Artemis II Checkmark Chart v3.pdf
PDF 819 KB Posted
- Solicitation number
- 80MSFC21LHP1105
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAJOR MILESTONES FOR
CMUS AT SEA TESTS
ORION MISSION
CONTROL
SIMULATIONS
HUMAN-IN-
THE-LOOP
TESTS
DIVER RECOVERY
TRAINING
VACUUM
PRESSURE CREW
TEST
PRESSURE VESSEL
COMPLETE
PRESSURE VESSEL
ARRIVES AT KSC
DISPLAY AND
CONTROL EVAL
ASSEMBLY,
INTEGRATION, AND
TESTING AT KSC
JETTISON
MOTOR
QUALIFIED
ATTITUDE
CONTROL MOTOR
QUALIFIED
HEAT SHIELD
BLOCK INSTALL
COMPLETE
PARACHUTES QUALIFIED
FOR FLIGHT
CREW EGRESS
TRAINING AT
NBL
ORION PRESSURE
VESSEL ELEMENTS
MACHINED
HAND
CONTROLLER
EVAL
DOCKING HATCH
EVAL
ORION
ENVIRONMENTAL
TESTS
CREW MODULE UPRIGHT
SYSTEM TEST
CREW AT SEA
TEST
ORION WATER
IMPACT TESTING
CREW
EMERGENCY
EGRESS TESTS
SLS BOOSTER
MOTOR
SEGMENTS CAST
RS-25
ENGINES
PROCESSED
SLS CORE STAGE
PROOFING AND
WELDING
SLS RL10
ENGINE
COMPLETION
CREW MODULE
TRAINING ARTICLE
TRANSPORTED TO
LETF
EES MOCKUP
EVALUATION
PAD EMERGENCY
EGRESS SYSTEM
60% DESIGN
REVIEW
SLS INTERIM
CRYOGENIC
PROPULSION
STAGE
COMPLETION
SLS LAUNCH
VEHICLE
STAGE
ADAPTER
COMPLETION
SLS ORION
STAGE
ADAPTER
COMPLETION
EUROPEAN
SERVICE
MODULE
SHIPS TO KSC
CREW MODULE
ADAPTER/
EUROPEAN
SERVICE
MODULE MATE
EUROPEAN
SERVICE MODULE
ASSEMBLY AT
AIRBUS
ABORT
MOTOR
QUALIFIED
EMERGENCY EGRESS
SYSTEM BASKET
PROTOTYPE
LH2 SPHERE MOBILE
LAUNCHER 1 60%
DESIGN REVIEW
ENVIRONMENTAL
CONTROL SYSTEM
CHILLERS INSTALLED
ENVIRONMENTAL
CONTROL SYSTEM
INFRASTRUCTURE
INSTALLED
CREW
MODULE
BACKSHELL
TILE INSTALL
CORE STAGE
2 FORWARD
JOIN
MOBILE
LAUNCHER 1
MULTI-
ELEMENT V&V
COMPLETE
EGS ARTEMIS
II DELTA SAR
PAD
UPGRADES
COMPLETE
MOBILE
LAUNCHER 1
CREWED MODS
COMPLETE
VAB ECS
UPGRADES
COMPLETE
CORE STAGE 2
AFT JOIN
CORE STAGE 2
FINAL
ASSEMBLY AND
INTEGRATION
CORE STAGE
2 FINAL
SHIPMENT
TO KSC
BOOSTERS
ARRIVE AT KSC
BOOSTER
STACKING
COMPLETE
VERTICAL
INTEGRATION
OF CORE STAGE
AT KSC
EGS BOOSTER
OFFLINE
PROCESSING
CREW MODULE
COMPLETE
ORION
HANDOVER TO
EGS
CREW AND
SERVICE
MODULE
MATE
EGS ORION
OFFLINE
PROCESSING
CREW AND
SERVICE
MODULE
POWER ON
START OF
INTEGRATED
TEST &
CHECKOUT
ARTEMIS II
TANKING
TEST
ARTEMIS II
LAUNCH
HEAT SHIELD
INSTALL ON CREW
MODULE
Slide Number 1
File details come from the government source that posted it. Updated .