80NSSC23848894Q SOW.pdf
PDF 181 KB Posted
- Solicitation number
- 80NSSC23848897Q
About this file
This statement of work outlines requirements for the procurement of an Epson 16,000-lumen 3LCD laser projector with 4K enhancement and related equipment and services from the National Aeronautics and Space Administration Shared Services Center. The solicitation seeks one Epson EB-PU2116W laser projector, one Epson wide lens, one 100" x 160" or 189" diagonal UTB contour ultra thin bezel frame and low profile parallax stratos 1.0 ALR material screen, dock to dock shipping, installation including removal of existing projector and installation of new laser and lens and screen mounting, and a three year unlimited phone support warranty. The period of performance for installation is 30 days after receipt of order at the NASA Glenn Research Center in Cleveland, Ohio.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 80NSSC23848894Q SOW.pdf | ||
| 80NSSC23848894Q RFQ.pdf | ||
| 80NSSC23848894Q RFQ.pdf | ||
| 80NSSC23848894Q BNJ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements Glenn Research Center has a requirement for the EPSON 16,000-Lumen 3LCD Laser Projector with 4K Enhancement.
2. Characteristics, Scope, and Specs
QTY 1: EPSON HIGH BRIGHTNESS EB-PU2116W (V11HA64920) LASER
PROJECTOR: 16,000 LU MENS: WUXGA: WHITE BODY: NO LENS: 3
YEAR WARRANTY. EB-PU2116W
QTY 1: EPSON WIDE LENS #2 V12H004W06
QTY1: HEAVY DUTY UNIVERSAL PROJECTOR MOUNT IN WHITE
QTY 1: 100" x 160" OR 189" DIAGONAL UTB CONTOUR ULTRA THIN BEZEL
FRAME AND LOW PROFILE: PARALLAX STRATOS 1.0 ALR MATERIAL.
QTY 1: SCREEN DOCK TO DOCK SHIPPING CHARGES: TRUCK OR SEMI
BASED ON WEIGHT AND DISTANCE INSURED: LIFT GATE OR INSIDE
DELIVERY EXTRA COST PLEASE ASK FOR RATES
QTY 1: INSTALL- REMOVE EXISTING PROJECTOR AND INSTALL NEW LASER AND LENS
INSTALL SCREEN ON WALL AND BUILD: INSTALLATION OF
EQUIPMENT: TERMINATION AND TESTING FOR PROPER OPERATION
TRAINING AND ON-SITE INSTALLATION WARRANTY FOR (3) YEARS
UNLIMITED PHONE SUPPORT.
3. Place of Performance Service Integration Lead/Bus. Architect- NASA Glenn Research Center OCIO HQ/GSFC OCIO - HITSS Contract COR Building 162, Room 302
4. Period of Performance Period of Performance Date: 30 days ARO
File details come from the government source that posted it. Updated .