISTING ND NEW WORK, SEE
DRAWING E-100.
DRAWING NOTES:
POWER RISER DIAGRAM -
EXISTING AND DEMOLITION
ED-200
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2022, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
ELECTRICAL SERVICE
IMPROVEMENTS
CYPRESS HILLS NATIONAL CEMETERY
815-NRM22-06
HU UB
March 10, 2023
FINAL CONSTRUCTION DOCUMENTS - ISSUED FOR CONSTRUCTION
DISCONNECT AND REMOVE EXISTING ELECTRICAL EQUIPMENT
(WIREWAY, METER BOX, DISCONNECT SWITCH, PANEL, PULL
BOX, WIRING AND CONDUIT). COORDINATE WITH
GOVERNMENT/UTILITY FOR SALVAGING THE METERS.
DISCONNECT AND REMOVE EXISTING WIRING BACK TO
SOURCE AS INDICATED. CUT AND FLUSH THE EMBEDDED
CONDUIT AND ABANDON IN PLACE.
DISCONNECT AND REMOVE THE SERVICE WIRES, SERVICE
DISCONNECT AND PULLBOX. DEMOLITION SHALL BE
COMPLETE INCLUDING PULLING THE WIRING BACK TO
NEAREST UTILITY CONNECTION POINT / TAP-OFF AND
DISPOSAL THEREOF. COORDINATE WITH UTILITY BEFORE
DEMOLITION WORK.
EXISTING ELECTRICAL EQUIPMENT INCLUDING WIRING AND
CONDUIT TO REMAIN-IN PLACE FOR REUSE. PROTECT DURING
CONSTRUCTION.
REMOVE EXISTING CIRCUIT WIRING FROM THE EXISTING
VAULT TO THE EXISTING BACKFLOW PREVENTER. ABANDON
EXISTING UNDERGROUND CONDUITS IN PLACE.
NONE
POWER RISER DIAGRAM - EXISTING AND DEMOLITION
ED-200
JAMAICA AVENUE
BLOCK 3892
PART OF LOT 1
PROPERTY LINE
SPLICE BOX
NEW DIRECTLY
BURIED
CONDUITS
D
ES-100
APPROXIMATE
LOCATION OF
UNDERGROUND
EXISTING ELECTRICAL
DUCTS
UTILITY METERS
AND DISCONNECT
SWITCHES
HAND
HOLE
DIRECTIONAL BORING
ELECTRICAL DUCTS
W M
BF
P
C
ES-100
REMOVE EXISTING VAULT. FOR
ELECTRICAL EQUIPMENT
DEMOLITION, SEE DRAWING ED-100
AND ED-200.
CAP, PLUG AND ABANDON EXISTING
4" WATER SERVICE
INSTALL TEMPORARY
CONSTRUCTION FENCE AS
NECESSARY AROUND VAULT
EXCAVATION PRIOR TO BACKFILL
NEW DIRECTLY
BURIED CONDUITS
A
ES-100
B
ES-100
TO ELECTRICAL
PANEL LOCATED IN
BASEMENT
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2022, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
ELECTRICAL SERVICE
IMPROVEMENTS
CYPRESS HILLS NATIONAL CEMETERY
815-NRM22-06
HU UB
March 10, 2023
FINAL CONSTRUCTION DOCUMENTS - ISSUED FOR CONSTRUCTION 0 5 10 20 30
SITE UTILITY PLAN
ES-100
GENERAL NOTES:
1. FOR ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES,
SEE DRAWINGS EG-100.
2. FOR FLOOR PLAN - EXISTING AND DEMOLITION, SEE DRAWING
ED-100.
3. FOR POWER RISER DIAGRAM - EXISTING AND DEMOLITION, SEE
DRAWING ED-200.
4. FOR POWER RISER DIAGRAM - EXISTING AND NEW WORK, SEE
DRAWING E-100.
5. FOR CONSTRUCTION DETAILS, SEE DRAWING ES-200.
DRAWING NOTES:
DISCONNECT AND REMOVE EXISTING WIRES FROM LODGE
BUILDING BASEMENT TO UTILITY METERS IN THE EXISTING VAULT.
SEAL DUCT ENDS AND ABANDON UNDERGROUND DUCTBANK IN
PLACE. FOR EXTENT OF DEMOLITION, SEE DRAWING ED-200
INSTALL NEW UTILITY COMPANY APPROVED PROPERTY LINE
SPLICE BOX INSIDE THE PREMISES WITHIN 5 FT OF THE PROPERTY
LINE. CONTRACTOR TO INSTALL NEW UNDERGROUND CONDUIT TO
CONNECT EXISTING UTILITY LINE, EXTENT UPTO AS REQUIRED.
UTILITY COMPANY TO SPLICE THE FEEDERS IN THE PROPERTY LINE
BOX. CONTRACTOR TO COORDINATE WITH UTILITY COMPANY AND
PERFORM ALL NECESSARY WORK. FOR CONSTRUCTION DETAILS,
SEE DRAWING ES-200.
INSTALL NEW ELECTRICAL UNDERGROUND DUCTS USING THE
DIRECTIONAL BORING METHOD FROM NEW HANDHOLE TO THE
PROPERTY LINE SPLICE BOX. DUCTS SHALL BE MINIMUM 24" BELOW
GRADE FROM PROPERTY LINE SPLICE BOX TO INTERMEDIATE HAND
HOLE. MATCH CONDUIT INVERT AT BOTH ENDS WITH PROPERTY
LINE SPLICE BOX AND INTERMEDIATE HAND HOLE, RESPECTIVELY.
ENSURE THAT THE SLEEVE IS LARGE ENOUGH TO ACCOMMODATE
2- 4" AND 1-2" CONDUITS AND CONDUITS SHALL SLOPE TOWARDS -
JAMAICA AVENUE.
PROVIDE AND INSTALL NEW 4'-0" X 4'-0" HANDHOLE OF REQUIRED
DEPTH FOR TERMINATING DUCTS COMING FROM PROPERTY LINE
SPLICE BOX ON THE SOUTH WALL AND CONNECTING TO DUCT
BANK ON THE NORTH WALL OF THE HANDHOLE.
PROVIDE DIRECTLY BURIED CONDUITS FROM HANDHOLE TO
UTILITY METERING & DISCONNECT SWITCHES ON THE EAST WALL
OF THE LODGE BUILDING AS SHOWN. FOR MORE DETAILS, SEE
POWER RISER DIAGRAM ON DRAWING E-100.
DEMOLISH EXISTING UNDERGROUND CONCRETE VAULTS IN THEIR
ENTIRETY. PERFORM THE FOLLOWING:
1. PROVIDE A TEMPORARY FENCE AROUND THE VAULT DURING
THE ENTIRE CONSTRUCTION TO PROTECT FOR ENDANGER
LIFE OR PROPERTY.
2. DEMOLITION WORK SHOWN ON THE DRAWING IS
DIAGRAMMATIC. ALL SITUATIONS MAY NOT BE SHOWN.
3. DEMOLISH ALL CONCRETE WALLS, FLOORS, FOOTINGS, AND
CEILINGS INCLUDING REBARS, BASE ROCK, ETC. REMOVE ALL
CONCRETE MATERIALS AND DEBRIS FROM THE GROUND.
4. ANY EXISTING IRRIGATION LINES HALL BE REMOVED OR
CAPPED AT LIMITS OF DEMOLITION AND BACKFILLED PER THE
DIRECTION OF THE GOVERNMENT.
5. BACKFILL THE VAULT OPENING WITH SIMILAR TO NATIVE SOIL.
AREAS TO RECEIVE SHALL BE FILLED AND COMPACTED
THROUGHOUT TO MINIMUM RELATIVE COMPACTION OF 90%.
6. GRADE, LEVEL, AND COMPACT ALL FILLED AREAS. FILLED AREA
PERIMETER TO BE GRADED TO JOIN AND MATCH EXISTING
ELEVATIONS.
7. PREPARE THE AREA WITH THE REQUIRED TREATMENT AND
INSTALL SOD MATCHING THE EXISTING TYPE.
8. 4” MINIMUM TOPSOIL CONSISTENT WITH ASTM D5268-02.
PROVIDE NEW ELECTRICAL CONNECTIONS TO EXISTING BACK
FLOW PREVENTER (BFP) VALVE INCLUDING WIRING AND CONDUIT
AS INDICATED.
CASING PIPE
2" PVC
SCHEDULE 80
(TYP.)
SP
AR
E
EL
EC
TR
IC
AL
M
AI
N
S
ER
VI
CE
W
IR
ES
DIRECTIONAL BORING CONDUITS
SCALE: NONE
C
ES-100
SAND OR CLEAN EARTH
12"
30"
10"
2"
SOIL OR BACKFILL
WARNING TAPE
ALLOWANCE FOR
ROCK BOTTOM
4" PVC
SCHEDULE 80
GRADE
SP
AR
E
EL
EC
TR
IC
AL
M
AI
N
S
ER
VI
CE
W
IR
ES
14"
MIN.
2"
TOPSOIL
(COMPACTED TO 85% AND
SOD TO MATCH EXISTING)
6"
DIRECTLY BURIED CONDUITS - A
SCALE: NONE
A
ES-100
PO
W
ER
W
IR
ES
TO
B
FP
SAND OR CLEAN EARTH
12"
30"
10"
2"
SOIL OR BACKFILL
WARNING TAPE
ALLOWANCE FOR
ROCK BOTTOM
2" PVC
SCHEDULE 80
GRADE 6"
MIN.
TOPSOIL
(COMPACTED TO 85% AND
SOD TO MATCH EXISTING)
6"
DIRECTLY BURIED CONDUITS - B
SCALE: NONE
B
ES-100
4" PVC
SCHEDULE 80
4" PVC
SCHEDULE 80
PO
W
ER
W
IR
ES
TO
B
FP
SAND OR CLEAN EARTH
12"
30"
10"
2"
SOIL OR BACKFILL
WARNING TAPE
ALLOWANCE FOR
ROCK BOTTOM
2" PVC
SCHEDULE 80
(TYP.)
GRADE
SP
AR
E
EL
EC
TR
IC
AL
M
AI
N
S
ER
VI
CE
W
IR
ES
18"
MIN.
2"
(TYP.)
TOPSOIL
(COMPACTED TO 85% AND
SOD TO MATCH EXISTING)
6"
DIRECTLY BURIED CONDUITS - D
SCALE: NONE
D
ES-100
4" PVC
SCHEDULE 80 (TYP.)
PO
W
ER
W
IR
ES
TO
B
FP
GENERAL NOTES:
1. FOR ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES,
SEE DRAWINGS EG-100.
2. FOR FLOOR PLAN - EXISTING AND DEMOLITION, SEE DRAWING
ED-100.
3. FOR POWER RISER DIAGRAM - EXISTING AND DEMOLITION, SEE
DRAWING ED-200.
4. FOR SITE UTILITY PLAN, SEE DRAWING ES-100.
5. FOR POWER RISER DIAGRAM - EXISTING AND NEW WORK, SEE
DRAWING E-100.
CONSTRUCTION DETAILS
ES-200
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2022, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
ELECTRICAL SERVICE
IMPROVEMENTS
CYPRESS HILLS NATIONAL CEMETERY
815-NRM22-06
HU UB
March 10, 2023
FINAL CONSTRUCTION DOCUMENTS - ISSUED FOR CONSTRUCTION
SCALE: NONE
HANDHOLE DETAIL
3SCALE: NONE
PROPERTY LINE SPLICE BOX DETAIL
1 SCALE: NONE
ELECTRIAL SERVICE INSTALLATION DETAIL
BLOCK OR CONCRETE WALL,
EXTERIOR OR INTERIOR,
NEW OR EXISTING
CONSTRUCTION
FILL IN VOIDS ALL ROUND
WITH APPROVED FIRE BARRIER
CAULK OR PUTTY AS REQUIRED
SYSTEM CONDUIT
FOR FIRE OR NON-FIRE RATED WALLS
USE "THRU-WALL BARRIER" SUITABLE
FOR THE TYPE OF APPLICATION
SCALE: NONE
TYPICAL THRU WALL CONDUIT
6. FOR EXACT NUMBER OF CONDUITS, SEE SITE UTILITY PLAN, DRAWING ES-100.
NEW SPLICE BOX
PANEL
208/120V, 3Ø, 4W
FIRST
FLOOR +
BASEMENT
BASEMENT
ECB -
REAR
NEW
OFFICE
60A, 2P
208/120V, 1P, 3W, 60A PANEL
FIRST
FLOOR
ECB -
SECOND
FLOOR
40A, 2P
208/120V, 1P, 3W, PANEL
SECOND
FLOOR
3 - #6 AWG, 1" C
3 - #6 AWG, 1" C
LODGE BUILDINGGARAGE
FIRST FLOOR
SECOND FLOOR
PULLBOX
208/120V, 1P, 3W, 100A PANEL
GARAGE
3 - #3 AWG, #8G
IN 1-1/2" C
NEW
3 - #6 AWG, #10G
IN 1" C
3 - #6 AWG, 1" C
NEW SPLICE BOX NEAR
PROPERTY LINE
4 - #3/0 AWG
FROM UTILITY
100A SERVICE ENTRANCE
FUSED DISCONNECT SWITCH
FOR #641 GARAGE JAMAICA
208/120V, 1Ø, 100A FUSE,
NEMA 3R
METER BOX
FOR #641
GARAGE
M
METER BOX
FOR #625
LODGE
BUILDING
M
NEW 4 - #3/0 AWG
IN 4"C
NEW 4 - #3/0 AWG IN 4"C
IN DIRECTIONAL BORING
NEW
HANDHOLE
NEW 3 - #3 AWG,
#4G IN 1-1/2" C.
NEW 4 - #3/0 AWG,
#4G IN 2"C
UTILITY COMPANY
APPROVED WIRE WAY
200A SERVICE ENTRANCE
FUSED DISCONNECT
SWITCH FOR #625
LODGE BUILDING
208/120V, 3P, 4W, 200A FUSE , NEMA 3R
NEW 3 - #3 AWG,
#8G IN 1-1/2" C.
EXTERIOR EAST WALL OF LODGE BUILDING
SPLICE WITH EXISTING
SERVICE ENTRANCE CABLE
GROUND
BUS BAR
EXISTING
BACK FLOW
PREVENTER
NEW 2 - #10 AWG,
#12G IN 2"C
PROPERTY LINE
ROADWAY
NEW 4 - #3/0 AWG,
#6G IN 2"C
GENERAL NOTES:
1. FOR ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES,
SEE DRAWINGS EG-100.
2. FOR FLOOR PLAN - EXISTING AND DEMOLITION, SEE DRAWING
ED-100.
3. FOR POWER RISER DIAGRAM - EXISTING AND DEMOLITION, SEE
DRAWING ED-200.
4. FOR SITE UTILITY PLAN, SEE DRAWING ES-100.
5. FOR CONSTRUCTION DETAILS, SEE DRAWING ES-200.
6. FOR ELECTRICAL GROUNDING DETAILS, SEE DRAWING E-200.
DRAWING NOTES:
POWER RISER DIAGRAM -
EXISTING AND NEW WORK
E-100
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2022, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
ELECTRICAL SERVICE
IMPROVEMENTS
CYPRESS HILLS NATIONAL CEMETERY
815-NRM22-06
HU UB
March 10, 2023
FINAL CONSTRUCTION DOCUMENTS - ISSUED FOR CONSTRUCTION
PROVIDE NEW PROPERTY LINE SPLICE BOX AS SHOWN. FOR
LOCATION AND CONSTRUCTION DETAILS, SEE DRAWINGS
ES-100 AND ES-200.
PROVIDE NEW HANDHOLE AS SHOWN. FOR LOCATION AND
CONSTRUCTION DETAILS, SEE DRAWINGS ES-100 AND ES-200.
PROVIDE NEW UTILITY COMPANY APPROVED WIREWAY AS
SHOWN ON EXTERIOR SURFACE OF EAST WALL OF LODGE
BUILDING.
PROVIDE NEW METER BOX AND FUSED DISCONNECT SWITCH
AS SHOWN ON EXTERIOR SURFACE OF EAST WALL OF LODGE
BUILDING.
PROVIDE NEW WIRING AND CONDUIT AS SHOWN.
PROVIDE NEW TWO WAY SPLICE TO JOIN THE NEW SERVICE
WIRES FROM NEW FUSED DISCONNECT SWITCH WITH
EXISTING FEEDER CABLES FOR GARAGE PANEL.
PROVIDE NEW CIRCUIT BREAKER (COMPATIBLE WITH EXISTING
PANEL) AT SPACE AVAILABLE IN EXISTING PANEL AS
INDICATED.
UPON COMPLETION OF WORK, UPDATE DIRECTORIES, LABELS,
TAGS, ETC., OF ALL AFFECTED EQUIPMENT, DEVICES, CABLES,
CONDUITS, JUNCTION BOX, ETC., TO ENSURE THAT ALL
SYSTEM ELEMENTS CARRY CORRECT IDENTIFICATION.
PROVIDE NEW GROUND BUS BAR AS INDICATED. PROVIDE
NEW GROUNDING SYSTEM PER NEC ARTICLE 250. SEE
SERVICE GROUNDING DETAIL, DRAWING E-200.
PROVIDE NEW ELECTRICAL CONNECTIONS TO EXISTING BACK
FLOW PREVENTER (BFP) VALVE INCLUDING WIRING AND
CONDUIT AS INDICATED.
NONE
POWER RISER DIAGRAM - EXISTING AND NEW WORK
E-100
4 4 4
#4/0 BARE COPPER
STRANDED GROUND GRID
24" MIN.
CONNECT GROUND ROD TO GROUND
GRID WITH EXOTHERMIC WELD
FINISHED GRADE
12" MIN.
3/4" DIA. x 10' LONG
COPPER CLAD ROUND
STEEL GROUND ROD
G
UTILITY COMPANY APPROVED WIREWAY
UL LISTED CONNECTORS
EXOTHERMIC WELD
PROVIDE
EXOTHERMIC WELD OR
UL APPROVED CONNECTORS
FOR ALL GROUND
CONNECTIONS AS REQUIRED
PER NEC (TYPICAL)
#4 AWG CU
BUILDING STEEL
#4 AWG CU,
BARE GROUNDING
ELECTRODE
CONDUCTOR
#4 AWG CU,
BARE GROUNDING
ELECTRODE
CONDUCTOR
WM
STREET SIDE
WATER METER
WATER SERVICE PIPE
#4 AWG CU,
BARE GROUNDING
ELECTRODE
CONDUCTOR
#4 AWG
BARE COPPER
#4 AWG CU,
BARE
GROUNDING
ELECTRODE
CONDUCTOR
NOTES:
1. CONTINUOUS GROUNDING ELECTRODE CONDUCTOR WITH
NO SPLICES OR JOINTS. INSTALL PER NEC ARTICLE 250.
2. CONTRACTOR SHALL OBTAIN AND PAY FOR THE SERVICE OF
AN INDEPENDENT ELECTRICAL TESTING. CONTRACTOR TO
MEASURE AND CERTIFY THAT RESISTANCE TO GROUND FOR
THIS GROUNDING SYSTEM IS LESS THAN 25 OHMS.
3. GROUNDING ELECTRODE CONDUCTOR SHALL BE
ACCORDING TO NEC TABLE 250.66.
4. BONDING JUMPER SHALL BE ACCORDING TO NEC TABLE
250.102 (C) (1).
#4 AWG,
COPPER CONDUCTOR
OR STEEL REINFORCING BAR
OR ROD NOT LESS THAN 1/2" DIA.
AT LEAST 20 FT LONG
AS PER NEC 250.52(A)(3)
NO LESS THAN 6'
3/4" x 10'-0" COPPER CLAD
STEEL GROUND BAR
#4/0 BARE COPPER
30" BELOW GRADE
N
#4 AWG CU,
MAIN BONDING
JUMPER
NEUTRAL
SERVICE
CONDUCTOR
GENERAL NOTES:
1. FOR ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES,
SEE DRAWINGS EG-100.
2. FOR FLOOR PLAN - EXISTING AND DEMOLITION, SEE DRAWING
ED-100.
3. FOR POWER RISER DIAGRAM - EXISTING AND DEMOLITION, SEE
DRAWING ED-200.
4. FOR SITE UTILITY PLAN, SEE DRAWING ES-100.
5. FOR CONSTRUCTION DETAILS, SEE DRAWING ES-200.
6. FOR POWER RISER DIAGRAM - EXISTING AND NEW WORK, SEE
DRAWING E-100.
GROUNDING DETAILS
E-200
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2022, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
ELECTRICAL SERVICE
IMPROVEMENTS
CYPRESS HILLS NATIONAL CEMETERY
815-NRM22-06
HU UB
March 10, 2023
FINAL CONSTRUCTION DOCUMENTS - ISSUED FOR CONSTRUCTION
NONE
SERVICE GROUNDING ELECTRODE CONDUCTOR DETAIL
E-200
NONE
COPPER CLAD STEEL GROUND ROD DETAIL
E-200
| 1_GI-100 Cover-GI-101 |
| GI-101 |
| 2_B-101 |
| Layout1 |
| 3_815-NRM22-06-EG-100-EG-100 |
| EG-100 |
| 4_815-NRM22-06-ED-100-ED-100 |
| ED-100 |
| 5_815-NRM22-06-ED-200-ED-200 |
| ED-200 |
| 6_815-NRM22-06-ES-100-ES-100 |
| ES-100 |
| 7_815-NRM22-06-ES-200-ES-200 |
| ES-200 |
| 8_815-NRM22-06-E-100-E-100 |
| E-100 |
| 9_815-NRM22-06-E-200-E-200 |
| E-200 |
File details come from the government source that posted it. Updated .