Text version

MAJOR MILESTONES FOR

CMUS AT SEA TESTS

ORION MISSION

CONTROL

SIMULATIONS

HUMAN-IN-

THE-LOOP

TESTS

DIVER RECOVERY

TRAINING

VACUUM

PRESSURE CREW

TEST

PRESSURE VESSEL

COMPLETE

PRESSURE VESSEL

ARRIVES AT KSC

DISPLAY AND

CONTROL EVAL

ASSEMBLY,

INTEGRATION, AND

TESTING AT KSC

JETTISON

MOTOR

QUALIFIED

ATTITUDE

CONTROL MOTOR

QUALIFIED

HEAT SHIELD

BLOCK INSTALL

COMPLETE

PARACHUTES QUALIFIED

FOR FLIGHT

CREW EGRESS

TRAINING AT

NBL

ORION PRESSURE

VESSEL ELEMENTS

MACHINED

HAND

CONTROLLER

EVAL

DOCKING HATCH

EVAL

ORION

ENVIRONMENTAL

TESTS

CREW MODULE UPRIGHT

SYSTEM TEST

CREW AT SEA

TEST

ORION WATER

IMPACT TESTING

CREW

EMERGENCY

EGRESS TESTS

SLS BOOSTER

MOTOR

SEGMENTS CAST

RS-25

ENGINES

PROCESSED

SLS CORE STAGE

PROOFING AND

WELDING

SLS RL10

ENGINE

COMPLETION

CREW MODULE

TRAINING ARTICLE

TRANSPORTED TO

LETF

EES MOCKUP

EVALUATION

PAD EMERGENCY

EGRESS SYSTEM

60% DESIGN

REVIEW

SLS INTERIM

CRYOGENIC

PROPULSION

STAGE

COMPLETION

SLS LAUNCH

VEHICLE

STAGE

ADAPTER

COMPLETION

SLS ORION

STAGE

ADAPTER

COMPLETION

EUROPEAN

SERVICE

MODULE

SHIPS TO KSC

CREW MODULE

ADAPTER/

EUROPEAN

SERVICE

MODULE MATE

EUROPEAN

SERVICE MODULE

ASSEMBLY AT

AIRBUS

ABORT

MOTOR

QUALIFIED

EMERGENCY EGRESS

SYSTEM BASKET

PROTOTYPE

LH2 SPHERE MOBILE

LAUNCHER 1 60%

DESIGN REVIEW

ENVIRONMENTAL

CONTROL SYSTEM

CHILLERS INSTALLED

ENVIRONMENTAL

CONTROL SYSTEM

INFRASTRUCTURE

INSTALLED

CREW

MODULE

BACKSHELL

TILE INSTALL

CORE STAGE

2 FORWARD

JOIN

MOBILE

LAUNCHER 1

MULTI-

ELEMENT V&V

COMPLETE

EGS ARTEMIS

II DELTA SAR

PAD

UPGRADES

COMPLETE

MOBILE

LAUNCHER 1

CREWED MODS

COMPLETE

VAB ECS

UPGRADES

COMPLETE

CORE STAGE 2

AFT JOIN

CORE STAGE 2

FINAL

ASSEMBLY AND

INTEGRATION

CORE STAGE

2 FINAL

SHIPMENT

TO KSC

BOOSTERS

ARRIVE AT KSC

BOOSTER

STACKING

COMPLETE

VERTICAL

INTEGRATION

OF CORE STAGE

AT KSC

EGS BOOSTER

OFFLINE

PROCESSING

CREW MODULE

COMPLETE

ORION

HANDOVER TO

EGS

CREW AND

SERVICE

MODULE

MATE

EGS ORION

OFFLINE

PROCESSING

CREW AND

SERVICE

MODULE

POWER ON

START OF

INTEGRATED

TEST &

CHECKOUT

ARTEMIS II

TANKING

TEST

ARTEMIS II

LAUNCH

HEAT SHIELD

INSTALL ON CREW

MODULE

Slide Number 1