QA_5.docx
DOCX document 12 KB Posted
- Attached to
- Heat Exchanger Demolition Federal contract opportunity
- Solicitation number
- 80NSSC19Q0416
About this file
Please see attached.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA4.docx | DOCX document | |
| Q&A_3.pdf | ||
| Q&A.docx | DOCX document | |
| RFQ_80NSSC19Q0416.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q: It appears that the specifications are requesting that the hot taps utilize the following valves posted in Q and A dated 4 17 19.
It is not possible to hot tap through a butterfly valve. It will require a ball or gate. Please advise if we have mistaken the scope of the hot taps and installation of new butterfly valves on the CH water supply and return pipes?
A: My apologies. Question 11 dated 4/17/19 :
11. What size and schedule is the existing supply and return lines that we are welding the hot taps on for the hose connections and can we use a weldolet for that?
• The existing supply and return piping where the hot taps will be located is standard schedule 40, 8” black iron.
| • | *Clarification* removed (HOT): The existing supply and return piping where the taps will be located is standard schedule 40, 8” black iron. No existing valve available for a hot tap to be installed, new tap will require isolating and draining the existing 8” branch piping, cutting existing pipe and welding in fittings for 6” valves. |
| • | Yes, a weld-o-let is acceptable. |