This is Amendment 3 to NASA Marshall Space Flight Center's Request for Proposal (RFP) for Safety and Mission Assurance Services II (SMAS II), a single-award IDIQ contract with an eight-year period of performance from September 2025 through March 2034. The amendment removes the hyperlink URL forwarding function for proposal submission and updates submission instructions to require direct URL entry into browsers.

The contract has a maximum potential value of $488 million and includes a firm-fixed-price phase-in period (September-October 2025), base ordering period (November 2025-September 2029), two option periods (October 2029-September 2033), and a six-month extension option (October 2033-March 2034). Task orders will be cost-plus-award-fee (CPAF) with options to transition to cost-plus-fixed-fee (CPFF). The contract is set aside for small businesses under NAICS code 541715 with a 1,300-employee size standard. Services include system safety, reliability and maintainability, software assurance, quality engineering, quality assurance, independent assessment, industrial discipline support, industrial safety, and pressure systems support at Marshall Space Flight Center, Kennedy Space Center, Michoud Assembly Facility, and Stennis Space Center. Questions are due by 2:00 PM CT on November 22, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80MSFC25R0004 P00003

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION M EVALUATION FACTORS FOR AWARD

14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED):

(a) The purpose of this amendment is to remove the hyperlink URL forwarding function for proposal submission and proposal submission instructions as reflected in Section L provision “Electronic Submission of Proposals – Proposal Marking and Delivery Through NASA’s EFSS Box.” Offerors shall copy and paste the URL directly into a browser to ensure full functionality. Please note that the revised submission link also references the FY25 solicitation number. This amendment replaces the Request for Proposal (RFP) in its entirety in order to both provide the updated links in the referenced provision and reflect Amendment P00003 in the header of each solicitation page.

(b) Failure by the offeror to acknowledge receipt of this amendment either on the Standard Form 1449, Solicitation/Contract/Order for Commercial Products and Commercial Services, SF30, Amendment of Solicitation/Modification of Contract, or transmittal letter by the due date for receipt of proposals may result in a determination that the proposal is unacceptable and therefore ineligible for award.

(c) All other terms and conditions of RFP 80MSFC25R0004 remain unchanged.

Template Version: Base ATTACHMENT B – SUMMARY OF CHANGES BETWEEN AMENDMENT P00002 AND AMENDMENT P00003 SOLICITATION

This attachment delineates changes made to the final solicitation, which was posted to www.SAM.gov on November 21, 2024.

Index
Section
Page
Clause or Provision
From
To
1
L
L-8
ELECTRONIC SUBMISSION OF PROPOSALS - PROPOSAL MARKING AND DELIVERY THROUGH NASA’S EFSS BOX (NOV 2024)

Removed hyperlink URL forwarding function for proposal submission and proposal submission instructions Revised submission link references the FY25 solicitation number.

80MSFC25R0004
80MSFC25R0004 P00003 in the header throughout the entire document.

SECTION A - SOLICITATION/CONTRACT FORM

Table of Content Contents No table of contents entries found.

80MSFC25R0004 P00003

1852.216-78 FIRM FIXED PRICE (DEC 1988)

The total firm fixed price of this contract is $To be Proposed (TBP) for the phase-in period Contract Line-Item Number (CLIN) 001.

(End of clause)

ESTIMATED COST AND FIXED FEE

The estimated cost of this contract is $To be Determined (TBD) exclusive of the fixed fee of $TBD. The total estimated cost and fixed fee is $TBD.

CLIN
Description
Period
Estimated

Cost

Fee
Total

Value

003
Base - Ordering Period - CPFF
11/01/2025 -

09/30/2029

$TBD
$TBD
$TBD
005
Option 1 Ordering Period - CPFF
10/01/2029 -

09/30/2031

$TBD
$TBD
$TBD
007
Option 2 Ordering Period - CPFF
10/01/2031 -

09/30/2033

$TBD
$TBD
$TBD
009
Option To Extend Services - CPFF
10/01/2033 -

03/31/2034

$TBD
$TBD
$TBD
Total for Estimated Cost and Fixed Fee
$TBD
$TBD
$TBD

(End of clause)

1852.216-85 ESTIMATED COST AND AWARD FEE (SEP 1993)

The estimated cost of this contract is $TBD. The maximum available award fee, excluding base fee, if any, is $TBD. The base fee is $0. Total estimated cost, base fee, and maximum award fee are $TBD.

CLIN
Description
Period
Estimated

Cost

Award Fee
Total

Value

Potential
Earned
002
Base - Ordering Period – CPAF
11/01/2025 -

09/30/2029

$TBD
$TBD
$TBD
$TBD
004
Option 1 Ordering Period – CPAF
10/01/2029 -

09/30/2031

$TBD
$TBD
$TBD
$TBD
006
Option 2 Ordering Period – CPAF
10/01/2031 -

09/30/2033

$TBD
$TBD
$TBD
$TBD
008
Option To Extend Services – CPAF
10/01/2033 -

03/31/2034

$TBD
$TBD
$TBD
$TBD
Total Estimated Cost and Award Fee
$TBD
$TBD
$TBD
$TBD

1852.232-81 CONTRACT FUNDING (JUN 1990)

(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $TBD as set forth in the table below.

(b) An additional amount of $TBD is obligated under this contract for payment of fee.

(c) The period through which these amounts are estimated to be adequate are contract award through $TBD.

Previous Funding Allotted
This Action
Total Funding Allotted
Estimated Cost
$TBD
$TBD
$TBD
Potential Fee Earned
$TBD
$TBD
$TBD
Fixed Fee
$TBD
$TBD
$TBD
Total Sum Allotted
$TBD
$TBD
$TBD

MSFC 52.216-90 IDIQ CONTRACT VALUE BY PERIOD OF PERFORMANCE (MAY 2017)

The maximum potential not-to-exceed (NTE) value of this contract including Options, is $488,000,000. This contract provides for performance of cost-plus-award-fee (CPAF) and cost-plus-fixed- fee (CPFF) indefinite-delivery indefinite- quantity (IDIQ) task orders (TOs). The NTE value shall not be exceeded without the prior written approval of the contracting officer.

The values for each period of performance are set forth below:

CONTRACT PERIOD
PERIOD OF PERFORMANCE
MINIMUM VALUE
MAXIMUM VALUE*
Phase-in
09/01/2025 – 10/31/2025
$1

$150,000

Base Ordering Period
11/01/2025 – 09/30/2029

$250,000 $218,850,000

Option 1 Ordering Period
10/01/2029 – 9/30/2031

$116,000,000

Option 2 Ordering Period
10/01/2031 – 9/30/2033

$122,000,000

Option to Extend Services
10/01/2033 – 3/31/2034

$31,000,000

Maximum Potential NTE Value
$488,000,000

*Unused IDIQ contract value may be rolled forward to any subsequent period, without change to the Maximum Potential NTE Value.

*The minimum value for the Base Ordering Period through Option to Extend Services Period is $250,000.

(End of clause) MSFC 52.216-91 SUPPLIES AND/OR SERVICES TO BE PROVIDED AND TYPE OF CONTRACT (JUN 2017)

(a) The contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to perform and/or deliver the services in accordance with Attachment J-1, Performance Work Statement (PWS).

(b) This is a single-award indefinite-delivery, indefinite-quantity (IDIQ) contract with cost-plus-award-fee (CPAF) task orders (TOs). The contract will have the option to transition from CPAF to cost-plus-fixed-fee (CPFF) TOs and the option to transition back to CPAF TOs if appropriate. This option exists on a contract year basis. However, the use of CPAF TOs will occur for no less than the first 11 months of the Base Ordering Period. A transition to CPFF would only be performed if the contractor demonstrates a firm understanding of the unique technical requirements and achieves sufficient history of sustained excellent performance. The option to transition back to CPAF will be included in order to preserve the Government’s ability to return to the full CPAF evaluation process to address poor contractor performance. Additionally, award fee performance will be evaluated in accordance with Attachment J-15, Award Fee Performance Evaluation Plan. Clauses delineated in this contract are applicable as appropriate specific to the type of TO awarded. Center-specific clauses delineated elsewhere in this contract will apply to TO efforts performed at the specified center. CLIN 001 for the phase-in period is firm-fixed-price (FFP) and all FFP clauses are applicable only to this CLIN.

(c) IDIQ ordering shall be performed in accordance with Federal Acquisition Regulation (FAR) 52.216-18, Ordering, FAR 52.216-19, Order Limitations, and NASA FAR Supplement (NFS) 1852.216-80, Task Ordering Procedure, of this contract.

(d) IDIQ Labor Categories and Labor Rates: Labor categories and associated hourly rates to be used in TOs are included in and Attachment J-4, Description of Labor Categories, and Attachment J-6, Schedule of Rates, and in performing IDIQ services. The contractor shall provide all required labor and other direct costs (ODCs), to include travel and training as delineated in the individual TOs proposals based on the rates delineated in Attachment J-6, Schedule of Rates.

(e) ODCs (e.g., travel, material, training, software): All ODCs required to support this contract shall be authorized and accounted for within IDIQ TOs. TO ODC burden rates shall not exceed those rates included in Attachment J-6, Schedule of Rates. Fee shall not be applied to ODCs. Travel shall be performed in compliance with the Federal Travel Regulations (FTR). The Government will not pay for expenses that exceed FTRs. ODCs shall be invoiced on separate line items in all invoices in which these costs are incurred. Travel shall also be invoiced to include complete backup documentation to support the invoiced travel amounts in all invoices in which these costs are incurred. The contractor shall obtain written approval from the contracting officer’s representative (COR) at least five (5) business days prior to the incurrence of any ODC or travel expenses.

(f) Based on availability, the contractor is authorized to drive or use Government-owned or leased vehicles in performance of this contract.

(End of clause)

MSFC 52.216-92 MATRIX OF CONTRACT LINE ITEMS (CLINS) (OCT 2017)

The current total contract value is as specified below. To separately track the components of the value, separate CLINs have been established as follows:

CLIN
DESCRIPTION
CONTRACT PERIOD
OPTION STATUS
001
Phase-in – FFP*
09/01/2025 –10/31/2025
N/A
002
Base Ordering Period - CPAF

11/01/2025 -09/30/2029

N/A

003
Base Ordering Period - CPFF
004
Option 1 Ordering Period - CPAF

10/01/2029 – 9/30/2031

Not Exercised

005
Option 1 Ordering Period - CPFF
006
Option 2 Ordering Period - CPAF

10/01/2031 – 9/30/2033

Not Exercised

007
Option 2 Ordering Period - CPFF
008
Option to Extend Services – CPAF

10/01/2033 – 3/31/2034

Not Exercised

009
Option to Extend Services - CPFF
Total Value of Base and All Exercised Options
$488,000,000

*Phase-in task order will be executed concurrent with contract effective date.

80MSFC25R0004 P00003

PART I – THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

[End of Section] B-1

MSFC 52.211-93 DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK (MAY 2019)

The Description Performance Work Statement is located in Attachment J-1, Performance Work Statement (PWS).

(End of clause)

MSFC 52.227-91 DATA REQUIREMENTS (JUN 2017)

(a) The contractor shall furnish all data identified and described in the data requirements list (DRL) of the data procurement document (DPD) which is attached to this contract. All expenses associated therewith are included in the estimated cost or firm fixed price of this contract, or any associated task orders if applicable.

(b) The Government reserves the right to delay the delivery of any or all data requirements descriptions (DRDs) specified in the DRL, and such right may be exercised at no increase to the estimated cost or firm fixed price of this contract or any associated task orders.

(c) Nothing contained in this clause shall relieve the contractor from delivering data that is not identified and described in the DRL/DPD but required under another section of this contract.

(d) To the extent that data required to be delivered under a DRD is also required to be delivered under another section of the contract, the requirements established by both the DRD, and such other contract section shall apply. In the event of a conflict between the data requirements of the DPD and another contract section, the specific contract section will take precedence.

[End of Section]

PART I – THE SCHEDULE

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C-1

1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)

1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT (JAN 2011)

(a) The contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.

(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.

(c) Concurrent with equipment delivery or transfer, the contractor shall provide the following data in an electronic spreadsheet format:

(1) Item Description.

(2) Unique Identification Number (License Tag).

(3) Unit Price.

(4) An explanation of the data used to make the unique identification number.

(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:

(1) Date originally placed in service.

(2) Item condition.

(3) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below: MSFC and other NASA Centers.

(e) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.

(End of clause)

80MSFC25R0004 P00003

PART I – THE SCHEDULE

SECTION D – PACKAGING AND MARKING

[End of Section] D-1

52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT (APR 1984)

52.246-15 CERTIFICATE OF CONFORMANCE (APR 1984)

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

Title
Number
Quality Management System Requirements
ISO 9001
MSFC Quality Management Policy
MPD 1280.1
Marshall Quality Management System
MPR 1280.10

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in—

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require—

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS (OCT 1988)

In accordance with the inspection clause of this contract, the Government intends to perform the following functions at the locations indicated:

Item
Quality Assurance Function
Location
All
Final Inspection and Acceptance
See MSFC 52.237-91, Place of Performance

[End of Section]

80MSFC25R0004 P00003

PART I – THE SCHEDULE

SECTION E – INSPECTION AND ACCEPTANCE

E-1

52.242-15 STOP-WORK ORDER (AUG 1989) ALTERNATE I (APR 1984)

MSFC 52.211-94 PERIOD OF PERFORMANCE (MAY 2017)

The ordering period for this contract is from 9/1/2025 through 9/30/2029 for Phase-in and Base Ordering Period. The periods of performance are defined at the individual task order level.

(End of clause)

MSFC 52.237-91 PLACE OF PERFORMANCE (JUL 2018)

The Contractor shall perform the work under this contract via indefinite-delivery, indefinite-quantity task orders at: Marshall Space Flight Center (MSFC), Michoud Assembly Facility (MAF), Stennis Space Center (SSC), MSFC efforts at Kennedy Space Center (KSC), MSFC Resident Management Offices (e.g. at prime contractor facilities in California (CA) and Utah (UT)), offsite at the SMAS II Contractor’s facilities, and at such other locations as may be approved in writing by the contracting officer. In the event services are required at other NASA operating locations or alternate work locations the Government and the Contractor shall negotiate the Fully Burdened Rates (FBR) for the location.

(End of clause) [End of Section]

80MSFC25R0004 P00003

PART I – THE SCHEDULE

SECTION F – DELIVERIES OR PERFORMANCE

F-1

1852.216-75 PAYMENT OF FIXED FEE (DEC 1988)

1852.227-70 NEW TECHNOLOGY—OTHER THAN A SMALL BUSINESS FIRM OR NONPROFIT ORGANIZATION (APR 2015) 1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND PATENT REPRESENTATIVE (APR 2015)

1852.227-86 COMMERCIAL COMPUTER SOFTWARE LICENSE (APR 2015)

1852.242-71 TRAVEL OUTSIDE OF THE UNITED STATES (DEC 1988)

1852.242-73 NASA CONTRACTOR FINANCIAL MANAGEMENT REPORTING (NOV 2004)

1852.245-70 CONTRACTOR REQUESTS FOR GOVERNMENT-FURNISHED PROPERTY (AUG 2015)

1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)

1852.216-76 AWARD FEE FOR SERVICE CONTRACTS (JUN 2018)

(a) The Contractor can earn award fee from a minimum of zero dollars to the maximum stated in NASA FAR Supplement clause “Estimated Cost and Award Fee” in this contract.

(b) Beginning 6 months after the effective date of this contract, the Government shall evaluate the Contractor 's performance every 6 months to determine the amount of award fee earned by the Contractor during the period. The Contractor may submit a self-evaluation of performance for each evaluation period under consideration. These self-evaluations will be considered by the Government in its evaluation. The Government's Fee Determination Official (FDO) will determine the award fee amounts based on the Contractor's performance in accordance with Attachment J-15, Award Fee Performance Evaluation Plan, which is incorporated by reference. The plan may be revised unilaterally by the Government prior to the beginning of any rating period to redirect emphasis.

(c) The Government will advise the Contractor in writing of the evaluation results. The NASA Shared Services Center (NSSC) will make payment based on unilateral modification by the contracting officer.

(d) The contracting officer may direct the withholding of earned award fee payments until a reserve is set aside in an amount that the contracting officer considers necessary to protect the Government's interest relative to an orderly and timely closeout of the contract. This reserve shall not exceed 15 percent of the contract's total potential award fee or $100,000, whichever is less.

(e) The amount of award fee which can be awarded in each evaluation period is limited to the amounts set forth at NFS 1852.216-85, Estimated Cost and Award Fee. Award fee which is not earned in an evaluation period cannot be reallocated to future evaluation periods.

(f)(1) Provisional award fee payments will, as applicable be made under this contract pending the determination of the amount of fee earned for an evaluation period. If applicable, provisional award fee payments will be made to the Contractor on a monthly basis. The total amount of award fee available in an evaluation period that will be provisionally paid is the lesser of 80 percent or the prior period's evaluation score.

(2) Provisional award fee payments will be superseded by the final award fee evaluation for that period. If provisional payments exceed the final evaluation score, the Contractor will either credit the next payment voucher for the amount of such overpayment or refund the difference to the Government, as directed by the contracting officer.

(3) If the contracting officer determines that the Contractor will not achieve a level of performance commensurate with the provisional rate, payment of provisional award fee will be discontinued or reduced in such amounts as the contracting officer deems appropriate. The contracting officer will notify the Contractor in writing if it is determined that such discontinuance or reduction is appropriate.

(4) Provisional award fee payments will, as appropriate be made prior to the first award fee determination by the Government.

(g) Award fee determinations are unilateral decisions made solely at the discretion of the Government.

(End of clause)

1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT (APR 2018)

(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hass Road, Stennis Space Center, MS 39529.

(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC's Vendor Payment information Web site at: https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.

(c) Payment requests.

(1) The payment periods are stipulated in the payment clause(s) contained in this contract.

(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:

(i) Vouchers.

(A) Breakdown of billed labor costs and associated Contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.

(B) Breakdown of billed other direct costs (ODCs) and associated Contractor generated supporting documentation for billed ODCs.

(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.

(D) Progress reports, as required.

(ii) Invoices.

(A) Description of goods and services delivered as part of the contract's terms and conditions, including the dates of delivery/performance.

(B) Progress reports, as required.

(C) Date goods and services were performed.

(iii) Fee vouchers.

(A) Listing of all provisionally-billed fee by period or date earned since contract award.

(B) A reconciliation of all billed and earned fee.

(C) A clear explanation of the fee calculations.

(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:

(1) The contracting officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.

(2) The contract includes provisions allowing the Contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) Improper vouchers/invoices. The NSSC Payment Office will notify the Contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.

(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.

(End of clause)

1852.245-71 INSTALLATION-ACCOUNTABLE GOVERNMENT PROPERTY (JUN 2018)

(a) The Government property described in paragraph (c) of this clause may be made available to the Contractor on a no-charge basis for use in performance of this contract. This property shall be utilized only within the physical confines of the NASA installation that provided the property unless authorized by the contracting officer under (b)(1)(iv). Under this clause, the Government retains accountability for, and title to, the property, and the Contractor shall comply with the following:

NASA Procedural Requirements (NPR) 4100.1, NASA Materials Inventory Management Manual;

NASA Procedural Requirements (NPR) 4200.1, NASA Equipment Management Procedural Requirements;

NASA Procedural Requirement (NPR) 4300.1, NASA Personal Property Disposal Procedural Requirements;

User Responsibilities:

The Contractor shall retain responsibility for ensuring proper use, care, and protection (safeguarding) Installation Accountable Government Property (IAGP) under his/her custody and control. Individual shall be responsible for the following:

(1) Ensuring IAGP is used only in the pursuit of approved programs, or as otherwise authorized;

(2) Updating record locations in EQUIPMENT or notifying cognizant Property Custodian, of all equipment location changes;

(3) Ensuring that any lost, missing, or damaged IAGP is officially reported to his/her supervisor, appropriate Property Custodian, and Protective Services Department;

(4) Notifying Property Custodian of IAGP not being actively used;

(5) Ensuring that IAGP is turned into Property Disposal Officer through Equipment or the Property Custodian when no longer needed; under no circumstances will the Contractor dispose of IAGP, whether tagged or untagged; and

(6) Notifying the contracting officer, cognizant Property Custodian, and the Center's Supply and Equipment Management Officer (SEMO) upon termination of employment.

Contractor Acquired Property Onsite:

Initiate transfer of accountability by submitting a MSFC Form 4554, “Transfer and Shipping Document" (or equivalent DD Form 1149), accompanied by a copy of the Contractor ’s applicable purchasing and receipt document for the property. The Contractor shall reference both the Contractor ’s Subcontractor Purchase Order number and the Government contract number on the Form 4554. For purchases of supplies and materials, this document shall be submitted within 30 calendar days after the end of each calendar-year quarter (that is, not later than January 30, April 30, July 30, and October 30). For equipment purchases, the Form 4554 (or equivalent DD Form 1149) shall be submitted within 15 working days after acceptance of each item of equipment by the Contractor.

Property not recorded in NASA property systems must be managed in accordance with the requirements of the clause at FAR 52.245-1, as incorporated in this contract.

The Contractor shall establish and adhere to a system of written procedures to assure continued, effective management control and compliance with these user responsibilities. In accordance with FAR 52.245-1(h)(1) the Contractor shall be liable for property lost, damaged, destroyed or stolen by the Contractor or their employees when determined responsible by a NASA Property Survey Board, in accordance with the NASA guidance in this clause.

(b)(1) The official accountable recordkeeping, financial control, and reporting of the property subject to this clause shall be retained by the Government and accomplished within NASA management information systems prescribed by the installation Supply and Equipment Management Officer (SEMO) and Financial Management Officer. If this contract provides for the Contractor to acquire property, title to which will vest in the Government, the following additional procedures apply:

(i) The Contractor 's purchase order shall require the vendor to deliver the property to the installation central receiving area.

(ii) The Contractor shall furnish a copy of each purchase order, prior to delivery by the vendor, to the installation central receiving area.

(iii) The Contractor shall establish a record for Government titled property as required by FAR 52.245-1, as incorporated in this contract, and shall maintain that record until accountability is accepted by the Government.

(iv) Contractor use of Government property at an off-site location and off-site subcontractor use requires advance approval of the contracting officer and notification of the Industrial Property Officer. The property shall be considered Government furnished and the Contractor shall assume accountability and financial reporting responsibility. The Contractor shall establish records and property control procedures and maintain the property in accordance with the requirements of FAR 52.245-1, Government Property (as incorporated in this contract), until its return to the installation. NASA Procedural Requirements related to property loans shall not apply to offsite use of property by contractors.

(2) After transfer of accountability to the Government, the Contractor shall continue to maintain such internal records as are necessary to execute the user responsibilities identified in paragraph (a) of this clause and document the acquisition, billing, and disposition of the property. These records and supporting documentation shall be made available, upon request, to the SEMO and any other authorized representatives of the contracting officer.

(c) The following property and services are provided if checked:

[X] (1) Office space, work area space, and utilities. Government telephones are available for official purposes only.

[X] (2) Office furniture.

[X] (3) Property listed in Attachment J-10, Installation-Accountable Government Property (IAGP) and Services.

(i) If the Contractor acquires property, title to which vests in the Government pursuant to other provisions of this contract, this property also shall become accountable to the Government upon its entry into Government records.

(ii) The Contractor shall not bring to the installation for use under this contract any property owned or leased by the Contractor, or other property that the Contractor is accountable for under any other Government contract, without the contracting officer's prior written approval.

[ ] (4) Supplies from stores stock.

[ ] (5) Publications and blank forms stocked by the installation.

[X] (6) Safety and fire protection for Contractor personnel and facilities.

[ ] (7) Installation service facilities: none.

[X] (8) Medical treatment of a first-aid nature for Contractor personnel injuries or illnesses sustained during on-site duty.

[X] (9) Cafeteria privileges for Contractor employees during normal operating hours.

[X] (10) Building maintenance for facilities occupied by Contractor personnel.

[X] (11) Moving and hauling for office moves, movement of large equipment, and delivery of supplies. Moving services may be provided on-site, as approved by the contracting officer.

(End of clause)

1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS (SEP 2017)

(a) In addition to the requirements of the clause at FAR 52.245-1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:

(1) NPD 8800.14, Policy for Real Estate Management.

(2) NPD 8831.2, Facilities Maintenance and Operations Management.

(b) The Contractor shall obtain the written approval of the contracting officer before installing or removing Contractor -owned property onto or into any Government real property or when movement of Contractor -owned property may damage or destroy Government-owned property. The Contractor shall restore damaged property to its original condition at the Contractor 's expense.

(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the contracting officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.

(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the contracting officer.

(End of clause)

MSFC 52.204-91 SECURITY AND BADGING REQUIREMENTS (NOV 2016)

Performance of this contract will require access to facilities, information technology systems, and other resources at the Marshall Space Flight Center and/or the Michoud Assembly Facility. To obtain and maintain access, the Contractor shall comply with the applicable requirements from the latest revision of (1) NASA Procedural Requirements (NPR) 1600.1, “NASA Security Program Procedural Requirements,” (2) NPR 1600.4, “Identity and Credential Management,” (3) Marshall Procedural Requirements (MPR) 1600.1, “MSFC Security Program Procedural Requirements,” (4) MPR 1600.4, “MSFC Identity, Credential, and Access Management,” and (5) NASA Advisory Implementing Instruction (NAII) 1600.4, “Foreign National Access Management.”

(End of clause)

STENNIS SPACE CENTER CONTRACTOR EMPLOYEE BADGING

(a) It is anticipated that performance of the requirements of this contract will require employee picture credentials by the John C. Stennis Space Center (SSC). Contractor requests for credentialing of employees shall be submitted electronically, prior to employee Enter on Duty Date, by the Contractor ’s HR or Security Representative into the Government provided system, Identity Management and Account Exchange (IDMAX). Requests for credentialing will be routed electronically to the appointed COR or other Federal civil service technical personnel responsible for work requirements for approval prior to processing by the SSC Protective Services Office.

(b) Contractor employees must undergo a background investigation prior to being issued a fulltime contractor credential granting access to SSC. Contractor employees not previously cleared for a full-time contractor credential (e.g., not previously included in the NASA/SSC database) must complete the Electronic Questionnaires for Investigations Processing (EQIP) and sign the appropriate Release form(s) as soon as practicable. When these forms are completed and submitted to SSC Protective Services, the Contractor employees may be granted an extended visitor’s badge granting SSC access for a period not to exceed 29 calendar days. This 29-day period is normally more than adequate for the Government to conduct its Background Investigation if the applicant’s submission is truthful, accurate and complete, and there are no preexisting issues noted in the investigation.

If the Contractor employee does not successfully clear the Background Investigation process within 29 calendar days, the extended visitor badge will be revoked. If the visitor badge is revoked, the Contractor employee may not enter SSC and, if the contractual work assignment requires the employee to be onsite and/or have access to Government IT systems, the employee shall discontinue charging their time to the contract immediately. Any Contractor concerns regarding the timeliness of investigation processing should be raised to the contracting officer.

(c) The Contractor shall establish procedures to ensure that credentialed Contractor employees who no longer require access to the Center process out and turn in their credential to the SSC Protective Services Badging Office ((Building 7001/North Reception Center or 3101/South Reception Center). An electronic PIV Employee Termination Request must also be submitted in IDMAX.

(End of clause) [End of Section]

80MSFC25R0004 P00003

PART I – THE SCHEDULE

SECTION G – CONTRACT ADMINISTRATION DATA

G-1

52.236-13 ACCIDENT PREVENTION - ALTERNATE I (NOV 1991)

1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING (NOV 2004)

1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP REPORTING (DEC 2015)

1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)

1852.223-76 FEDERAL AUTOMOTIVE STATISTICAL TOOL REPORTING (JUL 2003)

1852.228-76 CROSS-WAIVER OF LIABILITY FOR INTERNATIONAL SPACE STATION ACTIVITIES (OCT 2012)

1852.228-78 CROSS-WAIVER OF LIABILITY FOR SCIENCE OR SPACE EXPLORATION ACTIVITIES UNRELATED TO THE INTERNATIONAL SPACE STATION (OCT 2012)

1852.242-72 DENIED ACCESS TO NASA FACILITIES (OCT 2015)

1852.209-71 LIMITATION OF FUTURE CONTRACTING (DEC 1988)

(a) The contracting officer has determined that this acquisition may give rise to a potential organizational conflict of interest. Accordingly, the attention of prospective Offerors is invited to FAR Subpart 9.5 - Organizational Conflicts of Interest.

(b) The nature of this conflict is: There is a concern that the successful Contractor or its proposed subcontractor(s) services performed may give rise to the significant potential organizational conflicts of interest listed below.

(1) The Contractor (or its proposed subcontractors), as part of its performance of a Government contract, could set the ground rules for another Government contract and could skew future competitions, whether intentionally or not, to their advantage. By virtue of their special knowledge of the agency's future requirements, the Contractor or its proposed subcontractors would have an unfair advantage in the competition for those requirements.

(2) There is a concern that the successful Contractor or its proposed subcontractor(s), as part of their performance of a Government contract, could obtain access to another contractor ’s proprietary, business confidential, or financial data and/or non-public Government information, which may provide the firm an unfair competitive advantage in a future competition. The Contractor shall protect this data/information from unauthorized use and disclosure and agrees not to use it, either directly or indirectly, in any proposals responding to a future Government solicitation.

(3) There is a concern that the successful Contractor or its proposed subcontractor(s) judgment and objectivity in performing their contract requirements may be impaired due to the fact that the substance of the Contractor’s performance has the potential to affect other interests of the contractor (e.g., providing evaluation services of own products or services and oversight), thereby impairing the Contractor’s judgment and objectivity.

(c) The restrictions upon future contracting are as follows:

(1) If the Contractor, under the terms of this contract, or through the performance of tasks pursuant to this contract, is required to develop specifications or statements or work that are to be incorporated into a solicitation, the Contractor shall be ineligible to perform the work described in that solicitation as a prime of first-tier subcontractor under an ensuing NASA contract. This restriction shall remain in effect for a reasonable time, as agreed to by the contracting officer and the Contractor, sufficient to avoid unfair competitive advantage or potential bias (this time shall in no case be less than the duration of the initial production contract). NASA shall not unilaterally require the Contractor to prepare such specifications or statements of work under this contract.

(2) To the extent that the work under this contract requires access to proprietary, business confidential, or financial data of other companies, and as long as this data remain proprietary or confidential, the Contractor and its subcontractors shall protect this data from authorized use and disclosure and agree not to use this data, either directly or indirectly, in any proposals responding to a future Government solicitation. Similarly, the Contractor and its subcontractors shall protect Government non-public information from unauthorized use and disclosure and agree not to use it, either directly or indirectly, in any proposals responding to a future Government solicitation. If the Contractor and/or its subcontractor are unable to demonstrate adequate protection to ensure that non-public data/information could not be used to improve their competitive position in a future procurement, they will be ineligible for award of the contract resulting from such procurement.

(3) If the Contractor, through the performance of this contract, is required to participate in technical reviews or provide engineering consultation services on its own proposals/quotations, products, or services (or those of its affiliate(s) or competitor(s)) provided under a different contract(s), the Contractor shall be ineligible to perform such work as a prime or subcontractor unless the Contractor submits a specific plan fully mitigating the OCI and such plan is approved by the SMAS II contracting officer and contracting officer’s representative.

(4) To the extent a future NASA solicitation seeks products or services that are subject to review in performance of this contract, the Contractor will be ineligible to provide those products or services unless the Contractor submits a specific plan fully mitigating the OCI and such plan is approved by the SMAS II contracting officer and contracting officer representative.

(End of clause)

1852.225-70 EXPORT LICENSES (FEB 2000)

(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR parts 120-130, and the Export Administration Regulations (EAR), 15 CFR parts 730-799, in the performance of this contract. In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.

(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at MSFC, MAF, SSC, and KSC, where the foreign person will have access to export-controlled technical data or software.

(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.

(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.

(End of clause)

MSFC 52.209-91 ASSOCIATE CONTRACTOR AGREEMENT (ACA) (APR 2017)

(a) The Contractor shall enter into an ACA for any portion of the contract requiring cooperation and coordination with another NASA contractor in order to achieve successful contract performance.

(b) ACA shall include the following:

(1) Identification of the parties and the relevant NASA contract (see paragraph (e)).

(2) The specific area(s) of the contract requiring cooperation and coordination.

(3) A description of the proposed interfaces for each area.

(4) The specific nature of the cooperation and coordination for each area in terms of sharing technical data, knowledge, expertise, and/or other resources.

(5) Obligations regarding the protection of proprietary information and/or other restrictions on personnel.

(6) The identification of any organizational conflict of interest (OCI) created as a result of the ACA. (Resolution of identified OCIs shall be appended to the OCI plan in accordance with DRD 1854MA-002, Organizational Conflict of Interest (OCI) Plan.

(7) Expiration date or event.

(c) Prior to execution, a copy of each ACA shall be provided to the contracting officer for review and comment. However, notwithstanding the review and comment by the contracting officer, the Contractor shall remain fully responsible for the ACA and the successful performance of this contract. Furthermore, the Government shall not be liable in any manner for either a breach of the ACA by a party or the failure to resolve a disagreement with an associate contractor.

(d) Initial ACAs shall be in place within three months of contract award. Subsequent ACAs required during contract performance shall be executed within three months of written notification from the contracting officer.

(e) An initial ACA is required for each of the following relevant NASA contracts:

Contract
Description

80MSFC18C0011 - Engineering Services and Science Capability (ESSCA)

Engineering and Science Services

80MSFC23CA004 - Marshall Engineering Technicians and Trades Support (METTS III)
Engineering Technicians and Trade Services
80MSFC24D0002 - Center Operations Building (COBA) Automation
Operation and Maintenance Support of all

MSFC Facilities

80MSFC17C0007 - Facilities and Operations Maintenance Support Services (FOMSS)
MSFC Facilities Support Services
NNS15AA01C - Synergy-Achieving Consolidated Operations and Maintenance (SACOM)
Operations and Maintenances support of

facilities at MAF and SSC

MSFC 52.209-92 DISCLOSURE OF ORGANIZATIONAL CONFLICT OF INTEREST (OCI) AFTER CONTRACT AWARD (MAY 2017)

(a) If the Contractor identifies an actual or potential organizational conflict of interest that has not already been adequately disclosed and resolved (or waived in accordance with FAR 9.503), the Contractor shall make a prompt and full disclosure in writing to the contracting officer. This disclosure shall include a description of the action the Contractor has taken or proposes to take in order or resolve the conflict. This reporting requirement also includes subcontractors’ actual or potential organizational conflicts of interest not adequately disclosed and resolved prior to award.

(b) Organizational Conflict of Interest Plan. If there is an OCI plan in the contract, the Contractor shall periodically update the plan, based on changes such as changes to the legal entity, the overall structure of the organization, subcontractor arrangements, Contractor management, ownership, ownership relationships or modification of the work scope.

(End of clause)

MSFC 52.209-94 RESOLUTION OF ORGANIZATIONAL CONFLICTS OF INTEREST (MAR 2022)

(a) The Organizational Conflict of Interest (OCI) Plan and its obligations (which includes any appended resolution strategies related to identified OCIs), are hereby incorporated in the contract by reference.

(b) Changes. (1) Either the Contractor or the Government may propose changes to the OCI Plan. Such changes are subject to the mutual agreement of the parties and will become effective only upon incorporating the change into the plan by contract amendment.

(2) In the event that the Government and the Contractor cannot agree upon a mutually acceptable change, the Government reserves the right to make a unilateral change to the OCI Plan as necessary, with the approval of the head of the contracting activity, subject to Contractor appeal as provided in the Disputes clause.

(c) Violation. The Contractor shall report any violation of the OCI Plan, whether by its own personnel or those of the Government or other contractors, to the contracting officer (CO) as soon as possible, but no later than three business days after discovery of the incident. This report shall include a description of the violation and the actions the Contractor has taken or proposes to take to mitigate and avoid repetition of the violation. After conducting such further inquiries and discussions as may be necessary, the CO and the Contractor shall agree on appropriate corrective action, if any. If, in the event that the CO and Contractor cannot come to an agreement, the CO may unilaterally direct corrective action as it relates to the performance of the contract.

(d) Breach. Any breach of the above restrictions or any nondisclosure or misrepresentation of any relevant facts required regarding OCI to be disclosed may result in termination of this contract for default or other remedies as may be available under law or regulation.

(e) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (e), in subcontracts where the work includes or may include tasks related to the OCI. The terms “contractor” and “contracting officer” shall be appropriately modified to reflect the change in parties and to preserve the Government’s rights.

(End of clause)

MSFC 52.223-90 ASBESTOS MATERIALS (APR 2021)

Personnel performing work in buildings at Marshall Space Flight Center (MSFC), or Michoud Assembly Facility (MAF) may come in contact with materials containing asbestos. MSFC Building 4663 is of special concern since it is known to contain a sprayed-on fire insulation on or above the ceiling, usually located on the metal or concrete structure of the building. Examples of asbestos-containing material are floor tile, pipe and lagging insulation, exterior siding, roofing felt, and many other building materials. To facilitate communication, MSFC has established a website where the inventory of asbestos-containing material, their condition and approximate location are provided. The URL for this website is https://eeoh-portal.ndc.nasa.gov/asbestos. If the Contractor is unable to access this URL, they may contact the contracting officer or MSFC's Environmental Engineering and Occupational Health (EEOH) Office (organization code AS10) for assistance. Prior to performing tasks which may disturb building material containing asbestos or suspected asbestos at MSFC or MAF, the Contractor shall notify MSFC's EEOH Office at 256 544-2390 or MAF’s Safety Health, Environmental and Mission Assurance (SHEMA) Office for assistance at 228-264-0458. The Contractor shall be responsible for ensuring that all Contractor personnel working onsite are made aware of and comply with the requirements of this clause.

(End of clause)

MSFC 52.223-91 HAZARDOUS MATERIAL REPORTING (FEB 2021)

(a) If the Contractor transports or accepts delivery of any hazardous materials (hazardous as defined under the latest version of Federal Standard No. 313, including revisions adopted during the term of the contract) on-site to Marshall Space Flight Center, the hazardous material shall be processed through MSFC Central Receiving to be barcoded for inventory. Alternative receiving points may be designated if approval is granted in accordance with MWI 8550.5, "Hazardous Material Management." Chemical containers shall be managed in accordance with the provisions of MWI 8550.5. The Contractor shall be responsible for ensuring that all Contractor /subcontractor personnel are made aware of and comply with this clause.

(b) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material; or with clauses regarding hazardous materials, which may be contained in the contract and/or order.

(End of clause)

MSFC 52.223-92 ENVIRONMENTAL - GENERAL CLAUSE (AUG 2010)

Contractor s performing on-site shall comply with all applicable Environmental policies and procedures including, but not limited to, MPD 8500.1, “MSFC Environmental Management Policy” and MPR 8500.1,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .