QA_5.docx

DOCX document 12 KB Posted

Attached to
Heat Exchanger Demolition Federal contract opportunity
Solicitation number
80NSSC19Q0416
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

Please see attached.

View the file

Other files for this federal contract opportunity

Other files attached to Heat Exchanger Demolition, newest first.
File Type Posted
QA4.docx DOCX document
Q&A_3.pdf PDF
Q&A.docx DOCX document
RFQ_80NSSC19Q0416.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q: It appears that the specifications are requesting that the hot taps utilize the following valves posted in Q and A dated 4 17 19.

It is not possible to hot tap through a butterfly valve. It will require a ball or gate. Please advise if we have mistaken the scope of the hot taps and installation of new butterfly valves on the CH water supply and return pipes?

A: My apologies. Question 11 dated 4/17/19 :

11. What size and schedule is the existing supply and return lines that we are welding the hot taps on for the hose connections and can we use a weldolet for that?

• The existing supply and return piping where the hot taps will be located is standard schedule 40, 8” black iron.

•*Clarification* removed (HOT): The existing supply and return piping where the taps will be located is standard schedule 40, 8” black iron. No existing valve available for a hot tap to be installed, new tap will require isolating and draining the existing 8” branch piping, cutting existing pipe and welding in fittings for 6” valves.
•Yes, a weld-o-let is acceptable.