80NSSC23848894Q SOW.pdf

PDF 181 KB Posted

Attached to
GRC EPSON 16, 000-Lumen 3LCD Laser Projector with 4K Enhancement
Solicitation number
80NSSC23848897Q
Issued by

About this file

This statement of work outlines requirements for the procurement of an Epson 16,000-lumen 3LCD laser projector with 4K enhancement and related equipment and services from the National Aeronautics and Space Administration Shared Services Center. The solicitation seeks one Epson EB-PU2116W laser projector, one Epson wide lens, one 100" x 160" or 189" diagonal UTB contour ultra thin bezel frame and low profile parallax stratos 1.0 ALR material screen, dock to dock shipping, installation including removal of existing projector and installation of new laser and lens and screen mounting, and a three year unlimited phone support warranty. The period of performance for installation is 30 days after receipt of order at the NASA Glenn Research Center in Cleveland, Ohio.

View the file

Other files

File Type Posted
80NSSC23848894Q SOW.pdf PDF
80NSSC23848894Q RFQ.pdf PDF
80NSSC23848894Q RFQ.pdf PDF
80NSSC23848894Q BNJ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements Glenn Research Center has a requirement for the EPSON 16,000-Lumen 3LCD Laser Projector with 4K Enhancement.

2. Characteristics, Scope, and Specs

QTY 1: EPSON HIGH BRIGHTNESS EB-PU2116W (V11HA64920) LASER

PROJECTOR: 16,000 LU MENS: WUXGA: WHITE BODY: NO LENS: 3

YEAR WARRANTY. EB-PU2116W

QTY 1: EPSON WIDE LENS #2 V12H004W06

QTY1: HEAVY DUTY UNIVERSAL PROJECTOR MOUNT IN WHITE

QTY 1: 100" x 160" OR 189" DIAGONAL UTB CONTOUR ULTRA THIN BEZEL

FRAME AND LOW PROFILE: PARALLAX STRATOS 1.0 ALR MATERIAL.

QTY 1: SCREEN DOCK TO DOCK SHIPPING CHARGES: TRUCK OR SEMI

BASED ON WEIGHT AND DISTANCE INSURED: LIFT GATE OR INSIDE

DELIVERY EXTRA COST PLEASE ASK FOR RATES

QTY 1: INSTALL- REMOVE EXISTING PROJECTOR AND INSTALL NEW LASER AND LENS

INSTALL SCREEN ON WALL AND BUILD: INSTALLATION OF

EQUIPMENT: TERMINATION AND TESTING FOR PROPER OPERATION

TRAINING AND ON-SITE INSTALLATION WARRANTY FOR (3) YEARS

UNLIMITED PHONE SUPPORT.

3. Place of Performance Service Integration Lead/Bus. Architect- NASA Glenn Research Center OCIO HQ/GSFC OCIO - HITSS Contract COR Building 162, Room 302

4. Period of Performance Period of Performance Date: 30 days ARO

File details come from the government source that posted it. Updated .